Concreting of Farm to Market Road and Construction of Box Culvert
Transcription
Concreting of Farm to Market Road and Construction of Box Culvert
Republic of the Philippines MUNICIPALITY OF POZORRUBIO Province of Pangasinan Email Add: ompozorrubio@yahoo.com Telefax: (075) 566-7015 -oOo- OFFICE OF THE MUNICIPAL MAYOR The roads leading to barangays Inoman and Sugcong has never been this good. Based on the Comprehensive Land Use Plan of Pozorrubio, almost 60% of Pozorrubio’s rural roads (2010 figures) were unpaved - mostly made of macadam/gravel roads. Continuous effort of the local government reduced this figure to 59 % in 2012 with the remaining 67.891 kilometers of still unpaved roads targeted to be completed on a longterm basis. Translating this (pavement & widening) requirements, based on current minimum standard of 6 meter carriageway by 0.15m thickness of concrete roadways, the LGU needs to source-out an amount equivalent to Php 850 Million more of future funding cost to complete the remaining unpaved roads. 1|P age Roads are vital conduits to progress not only in the Urban and Central Business District of the municipality but also in the rural areas where most of the (farm) produce emanates enroute to the market. Thus, the local administration puts “a priory” to upgrade existing gravel/unpaved roads to spur economic development of the rural area/s. This form of intervention is contributive to reducing poverty, enhance accessibility of farm products to the market, address some concerns of gender development such as accessibility to social facilities and services: e.g. schools, health facilities, and enhance mobility and response in times of disaster and/or calamities. The projects implemented by the LGU funded by the Presidential Challenge Fund in barangays Inoman and Sugcong contributed much to the fulfillment of these aforementioned targets and objectives of the LGU. Although limited in its scope, with a total project costamounting to Php 1 Million, the completed projects served and benefitted the LGU’s constituentsacross all strata of the society (poor, farmers, schoolchildren, women, etc.) and likewise improved the transportation infrastructure sector of the LGU. The real challenge is for the LGU to continuously improve its vital infrastructure facilities/structures despite of its limited fund. On a positive note, external funding source such as the Presidential Challenge Fund or any other sources for that matter is a welcome relief of resolving and implementing the varied sectoral development concerns outlined in the LGU’s Comprehensive Development and Land Use Plans. Submitted by: Hon. ARTEMIO Q. CHAN Municipal Mayor asg/07-15-14 attachments: pictures of the projects 2|P age PERFORMANCE CHALLENGE FUND – SUPPORTED PROJECTS CONCRETING OF FARM-TO-MARKET ROAD AND CONSTRUCTION OF BOX CULVERT LOCATED AT BRGY. INOMAN, POZORRUBIO, PANGASINAN (BEFORE) (DURING) (AFTER) (All photos and projects were featured in the 2013 Annual Accomplishments Report of LGU Pozorrubio, Pangasinan as submitted to DILG February 28, 2014) 3|P age PERFORMANCE CHALLENGE FUND – SUPPORTED PROJECTS CONCRETING OF FARM-TO-MARKET ROAD AND CONSTRUCTION OF BOX CULVERT LOCATED AT BRGY. INOMAN, POZORRUBIO, PANGASINAN (DURING) (AFTER) 4|P age PERFORMANCE CHALLENGE FUND – SUPPORTED PROJECTS CONCRETING OF FARM-TO-MARKET ROAD LOCATED AT BRGY. SUGCONG, POZORRUBIO, PANGASINAN (Location 1) (BEFORE) (DURING) (AFTER) (All photos and projects were featured in the 2013 Annual Accomplishments Report of LGU Pozorrubio, Pangasinan as submitted to DILG February 28, 2014) 5|P age PERFORMANCE CHALLENGE FUND – SUPPORTED PROJECTS CONCRETING OF FARM-TO-MARKET ROAD LOCATED AT BRGY. SUGCONG, POZORRUBIO, PANGASINAN (Location 2) (BEFORE) (DURING) (AFTER) (All photos and projects were featured in the 2013 Annual Accomplishments Report of LGU Pozorrubio, Pangasinan as submitted to DILG February 28, 2014) 6|P age PERFORMANCE CHALLENGE FUND – SUPPORTED PROJECTS CONCRETING OF FARM-TO-MARKET ROAD LOCATED AT BRGY. SUGCONG, POZORRUBIO, PANGASINAN 7|P age