Diapositiva 1 - Piping Engineering Constructions

Transcription

Diapositiva 1 - Piping Engineering Constructions
Engineering & Contractor
Via Umbria, 1
74121 TARANTO - ITALY
Tel./Fax: +39 099 7305500
E-mail:
segreteria-taranto@pecsrl.it
Web-site: www.pecsrl.it
1
General References
Company Name: P.E.C. S.r.l. - Piping Engineering
Constructions
Corporate: October 16th 1987
Premises: Taranto (Headquarters) – Surface sqm 820
Via Umbria n.1 – 74121 Taranto
Tel./Fax +39 099 7305500
E-mail: segreteria-taranto@pecsrl.it
2
Here we are
3
Organization
P.E.C. was founded as Private Company on July 1984.
It was turned into a Corporation Company on October
1987, including resources and experiences acquired
mainly in Industrial plants.
4
Organization Chart
Resources:
80.000 hours/year
5
Quality, Safety & Environment
Quality Certification
 Certification of Quality UNI EN ISO 9001:2008 – issued by the certificate agency
Det Norske Veritas Italia - certificate. n° CERT-01839-97-AQ-BRI-SINCERT.
“Project management, basic and detailed engineering in the plant engineering field.
Construction and maintenance of mechanical and electro-instrumental
systems for the industrial field and related civil works”
Safety and Environment
 “Conformity Certification to the standard OHSAS 18001:2007 of the occupational
health and safety management system”
Issued by e Certification Body Bureau Veritas – Settori EA 34, 28
Certificate n° IT255926/UK
 “Conformity Certification to the standard UNI EN ISO 14001:2004 - Enviromental
management system”
Issued by the Certification Body Bureau Veritas – Certificate n° IT244230/UK
6
Offered Services
ENGINEERING
FEASIBILITY STUDY
Cost Estimate ± 30%
BASIC DESIGN
Cost Estimate ± 20%
DETAIL ENGINEERING
7
COMMISSIONING
ASSISTANCE / START
UP / TEST RUN
MAINTENANCE
ENGINEERING
FEED
(Front-End
Engineering Design)
Cost Estimate ± 10%
OTHER SERVICES
PROCUREMENT
SERVICE
WORK
SUPERVISION
PRECOMMISSIONING
SUPERVISION
Offered Services
EM
Engineering
Management
8
EPM
Engineering
Procurement
Management
EPC
Engineering
Procurement
Construction
Field of Activitiy
WATER SYSTEM
OIL & GAS
Refinery - LNG - LPG - On/Off shore
Fire Fighting
CHEMICAL
IRON-METALLURGY
PETROCHEMICAL
THERMOELECTRICAL
PHARMACEUTIC
TEXTILE
INCINERATION
9
ENVIRONMENTAL
MARINE
Depot - Pipeline - Pier - Mooring
TERMINAL
Container
Main Customers
10
Revenue
P.E.C., during the years 2011-2013, produced a turnover equal to €uro 39.452.000,00
(Thirtyninemillionfourhundredfiftytwothousand/00) characterized by the increase of the order
“turnkey” backlog that is about the 80% of the average annual revenue.
11
MAIN WORKS
BASIC & DETAILED
ENGINEERING
12
LNG PRODUCTION PLANT
13
SULPHUR DEGASSING PLANT
14
WASTEWATER TREATMENT PLANT
15
ETHYLENE PRODUCTION PLANT
16
AIR SEPARATION PLANT - NITROGEN PRODUCTION PLANT
17
AIR SEPARATION PLANT - OXYGEN PRODUCTION PLANT
18
SLUDGE PYROLYSIS PLANT
19
SLUDGE PYROLYSIS PLANT
20
LNG REGASIFICATION PLANT
21
WATER DELUGE FIRE FIGHTING SYSTEM
22
FOAM SOLUTION FIRE FIGHTING SYSTEM
23
SCADA CONTROL & SECURITY SYSTEM
24
LPG STORAGE PLANT
25
AMINE PLANT
26
AMMONIA STORAGE PLANT
27
TOPPING UNIT
28
CLAUS UNIT
29
SCOT UNIT
30
VISBREACKING UNIT
31
CRACKING UNIT
32
COKING UNIT
33
MAIN WORKS
OIL & GAS
34
Raffineria di Gela S.p.A.
IMPROVING OF PIPELINE P2 OF 36"
FOR THE CRUDE DISCHARGE TO THE MARINE TERMINAL
35
36
37
38
39
40
Polimeri Europa S.p.A
Porto Marghera
ENERGY INDEX REDUCTION
41
PIPING INSTALLATION
42
PIPING INSTALLATION
43
PIPING INSTALLATION
44
PIPING INSTALLATION
45
Polimeri Europa S.p.A
Porto Marghera
DEBOTTLENECKING C-105 PLANTS
NEW EXCHANGERS
46
INTERCONNECTING
AUGUST 2007
47
NEW STEAM TURBINES
AUGUST 2007
48
COLUMN REVAMPING
AUGUST 2007
49
Eni S.p.A. Div. R. & M.
Sannazzaro De’ Burgundi Refinery
CONDENSATE QUALITY UPGRADING
50
PLANT COMPLETION
AUGUST 2007
51
Eni S.p.A. Div. R. & M.
Venice Refinery
CONTROL ROOM BUNKERIZATION
BEFORE WORKS
52
CONSTRUCTION
53
AUGUST 2007
COMPLETION
54
DCS ARCHITECTURE
55
Milazzo Refinery
SULFUR DEGASSING SYSTEM
56
Eni S.p.A. Div. R. & M.
Taranto (Italy)
NEW DEISOPENTONER PLANT
57
Raffineria di Gela S.p.A.
CONSTRUCTION OF A COVERED AREA FULLY AUTOMATIC
HANDLING AND STOCKING - PET-COKE PLANT
58
July 2012
59
September 2012
60
January 2013
61
62
63
64
MAIN WORKS
LNG - LPG
65
GPL/PROPYLENE STORAGE CAPACITY IMPROVEMENT
FROM 15,000 cu.m. TO 37,500 cu.m.
66
NEW FENCES
JUNE 2007
67
FOUNDATION TANKS
MAY 2007
OCTOBER 2007
68
JANUARY 2008
TANK FRONT RETANING WALL
AUGUST 2007
JULY 2007
OCTOBER 2007
69
SEPTEMBER 2008
RAILWAY IMPROVEMENT
APRIL 2008
JULY 2008
70
SEPTEMBER 2008
NEW PIPING
SEPTEMBER 2008
JULY 2008
64
IN SITU CONSTRUCTION
72
TANKS HANDLING
73
New Malta Depot
2011-2012
74
75
MAIN WORKS
CHEMICAL
76
AND
PHARMACEUTICAL
PLANTS
AKZO CHEMICAL PLANT - TERMOLI
NEW UNIT FOR RUBBER CATALYST
77
NEW UNIT INSTALLATION
78
NEW PUMPING STATION
79
MAIN WORKS
CRYOGENIC SYSTEMS
80
ETHYLENE PRODUCTION PLANT
81
AIR SEPARATION PLANT
82
NITROGEN PRODUCTION PLANT
83
84
MAIN WORKS
FIRE FIREFIGHTING
SYSTEM
85
FIRE FIGHTING NFPA-20 PUMPING STATION
DIESEL MOTORS
VERTICAL PUMP
86
87
FIRE FIGHTING WATER CURTAIN
88
NORMATIVE REFERENCES
NATIONAL TECHNICAL STANDARDS:
 Norma UNI EN 12845 “Installazioni fisse antincendio - Progettazione, installazione e
manutenzione”.
 Norma UNI 10779 “Impianti di estinzione incendi - Progettazione, installazione ed
esercizio”.
 D.P.R. n. 126 del 23/03/1998 “Regolamento recante norme per l’attuazione della Direttiva
94/9/CE (ATEX) in materia di apparecchi e sistemi di protezione destinati ad esser utilizzati in
atmosfera potenzialmente esplosiva”.
 D.Lgs n. 81/2008, “Testo unico sulla salute e sicurezza sul lavoro” coordinato con il D.Lgs.
3 agosto 2009, n.106.
 Norma UNI 9795:2010 “Sistemi fissi automatici di rivelazione, di segnalazione manuale e
di allarme d’incendio. Sistemi dotati di rivelatori puntiformi di fumo e calore e punti di
segnalazioni manuali”.
 Norma UNI 9485 “Apparecchiature per estinzione incendi – idranti a colonna soprasuolo.
89
 Norma UNI 8478 “Apparecchiature per estinzione incendi. Lance a getto pieno.
Dimensioni, requisiti e prove. Ed. 01/05/1983.
NORMATIVE REFERENCES
INTERNATIONAL TECHNICAL STANDARDS
 NFPA11: Standard for Low, Medium, and High-Expansion Foam, 2010 Edition”.
 NFPA13 “Standard for the installation of sprinkler systems”.
 NFPA15: Standard for Water Spray Fixed Systems for Fire Protection, 2007 Edition”.
 NFPA16: Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray
Systems, 2011 Edition”.
 NFPA 30 “Flammable and combustible liquids code”.
 API Publ. 2030 “Fire protection in Refineries”.
API RP 581 U. ed. - RISK-BASED INSPECTION TECHNOLOGY.
NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection, 2013 Edition.
90
MAIN WORKS
MARITIME AND JETTY WORKS
91
Service activities and Supervision on Marine Loading Arms
NAFTOPORT - Gdansk (PL) 2014
92
Service activities and Supervision on Marine Loading Arms
DECAL – Porto Marghera (IT) 2014
93
Marine Loading Arms Erection
OILTANKING – Antwerp (Belgium) 2014
94
Marine Loading Arms Erection
OILTANKING – Antwerp (B) 2014
95
Service activities and Supervision on Marine Loading
Arms PDVSA - Puerto La Cruz (YV) 2014
96
97
Marine Loading Arms replacement
and new structures installation
98
MARINE LOADING ARMS EAST MOORING
RAM S.C.p.A. - MILAZZO (IT) 2010
DISMANTLING PHASE
JUNE 2010
99
DISMANTLING
PHASE JUNE 2010
100
MARINE LOADING ARMS EAST MOORING
RAM S.C.p.A. MILAZZO (IT) YEAR 2010
FINAL TEST
101
MAIN WORKS
PORT FACILITIES
OFFSHORE
TRANSHIPPING
102
Port of Naples
Mediterranean
sea
103
104
Port of Naples - Terminal di Levante – Site at present time
105
Port of Naples -Terminal di Levante - Site after works
106
107