mani̇sa cities
Transcription
mani̇sa cities
İZMİR – MANİSA CITIES Zertifikat: 01 100 032814 PROJECT OWNER Project Owner’s Name : TEİAŞ The Turkish Electricity Transmission Corporation Adresss : İnönü Bulvarı No:27 Bahçelievler 06100/ANKARA Telephone : 0 312 215 98 23 Fax : 0 312 213 84 15 Name of the Project : 154 kV Bornova – Morsan Cable Energy Transmission Line Introductory File Address of the Project Area : City of İzmir FIRM PREPARING THE ENVIRONMENTAL MANAGEMENT PLAN Name : Selin İnşaat Turizm Müşavirlik Sanayi ve Ticaret Ltd. Şti. Adress : 4. Cad. 26. Sok. No: 8/10 Aşağıöveçler / ANKARA Telephone : 0 (312) 481 33 73 (Pbx) Fax : 0 (312) 481 45 85 Web / E-mail : www.selinltd. com.tr / selininsaat@selinltd.com.tr / selininsaat@superonline.com Report Date : November -2005 INDEX Page Number INTRODUCTION OF THE PROJECT: .................................................................................................................... 5 A - MITIGATION PLAN........................................................................................................................................... 7 B- MONITORING PLAN ....................................................................................................................................... 11 C- WORK PROGRAM .......................................................................................................................................... 16 D- INSTITUTIONAL ARRANGEMENTS............................................................................................................... 17 E- CONSULTATION WITH ORGANIZATIONS AND PUBLIC THAT WILL BE EFFECTED FROM THE PROJECT................................................................................................................................................. 18 Table Page Number Table 1: Mitigating Plan ........................................................................................................................... 9 Table 2: Monitoring Plan........................................................................................................................ 13 Table 3 : Work Program ........................................................................................................................ 16 APPENDIX : APPENDIX-1: Layout Plan of the Route APPENDIX-2 : Map Showing the Present Situation of the Route APPENDIX-3 : Crossection of Underground Cable’s Canal APPENDIX-4: Photographs of the Route APPENDIX-5: Introductory Brochure of the Project APPENDIX-6: Anouncements Made by Muhtars APPENDIX-7: Anouncementon Local Newspaper APPENDIX-8: List of People Participatingthe Meeting APPENDIX-9: Reports of Meeting with Interested/Invited People and Organisations APPENDIX-10: Questionare APPENDIX-11: Photographs of Meeting The General Directorate of TEİAŞ 154 kV Bornova-Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________ The Firm Preparing Environment Management Plan : Selin İnşaat Turizm Müşavirlik San. ve Tic. Ltd. Şti. 4. Cad 26.Sok. No: 8/10 A.Öveçler ANKARA Tel: 0 312 481 33 73 Faks: 0 312 481 45 85 www.selinltd.com.tr E-Posta: selin@selinltd - selininsaat@superonline.com Report Date : November -2005 Responsibility : The contractor will appoint an Environment Manager. The Environment Manager (EM) will be the contractor’s representative about environmental subjects. The contractor will ensure that all staff, subcontractors, sellers and others are fully conscious about environmental topics. The contractor will be in close contact with EM and work at site in a sensitive way about environment. The contractor must supply a copy of Environment Management Plan (EMP) at site and have full knowledge of its content. Aim Of The Environmental Management Plan: The purpose of the Environmental Management Plan is to adopt suitable environment management and control methods, to get environment fully protected and/or to keep the environmental effects at the minimum level during the work and services and to fullfil the requirements of the national laws and regulations. 4 The General Directorate of TEİAŞ 154 kV Bornova-Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________ INTRODUCTION OF THE PROJECT: The General Directorate of TEIAS planned to renew the present 154 kV Bornova-MorsanManisa Energy Transfer Line (ETL) . Bornova-Morsan-Manisa ETL is an aerial line of 154 kV, starting from TEIAS’s 3rd Transmission Plant and Management Group Directorate’s shalt field, passing through 58th pole till MORSAN (Manisa Organized Industrial Region) Transformation Plant (TP) and ending with 10 electricity poles at Manisa TP. There is totaly 85 poles present at the moment. Through the concept of renovation ; 154 kV Bornova-Morsan-Manisa ETL’s part of 6,670 km passing through Kazımdirik, Ergene and Evka3 districts of İzmir-Bornova will be done as underground cable route and the present poles at the rest will be renewed. The Environmental Management Plan is prepared for only underground cable route. Topographic map and current map belonging to the route are given in Appendix-1 and Apppendix-2 respectively. Current telephone line, substructure ( tap water line, sewer system ) are shown on this map. A typical cross-section of underground cable energy transmission line and photographs of the route are given at Appendix-3 and Appendix-4 respectively. In the content of this project , existing aerial lines in the city limits, about, 6,670 km. beginning from BornovaTransformer Center, are planned to be underground cable lines. Underground cables are designed as , 1000 mm2 cable + ( 2x1272 MCM conductivity) 154 kV underground cable ETL. The length of the cable route planned for this project is 6,670 km. For the 6,670 km underground cable line, a different route from the present aerial line was chosen. The Underground Cable Line will be built till the 18th pole of the present line. Any protected areas, cultural or historical values do not exist on and around the route of underground cable energy transmisssion line. The total length of the cable route planned for this project is 6,670 km. For the underground cable line construction a bulding will be rented at a near place of project area or a temporary work-site will be built at an empty region in Bornova. In addition, a generator and a container will be placed at cable connection points and a guard will be on duty continuously. Domestic waste arised from the site will be discharged to the current sewerage system since the worksite is inside the city limits. Work plan of the project is given in Figure-1. Excavation of Canals Installation of Conduits that Cables will pass Fill the Canals( except the junction points) Joining of cables and installation of cables inside pipes Fill the Junction Points Şekil 1: Work plan of the underground cable construction 5 The General Directorate of TEİAŞ 154 kV Bornova-Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________ Cable laying will be done by excavating canals at stages. Firstly, canals of 1.5 mt. depth and 1.1 mt. wide and different lengths changing due to the condition of the route will be cut. The lengths of the canals to be opened along the planned route will be 215 m. at the university housing sites, 120 mt. at 119th street(wide road), 375mt. near the current 18th pole and 440 mt. at other places. HDPE type of pipes will be installed in these canals. Firstly, a special kind of bedding soil will be layed as 20 cm. thick at the bottom of the canals and 3 HDPE pipes will be put on it side by side. After the pipes are burried by 30 cm. thick special soil, PVC plated fences will be installed through the width of the canal. Canal will be filled with 20 cm. of concrete after 50 cm thick stabilized filling material is layed down on the wire. At last, the concrete will be covered with 10cm. thick asphalt by the Municipality (Aasphalt price will be paid by TEİAŞ) At the starting and ending points of the canals 10 mt. length will be resevedfor junctions and cable laying without fillling. but rest of the canal will be filled. Surface of these junction points will be covered with tent canvas, tape will be wrapped around for not to endanger the traffic, sandbags and warning signs will be placed. Excavation of 440 meters long canal, laying HDPE pipes and earth filling the canal and, installation of cable inside the pipes and making the junctions and will take 10 days. At the connection points which are unfilled, cable will be inserted from one end of the canal inside the HDPE pipe placed before and by pulling from the other end with the help of guide, cable will be passed inside HDPE pipe. During this operation, soft soap and oil will be rubbed continuously for the cable to be easily pulled. After this step, the operation will finish by closing the top of the connection points also. By this way, totally 6.405 km length of canals will be excavated along the planned route. 14 connection canals will be on this 6.405 km length route. Since street will be passed at two points of the planned cable route, cables will be passed inside of steel pipes at these places. Underground cable line going out from Directorate of TEİAŞ’s 3rd Transformer Plant will enter into the University Street for 2,25 km and then will pass through the Industry Street. It will exit from the University area at 5,10 km by passing through the Ege University Campus at 3,15 km and will pass the 119th street. It will go in to the 113th street and will connect to the current 18th pole at 6,670 km. The underground cable energy transmission line route passes completely inside the city’s residential areas. Therefore, the route passes through urban areas and there are no agricultural land. Bornova, which is placed at north-east of İzmir, at the foot of Yamanlar mountain and on 380 degrees latitude-270 degrees longitude is 8 km. to İzmir. Bornova has 400.000 permanent and 1.000.000 temporary population covers an area of 205 kilometersquare with its villages. Bornova is placed inside the metropolis limits. It is surrounded by Manisa city fields at its North, Kemalpaşa at its east, Karşıyaka and Konak at its west and Buca at its South. Its Municipality is established at the year 1882 and became town at 1957. Bornova’s total population is 396.770 due to General Census done in the year 2000. 391.128 of this population lives at centrum, 5.642 at the villages.. Population density is 1771 and population increase rate is 35.46 %. Ege University which is the first university of Izmir has been built at Bornova and its main campus is at Bornova. 6 The General Directorate of TEİAŞ 154 kV Bornova-Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________ A– MITIGATION PLAN To prevent or minimize the environmental effects during the work that will be done at planning, construction and operation stages of the project is separately explained below. Planning Stage; The part of the present line up to the 18th pole will be taken under the ground, but this part is not on the route of the present aerial line. The areas that the underground cable line route pass is given below. Street Name Bornova TM exit Sanayi Caddesi Sanayi Caddesi Sanayi Caddesi Sanayi Caddesi Universite Caddesi Universite Caddesi At the Campus (University) At the Campus (University) At the Campus (University) İzmir-Ankara Road Tunnel Pass University’s Resident Area University’s Resident Area 119th sokak (wide, two-way road) 113th sokak 113. sokak 113. sokak Interface near 18th pole Distance 0+00 0+450 0+900 1+350 1+800 2+250 2+700 3,150 3+600 4+050 4+275 4+500 4+950 5+100 5+400 5+850 6+300 6+670 For the underground cable line that will pass through Bornova’s street and crossroads, necessary protocols will be signed with the Municipality of İzmir. The protocols will also be signed with the Presidency of Ege University for the line that will pass from Ege University Campus and Resident Area. Most important subject at the stage of planning the underground cable line is determination of the route. On the route determined by TEIAS, existence of present infrastructural foundations and telephone line and the distance to them will be considered. In case where route passes near present telephone line, probability of disturbing these telephone lines that will cause by the electromagnetic field arising at operation stage must be taken into consideration. In addition, the present situation must be well considered for not disturbing the infrastructural foundations because of the excavations on the route of the underground cable line will pass. Necessary information for that is taken from the City Directorate of Telekom and General Directorate of İZSU. For this reason, planning stage is important to minimize the environmental effects that may occur during construction and operating stages. The present map for the underground cable route is given in Appendix-2. The present telephone line, infrastructure ( clean water, sewer systems ) and critical points for noise measurement are shown on this map. 7 The General Directorate of TEİAŞ 154 kV Bornova-Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________ Construction Stage The precautions that will be taken for environmental effects during construction stage of the Underground Cable Line and ENH are given below : 1. Dust Formation: At the construction stage of the underground cable line, operations of canal excavation, loading the soil to trucks, discharging it to the filling places that Municipality shows and pouring of filling material into the canals will be done. During these operations, dust formation may occur. At this stage, loading and unloading will be done paying attention not to cause dust and soil will be sprinkled with water to minimise dust formation. 2. Solid Wastes: Solid wastes that will occur during construction stage will consist of domestic waste arising from staff working and the waste caused by the construction operations( paper, plastic, cement bag, wire, HPE pipe pieces etc.) Waste causing from the construction operations and domestic waste will be collected separately and will be transferred to firms licensed for collection or recycling of them. 3. Soil Waste; The soil excavated during the underground cable construction will never be put back into the cable canal. Special stabilized materials will be used for the filling. Soil taken out of canals must be sent separately to Excavated Soil Discharge Area, not being mixed with concrete and asphalt waste. Recycling of asphaltic waste must be transferred to Municipality’s asphalt production plant. Excavated soil will be loaded to trucks and brought to the place Municipality permits. 4. Liquid Waste; During the construction stage, domestic waste water will arise from the staff working. Since the construction will be done in the city, a suitable place whose infrastructure is completed will be used for the work site/office or a depot area will be rented. Domestic waste water arising from the work site will be given to the existng sewer system. 5. Waste Oil; Oil changes of the construction equipment will be done at service stations. Leakage controls of these equipment will always be done at site. 6. Noise ; At the construction stage, noise will occur due to the construction equipment. This noise will shift with changing site. Since the work will be done step by step for underground cable line, noise will only occur during excavation and cable montage stages. For these reasons, noise will not be a continious problem and also work will be done during daytime. 7. In order not to damage the existing infrasructral facilities, work will be done at the presence of a supervisor from the related organisations. This will be determined at planning stage and necessary informations will begiven beforehand. 8. Magnetic Field: During commissioning stage three points of measurement will be identified and masured values will be compared with reference values. If measured values are above the references countermeasured will be taken. Operation Stage Magnetic Field; system will be operated below ICNRP and TSI (TSE) referance values. In case of copmlaints measurement will be repeated. 8 GENERAL DIRECTORATE OF TEIAS 154 kV Bornova-Morsan-Manisa Cable+ETL Environmental Management Plan ______________________________________________________________________________________________________________________________ Table 1: Mitigation Plan Phase Planning/ Design Construction Construction Issue Area includes sites of significance to human and natural environment (historical/religious/cultural value or ecologically significant or protected) or high population clusters.. Historical, Cultural and Archaeologic Values Removal of Mud Construction Dust Construction Solid Waste Construction Soil Waste Construction Liquid Waste Construction Noise Mitigating Precaution -Determination of present underground line, substructure and communication lines that pass. -During the excavations being done, whenever a subject having a historical, cultural or archaeologic value is found the work will be stopped and Directorate of Cultural and Natural BeingsCommittee will be informed -The construction will be tried to be done in dry season, not in rainy weather as much as possible. – Watersystems wiil be protected from erosion of exposed soil surfaces created during land clearing by the use of silt trapping systems ( e.g. bunds, sediment ponds etc. ) Responsibility TEİAŞ Employer TEİAŞ Employer Contractor - Sprinkle area with water particularly during hot, dry and windy conditions. Contractor - Waste causing from the construction operations and domestic waste will be collected separately and will be transferreed to the licensed firm to be recycled.. - Domestic solid waste will be disposed to the closest container of Municipality. Contractor - The soil that will be excavated from the canals during the underground cable construction must be deposited at the places determined by the Municipality. - The excavated soil should never be poured into water sources.(streams, rivers, lakes, ponds, etc.) Contractor - For the work-site choice, the places having infrastructure will be preferred and discharge of the toilets will be connected to the sewer system of the city. - Construction must be done during daytime hours. (07:00-19:00). Work will not be done in the evening or at night due to ‘’Evaluation and Management of Environmental Noise’’ Regulation-item 26.c. Sliencers of excavation machines and trucks will be kept working and be suitable to the standarts. Work machines and equipments used will be suitable to the ‘’Regulation about Emission of Environmental Noise Occurred by Equipments Working at Open Areas’’ (2000/14/AT) prepared by Ministry of Industry and Trade, published at Official Newspaper of date 22/01/2003 and number 25001. Old work machines must also supply the values given in this regulation. Contractor Contractor 9 GENERAL DIRECTORATE OF TEIAS 154 kV Bornova-Morsan-Manisa Cable+ETL Environmental Management Plan ______________________________________________________________________________________________________________________________ Construction Soil, surface and groundwater contamination from oil, lubricant or fuel spills Construction Polychlorinated Biphenbyls ( PCB ) Construction Occupacional Health And Safety Construction Safety of Public and Economical Activities Construction Operation Magnetic Field Magnetic Field Operation Occupacional Health And Safety Operation Solid Waste - Operational procedures must be established and implemented for spill protection and control must be prepared, approved by the Environment Directorate of TEIAS and be applied. (Oil changes of the construction equipment that will be done at service stations. Continious leakage controls and prevention of these equipment will also be done especially by using leakage boxes at site. ) İn addition, Leakage - Emergency Plans will be prepared and Staff must be trained. It is forbidden to purchase any electric equipment containing PCBs, or to purchase any PCBs for use in any equipment. - Health and Safety Plan must be prepared by the construction contractor and submitted to TEIAS for approval prior to any work activity. - Risk Analysis, Training Plan, Management Plan for Occupacional Health and Safety, Measurement-Observation Plan, Fire, work accident, environmental accident and first aid emergency plans must be prepared and controls must be done periodically. Control check lists to be formed. Must be worked in accodance wit he of ‘’Work Law’’ and Regulations abot Occupacional Health and Safety, PPE (Personal Protection Equipment) should be used. -Contractor can’t begin to work without TEİAŞ Environment Directorate’s approval of procedures, plan, measurement programme and preodical control lists that will be prepared as extention of Environmental Management Plan. -Along the canals to be excavated, public’s entrance to the canal and other dangerous places will be prevented by barriers, warning signs will be put at visible places and warning will be supplied by reflector lights at nights. Walker passage must be given at every 50 meters, passages must be at least 60 cm wide and have strong barriers at the edges -Special precaution must be taken for ambulance passage in front of Ege Nephrology and Dialisis Center During commissioning stage measurement will be done at identified points and if measured values are above the references countermeasured will be taken. System will be operated below ICNRP and TSI (TSE) referance values. In case of copmlaints measurements will be repeated Health and Safety Plan must be prepared and applied. The plan must include safety training and practical purposed applications. After 30 years of operation, used spare parts and/or similar materials will be kept in the temporary depots of Group Directorate at suitable conditions and than will be tarnsferred to licenced firms for recycling. Contractor Contractor Contractor (Plan Preparation) TEİAŞ (Plan Approval) Contractor Contractor TEİAŞ TEİAŞ TEİAŞ 10 TEİAŞ GENEL MÜDÜRLÜĞÜ 154 kV Bornova-Morsan Kablo Enerji İletim Hattı Çevre Yönetim Planı __________________________________________________________________________________ B- MONITORING PLAN Noise ; There are 3 critical points determined on the route. These points are shown on the current map given in Appendix-2. The current noise level at these points must be measured at day and night hours before the construction starts. Measurements must be repeated at construction stage after the work has started. The noise measured must be compared with the limits given in ‘’The Regulations for the Evaluation and Management of Environmental Noise’’. Client must be informed if precaution must be taken due to the regulations. The complains that may come from the local people other than the pre-deteremined critical points must also be taken into consideration and the reason for complains must be removed by making additional measurements. Studies done must be included in the Environmental Management Plan reports that will be prepared every 3 months. Dust : Dust will form during excavation, , filling , loading and unloading and storage operations. Dust measurements will be done at 3 points shown on the map given in Appendix2 along the route where excavation will be done before the construction starts and will be repeated at the construction stage. Measurements must be evaluated due to ‘’ The Regulation for Industrial Based Air Pollution’s Control’’. Measurement results must not exceed the value of 1.5 /dust-hour due to the regulation. After the evaluation due to the regulation, the contractor must take the necessary precautions. Among these precautions, sprikling the workplace with water , paying attention not to blow around and covering the trucks with tents can be counted. Results of the measurements must be included in every 3 months Environmental Management Plan reports. Magnetic Field: During commissioning stage measurement will be done at 3 pre- identified points and if measured values are above the references countermeasures will be taken. System will be operated below ICNRP and TSI (TSE) referance values. In case of copmlaints measurements will be repeated.. In case of copmlaints measurement will be repeated 11 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________________________________________________________ Table 2: Monitoring Plan What Where How Parameter is to be monitored is the parameter will be is the parameter will be monitored / monitored type of monitoring equipment Historical, Cultural, and At Field Observation Construction Archaeologic Values Erosion/Silt run off At Work site - It must be controlled that Construction mitigating precautions are organized. –Ground water must be controlled by eye. Dust Dust measurements will - Dust measurement will be done Construction by the firms having certificate of be done at work site Sufficiency for Environmental and affected area of Analysis. work sites’ critical points. 3 Measurement points are shown on the map given in Appendix-2. If there any complaints measurements wiil be repeted. Construction Domestic Water At Work Site Construction Noise Noise measurements will be done at work site and affected area of work sites’ critical points ( hospitali school, When Is the parameter will be monitoredfrequency of measurement Whenever a cultural value is met. Responsibility Contractor - Once a day - During or after a rainy or windy weather TEİAŞ Environmental Unit and Contractor Dust measurements will be done at 3 points shown on the map given in Appendix-2 along the route where excavation will be done before the construction starts and will be repeated at the construction stage. Measurements must be evaluated due to ‘’ The Regulation for Industrial Based Air Pollution’s Control’’. After the evaluation due to the regulation, the contractor must take the necessary precautions. Among these precautions, wetting the workplace, paying attention not to blow around and covering the trucks with awning can be counted. -Result of measurement must be lower than 1.5 kg/dust hour due to Industrial Based Air Pollution Regulation. - It must be controlled that At the construction and closing mitigating precautions are taken. stages of the work site TEİAŞ Environmental Unit and Contractor - Will be done by laboratory according to Consideration and Management of Environmental Noise Regulation’ -At the beginning of work, noise measurement will be done for 10 minutes and will be repeated when the type of work changes (when additions done or a new equipment Contractor Contractor 13 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________________________________________________________ What Where How Parameter is to be monitored is the parameter will be is the parameter will be monitored / monitored type of monitoring equipment house,etc). . There are 3 critical points determined in the project area.These points are marked on the present map given in Appendix-2. If there any complaints measurements wiil be repeted Construction Soil At works-sites of camp and line route Construction Waste Oil Construction PCB Construction Occupational Health and Safety Construction right-ofway Construction Public Safety At works-site of line route When Is the parameter will be monitoredfrequency of measurement starts to work etc.). -Measurements will be repeated at night shifts and be done away at a point from the affects and at east 1 m. of nearest house and 1.5 m above the ground. Measurement results of daytime hours must be lower than 70 dBA. The contractor must take precautions if this limit is exceeded. Night time value is not given since night work is forbidden due to the regulation. It must be examined that - Every day after the first canal is mitigating precautions in the opened till the canals are closed. contract are applied. -Once at construction stage of worksite and once at the end of work. At the work sites where Will be observed by eye. leakage may occur and for every machineequipment At delivery site of Certification showing no equipment or materials content will be reviewed Continuous inspection while machines are working and during oil addition. Responsibility Contractor Contractor PCB When equipment or materials are TEİAŞ delivered. Environmental Unit and Contractor - Must be controlled with Daily/Weekly/Monthly TEİAŞ periodical control lists due to Work Environmental Unit Law and Regulations. and Contractor Observation must be done about compliance specified in contract (strength of passages-barriers, existence of warning signs at the right place, reflector lights’ condition must be controlled ) Daily TEİAŞ Environmental Unit and Contractor 14 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan ____________________________________________________________________________________________________________________________ What Where How When Parameter is to be monitored is the parameter will be is the parameter will be monitored / Is the parameter will be monitoredmonitored type of monitoring equipment frequency of measurement Not to damage local and On the route Will be controlled by eye. Control During Construction economical activities. if tere areany complaints construction stage. Construction Commissioning Stage Magnetic Field Operation Occupational Health and Safety Operation Solid Waste Operation Magnetic Field At 3 points determined on the route (shown on the map given in Appendix-2) At maintenance places - Measurements will be done by magnetic field measurement equipment At Commissioning Stage - Control due to Risk Analysis and At every maintenance action Occupational Health and Safety Management Program. At maintenance places - Will be determined by At every maintenance action observations. At complaint points, if - Measurements will be done by In case of complaints there are any magnetic field measurement equipment. Responsibility TEİAŞ Contractor Contructor TEİAŞ Operation Unit TEİAŞ Operation Unit TEİAŞ Operation Unit 15 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _________________________________________________________________________________________________________________________________________________________________ C- WORK PROGRAM The activities stated in the Precaution and Observation Plans start and end dates are given in Table 3. Tablo 3 : Programme Date of Contract Months Activities Excavation Work Excavation Work Monitoring Programme Erosion7mud leakage Soil waste disposal Solid waste Occupational Health and Safety Issues Public Safety Dust Noise Historical and cultural values Installation Operations (Underground Cable) Installation Operations Monitoring Programme Solid waste Occupational Health and Safety Public Safety Noise Filling Work Filling Work MonitoringProgramme Occupational Health and Safety Public Safety Dust Noise Operational Tests Test Monitoring Programme Occupational Health and Safety Public Safety Commissioning Maintenance woks Line Maintenance Monitoring Programme Occupational Health and Safety Solid Waste Precautions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 16 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ D- INSTITUTIONAL ARRANGEMENTS A monitoring program for possible environmental effects that may occur during planning, construction and operation stages of 154 kV Bornova-Morsan Cable ETL project and precautions to minimize these effects is prepared and given in Part 2 which also shows the responsible bodies. In this part, the topics below are mentioned: Responsibilities of Client for monitoring and precautions, their relation with the environmental management Reporting of environmental information and providing data flow, Organizational structure of Environmental Management, thr following topics are explained; how monitoring activities will go on, who will collect and analyze the data, who will prepare the reports, how long will be reporting periods, what will be done according to the activity for the report and who will be authorized to change or stop the applications. Precautions and observation activities in the project begin at planning stage and continues at construction and operating stages. Precautions given in Part 2 includes activities in Monitoring Plans and responsibilities. Precautions and monitoring to be done by Contractor will be reported in definite periods to TEİAŞ. This project is evaluated in EIA Regulation Appendix-II, since it is prepared to renew of present energy transmission line. For this reason, Project Introductory File which is prepared in accordance to EIA Regulation Appendix-4 is presented to İzmir and Manisa Environmental and Forestery Directorates. After the investigations, the decision was taken that ‘EIA was not necessary After this stage, project works will be awarded to a Firm by TEİAŞ. When the project is prepared construction works will be awarded to Contractor. While construction work is done, Client( Group Directorate of TEİAŞ) will inspect if the requirements of Environmental management Plan are fullfiled and EIA Report is followed. Contractor is responsible for taking the precautions mentioned in the ‘Project Introductory Report’ which is approved by Environmentalo and Foresery Directorate. Constructor will report regularly permissions taken according to the works done and beginning-end of construction to TEİAŞ General Directorate when construction starts. Permissions taken from beginning to the end of construction and situation of the work undertaken in Project Introductory Report will be presented to the relevant Environment and Forest Directorates under coordination of TEİAŞ. If the constructor fails to fulfill the environmental requirements a written warning note is given. If the warning is not taken into consideration payments of the constructor is stopped until the environmental requirements are fulfilled Environment Management Plan includes ; mitigating plan, monitoring plan and political, legal and administrative frame of reports prepared according to EIA procedure. 17 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ E- CONSULTATION WITH ORGANIZATIONS AND PUBLIC THAT WILL BE EFFECTED FROM THE PROJECT Underground Cable Transmission Line Route passes through Kazımdirik, Erzene and Evka-3 regions of İzmir-Bornova. A consultation meeting has been arranged to which people living there and related organizations are invited. Meeting was held at Evka-3 where housing sites will be affected most.In addition, inquiry study was done with the people living at this region and their opinions about the project were asked. A brochure given in appendix involving introductory knowledge about the project was prepared and distributed to the people living there, private sector owners and the people joining the meeeting. Information about this meeting is given below. Time of the meeting : 28.12.2005, 10:00 A.M. Place of the meeting : Aras Kıraathanesi 119. Sokak No: 20/A Evka-3 Bornova/İZMİR People Invited to the Meeting : Name-Surname Occupation or Profession Telephone Fax Home Adress Business Adress : F. Gülay IŞIN : Evka-3 District Muhtar : 0232 375 88 85 : 0232 375 28 30 : Evka-3 mahallesi, 127/5 sokak No: 21 D: 2 Bornova/İZMİR : Evka-3 mahallesi, 126/12 sokak No: 5/1 Pasaj 27 Bornova/İZMİR Name-Surname Occupation or Profession Telephone Fax Business Adress : Dilek İduğ ÇELİK : Kazımdirik District Director : 0232 339 59 45 : 0232 388 09 52 : Kazımdirik mahallesi Zafer Caddesi No: 27 Bornova/İZMİR Name-Surname Occupation or Profession Telephone Fax Business Adress : Ayşe Müjgan PAKYÜREK : Erzene District Muhtar : 0232 374 44 52 : 0232 373 57 56 : Erzene mahallesi 8. sokak No: 25/4-D Bornova/İZMİR Name-Surname Occupation or Profession : Musa ÇEÇEN : President of the Management Board of İzmir Electrical Engineers’ Society : 0232 489 34 35 : 0232 445 68 68 : izmir@izmir.org.tr : 1337 sokak No: 16/8 Çankaya/İZMİR Telephone Fax E.Posta Business Adress Name-Surname Occupation or Profession Telephone Fax E.Posta Business Adress : Faruk İŞGENÇ : President of the Management Board of İzmir Environmental Engineers’ Society : 0232 464 00 22 : 0232 422 09 59 : cmoizmir@cmo.org.tr : 1479 sokak No: 11/9 Alsancak/İZMİR In addition to these people, people living in the region are also invited to the meeting . Anouncements were done at Muhtar’s offices. Reports of Muhtars’ about these anouncements were also given at the appendix. Besides these, meetings were anounced in a locally published daily newspaper and the interested people’s participation was requested. Announcement at the local newspaper was given at Appendix. 18 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ Those who have invited to join the meeting are : Name-Surname Occupation or Profession Telephone Fax Home Adress Business Adress : F. Gülay IŞIN : Evka-3 District Muhtar : 0232 375 88 85 : 0232 375 28 30 : Evka-3 mahallesi, 127/5 sokak No: 21 D: 2 Bornova/İZMİR : Evka-3 mahallesi, 126/12 sokak No: 5/1 Pasaj 27 Bornova/İZMİR Name-Surname Occupation or Profession : Musa ÇEÇEN : President of the Management Board of İzmir Electrical Engineers’ Society : 0232 489 34 35 : 0232 445 68 68 : izmir@izmir.org.tr : 1337 sokak No: 16/8 Çankaya/İZMİR Telephone Fax E.Posta Business Adress Name-Surname Occupation or Profession Telephone Fax E.Posta Business Address Home Address : Ahmet Avni ATAYOL : Member of the Management Board of İzmir Environmental Engineers’ Society : 0232 464 00 22 : 0232 422 09 59 : cmoizmir@cmo.org.tr : 1479 sokak No: 11/9 Alsancak/İZMİR : 119/8 sokak No: 4/2 Daire: 23 Evka-3 Bornova/İZMİR The List of other local people participating the meeting are given below. NAME SURNAME Yavuz EFEOĞLU Hüseyin BİLGİ Yunus YILMAZ ORGANİZATION OR OCCUPATION Mechanical Engineer Group Director Deputy Environmental Engineer Environmental Director of TEİAŞ Electrical Engineer TELEPHONE/FAX NO BUSINESS AND HOME ADDRESS 0232 462 70 00 Business: TEİAŞ 3. İletim, Tesis ve İşletme Grup Müdürlüğü Bornova/İzmir Tel: 0312 215 98 23 Faks: 0312 213 84 15 Business: TEİAŞ Genel Müdürlüğü İnönü Bulvarı No:27 Bahçelievler/Ankara 0232 462 70 00 Business: TEİAŞ 3. İletim, Tesis ve İşletme Grup Müdürlüğü Bornova/İzmir Home: TEİAŞ Lojmanları Bornova/İzmir Business: TEİAŞ 3. İletim, Tesis ve İşletme Grup Müdürlüğü Bornova/İzmir Business: 4. cadde 26. sokak No: 8/10 Aşağıöveçler/Ankara Home: Emlak Bankası Konutları B5 blok No: 17 Elvankent/Ankara Home: 119. sokak No: 20/3 Evka-3 Bornova/İzmir Business: Evka-3 Merkez Taksi Durağı Bornova/İzmir Home: 1203 sokak No: 8/7 Bornova/İZMİR Kubilay UYLU Map Engineer 0232 435 90 00 Orkun GÜMÜŞTEKİN Environmental Engineer Tel: 0312 481 33 73 Faks: 0312 481 45 85 Bünyamin ŞAHİN Mustafa TÜRKAY Retired 0232 375 03 74 RetiredTaxi driver 0232 375 12 30 19 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ Hüsnü BARDAKÇI Retired 0232 375 78 54 Home: 125/7 sokak No:18 Daire:24 Bornova/İzmir Refik TOP Retired 0232 375 14 18 Kerim AKIN Retired 0232 375 14 52 Home: 120. sokak Adil Demir Sitesi 5. blok 2/2 Evka-3 Bornova/İzmir Home: 119. sokak No: 45/1 Evka-3 Bornova/İzmir Programme of the meeting/Time Schedule: Opening : 10:00 A.M. Opening speech and information about the project : 10:00 – 10:20 Yavuz EFEOĞLU TEİAŞ 3rd Group Deputy Director Information about environmental effects of the project and the Environmental Management Plan : 10:20 – 10:40 Hüseyin BİLGİ General Directorate of TEİAŞ Environment Director Questions and answers : 10:40 – 12:00 Closing : 12:00 Summary of the Meeting (comments, questions asked and answers given ) Report involving the topics that has been discussed is given at Appendix-9 Meeting has been started with the speech of Yavuz EFEOĞLU who is TEİAŞ’s 3rd Group Deputy Director. Information about definition of the project, aim, the places route will pass, constructionoperation stages and secondary projects is given by Yavuz EFEOĞLU. Afterwards, a brief description of the project is done by Hüseyin Bilgi who is the Environment Director of General Directorate of TEİAŞ. Information is given about possible environmental effects of the project and precautions that will be taken to reduce these effects in the concept of Environmental Management Plan and period of Environmental Impact Assesment. TEİAŞ’s environmental point of view and policy is explained. Then, question-answer part began to take the opinions and suggestions of the participants. Questions, opnions and suggestion that came from the participants and the answers given to them are given below : Bünyamin ŞAHİN (Retired): This service is comfortable for the people sitting at this region. Appearance will be better when this project is finished. Hüsnü BARDAKÇI (Emekli) : It is a good project for İzmir, it will have benefit. It will be very useful if control is established about environmental noise protection. A permanent solution. İs it safe? Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Director Deputy): There is risk if you get as close as 2 mt. to the current aerial energy transmission line. But you can walk on the pavement covering this cable. It is much safer and serious controls will be held about this. Musa ÇEÇEN (Management Committee’s President of İzmir Electrical Engineers’ Society): Even though it is well introduced among the public that ‘underground line is good’, we know that there are aerial lines in Europe and USA. Aerial lines in our country brings bad appearance because of route choice and operation. In this route, an area of 30 meters will be nationalized by TEİAŞ. You can’t even plant grass at this region. 20 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ Hüsnü BARDAKÇI (Retired) : But it is a good project. Musa ÇEÇEN (President of Management Board of the İzmir Electrical Engineers’ Society): Illegal buildings are constructed at these regions. Electricity is also supplied after water by the Municipality and aerial lines become unsafe. You should inform the public while doing this project.You can’t expect participation without a prior information. A meaningful work is being done by this project. Brochures and announcements are very good and as İzmir Electrical Engineers’ Society, we support this project. Protection of only one person’s life is important to us. The region has high population density and underground able will be better. There is a subject in the brochure you have prepared. A 154 kV project is not firstly applied by TEİAŞ here. We will have only one demand: we want ferro magnetic coating at near of housing. There is no electromagnetic coating in the project. Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Director Deputy): There is red PVC coated 6*6 fence wire as can be seen on the brochure . Musa ÇEÇEN (Management President of Management Board of the İzmir Electrical Engineers’ Society): I’m not sure if this kind of wire will be enough for 154 kV at near housing sites. If electromagnetic current density is calculated and screening will be done at places close to housing sites, it will be a study that will not cause any trouble to you in the future. We can help if you want. This subject has not been considered in Turkey yet. Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Deputy Director): Red PVC plated 6*6 fence wire will be enough. This subject is searched in detail but we may require your opinions. F. Gülay IŞIN (Evka-3 District Muhtar): Have you been informed public about the project via media? Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Director Deputy): We have given advertisement to a local newspaper. TEİAŞ isn’t an establishment new at these things. We do all the necessary work. F. Gülay IŞIN (Evka-3 District Director): As an example; there is a pole at the middle of the road where this line will pass. Musa ÇEÇEN (Management President of Management Board of the İzmir Electrical Engineers’ Society): A small house may be built in place of these poles. F. Gülay IŞIN (Evka-3 District Muhtar): For example; BOTAŞ has been doing natural gas pipeline work here. Can it be combined with the cable line? Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Deputy Director): These lines can not be passed from the same place with another substructure line. You can’t bend this line. Natural gas, etc. Lines can be bend. If you bend like natural gas and pass from the same place, it will explode at first time energy is given. For this reason, natural gas and alike lines can not be passed under this line. Natural gas line can not be passed under this line. F. Gülay IŞIN (Evka-3 District Muhtar): People mostly says ‘’ since excavation is done at winter time, we are having troubles like mud, etc. Yavuz EFEOĞLU (TEİAŞ TEİAŞ’s 3rd Group Deputy Director): But this is being done for the safety of public, brings public interest. Musa ÇEÇEN (Management President of Management Board of the İzmir Electrical Engineers’ Society): Buildings can not be constructed at the place where aerial line were removed. Let me suggest this; can these areas be modified to a park ? Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Deputy Director): We are not owners of these areas. We only own the pole places and have servitude under the wires. For this reason, we can’t do anything about that. Ahmet Avni ATAYOL (Member of Management Board of the Environmental Engineers’ Societyİzmir Branch): I am a citizen living in one of the buildings here at the same time. This meeting is being done for only World Bank’s project ,beause it was requested be th Bank. Our opinion is not 21 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ being asked for the other projects. I was informed of this meeting from the invitation came to our Society, not as a citizen. Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Deputy Director): But an advertisement is published at newspaper, written announcements are given to the district muhtars and written invitation has been sent to your Society. We have used every kind of communication methods for this meeting to be heard. Hüsnü BARDAKÇI (Retired) : Did any study be performed about the Earthquake Fault Line ? Yavuz EFEOĞLU (TEİAŞ’s 3rd Group Deputy Director): We have been doing detailed studies about fault lines in all of the studies we do. Therefore, we have also done the necessary studies for this project. Ahmet Avni ATAYOL (Member of Management Board of the Environmental Engineers’ Societyİzmir Branch): You have told that the EIA studies have been completed, but we don’t have knowledge about that. Cable route doesn’t pass from a special area since it is in the city limits. Intersection can occur with other substructure lines. Did you negotiate with the other instituitons? You must have some plans for this. What will you do when another line will intersect with yours ? You must inform the other institutions for such a situation. In addition, it will be better if information about soil waste arising from excavation is mentioned in the Environmental Management Plan. EnvironmentalOccupational Health and Safety Regulations that will be obeyed are given in the brochure. There is a need for more information about every regulation for assessment. In addition, we are pleased to hear that TEİAŞ’s Environment Director is a member of Environment Engineers’ Society. I became very happy about that. It will be good if staff who will work at field are experts about this subject. Orkun GÜMÜŞTEKİN (Representative of the firm preparing the Environmental Management Plan): During the EIA studies, we have taken the coordinates of lines passing near our route from the related institutions to determine if there will be intersection and showed them on our current map. At the survey stage of cable line route, studies will be performed considering this subject. Hüseyin BİLGİ (Environmental Director of TEİAŞ): 46000 km. of energy transmission line has been built since the establishment of EIA regulation. We are performing these kinds of meetings at various places. In fact, this meeting is being done for World Bank’s request, but Turkish regulations don’t recognize these. Also, people don’t show enough interest to these kinds of meetings. Sometimes, we bring people to these meetings by taking them from their homes. For example, these meetings collect more interest when arranged at villages. I am bothered from this situation. Citizens see us as government and tell us us every trouble they have. We have been performing all kind of studies about electromagnetic field since the year 2000. Please don’t tell us that it’s not being done. We have given advertisement at newspaper, prepared and distributed brochures, made written announcements. I wish we could reach everyone. Let me give you the files involving the studies we have done about electromagnetic field for your examination. Questionnaire Studies: Quastionnaire is done with public living in the residence mostly affected from the project. Evaluation of the questionaire by tables and graphics is given below. Education Levels of People Participating the Questionnaire Ratios Education profile (%) Primary school 22,2 Middle school 22,2 High school 11,1 University 44,4 Total 100,0 Sex of People Joining the Questionnaire Ratios (%) Female 11,1 22 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ Male Total 88,9 100,0 Home Ownership Status of People Joining the Questionnaire Ratios (%) Own house 66,7 Rent 33,3 Toplam 100,0 Occupation of People Joining the Questionnaire Ratios (%) Salary ( Regular Work) 33,3 Little Tradesman 22,2 Big Tradesman 22,2 Retired 22,2 Total 100,0 Questionnaire: housing sites? YES NO Total Are you worried about passing of the current aerial electricity line through your Ratios (%) 55,6 44,4 100,0 Questionnaire: Did you get any other information about construction of underground ETL ? Ratios (%) YES 22,2 NO 77,8 Total 100,0 23 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ 100 80 78 60 Percent 40 20 22 0 evet YES hayýr NO YIHDUYUM Questionnaire: Did you get any other information about construction of underground ETL ? Questionnaire: Where would you like to see the information about underground ETL ? A) Television Ratios (%) YES 100,0 B) Radio Ratios (%) YES 33,3 C) Newspaper Ratios (%) YES 77,8 D) Billboard Ratios (%) YES 11,1 E) Internet Ratios (%) YES 11,1 24 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ Questionnaire: Do you support the precence of an underground ETL in the neigbourhood of your residential area? Ratios (%) YES 100,0 Questionnaire: What benefits will underground ETL bring to your region? Do you have any opinions? Ratios (%) No benefit 11,1 Indirect job oportunities (For example: material and service supply to construction team) Other 22,2 Total 100,0 66,7 70 67 60 50 40 Percent 30 20 22 10 11 0 hiç bir yarar No benefit Job opprtunities dolaylý istihdam diðer Other YARAR Question: Do you think that construction of such an underground ETLmay cause any problem here ? Ratio (%) YES 100,0 What kind of problems may be caused? A)Noise Formation Ratio (%) YES 100,0 25 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ B)Damage of roads Ratio (%) YES 100,0 C) Dust Formation Ratio (%) YES 77,8 D)Traffic Jam Ratio (%) YES 22,2 E)Security Ratio (%) YES 33,3 Question: While underground ETL constructed in your region, would workers staying near your housing sites be better or worse for your region? Will be better Doesn’t matter Total Ratio (%) 66,7 33,3 100,0 70 67 60 50 40 33 30 Percent 20 10 0 iyi olur Better ne iyiDoesn’t olurmatter ne kötü INPERZAR 26 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ Question: What kind of benefits may bring the staff who will be there for construction work to you ? A)No benefit Ratio (%) YES 22,2 B)Bring Money Ratio (%) 55,6 YES C)Bring Employment Ratio (%) YES 55,6 Question: If underground electricity conduction line workers will stay in your region, what may be the main problems arising from them ? Ratio (%) Will be no problems 44,4 Noise Pollution 11,1 Ethic botherings, theft, etc. 44,4 Total 100,0 50 44 44 40 30 Percent 20 10 11 0 No bothering olmaz rahatsýzlýk Noise Pollution gürültü artacak Ethic diðer botherings, theft etc MAHRAH 27 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ COMPARATIVE TABLE OF WORRIED PEOPLE’S RATIO TO THE EDUCATION LEVEL WORRIED EDUCATION LEVEL Total YES NO Primary School 50,0% 50,0% 100,0% Middle School 100,0% - 100,0% - 100,0% 100,0% 50,0% 50,0% 100,0% High School University 100% 80% 60% 40% 20% 0% Primary School Middle school High School University YES NO COMPARATIVE TABLE OF CABLE LINE SUPPORTERS AND FORSEEN BENEFITS SUPPORT RATIO BENEFIT YES Thinks no benefit will bring 11,1% Thinks indirect employment will come 66,7% Other 22,2% Total 100,0% 100% 66,7% 80% 60% 40% 20% 22,2% 11,1% Other Indirect Employment No Benefit 0% 28 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ COMPARATIVE TABLE OF CABLE LINE’S SUPPORTERS AND DISTURBING TOPICS DisturbingTopics Yüzdelik Oranları Supports , but worries about Noise 100,0% Supports, but worries about Road Damage 100,0% Supports, but worries about Dust 77,8% Supports, but worries about Traffic Jam 22,2% Supports, but worries about Security 33,3% 100% 80% 100,0% 100,0% 77,8% 60% 33,3% 40% 22,2% 20% 0% Supports, but Supports, but Supports, but Supports, but Supports, but worries about worries about worries about worries about worries about Security Traffic Jam Dust Road Noise Damage F- CONCLUSION Results taken from the consultation meeting and questionnare done about the project : 1. All of local people and organizations support the project. 2. Most of the people living at the region were disturbed from the existing aerial line. 3. It is thought that the current aerial line may cause health problems, creates bad appearance, is dangerous at rainy weather and give rise to corruption of electronic equipment lie TV, etc. 4. It will be efficient if information about the project is given by press (especially radio and TV) 5. Related professional Societies wants to be informed about the project in the beginning and wants to be asked their opinions. 6. It was thought that Project’s construction stage would supply benefit by indirect employment ( e.g. Material and Service Supply to the construction ) at the regions it passes through. 7. During the construction stage, noise and dust formation, damaging of the roads are the possible effects expected by most of the people.It is requested that the necesaary precautions to be taken 8. Traffic jam is not expected during the construction stage since the traffic is not dense near the housing sites that route passes. 9. It is thought that in case a worksite is built and the workers stays at the region, economical contribution will be supplied to th region. 29 GENERAL DIRECTORATE OF TEİAŞ 154 kV Bornova – Morsan Cable+ETL Environmental Management Plan _____________________________________________________________________________________________________ 10. People are generally worried of ethic botherings,e.g. theft, etc. if workers stay at the region. However, most of the people mentioned that they believe the contractor firm will consider this when choosing the workers to be employed. 11. A general opinion is dominant that there may be negative temporary environment effects during the construction stage, but if the necessary precautions are taken, they will not be effected much from the project. 30 APPENDICES : APPENDIX-1: Layout Plan of the Route APPENDIX-2 : Map Showing the Present Situation of the Route APPENDIX-3 : Crossection of Underground Cable’s Canal APPENDIX-4: Photographs of the Route APPENDIX-5: Introductory Brochure of the Project APPENDIX-6: Anouncements Made by Muhtars APPENDIX-7: Anouncementon Local Newspaper APPENDIX-8: List of People Participatingthe Meeting APPENDIX-9: Reports of Meeting with Interested/Invited People and Organisations APPENDIX-10: Questionare APPENDIX-11: Photographs of Meeting APPENDIX-1 Layout Plan of the Route APPENDIX-2 Map Showing Present Situation of the Route APPENDIX-3 Crossection of Underground Cable’s Canal APPENDIX-4 Photographs of the Route Bornova Transformer Centre (TC) 18th Pole Where Underground Cable Line Ends View From Underground Energy Transmission Line Route (Industry Street) View From Underground Energy Transmission Line Route (Evka-3) Ankara Road Crosssection of the Underground Cable Route APPENDIX-5 Introductory Brochure of the Project APPENDIX-6 Anouncements Made by Muhtars APPENDIX-7 Anouncementon Local Newspaper APPENDIX-8 List of People Participatingthe Meeting APPENDIX-9 Reports of Meeting with Interested/Invited People and Organisations APPENDIX-10 Questionare QUESTIOANRE PREPARED FOR TAKING OPINIONS OF PUBLIC TO BE AFFECTED FROM THE PROJECT FOR THE UNDERGROUND CABLE ELECTRICITY CONDUCTION LINE PLANNED IN SCOPE OF 154 kV BORNOVA – MORSAN – MANİSA CABLE+ECL PROJECT. INTRODUCTION General Directorate of TEİAŞ is planning to construct an underground electricity transmission line passing through your housing sites. This meeting is a part of the study to collect data about residence along the route and take your opinions about environmental and social topics. Information you give will be very useful for decision. Personal Knowledge and Social Status 1. Name of Region : 2. Town/City : 3. Name-Surname : 4. Adress / Telephone number : 5. Sex : Male ( ) 6. Age : Female ( ) 7. What is your education level? 1( ) None 2( ) Primary school 4( ) High School 5( ) University 8. Your Profession 3( ) Middle school : 9. Who is the owner of the house you’re living? (PLease check only one choice) 1( ) Our own house 2( ) Rental 3( ) Provided by Employer 4( ) Guest house 5( ) Rent without payment 6( ) Other (please mention)………………………………………………. 10. How many people live in your house? :……………………people 11. What is your occupational status? 1 ( 2 ( 3 ( 4 ( 5 ( 6 ( 7 ( 8 ( 9 ( 10( 11( ) With Salary (regular work) ) Temporary worker ) Little Tradesman ) Big Tradesman ( alone ) ) Boss ) Farmer ) Student ) Housewife ) Unemployed (Les than a year) ) Unemployed (More than a year) ) Retired, no working Opinions about Current Aerial Electricity Line 12. Are you worried about passing of the current aerial electricity line through your housing sites? 1( ) Yes 2( ) No (Pass to 13th question) 13. What are your worries? ...................................................................................................................... …………………………………………………………………………………………………………………. …………………………………………………………………………………………………………………. …………………………………………………………………………………………………………………. Opinions about Underground Cable Electricity Conduction Line 14. Did you get any other information about construction of underground ETL? 1( ) Yes 2( ) No (Pass to 16th question) 15. What kind of things did you hear.?...................................................................................................... …………………………………………………………………………………………………………………. …………………………………………………………………………………………………………………. 16. Where did you hear these from?……………………….. …………………………………………………. …………………………………………………………………………………………………………………. …………………………………………………………………………………………………………………. 17. From which of the below can you hear and be informed more about underground cable electricity conduction line? 1( ) TV 2( ) Radio 3( ) Newspapers 4( ) Bill 5( ) Hand bill 6( ) Meeting 7( ) Internet 8( ) Other (please mention)…………………………... 18. Do you support the precence of an underground ETL in the neigbourhood of your residential area? 1( ) Yes 2( ) No (Why?)……………………………………………………………………………………. …………………………………………………………………………………………...………………... …………………………………………………………………………………………...………………... 19. What benefits may construction of such an underground cable electricity conduction line bring to your housing sites ? Do you have any opinions? Give a number due to priority. Thinks no benefit will be supplied 1( ) No idea/don’t know 2( ) Direct employment (employment during construction) 3( ) İndirect emplyment (e.g.: supply of material and service to 4( ) construction staff) Other (please mention) 5( ) …………………………………………………………… …………………………………………………………… 20. Now let’s think in opposite way. Do you think that construction of suhc an underground ETL may cause any problem here ? What kind of problems may be caused? Give a number due to priority. No worries 1( ) No idea / don’t know 2( ) Noise 3( ) Damage of the roads 4( ) Dust 5( ) Traffic Jam 6( ) Security 7( ) Other (please mention) 8( ) …………………………………………………………… …………………………………………………………… 21. While underground ETL constructed in your region, would workers staying near your housing sites be better or worse for your region? 1( ) Much better 4( ) Bad 2( ) Better 5( ) Very bad 3( ) Doesn’t matter 6( ) I don’t know 22. What kind of benefits may bring the staff who will be there for construction work to you ? Else? (Please check all the related answers) 1( ) No benefits 3( ) Money 2( ) No idea / don’t know 4( ) Work oppurtinities 5( ) Other………………………………………………………………………...... 23. If underground electricity conduction line workers will stay in your region, what will be the main bothers arising from them ? (Please check all the related answers) 1( 2( 3( 4( 5( 6( ) Will be no bother ) No idea / don’t know ) Noise will increase ) Pressure on substructure will be formed ) Traffic jam will occur ) Other…………………………… THANKS… Application Date :……./……./2005 Pollster : APPENDIX-11 Photographs of Meeting REGULATIONS TO BE OBEYED DURING THE PROJECT REPUBLIC OF TURKEY MINISTRY OF ENERGY AND NATURAL RESOURCES Regulation about Environment Environment Law Regulation for Excavation Soil and Construction Wastes’ Control Regulation for Solid Wastes’ Control Regulation for Soil Pollution’s Control Regulation for Water Pollution’s Control Regulation for Excavations where Sewer System can’t be Constructed Regulation for Industrial Based Air Pollution’s Control Regulation for Oil Wastes’ Control Regulation for Dangerous Wastes’ Control Regulation for Evaluation and Management of Environmental Noise Evaluation for Environmental Effects’ Regulation Regulation for Evaluation of Package and Package Wastes’ Control Protection of Cultural and Natural Beings Regulation TEİAŞ 2001 GENERAL DIRECTORATE OF TEİAŞ BORNOVA-MORSAN-MANİSA ENERGY TRANSMISSION LINE PROJECT BORNOVA UNDERGROUND CABLE ELECTRICITY TRANSMISSION LINE PROJECT Regulation about Occupational Health and Safety Work Law Regulation for Occupational Health and Safety Regulation for Personal Protection Equipments Regulation for Health and Safety about Usage of Work Equipments Regulation for Methods and Principles of Workers’ Health and Safety Training Regulation for Health and Safety Warnings SELİN İnşaat Turizm Müşavirlik Sanayi ve Ticaret Ltd. Şti. PLANNED UNDERGROUND CABLE ROUTE 4. Cadde 26. Sokak No: 8/10 Aşağıöveçler / ANKARA Tel: 0312 481 33 73 (Pbx) Faks: 0312 481 45 85 E.Posta: selininsaat@superonline.com Web: www.selinltd.com.tr 6670 km. length of ETL passing through İzmirBornova limits of Bornova-Morsan-Manisa Electricity Construction Line is planned to be constructed as underground cable electricity construction line by the Ministry of Energy and Natural Sources. Excavation of Canals Installation of Conduits that Cables will Pass CROSS-SECTION OF UNDERGROUND CABLE CANAL Road level Asphalt 10 cm Concrete 20 cm Warning Tapes PVC+PE 20 cm Stabilized Filling Material AIM OF THE PROJECT Filling the Canals( except the connection points) 150 cm 30 cm 120 cm CONSTRUCTION STAGE OF THE PROJECT DEFINITION OF THE PROJECT Red PVC coated Wire (Φ2 mm) 30 cm Aim of the project is to repalce 6670 km. aerial lines passing through city with underground ETL, starting from Bornova Transformer Center of the Bornova-Morsan-Manisa Line by the General Directorate of TEİAŞ. Special Bedding Soil 20 cm Joining of cables and installation inside pipes HDPE Pipe (Φ 200 mm) Fill the Junction Points 20 cm Underground Power Cable 33 cm 110 cm REGIONS THAT LINE WILL PASS THROUGH Kazımdirik – Erzene – Evka 3 POSSIBLE ENVIRONMENTAL EFFECTS OF THE PROJECT ADVANTAGES OF THE PROJECT When the Underground Cable Electricity Conduction Line Project has finished; Bad appearance of aerial lines at settelement areas will disappear, A safer electricity conduction will be supplied, Construction problems at rural areas due to the aerial lines will be removed. Noise and Vibration Temporary Dust Formation Temporary visual Image Pollution Temporary Traffic Jam Temporary damages on the roads Domestic Solid Waste Formation Domestic Waste Water Formation 33 cm F/0 Cable HDPE Pipe (Φ32 mm) SITES UNDERGROUND CABLE E.T.L. WILL PASS Name of Site Length of Line Passing (Meters) Sanayi Street 2250 University Street 900 Campus (University) 1125 Ankara Road-Tunnel Passage 225 University Resident Houses 600 119th street (the wide road) 300 113th street 1270 Total 6670