KGOT Maps 5 to 6

Transcription

KGOT Maps 5 to 6
Version: Final 2.01
ESS Group: Water Crossing
SecID
ESS Group: Archaeological
ESS ID
ESS
Name
Easting
Northing
UTM
Zone
Channel Wet
Width
Width
KGOT3 KGOT-Aqua-115
Butnau
River
380765
6243820
15N
KGOT2 KGOT-Aqua-116
Butnau
River
380702
6243857
15N
N/A
N/A
N/A
N/A
KGOT1 KGOT-Aqua-117
Butnau
River
380658
6243907
15N
N/A
N/A
N/A
N/A
N/A
N/A
Fish Habitat
Class
Habitat
Sensitivity
N/A
N/A
ESS Name
Easting
Northing UTM Zone
KGOT3 KGOT-Hert-100
Potential Archaeological Site
380666
6243834
15N
KGOT2 KGOT-Hert-101
Potential Archaeological Site
380633
6243891
15N
KGOT2 KGOT-Hert-102
Potential Archaeological Site
380687
6243924
15N
KGOT3 KGOT-Hert-103
Potential Archaeological Site
380742
6243884
15N
Potential Effects:
Potential discovery for unknown heritage resources
Potential Effects:
Habitat loss & contamination from structure foundations & installations; Increased erosion & sedimentation of streams;
Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbance & impeded fish movement; Rutting of
floodplain
Specific Mitigation:
Specific Mitigation:
• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion
• Identify and flag prior to start of work
• Conduct site investigation with Archaeologist post clearing and prior to construction
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion
• Use existing trails, roads or cut lines whenever possible as access routes
• Identify and flag buffer areas prior to start of work
• Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg
Clearance Requirements
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing
ESS Name
• Minimize surface disturbance around the site to the extent possible
• Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental
Inspector
• Implement additional mitigation from site investigation
ESS Group: Historic
Sec-ID ESS ID
ESS Name
KGOT3 KGOT-Hert-300
Memorial Cross
Easting
380800
Northing UTM Zone
6243843
15N
Potential Effects:
ESS Group: Birds and Habitat
Sec-ID ESS ID
Sec-ID ESS ID
Easting
Northing
UTM Zone
KGOT1 KGOT-Wild-115 Butnau River
380765
6243820
15N
KGOT2 KGOT-Wild-116 Butnau River
380702
6243857
15N
KGOT3 KGOT-Wild-117 Butnau River
380658
6243907
15N
Potential Effects:
Potential disturbance of site
Specific Mitigation:
• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion
• Identify and flag prior to start of work
• Minimize surface disturbance around the site to the extent possible
Potential loss of SAR habitat; Higher risk of wire collision within the ROW
Specific Mitigation:
• Adhere to reduced risk timing windows for protection of birds (August 1- April 30)
• Maintain applicable setback during nesting and breeding timing window
• Conduct priority assessment for bird diverters and other measures prior to transmission line stringing
• Install bird diverters or other measures at high priority sites
MAP NUMBER: 6