KGOT Maps 5 to 6
Transcription
KGOT Maps 5 to 6
Version: Final 2.01 ESS Group: Water Crossing SecID ESS Group: Archaeological ESS ID ESS Name Easting Northing UTM Zone Channel Wet Width Width KGOT3 KGOT-Aqua-115 Butnau River 380765 6243820 15N KGOT2 KGOT-Aqua-116 Butnau River 380702 6243857 15N N/A N/A N/A N/A KGOT1 KGOT-Aqua-117 Butnau River 380658 6243907 15N N/A N/A N/A N/A N/A N/A Fish Habitat Class Habitat Sensitivity N/A N/A ESS Name Easting Northing UTM Zone KGOT3 KGOT-Hert-100 Potential Archaeological Site 380666 6243834 15N KGOT2 KGOT-Hert-101 Potential Archaeological Site 380633 6243891 15N KGOT2 KGOT-Hert-102 Potential Archaeological Site 380687 6243924 15N KGOT3 KGOT-Hert-103 Potential Archaeological Site 380742 6243884 15N Potential Effects: Potential discovery for unknown heritage resources Potential Effects: Habitat loss & contamination from structure foundations & installations; Increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbance & impeded fish movement; Rutting of floodplain Specific Mitigation: Specific Mitigation: • Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements • 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing ESS Name • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental Inspector • Implement additional mitigation from site investigation ESS Group: Historic Sec-ID ESS ID ESS Name KGOT3 KGOT-Hert-300 Memorial Cross Easting 380800 Northing UTM Zone 6243843 15N Potential Effects: ESS Group: Birds and Habitat Sec-ID ESS ID Sec-ID ESS ID Easting Northing UTM Zone KGOT1 KGOT-Wild-115 Butnau River 380765 6243820 15N KGOT2 KGOT-Wild-116 Butnau River 380702 6243857 15N KGOT3 KGOT-Wild-117 Butnau River 380658 6243907 15N Potential Effects: Potential disturbance of site Specific Mitigation: • Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Minimize surface disturbance around the site to the extent possible Potential loss of SAR habitat; Higher risk of wire collision within the ROW Specific Mitigation: • Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites MAP NUMBER: 6