Reference as PDF
Transcription
Reference as PDF
Reference project - infrastructure / drainage Project: Sewers, Neugraben Fischbek Construction costs: n.a. Client: Period: Hamburger Stadtentwässerung (Hamburg Municipal Drainage) 2005 to 2006 Performance: The around 65 hectare Neugraben-Fischbek development area was created in Hamburg-Harburg where around 1250 new flats are to be built. This required that a sewer system be built for the new development area with planning and construction of the necessary public sewer systems. Around 11 kilometres of drains for dirt water and rainwater in nominal sizes of DN 250 to DN 1400 were required for this work. The engineering services included all planning work, such as the drawing up of the sewer plans, the necessary draft and execution plans along with the preparation of the documents for the invitation to tender bids. LEHNE Ingenieurgesellschaft mbh für Bauen und Umwelt Danziger Straße 35a 20099 Hamburg Reference - infrastructure/drainage Tel: Fax: Mail: Web: 040 / 28 499 16 – 0 040 / 28 499 16 -11 info@Lehne-ing.de www.Lehne-ing.de © 2011 LEHNE Ingenieurgesellschaft mbH für Bauen und Umwelt
Similar documents
Reference project – infrastructure / drainage
from a technical and economic point of view. New separating methods and lowemulsion conveyor and lifting systems were employed in this regard. The extensive planning, including specialist planning,...
More informationReference as PDF
Around 22,000 m² road surface in total was rebuilt, 1550 metres of sewers for dirt water and rainwater as well as road drainage pipes with nominal widths of DN 250 to DN 900 had to be relocated and...
More information