Untitled - Türkerler Holding A.Ş.
Transcription
Untitled - Türkerler Holding A.Ş.
With our professional experience and financial power, together with the technical and executive staff capable of competing with the entire world, we add value to our business and we are proud to be a symbol of Turkey’s transcending power. Türkerler Construction Türkerler Energy Infrastructure Energy Generation Emaar Libadiye Hydroelectric Power Plant (14 Licenses 428 MW) Kayabeyi Dam and Akıncı Hydroelectric Power Plant Wind Energy Power Plant Renewable Energy Systems Erenköy Regulator and Hydroelectric Power Plant Yayla Regulator and Hydroelectric Power Plant Geothermal Energy (4 Licenses 150 MW) Angutlu I-II Regulator and Hydroelectric Power Plant Thermal Power Plant (609 MW) Demirci Regulator and Hydroelectric Power Plant Kanat Regulator and Hydroelectric Power Plant Electricity Trading Başköy Dam Ambar Dam Mucur Compressor Station Natural Gas Natural Gas Pipelines İzmirgaz (Distribution – 6,5 bcm/year capacity) Taşoluk Potable Water Treatment Plant İnci Natural Gas Imports and Exports Ulus – Keçiören Subway İnci Natural Gas Transmission Bağcılar – Güneşli Highway Junction Angoragaz Natural Gas Wholesale Imports and Exports İzmir Natural Gas Distribution Project Turga Natural Gas Exports and Imports Ankara Natural Gas Distribution City Gate Station Project Superstructure Ankara Etlik Integrated Healthcare Campus Çiftçi Towers Park Yaşam Mavişehir Ankara Westgate Project Ankara Arena Multipurpose Sports Complex Ankara Metropolitan Municipality Building Kuzey Ankara 2nd, 11th and 16th Stages Çarşamba 672 Residence Samsun Training and Research Hospital Adıyaman Public Hospital Fatih Sultan Mehmet Han Hospital Police Morale and Education Center (35 Licenses 1,527.5 MW) Türker Group Electricity Public Private Partnership Hospital Projects Water Treatment and Distribution Other Group Companies Ankara Etlik Integrated Healthcare Campus Türkerler Water Distribution Textile (Astaldi – Türkerler Partnership) (Türkerler – Veolia Water Treatment Selen Giyim (Garments) Joint Venture) Saten Hazır Giyim (Ready wear) Selnes Textile Consultancy Petroleum Petsel Petroleum Informatics TG Technology MTG Soft Kazım TÜRKER / Chairman Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) was established in 1993 with the purpose of undertaking infrastructural and super-structural contracts and real estate investments. The company managed to become a leading brand in the construction business in no time thanks to its high quality notion of service in the projects it has realized. In terms of sectoral diversity, we have affiliates in the fields of renewable energy generation, energy trading, natural gas distribution, real estate development, public private partnership, petroleum, textile and informatics. The group has considerable know-how and work experience in terms of public and private contracts, privatizations, partnerships, natural gas, energy and undertaking projects. Proceeding with momentum and determination in becoming one of the leading firms of the electricity industry in Turkey, our company plays a major role as project developer, investor, producer and operating firm together with international finance institutions and partners in the energy sector. To this effect, our operations and investments in the fields of wind, hydroelectric, geothermal and thermal energy are carried on with full speed. Our interest in new sources of energy such as solar, biomass, etc. is also rapidly increasing. We rely on our expert staff, professional experience and financial capabilities in performing our activities. I have full confidence in our technical and executive staff which is capable of competing in the global environment we are working in. I strongly believe that with the entrepreneurial spirit of the Turkish people, any project can be completed with success and any obstacle can be overcome. The whole world is currently undergoing a process of serious change. All balances are changing and a brand new world order is being created. Our company is also renewing and developing itself in this process to confidently take its position in the new order. We have realized very important projects through hard work that took long years, which were regarded as dreams only yesterday and we are continue to work as hard in order to finalize the ones which are currently on our agenda. We are taking utmost care to increase our competitive power by becoming even stronger through continuous improvement and by prioritizing long term investments. As Türkerler, we will carry on creating value for our country and our employees with our construction and energy projects in the global environment. I hereby thank all our staff and partners who are working with devotion. Regards. On earth, we have carved our dreams which we believe were the best through the many projects we have completed in the field of construction since 1993. We continue to perform the best. Construction and Investment Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) was established in 1993 with the purpose of undertaking infrastructural and super-structural projects and real estate investments. The company managed to become a leading brand in the construction business in no time thanks to its high quality notion of service in the projects it has realized. Particularly due to the magnitude of its investments involving real estate development and flat for land and revenue sharing type investments, Türkerler is cited among the major construction firms that contribute to Turkey’s development. Our Fields of Activity • • • • • Hospital, Hotel and School Projects Residential Buildings and Intelligent Buildings Touristic Facilities Privatization and Public Private Partnership Projects Real Estate Development Projects • Highways, Bridges and Junctions • Light Rail System, Subway and Tramway Systems • Offshore Structures • • • Dams, Hydroelectric Power Plants and Irrigation Projects Natural Gas Pipelines Natural Gas Municipal Distribution Projects • Water Treatment Facilities • Water Distribution Projects • Mains (natural gas, water, electricity) çiftçi towers Employer : Çiftçiler Real Estate, Investment, Consultancy, Construction, Trade Inc. Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : İstanbul, Turkey Start : June 2011 Completion : June 2014 Project Details: The “Çiftçi Towers Project which we are a partner of, consists of two towers, each with 10 floors underground and 45 above ground, built on a base of 25,000 m², located in Zincirlikuyu, the most valuable site in İstanbul, over a total construction site of 292,000 m². Our project incorporates a parking space of approximately 2,500 vehicles, residential area of 84,000 m², office area of 10,000 m², shopping center area of 68,000 m², as well as depot and technical floors. The design of the project is performed by John McAslan, a British architect. The facades will be covered with aluminum and terracotta panel systems. Heating and cooling will be provided with central systems of fan coils. 09 park yaşam mavişehir Employer : Emlak Real Estate Investment Company Contractor :Türkerler – Durmaz – İzka Partnership Location :İzmir, Turkey Start :26 December 2008 Completion : 30 May 2013 Project Details: Located on an area of 32,104 m² at a 2-minute distance from the shore and the light rail system, Park Yaşam Mavişehir consists of 521 residences, 184 offices and a shopping hall over a total construction site of 150,000 m². The project incorporates 27 different types of flats in 7 blocks, an outdoor and an indoor swimming pool, 2 tennis courts, 1 basketball court and playgrounds. 11 emaar libadiye Employer : Emaar Turkey Contractor : Makyol – Türkerler Ordinary Partnership Location : İstanbul, Turkey Date of Contract : 07 September 2011 Date of Completion Foreseen : 12 February 2013 Contract Value : USD 63,919,928 Project Details: Within the scope of this project which is planned to be become operational under the name “Yeni İstanbul” (“New İstanbul”), deep foundation excavations of 52 m and shoring work has been conducted. Excavations over an area of 2,777,997 m², embedment work of 243,057 m and bored piling of 53,028 m have also been completed. 13 ankara westgate project Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Ankara, Turkey Start : 30 October 2011 Completion : 12 April 2015 Project Details: The project which has a construction site of 275,000 m² over a landed property of 40,000 m² is located on Eskişehir Highway, which is the most valuable and rapidly developing axis of Ankara. With a 2-minute distance to the subway, Ankara Westgate will comprise residential area of 62,000 m² (495 residences), office area of 54,000 m², a business hotel of 180 rooms (15,000 m²) and commercial area of 16,000 m². 15 ankara etlik integrated healthcare campus Employer : Ministry of Health – Public Private Partnership Department Investor and Contractor : Astaldi – Türkerler Partnership Location : Ankara, Turkey Date of Contract : 05 March 2012 Investment / Operation Period : 42 Months / 25 Years Investment Value : TL 2,414,000,000 Project Details: The largest integrated hospital campus of the world, Ankara Etlik Integrated Healthcare Campus will be constructed over a landed property of 1,400,000 m². Consisting of several hospitals with a total covered area of 1,071,000 m² and (several hospitals with) a total bed capacity of 3,566, it is the largest implementation of the Public Private Partnership in Turkey. Within the scope of the project, there will be a main hospital, a rehabilitation hospital, a high-security psychiatric hospital, Provincial Directorate of Health building, hotels, shopping halls and commercial areas. The main hospital will incorporate general branches, orthopedics, neurology, cardiovascular, child, gynecology and oncology clinics and over 100 surgery rooms. The final objective of the project is to offer our country and the neighbor countries non-stop, world-class quality healthcare services employing state-of-the-art technologies. 17 400-bed capacity samsun training and research hospital Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Samsun, Turkey Start : 20 December 2006 Completion : 11 January 2010 Contract Value : TL 59,493,000 Project Details: Built over a total construction site of 77,600 m², the hospital with 400-bed capacity provides emergency airlift service and incorporates an intensive care unit, 16 surgery rooms and 3 conference halls. The project has been cited as a model implementation by TOKİ and received Best Work Prize. 19 kayabeyi dam and akıncı hydroelectric power plant project Employer : Pelin Enerji A.Ş. (Pelin Energy Inc.) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Ardahan, Turkey Start : 17 January 2010 Completion : 14 June 2013 Investment Value : USD 132,000,000 Project Details: The roller-compacted concrete (RCC) hydroelectric power plant (900,000 m²), which is a Türkerler Holding construction and investment project, will be 145 m in height. The project will be realized with a total installed capacity of 77.5 MW and 344 GWh/ year energy generation. yayla regulator and hydroelectric power plant project Employer : Egeli Enerji A.Ş. (Egeli Energy Inc.) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Artvin, Turkey Start : 30 December 2009 Completion :31 December 2012 Investment Value :USD 15,000,000 21 Project Details: The river-type hydroelectric power plant project which is a Türkerler Holding construction and investment project will be realized with a total installed capacity of 5.1 MW and 22.26 GWh/year energy generation. başköy dam Employer : State Hydraulic Works Contractor : ASKA – Türkerler Partnership Location : Erzurum, Turkey Start : 01 April 2010 Completion : 01 October 2015 Contract Value : TL 97,447,331 Project Details: Within the scope of the irrigation project to be built over the Başköy Stream of Erzurum by Türkerler Construction Inc., a 3,000,000 m³ clay core rock fill dam with a height of 101 m is under construction. ambar dam Employer : State Hydraulic Works Contractor : Yöntaş – Türkerler Partnership Location : Diyarbakır, Turkey Start : 21 October 2011 Completion : 29 September 2015 Contract Value : TL 31, 912,282 23 Project Details: Within the scope of the irrigation project undertaken by Türkerler Construction Inc, a 45 m high dam with 1,006,000 m³ clay core and 2,900,000 m³ hard core is being constructed. ankara arena multi-purpose sports complex Employer : Ankara Metropolitan Municipality Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Ankara, Turkey Start : 15 June 2009 Completion : 01 May 2010 Contract Value : TL 47,100,000 Project Details: This FIBA-approved, multi-purpose sports complex, which has hosted the World Basketball Championship, has been built over a construction site of 40,000 m² and has an audience capacity of 10,600, 1,425 of which are protocol seats. The project was nominated for the Mies van der Rohe prize within the scope of “Cityscape Global 2011” and received the second prize at the “Highly Commended” status in the “Community Built” category. ankara metropolitan municipality service building Employer : EGO (Electricity, Gas, Transportation) Directorate General Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Ankara, Turkey Start : 10 September 2002 Completion : 01 March 2007 Contract Value : TL 86,497,337 25 Project Details: The project incorporating intelligent building technologies at an elevated level consist of the service building of 26 floors and additional buildings erected over a construction site of 92,854 m². erenköy regulator and hydroelectric power plant project Employer :Nehir HES A.Ş. (Nehir Hydroelectric Power Plant Inc.) Contractor :Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location :Artvin, Turkey Start :14 December 2006 Completion :01 October 2010 Investment Value :USD 48,000,000 Project Details: The river-type hydroelectric power plant project which is a Türkerler Holding construction and investment realizes 87 GWh/ year energy generation with a total installed capacity of 22.5 MW. angutlu I-II regulator and hydroelectric power plant Employer : T.G. Elektrik A.Ş. (T.G. Electricity Inc.) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Giresun, Turkey Start : 06 July 2010 Completion : 06 March 2013 Investment Value : USD 58,500,000 27 Project Details: The Angutlu Hydroelectric Power Plant project we have undertaken the construction and investment of which is being built at two stages over the Aksu Stream located in the Dereli County of Giresun. Angutlu I will consist of a regulator, a 3,931 m tunnel, 3-stage Francis-type turbine and an operator building. Angutlu II, on the other hand, consists of a regulator, a 3,441 m tunnel, a Francis-type turbine with 3 units and an operator building. demirci regulator and hydroelectric power plant Employer : Demirci Enerji A.Ş. (Demirci Energy Inc.) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Kastamonu, Turkey Start : 30 September 2010 Completion : 30 September 2012 Investment Value : USD 28,000,000 Project Details: The Demirci Regulator and Hydroelectric Power Plant constructed over Gökırmak in Kastamonu which we have undertaken the construction and investment of is a rock fill regulator at a height of 5 m from the river bed (thalweg) and 8 m from foundation. It consists of a supply duct of 21,900 m, a fore bay, a pressure pipeline of 220 m, a Francis-type horizontal axis turbine with 3 units and an operator building. kanat regulator and hydroelectric power plant Employer : Türkerler Enerji Yatırım Üretim İnşaat ve Ticaret A.Ş. (Türkerler Energy, Investment, Production, Construction and Trade Inc.) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Giresun, Turkey Start : 01 April 2012 Completion : 30 September 2013 Investment Value : USD 32,000,000 Project Details: The Kanat Regulator and Hydroelectric Power Plant being constructed on Aksu Stream and Dereli Stream, which is a branch of Aksu, located in the Dereli County of Giresun will consist of a regulator, a power tunnel of 3,050 m, a transmission tunnel of 1,403 m and an operator building. The license for the project was obtained in 2010 and it is planned to generate 49.2 GWh/year with an installed capacity of 13.3 MW. Construction work of the project is ongoing. 29 adıyaman state hospital with 400-bed capacity Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Adıyaman, Turkey Start : 10 November 2009 Completion : 21 February 2013 Contract Value : TL 68,430,000 Project Details: The hospital with capacity of 400 beds, built over a construction site of 83,900 m², comprises 4 intensive care units, 20 surgery rooms and 1 conference hall. mucur compressor station Employer : BOTAŞ Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Mucur, Kırşehir, Turkey Start : 21 July 2011 Completion : 21 December 2012 Contract Value : USD 19,889,925 31 Project Details: The project involves the demounting of the current Gebze Compressor Station, its transfer to the transmission line coming from East Anatolia, and thereby, construction of a new compressor station. taşoluk potable water treatment facility Employer : İstanbul Water and Sewerage Administration General Directorate Contractor : Türkerler – Güriş Partnership Location : İstanbul, Turkey Start : 27 March 2003 Completion : 02 January 2006 Completion Value : TL 19,945,398.42 Project Details: The capacity of the project, which is built over a total construction site of 94,000 m², is 150,000 m²/day. north ankara 11 stage th Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc) Location : Ankara, Turkey Start : 03 January 2010 Completion : 30 June 2012 Contract Value : TL 38,187,079 33 Project Details: The project built on a construction site of 114,000 m² consists of 610 residences and social infrastructural units and includes 13 blocks, a commercial center, parking lot, sports facilities, a mosque and green space. north ankara 16 stage th Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc) Location : Ankara, Turkey Start : 03 December 2009 Completion : 01 June 2012 Contract Value : TL 38,253,000 Project Details: The project built on a construction site of 92,177 m² consists of 512 residences and social infrastructural units and includes 13 blocks, parking lot, a primary school, sports facilities, a mosque and green space. bağcılar-güneşli highway junction Employer : İstanbul Metropolitan Municipality Contractor : Limak – Türkerler Partnership Location : İstanbul, Turkey Start : 09 January 2003 Completion : 25 July 2007 Contract Value : TL 16,692,540.93 Project Details: The project involved stream remediation and construction of 3 bridges, 1 overpass and 2 underpasses, as well as rehabilitation of the existing two bridges and displacement of the facilities on the road. ulus-keçiören subway Employer : Ankara Metropolitan Municipality Contractor : Türkerler – Limak Partnership Location : Ankara, Turkey Start : 19 August 2003 Completion : 31 March 2011 Contract Value : USD 86,312,000 Project Details: The project involved boring of a tunnel with a length of 2,916 m, excavations of 6 stations, cut and cover of 490 m, tbm of 2,650 m and conventional system of 3,100 m. 35 çarşamba 672 residences Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Samsun, Turkey Start : 27 August 2007 Completion : 16 July 2009 Contract Value : TL 53,690,000 Project Details: The project built over a total construction area of 132,671 m², construction of 672 residences and social infrastructure facilities has been undertaken. north ankara nd 2 stage Employer : TOKİ (Housing Development Administration of Turkey) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Ankara, Turkey Start : 25 May 2007 Completion : 29 April 2010 Contract Value : TL 47,247,613 Project Details: The project that involved construction of 755 residences and social infrastructure units over a total construction site of 114,401 m² consisted of 6 blocks of 13 floors, 7 blocks of 6 floors and a kindergarten. 37 fatih sultan mehmet han hospital Employer : Keçiören Municipality Location : Ankara, Turkey Start : 27 June 1997 Completion : 28 September 1998 Project Details: The project equipped with all required service systems consisted of an intensive care unit, 3 surgery rooms, delivery rooms and 5 patient and guest lifts. police morale and education center Employer : İstanbul Security Directorate Location : İstanbul, Turkey Start : 27 March 1998 Completion : 30 December 1998 Project Details: The 200-bedded facility constructed at a 5-star hotel standard consists of 3 sports centers, 3 restaurants and 2 conference halls. izmir natural gas distribution project Employer : İzmirgaz A.Ş. (İzmir Natural Gas Inc.) Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : İzmir, Turkey Project Details: The “Natural Gas Distribution License for İzmir” has been granted to İzmirgaz Intracity Natural Gas Distribution Inc., of which Türkerler is also a partner, on 07 July 2005 for a period of 30 years, to cover the area including İzmir Central, Konak, Karşıyaka, Bornova, Buca, Balçova, Çiğli, Gaziemir, Narlıdere, Güzelbahçe, Aliağa, Kemal Paşa, Menemen, Torbalı, Menderes and Tire. Within the framework of this project with an investment budget of USD 300 million, engineering and design service, infrastructural construction work and construction of regulator facilities is being undertaken by Türkerler Construction Inc. Within this scope, construction of steel pipeline fittings of 240 km, polyethylene distribution pipeline of 2,360 km, 76,000 service lines and 90 regional regulators has been completed. 39 ankara natural gas distribution city gate station project Employer : EGO (Electricity, Gas, Transportation) Directorate General Contractor : Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) Location : Ankara, Turkey Start : 11 January 2002 Completion : 15 April 2005 Contract Value : USD 32,045,807.51 Project Details: Within the scope of this project which involved a natural gas pipeline of 90 km, decompression stations of 1,000,000 m³/s and 250,000 m³/s were constructed for city gate station of Ankara. anadolu (95) ümraniye natural gas transmission pipeline Employer : İGDAŞ (İstanbul Gas Distribution Inc.) Location : İstanbul, Turkey Start : 26 July 2001 Completion : 25 April 2002 Project Details: Within the scope of the project that involved the urban distribution network and residential connections, natural gas pipeline connections of 90 km and natural gas infrastructural constructions were performed. anadolu (106) beykoz natural gas steel pipeline Employer : İGDAŞ (İstanbul Gas Distribution Inc.) Location : İstanbul, Turkey Start : 23 July 2002 Completion : 26 February 2003 Project Details: The project involved construction of the natural gas infrastructure consisting of a steel pipeline of 20 km. 41 water treatment and distribution In line with the joint venture decision we have taken with Veolia, one of the world’s largest water treatment firms, we are undertaking water treatment and water distribution projects in Turkey in cooperation with this company. Within the framework of the standards set for treated water compatible with the chemical and bacteriological limits stated in the European Union Pharmacopy, we choose the water resources adequately in line with our environmental perspectives so as to prevent any irrecoverable outcomes and we offer high technology and high quality with local price advantages. 43 We trace renewable, sustainable, economical, environment-friendly, local energy sources and mobilize our efforts in the field of energy with our R&D activities. energy The increase in the demand for energy as a result of our growing economy and the priority given to local and renewable sources in terms of energy generation provoke our enthusiasm to proceed with speed and determination in becoming one of the leading firms of the industry. We are undertaking an active role in cooperation with international finance institutions and partners thereof through renewable energy projects we realize. Our fields of activity: We are accelerating our efforts so as to establish as energy trading network with strong international connections. • Natural Gas Transmission Imports Exports • Energy Generation Wind Energy Hydroelectric Energy Geothermal Energy Thermal Energy • Energy Trading We are keeping with the adventure that started with moving a sailboat, dating back 5,500 years, and we are dominating the wind to convert it into energy at the most adequate locations, employing the state-of-the-art technological trends. wind power With the purpose of contributing to healthy formation and As the licensing and investment process continues, the rapid development of wind power industry in our country, wind energy projects of 1,527.5 MW in our portfolio, which just like other countries in the world and especially in the are subject to investment and partnership negotiations, European Union, 67 projects which have been prepared constitute approximately 18% of the Turkish wind power through comprehensive efforts were submitted to the market. Energy Market Regulatory Board (EPDK) on 1 November 2007, located in various areas and adding up to a capacity In order to meet Turkey’s electricity energy requirements of approximately 9,000 MW. As a result of decisions in a reliable and environmentally friendly manner, we are involving technical and administrative amendments of targeting to become a leading energy firm in the industry EDPK and other institutions, detailed development efforts with our wind power investments, which is among continued for 59 projects for a total of 3,432.5 MW. renewable energy sources. (*In accordance with WEPP Of these projects, those that were licensed as single (wind power plant) license and compatibility data published applications and those that were qualified as a result of on the web page of EMRA as of 24 February 2012.) competitions approached 2,000 MW within the portfolio. Wind Power Projects Licensed Projects Uluborlu WEPP Isparta 60 MW Yuvacık WEPP Kocaeli 120 MW Gölmarmara WEPP Manisa 45 MW Pamukova WEPP Sakarya 20 MW Zonguldak WEPP Zonguldak 120 MW M. Şevket Paşa-2 WEPP İstanbul 100 MW Gölyaka WEPP Düzce 15 MW Tire WEPP İzmir 50 MW Meryem WEPP Bilecik 30 MW Kalfaköy WEPP Balıkesir 10 MW Türkeli WEPP Sinop 30 MW Şapdağı WEPP Balıkesir 55 MW İncesu WEPP Afyon 10 MW M. Şevket Paşa-1 WEPP İstanbul 8 MW Afyon – 2 WEPP Afyon 88 MW Korudağı WEPP 3 MW Sandıklı WEPP Afyon 12 MW FROM COMPETITION 790 MW Kandıra WEPP Kocaeli 49 MW Çakıl WEPP İstanbul 52,5 MW Tekirdağ Compatibility Approved Projects SINGLE APPLICATIONS Kirazlı WEPP İzmir 50 MW Şile WEPP İstanbul 50 MW Söke WEPP Aydın 104 MW Adapazarı WEPP Sakarya 80 MW Gökdağ WEPP Kocaeli 10 MW Çandır WEPP Edirne 10 MW Bozüyük WEPP Bilecik 90 MW Pazarköy WEPP Balıkesir 44 MW Geyve WEPP Sakarya 50 MW Gelibolu WEPP Çanakkale 30 MW Ömerli WEPP İstanbul 100 MW Barbaros WEPP Tekirdağ Yenihisar WEPP Aydın 20 MW COMPATIBILITY DECISION 226 MW 12 MW ACQUIRED FROM TURKISH ELECTRICITY TRANSMISSION CORPORATION COMPETITIONS : 1.016 MW TOTAL : 1.527,5 MW 47 We are tracing water running across rivers and we convert it into energy. hydroelectric power As the host of hydroelectric power plant projects with a capacity of 428 MW, currently in operation, being constructed or at the licensing stage within the process of making use of Turkey’s renewable energy resources, we are proceeding with speed and determination in becoming one of the leading firms of the electricity industry in Turkey. We are undertaking an active role as project developer, investor, constructor and operator in the energy industry in cooperation with international finance institutions and our partners. The Erenköy Regulator and Hydroelectric Power Plant in Artvin have become operational in October 2010 with an installed capacity of 22.5 MW. We are targeting to start operating our new hydroelectric facilities of approximately 150 MW, together with the projects currently being constructed, in the near future. 49 erenköy regulator and hydroelectric power plant The Erenköy Regulator and Hydroelectric Power Plant which is our first power generation facility were put into operation in 2010. Contributing to Turkey’s supply of electricity, the project is remarkable in terms of the innovative methods employed for its construction. The project of Erenköy Regulator and Hydroelectric Power Plant constructed with a power of 22.5 MW in less than two years’ time on the Murgul Stream in Borçka County of Artvin is planned to generate 87 GWh of electricity on average every year. During the construction of the project, Türkerler has reflected its construction experience on the field successfully. Within the scope of this project, a tunnel of 6,500 m, a regulator, a fore bay pool, a pressure pipeline, an operator building and an energy transmission line of 9 km were constructed. kayabeyi dam and akıncı hydroelectric power plant The project is located on the Kura River in Çıldır County of Ardahan. The plant, which is a roller compacted concrete dam with a fill volume of 900,000 m³ and a height of 145 m from the river bed (thalweg), consists of a derivation tunnel with a diameter of 6 m and a length of 360 m, an energy tunnel with a diameter of 4 m and a length of 2,620 m, a surge chamber and an operator building. With an installed capacity of 77.5 MW, the plant is projected to generate 343.7 GWh of electricity every year. The project which is currently being constructed is targeted to be completed within 2013. yayla regulator and hydroelectric power plant The project is located in Murgul County of Artvin. The plant consists of a regulator to be built on the Murgul Stream, an energy tunnel with a length of 1,354 m, a surge chamber and an operator building. With an installed capacity of 5.1 MW, yearly generation of 22.26 GWh of electricity is foreseen. The project licensed in 2008 is currently being constructed and planned to be completed within 2012. angutlu ı-ıı regulator and hydroelectric power plant Constructed in two stages, the Angutlu Hydroelectric Power Plant Project is located on Aksu Stream in the Dereli County of Giresun. Angutlu I Hydroelectric Power Plant will consist of a regulator, a 3,931 m tunnel, 3-stage Francis-type turbine and an operator building. With an installed capacity of 15 MW, it is foreseen to generate 54.47 GWh of electricity annually. Angutlu II Hydroelectric Power Plant, on the other hand, consists of a regulator, a 3,441 m tunnel, a Francis-type turbine with 3 units and an operator building. With an installed capacity of 9.25 MW, it is foreseen to generate 34.07 GWh of electricity annually. The project licensed in 2008 has started to be constructed. 51 çayırlı regulator and hydroelectric power plant The project of Çayırlı Regulator and Hydroelectric Power Plant which is planned to be constructed over the Kura River in central Ardahan will consist of a supply duct with a length of 1,579 m, a regulator and an operator building. With an installed capacity of 5.5 MW, it is planned to generate 13.6 GWh of electricity annually. taşköprü regulator and hydroelectric power plant Licensed in 2008, the Taşköprü Regulator and Hydroelectric Power Plant which will be constructed over the Aralık Stream in Borçka County of Artvin will consist of a tunnel with a length of 2,800 m, a supply duct with a length of 748 m and an operator building. With an installed capacity of 16.4 MW, the plant is planned to generate 56.8 GWh of electricity annually. demirci regulator and hydroelectric power plant The Demirci Regulator and Hydroelectric Power Plant being constructed over Gökırmak Stream in Kastamonu is a fill dam at a height of 5 m from the river bed (thalweg) and 8 m from foundation. It will consist of a supply duct of 21,900 m, a fore bay pool, a pressure pipeline of 220 m, Francis-type horizontal axis turbine with 3 units and an operator building. With an installed capacity of 12.06 MW, it is projected to generate 59.1 GWh of electricity annually. The project licensed in 2009 is currently being constructed. kanat regulator and hydroelectric power plant The Kanat Regulator and Hydroelectric Power Plant being constructed over Aksu Stream and its branch Dereli Stream located in the Dereli County of Giresun will consist of a regulator, an energy tunnel with a length of 3,050 m, a supply duct with a length of 1,403 m and an operator building. Licensed in 2010, this project is foreseen to generate 49.2 GWh of electricity annually with an installed capacity of 13.3 MW. Construction work of the project is ongoing. 53 dilektaşı ı-ıı dam and hydroelectric power plant The project is planned to be constructed in two stages in Zap Suyu Basin and Nehil Stream of Hakkari. Dilektaşı I Dam and Hydroelectric Power Plant will be a concrete faced rock fill dam with a fill volume of 1,629,231 m3 and a height from the river bed (thalweg) 73 m. It will have a derivation tunnel with a diameter of 7 m and a length of 304 m and an energy tunnel with a diameter of 3.5 m and a length of 6,200 m. With an installed capacity of 30 MW, it is planned to generate 85.6 GWh of electricity annually. Dilektaşı II Dam and Hydroelectric Power Plant, on the other hand, will incorporate a regulator with a height of 21 m from the river bed (thalweg) and a transmission tunnel with a diameter of 3.60 m and length of 5,055 m. With a 100 MW installed capacity, the project is foreseen to generate 255.4 GWh of electricity. mut dam and hydroelectric power plant The project planned to be constructed over Göksu River in Mut County of Mersin will be a clay core rock fill dam and consist of an impoundment plant and a main central building to be built to supply sap to the river mouth. With an installed capacity of 92 MW, it is foreseen to generate 229.4 GWh of electricity annually. hidronehir ı regulator and hydroelectric power plant The Hidronehir I Regulator and Hydroelectric Power Plant project is located in the east of Tosya County of Kastamonu. Planned to be constructed over Devrez Stream, the project will consist of two supply ducts of 1,964 m and 5,278 m, two transmission tunnels of 352 m and 300 m, a regulator and an operator building. With an installed capacity of 10.1 MW, the plant is foreseen to generate 29.4 GWh of electricity annually. 55 hidronehir ıı regulator and hydroelectric power plant The Hidronehir II Regulator and Hydroelectric Power Plant project is located in Kargı County of Çorum. Planned to be constructed over Devrez Stream, the project will consist of two supply ducts of 6,730 m and 2,812 m, a transmission tunnel of 66 m, a regulator and an operator building. With an installed capacity of 15 MW, the plant is foreseen to generate 44.7 GWh of electricity annually. We are extracting underground heat to convert it into energy employing the safest methods, following the latest technological developments. geothermal energy Turkey is fortunate in terms of geothermal energy, as it is a clean, environment-friendly and renewable source of energy. With its approximately 2,000 MW potential capacity, our country ranks 7th in the world and 1st in Europe in terms of highest potential for geothermal energy. With its four different geothermal exploration licenses, Türkerler has started its geothermal drilling operations in February 2011 near Alaşehir, Manisa. Following the successful results obtained in the first wells, efforts continue for energy generation investments in binary plants. The objectives for these areas are reaching installed capacity of 150 MW, generating 1.26 million kWh of energy and completing the initial stage of the project within a period of 1 year. thermal energy With its decision dated 04 April 2012, the Energy Market Regulatory Board (EPDK) has approved licensing for period of 49 years for the ES-ES Elektrik Üretim A.Ş. (ES-ES Electricity Generation Inc.). The natural gas combined cycle plant to be constructed in Muttalip Village of the central district of Eskişehir will be of an installed capacity of 609 MW and have approximately 4.8 billion kWh of electrical energy generation capacity. With the Environmental Impact Assessment Certification relevant to the project having obtained, the engineering and machinery-equipment procurement activities are being pursued simultaneously. The plant is foreseen to be commercially operated in 2016. electricity trading With its license obtained in 2011, Türkerler Elektrik Toptan Satış Şirketi (Türkerler Wholesale Electric Supply Company) targets to become one of the leading firms of the electricity market. The company pursues its efforts in an innovative and reliable manner with the purpose of meeting the needs of independent consumers besides its output supplied to Market Financial Settlement Center. Within this framework, Türkerler is becoming increasingly preferred by consumers who are carbon emission sensitive thanks to its ample capabilities in renewable energy generation. 59 With our natural gas distribution and procurement projects, we bring warmth and happiness to homes and accelerate industrial production. natural gas Rich natural gas reserves of Turkey’s neighbor countries, environmental factors and primary energy resources diversification policies are the factors that contributed to conveying of natural gas to Europe and bringing our country to an important position in natural gas trading. Türkerler continues its efforts in the imports, storage, exports, sales and distribution of natural gas, in parallel with deregulation of the natural gas sector. izmirgaz The “Natural Gas Distribution License for İzmir” has been granted to İzmirgaz Intracity Natural Gas Distribution Inc., of which Türkerler is also a partner, on 07 July 2005 for a period of 30 years, to cover the area including İzmir Central, Konak, Karşıyaka, Bornova, Buca, Balçova, Çiğli, Gaziemir, Narlıdere, Güzelbahçe, Aliağa, Kemal Paşa, Menemen, Torbalı, Menderes and Tire. Within the framework of this project with an investment budget of USD 300 million, Türkerler is offering services involving operation, subscription, sales and service for the natural gas network including the engineering and design services, infrastructural construction work and construction of regulator facilities. Upon completion of the investment period, the company aims at reaching 6.5 billion m³/year of gas consumption and over 1 million customers inci doğalgaz inci natural gas With the purpose of meeting our country’s natural gas requirement, Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) and Crescent Petroleum have established the companies İnci Doğalgaz İthalat İhracat San. ve Tic. A.Ş. (İnci Natural Gas Imports Exports Industry and Trade Inc.) and İnci Doğalgaz İletim Sanayi ve Ticaret A.Ş. (İnci Natural Gas Transmission Inc.). İnci companies have applied to EPDK (Energy Market Regulatory Authority) for “Imports License” and “Transmission License” for a period of 30 years, to be able to operate in the natural gas market. At the end of the licensing process, provision of gas to Turkey, Nabucco, ITGI and Tap projects and neighbor countries will be possible. turga doğalgaz turga natural gas TURGA Doğalgaz İthalat Sanayi Ticaret A.Ş. (TURGA Natural Gas Imports Industry and Trade Inc.) has been established in our country which is to eventually become a power bridge, to export natural gas and LNG from Turkey initially through the Turkish-Greek pipeline, Nabucco and other export pipelines. 63 We are adding onto our strength with our companies functioning in the fields of textile, petroleum and informatics, which were established during the startup and development stages of our company. group companies textile The Türker Family has started its commercial activities in the field of textiles, which it currently continues with 3 different firms. Selen Giyim which was established in 1989 in Ankara pursues its operations with its production capacity of 15,000 units a month and its manufacturing park consisting of computerized sewing machines. Selen Giyim products are sold in select stores in 50 provinces of Turkey and in Russia and United Arab Emirates abroad. Saten Giyim which has been established in Ankara in 2004 serves in the field of women’s outerwear and has a monthly production capacity of 8,000 units. Selnes which started to operate in 2009 in cooperation with Advansa imports special fabrication textiles from abroad and provides garment sewing and designing services to corporations in Turkey. petroleum informatics Petsel Petroleum Construction Tourism Food Mining Imports Exports Industry TG Technological Systems Inc. established in Ankara in 2002 provides and Trade Ltd. which was established in 2003 in Ankara serves the energy contemporary consultancy and outsourcing services, with first and foremost market mainly with petroleum and petroleum products. system selection and integration that suit the firms’ purposes. 67 With the awareness of social responsibility, we provide uninterrupted support to education. social responsibility Within the scope of uninterrupted support to education, we provide education opportunity to new generations with the primary school buildings we have constructed with 1000 and 800 student capacity, in line with our motto “full support for a bright future”. We have had 500,000 books printed from among the 100 elementary literary works determined by the Ministry of Education and distributed these books to students enrolled in the schools all over Turkey. We continue our efforts of social responsibility in the field of “education”, which we believe is the most important factor in the development of our country. Within this scope, the construction of Azizli Bağlar Village Primary School has been initiated, in addition to the Türker and Türkerler Primary Schools previously constructed. 71 Türkerler Construction Inc. Türkerler Energy Türkerler İstanbul Office Turan Güneş Bulvarı Galip Erdem Caddesi Turan Güneş Bulvarı Galip Erdem Caddesi Çamlık Caddesi Zambaklı Sokak No:1 (Eski 15. Cadde) No:11 (Eski 15. Cadde) No:9 3. Levent 34340 İSTANBUL / TURKEY Çankaya 06650 ANKARA / TURKEY Çankaya 06650 ANKARA / TURKEY Tel : +90 212 278 3266 Tel : +90 312 492 0306 Tel : +90 312 492 0306 Faks: +90 212 278 3099 Faks: +90 312 490 9451 Faks: +90 312 490 9451 www.turkerler.com / info@turkerler.com Design: Cosmic Creative / Print: Acar Basım ve Cilt San. Tic. A.Ş.