Reference as PDF
Transcription
Reference as PDF
Reference project - infrastructure / drainage Project: Two-track extension of the AKN in Hamburg Eidelstedt Construction costs: n.a. Client: City of Hamburg / AKN Period: 2000 to 2003 Performance: Im Within the scope of the two-track extension of the AKN A1 route in HamburgEidelstedt, the rail bed was lowered and laid in a channel to allow the crossings at Lohkampstraße, Pinneberger Chaussee and Upn Hornack to be elevated. The roads were adapted accordingly and routed across the new channel. Public transport stops for the new AKN Eidelstedt-Zentrum stop were installed for the HHA. The new road layout also allowed many green areas with trees and additional parking places to be created around the AKN stop. The lowering of the rail system also meant that many supply pipes and sewers had to be moved. Around 22,000 m² road surface in total was rebuilt, 1550 metres of sewers for dirt water and rainwater as well as road drainage pipes with nominal widths of DN 250 to DN 900 had to be relocated and around 3500 metres of piping had to be laid or moved for the utilities concerned. The engineering services included all planning work for the construction of the roads and drainage systems, including execution, the invitation to tender bids and local construction monitoring, as well as the planning and coordination of the piping and cable trenches for the utilities. LEHNE Ingenieurgesellschaft mbh für Bauen und Umwelt Danziger Straße 35a 20099 Hamburg Reference - infrastructure/drainage Tel: Fax: Mail: Web: 040 / 28 499 16 – 0 040 / 28 499 16 -11 info@Lehne-ing.de www.Lehne-ing.de © 2011 LEHNE Ingenieurgesellschaft mbH für Bauen und Umwelt