Diapositiva 1 - Piping Engineering Constructions
Transcription
Diapositiva 1 - Piping Engineering Constructions
Engineering & Contractor Via Umbria, 1 74121 TARANTO - ITALY Tel./Fax: +39 099 7305500 E-mail: segreteria-taranto@pecsrl.it Web-site: www.pecsrl.it 1 General References Company Name: P.E.C. S.r.l. - Piping Engineering Constructions Corporate: October 16th 1987 Premises: Taranto (Headquarters) – Surface sqm 820 Via Umbria n.1 – 74121 Taranto Tel./Fax +39 099 7305500 E-mail: segreteria-taranto@pecsrl.it 2 Here we are 3 Organization P.E.C. was founded as Private Company on July 1984. It was turned into a Corporation Company on October 1987, including resources and experiences acquired mainly in Industrial plants. 4 Organization Chart Resources: 80.000 hours/year 5 Quality, Safety & Environment Quality Certification Certification of Quality UNI EN ISO 9001:2008 – issued by the certificate agency Det Norske Veritas Italia - certificate. n° CERT-01839-97-AQ-BRI-SINCERT. “Project management, basic and detailed engineering in the plant engineering field. Construction and maintenance of mechanical and electro-instrumental systems for the industrial field and related civil works” Safety and Environment “Conformity Certification to the standard OHSAS 18001:2007 of the occupational health and safety management system” Issued by e Certification Body Bureau Veritas – Settori EA 34, 28 Certificate n° IT255926/UK “Conformity Certification to the standard UNI EN ISO 14001:2004 - Enviromental management system” Issued by the Certification Body Bureau Veritas – Certificate n° IT244230/UK 6 Offered Services ENGINEERING FEASIBILITY STUDY Cost Estimate ± 30% BASIC DESIGN Cost Estimate ± 20% DETAIL ENGINEERING 7 COMMISSIONING ASSISTANCE / START UP / TEST RUN MAINTENANCE ENGINEERING FEED (Front-End Engineering Design) Cost Estimate ± 10% OTHER SERVICES PROCUREMENT SERVICE WORK SUPERVISION PRECOMMISSIONING SUPERVISION Offered Services EM Engineering Management 8 EPM Engineering Procurement Management EPC Engineering Procurement Construction Field of Activitiy WATER SYSTEM OIL & GAS Refinery - LNG - LPG - On/Off shore Fire Fighting CHEMICAL IRON-METALLURGY PETROCHEMICAL THERMOELECTRICAL PHARMACEUTIC TEXTILE INCINERATION 9 ENVIRONMENTAL MARINE Depot - Pipeline - Pier - Mooring TERMINAL Container Main Customers 10 Revenue P.E.C., during the years 2011-2013, produced a turnover equal to €uro 39.452.000,00 (Thirtyninemillionfourhundredfiftytwothousand/00) characterized by the increase of the order “turnkey” backlog that is about the 80% of the average annual revenue. 11 MAIN WORKS BASIC & DETAILED ENGINEERING 12 LNG PRODUCTION PLANT 13 SULPHUR DEGASSING PLANT 14 WASTEWATER TREATMENT PLANT 15 ETHYLENE PRODUCTION PLANT 16 AIR SEPARATION PLANT - NITROGEN PRODUCTION PLANT 17 AIR SEPARATION PLANT - OXYGEN PRODUCTION PLANT 18 SLUDGE PYROLYSIS PLANT 19 SLUDGE PYROLYSIS PLANT 20 LNG REGASIFICATION PLANT 21 WATER DELUGE FIRE FIGHTING SYSTEM 22 FOAM SOLUTION FIRE FIGHTING SYSTEM 23 SCADA CONTROL & SECURITY SYSTEM 24 LPG STORAGE PLANT 25 AMINE PLANT 26 AMMONIA STORAGE PLANT 27 TOPPING UNIT 28 CLAUS UNIT 29 SCOT UNIT 30 VISBREACKING UNIT 31 CRACKING UNIT 32 COKING UNIT 33 MAIN WORKS OIL & GAS 34 Raffineria di Gela S.p.A. IMPROVING OF PIPELINE P2 OF 36" FOR THE CRUDE DISCHARGE TO THE MARINE TERMINAL 35 36 37 38 39 40 Polimeri Europa S.p.A Porto Marghera ENERGY INDEX REDUCTION 41 PIPING INSTALLATION 42 PIPING INSTALLATION 43 PIPING INSTALLATION 44 PIPING INSTALLATION 45 Polimeri Europa S.p.A Porto Marghera DEBOTTLENECKING C-105 PLANTS NEW EXCHANGERS 46 INTERCONNECTING AUGUST 2007 47 NEW STEAM TURBINES AUGUST 2007 48 COLUMN REVAMPING AUGUST 2007 49 Eni S.p.A. Div. R. & M. Sannazzaro De’ Burgundi Refinery CONDENSATE QUALITY UPGRADING 50 PLANT COMPLETION AUGUST 2007 51 Eni S.p.A. Div. R. & M. Venice Refinery CONTROL ROOM BUNKERIZATION BEFORE WORKS 52 CONSTRUCTION 53 AUGUST 2007 COMPLETION 54 DCS ARCHITECTURE 55 Milazzo Refinery SULFUR DEGASSING SYSTEM 56 Eni S.p.A. Div. R. & M. Taranto (Italy) NEW DEISOPENTONER PLANT 57 Raffineria di Gela S.p.A. CONSTRUCTION OF A COVERED AREA FULLY AUTOMATIC HANDLING AND STOCKING - PET-COKE PLANT 58 July 2012 59 September 2012 60 January 2013 61 62 63 64 MAIN WORKS LNG - LPG 65 GPL/PROPYLENE STORAGE CAPACITY IMPROVEMENT FROM 15,000 cu.m. TO 37,500 cu.m. 66 NEW FENCES JUNE 2007 67 FOUNDATION TANKS MAY 2007 OCTOBER 2007 68 JANUARY 2008 TANK FRONT RETANING WALL AUGUST 2007 JULY 2007 OCTOBER 2007 69 SEPTEMBER 2008 RAILWAY IMPROVEMENT APRIL 2008 JULY 2008 70 SEPTEMBER 2008 NEW PIPING SEPTEMBER 2008 JULY 2008 64 IN SITU CONSTRUCTION 72 TANKS HANDLING 73 New Malta Depot 2011-2012 74 75 MAIN WORKS CHEMICAL 76 AND PHARMACEUTICAL PLANTS AKZO CHEMICAL PLANT - TERMOLI NEW UNIT FOR RUBBER CATALYST 77 NEW UNIT INSTALLATION 78 NEW PUMPING STATION 79 MAIN WORKS CRYOGENIC SYSTEMS 80 ETHYLENE PRODUCTION PLANT 81 AIR SEPARATION PLANT 82 NITROGEN PRODUCTION PLANT 83 84 MAIN WORKS FIRE FIREFIGHTING SYSTEM 85 FIRE FIGHTING NFPA-20 PUMPING STATION DIESEL MOTORS VERTICAL PUMP 86 87 FIRE FIGHTING WATER CURTAIN 88 NORMATIVE REFERENCES NATIONAL TECHNICAL STANDARDS: Norma UNI EN 12845 “Installazioni fisse antincendio - Progettazione, installazione e manutenzione”. Norma UNI 10779 “Impianti di estinzione incendi - Progettazione, installazione ed esercizio”. D.P.R. n. 126 del 23/03/1998 “Regolamento recante norme per l’attuazione della Direttiva 94/9/CE (ATEX) in materia di apparecchi e sistemi di protezione destinati ad esser utilizzati in atmosfera potenzialmente esplosiva”. D.Lgs n. 81/2008, “Testo unico sulla salute e sicurezza sul lavoro” coordinato con il D.Lgs. 3 agosto 2009, n.106. Norma UNI 9795:2010 “Sistemi fissi automatici di rivelazione, di segnalazione manuale e di allarme d’incendio. Sistemi dotati di rivelatori puntiformi di fumo e calore e punti di segnalazioni manuali”. Norma UNI 9485 “Apparecchiature per estinzione incendi – idranti a colonna soprasuolo. 89 Norma UNI 8478 “Apparecchiature per estinzione incendi. Lance a getto pieno. Dimensioni, requisiti e prove. Ed. 01/05/1983. NORMATIVE REFERENCES INTERNATIONAL TECHNICAL STANDARDS NFPA11: Standard for Low, Medium, and High-Expansion Foam, 2010 Edition”. NFPA13 “Standard for the installation of sprinkler systems”. NFPA15: Standard for Water Spray Fixed Systems for Fire Protection, 2007 Edition”. NFPA16: Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray Systems, 2011 Edition”. NFPA 30 “Flammable and combustible liquids code”. API Publ. 2030 “Fire protection in Refineries”. API RP 581 U. ed. - RISK-BASED INSPECTION TECHNOLOGY. NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection, 2013 Edition. 90 MAIN WORKS MARITIME AND JETTY WORKS 91 Service activities and Supervision on Marine Loading Arms NAFTOPORT - Gdansk (PL) 2014 92 Service activities and Supervision on Marine Loading Arms DECAL – Porto Marghera (IT) 2014 93 Marine Loading Arms Erection OILTANKING – Antwerp (Belgium) 2014 94 Marine Loading Arms Erection OILTANKING – Antwerp (B) 2014 95 Service activities and Supervision on Marine Loading Arms PDVSA - Puerto La Cruz (YV) 2014 96 97 Marine Loading Arms replacement and new structures installation 98 MARINE LOADING ARMS EAST MOORING RAM S.C.p.A. - MILAZZO (IT) 2010 DISMANTLING PHASE JUNE 2010 99 DISMANTLING PHASE JUNE 2010 100 MARINE LOADING ARMS EAST MOORING RAM S.C.p.A. MILAZZO (IT) YEAR 2010 FINAL TEST 101 MAIN WORKS PORT FACILITIES OFFSHORE TRANSHIPPING 102 Port of Naples Mediterranean sea 103 104 Port of Naples - Terminal di Levante – Site at present time 105 Port of Naples -Terminal di Levante - Site after works 106 107