Aboriginal Traditional Knowledge Manitoba Hydro recognizes the
Transcription
Aboriginal Traditional Knowledge Manitoba Hydro recognizes the
Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use and is appreciative to all the communities who took time to share information about their history and culture as well as their valued knowledge and perspectives with regards to the Bipole III study area and Project. The ATK that has been shared assisted Manitoba Hydro in: developing a greater understanding of the study area; identifying potential Project effects; planning and designing the Project; developing potential mitigation measures, some of which can be found throughout this document. Document Owner: Licensing and Environmental Assessment Department Transmission Planning and Design Division Transmission Business Unit Manitoba Hydro Final 3.08 List of Revisions- BPIII Environmental Protection Plan N3 Section Number Nature of Revision Page/Map # Revised By Date 2.01 Update of mitigation measures after site visit from Project Archaeologist for “N3Hert-103” Cormorant Lake Petroform Site Page #144 Kris Watts 2014-02-07 2.02 Update of mitigation measures after site visit from Project Archaeologist for “N3Hert-100” (Mitishto River), “N3-Hert-101” (Sky Sailor) and “N3-Hert-102” (Mistishto River) Page #117 Kris Watts 2014-02-07 2.03 Stream Crossing Habitat Classification information missing in previous version due to computer scripting error are now populated in this update Any page that has a stream crossing and that info was available Kris Watts 2015-03-05 3.00 Sensitive sites will now be symbolized in grey with white Halos for better visibility All maps with SS Stantec 2015-03-27 3.01 Removed Mitigation measure that referred to DFO operational statement as Fisheries and Oceans Canada no longer uses operational statements but rather “Measures to Avoid Causing Harm to Fish and Fish Habitat” These measures are reflected in the text of the CEnvPP Any mitigation text for stream crossings or water bodies Kris Watts 2015-03-27 3.02 To help prevent confusion with access trails, recreational trails will be renamed, for example ALL Accss features will now be called RecUse eg "N4-Accss-100" will now be "N4-RecUse-100" Maps 158,113,114 Stantec 2015-03-27 Removed the Bird Sensitive timing window mitigation measure statement that indicates a timing window as this is observed throughout the project not just at that specific ESS and indicated in the appendix of the text CEnvPP document Any map with ESS Group: Birds and Habitat on it Manitoba Hydro 2015-10-14 Any associated map Manitoba Hydro 2015-10-17 Map 135 Manitoba Hydro 2015-10-29 3.03 3.04 Updates to Access trails as well as the addition of Bypass utilized during construction 3.05 The addition of Species of Concern Identified by field activities (N3-Eco-300) 3.06 Removed Bird Sensitivity Area Line features that were used to indicate locations of intended bird diverter installations. This will be indicated to the contractor through engineer drawings Removed from any associated map Manitoba Hydro 2015-10-29 3.07 Removed labels from major stream crossings, rail crossing and transmission line crossings, and access route points. Labels for access routes remain. Any associated Map Manitoba Hydro 2015-11-03 3.08 Incorporation of additional access routes from the 2014 construction season Any associated Map Stantec 20151112 Schist Lake 100°W 95°W 90°W 392 Keewatinoow N1 55°N GRAS ASS SR RIIV VE ER R GR W X ( ! N3 ( ! Herb Lake Landing PRO ROV VIINC NCIIA ALL PA PARK RK P 55°N N2 Athapap À ¾ Reed Lake 39 [ \ N4 Athapapuskow Lake C1 C2 50°N 596 Riel S1 À 124 ¾ 50°N W X S2 Goose Lake 100°W 95°W Bipole III Transmission Project Co rmo ra nt 134 File Location: G:\_GIS_Project_Folder\00_Hydro\111440054_BPIII_EPP\ArcMAP\ESS_N3\BPIII_CEnvPP_N3Constr uctionSection_MitigationESSMapIndex_475K_BTB_20151104.m xd For es t R e se rv e Cormorant 287 À ¾ Rocky Lake 145 CLE EAR ARWAT WATE ER R LLAK AKE E CL PRO ROV VIINC NCIIA ALL PA PARK RK P The Pas Airport !( SAS KERA M WMA ( ! Prospector OPASKWAYAK CREE NATION 152 628 THE PAS ( ! 289 À ¾ 283 À ¾ ( ! Young 158 Point 282 À ¾ 285 À ¾ 0 149 150 William Lake 151 TOM LA MB WMA 154 156 384 À ¾ 12.5 5 Limestone Bay South Moose MOSAKAHIKEN Lake CREE NATION ( ! Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, Stantec, ProvMB, NRCAN Date Created: November 04, 2015 Version: 3.07 0 North Moose Lake Talbot Lake Ralls 155 Island 157 142 140 138 148 153 À Umpherville ¾ 144 143 141 139 147 ( ! \6 [ Dyce 146 ( ! Clearwater Lake Wekusko 137 ( ! Clearwater Lake 121 136 10 \ [ Root Lake 131 128 122 119 117 115 113 111 135 Cormorant Lake ROCKY KY LLA AKE KE ROC PRO VIN VINCIA CIALL PRO PARK K PAR 133 132 ( ! 130 129 127 126 125!( 123 120 118 116 114 112 25 Kilometres 10 Miles ± 1:475,000 Legend Final Preferred Route N3 Map Index Grid (1:10,000) ! ! ! Transmission Line Provincial Forest Mineral Rights Provincial Park First Nation Wildlife Management Area Bipole III Transmission Line Project Construction Environmental Protection Plan Construction Section N3 Key Map Index * M AP SHEET FULLY WITHIN THE N3-AQUA- 201 FEATURE * M AP SHEET FULLY WITHIN THE N3-RUSE-301 FEATURE ± N3-Aqua-201 N3-Ruse-301 N3-Soils-124 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Provincial Park ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 1:10,000 Railway (Operational) Railway (Discontinued) Mining ! Metres 500 Transmission Line Highway Major Road Local Road Winter Road ( ! 250 ! ( ! ! ! ! 125 ! 137 L7 ( ! ! ! ! ! ! 0 Land Base N3-W ild-107 138 ( ! Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: November 29, 2013 SAMPLE SAM SA S AMP MPLE PLE ( ! Tower 72 E-383776, N-5992189 L8 N3-Aqua-124 ! ( l 139 1 3 140 1 40 AR EA ( ! 145 128 143 ! 141 130134 3 S 13 3 -S N3- M EN T EM NAG A GE AN MA E M WI LDL IFE O M LA M B W TO T 100 -1 N3-LU se-10 ! H75P ! ( ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! DOC UMEN T PATH: G :\_G IS_ PRO JEC T_ FOLD ER\0 0_ H YD R O\1114 40 05 4_ BPIII_EPP\ARC MAP\ESS_ N3 \BPI II_C EN VPP_N 1N 2N 3N 4C 1SEC TION BASEMAP_MAPBOO K_ BTB_STAN TEC _2 01 3112 8A.MXD 287 ¾ À N3-Wild-300 Project Infrastructure Points of Access* Angle Tower Locations ( ! Proposed Access Point BPIII Final Preferred Route ( ! Major Stream Crossing 66 m Right of Way # # Rail Crossing ) " Transmission Line Crossing Abandoned Rail Crossing Proposed Access Route *Labels correspond to BPIII Access Management Database ESS Features Water ( Water Crossing ! Wildlife Birds and Habitat Wildlife Wildlife, Reptiles/Amphibians Land Use Conservation Resource Use Forestry Soils and Terrain Permafrost Water Groundwater Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N3 Environmentally Sensitive Site Locations Map 146 SAMPLE MITIGATION TABLE (see adjacent KEY for additional information) KEY to SAMPLE MITIGATION TABLE MAP NUMBER : 1461 ESS Group : Permafrost Sec-Seg ID ESS ID N3-S13 1 Map on which ESS listed in the ESS Location Summary tables are illustrated 2 ESS *roup classi¿cation oI ESS shown on the map 2 ESS Name Location Start N3-Soils-124 Permafrost Site: 137 to 138 Potential Effects: Stop E-384894 E-384719 N-5994010 N-5993726 location summary includes the IollowinJ ¿elds SecSeJ ,' oI the construction section ie & and seJment ie S Ior ESS location ESS ,' Site speci¿c ,' assiJned to each ESS accordinJ to naming convention listed below ESS 1ame %rieI namedescription oI ESS EastinJ1orthinJ 87M coordinates oI ESS location Ior points only Location site identi¿cation numbers Ior the start and stop site points oI ESS intersection with the 52: lines and polyJons only StartStop 87M coordinates oI the startstop identi¿cation numbers listed in the ³Location´ ¿eld lines and polyJons only &haracteristics oI stream crossinJs identi¿ed in the ESS Location Summary tables where applicable and as inIormation is aYailable 3 ESS UTM Zone Distance 14N 3 333m 4 0HOWLQJRUORVVRISHUPDIURVWGXHWRGLVWXUEDQFHRIWKHDFWLYHOD\HU Specific Mitigation: x x 5 Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access route 4 3otential eIIects identi¿ed Ior ESS listed in the ESS Location Summary table ESS Group : Birds and Habitat Sec-Seg ID ESS ID N3-S13 2 ESS Name 5 MitiJation measures identi¿ed Ior ESS listed in the ESS Location Summary table Location Start UTM Zone Stop E-384697 E-384919 N3-Wild-107 Waterfowl sensitivity area Site: L7 to L8 N-5993592 N-5994051 Potential Effects: Distance 14N 539m ESS NAMING CONVENTION CATEGORY 4 ,ntersection 1$css Ecosystem +abitat 1Eco 5esearch 1Eco Species oI &oncern 1Eco $rchaeoloJical 1+ert &ultural 1+ert 5 Heritage x Adhere to reduced risk timing windows for protection of birds (August 1- April 30) x Maintain applicable setback during nesting and breeding timing window Land Use ESS Group : Water Crossing 2 SecESS ID ESS Name Seg ID Easting Northing N3N3-S13 Aqua124 384758 5993791 Unnamed Tributary of Unnamed Lake Potential Effects: UTM Zone 14N Channel Width N/A Wet Width N/A Fish Habitat Class No Fish Habitat Habitat Sensitivity Resource Use Low 4 Soils and Terrain +DELWDWORVVFRQWDPLQDWLRQIURPVWUXFWXUHIRXQGDWLRQVLQVWDOODWLRQVLQFUHDVHGHURVLRQVHGLPHQWDWLRQRIVWUHDPV GDPDJHWRVWUHDPEDQNVORVVRIULSDULDQYHJHWDWLRQ Specific Mitigation: x x 5 Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes *Mitigation shown includes only a sample of actual mitigation for the ESS features listed; refer to the Construction (QYLURQPHQWDO3URWHFWLRQSODQIRUDOOVSHFL¿FPLWLJDWLRQPHDVXUHVUHFRPPHQGHG ESS ID (Section ID-Category-Group Number) Access +LJKHUULVNRIZLUHFROOLVLRQULVNRIZLUHFROOLVLRQLVORFDOL]HGWRWKHULJKWRIZD\ Specific Mitigation: GROUP (Number Series Representing Group) Water Wildlife +istoric 1+ert &onserYation 1L8se &rown Land Encumbrance 1L8se 5ecreation 1L8se 5esidential 1L8se $Jriculture 158se )oodMedicinal 158se )orestry 158se +untinJ)ishinJ 158se 7rappinJ 158se 3ermaIrost 1Soils Erosion 1Soils 7errain 1Soils :ater &rossinJ 1$Tua *roundwater 1$Tua :etlands 1$Tua %irds and +abitat 1:ild Mammal and +abitat 1:ild 5eptiles$mphibians and +abitat 1:ild ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ± \6 [ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! P19W ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! J3 ! ! ! ! !! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 0P ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! N3-Eco-100 90 A ! ! ! ! ! ! ! ! 3 1456 N3-Soils-100 # ! ! " )!( 2000 N2 -S # ! ! ! ! ! ! # 2 1 l ! ! ! 2002 ! ! ! ! ( ! 28 # 1455 ! ! ! ! ! ! # 21 1454 # 1453 ! ! 2004 ! ! ! ! # ! ! 5 ! ! 01 N3 -S # END OF N2 SECTION BEGINNING OF N3 SECTION ! # ! N3-Soils-101 ( ! ! 2003 ! ! 7 ! # ! ! ! ! 2005 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ( ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! GORMLEY LAKE ! ! ! ! ! ! ! ! ! ! ! ! ! Map 111 ! ! Bypass Trails Approved Access Route Construction Section N3 Environmentally Sensitive Site Locations ! *Currently outside the Project footprint Transmission Line Crossing ! Point Features Linear Features Area Features Rail Crossing Abandoned Rail Crossing Bipole III Transmission Project Construction Environmental Protection Plan ! ( ! # # " ) Water ( Water Crossing ! Ecosystem Habitat Soils and Terrain Permafrost Wildlife Mammals and Habitat ! Sensitive Sites* ( ! Major Stream Crossing ESS Features ! 66 m Right of Way *Towers are subject to change, and are only used as a rough guide Proposed Access Point ! Railway (Discontinued) Mining Provincial Park Towers (Preliminary)* BPIII Final Preferred Route ( ! ! Railway (Operational) # Points of Access ! Local Road Winter Road Angle Tower Locations* ! 1:10,000 Major Road Project Infrastructure ! Metres 500 Transmission Line Highway ! 250 ! ! 125 ! ! 0 Land Base ! Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: November 12, 2015 Version: Final 3.08 ! DOC UMEN T PATH: G :\_G IS_ PRO JEC T_ FOLD ER\0 0_ H YD R O\1114 40 05 4_ BPIII_EPP\ARC MAP\ESS_ N3 \BPI II_C EN VPP_N 3SEC TION _MAPBOOK_ FOR HYD RO_ 20 15 1112 .MXD ! N3-Wild-200 2001 ! ! Version: Final 3.08 ESS Group: Permafrost Sec-Seg ID ESS ID ESS Group: Habitat ESS Name Location Start Stop UTM Zone Distance N3-S01 E-501860 E-501697 N3-Soils-100 Permafrost Site: 1 to 3 N-6060005 N-6059945 14N 172 m N3-S01 N3-Soils-101 Permafrost Site: 5 to 6 E-500443 E-492274 N-6059486 N-6056498 14N 8698 m Sec-Seg ID ESS ID N3-S01 ESS Name Location Start Stop E-500037 E-497319 N3-Eco-100 Patterned Fen Site: 7 to 8 N-6059338 N-6058344 UTM Zone Distance 14N 2894m Potential Effects: Potential loss of plants of conservation concern and habitat disturbance from clearing, construction, maintenance and decommissioning activities if route is moved to include this site. Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation: Specific Mitigation: • Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Carry out construction activities on frozen ground to minimize surface damage and rutting. • Use existing access roads and trails to the extent possible • Use existing trails, roads or cut lines whenever possible as access routes • Provide 30 m vegetated (shrub and herbaceous) buffer around site • Maintain shrub and herbaceous vegetation to the extent possible • Remove trees by low-disturbance methods • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible • Confine vehicle traffic to established trails to the extent possible • Install erosion protection and sediment control measures in accordance with Erosion/Sediment Control Plan • Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control Plan ESS Group: Mammals and Habitat Sec-Seg ID ESS ID N3-S01 ESS Name Location N3-Wild-200 MCWS Caribou Sensitive Area Site: 2 to 4 Start Stop E-501860 E-491176 N-6060005 N-6056097 UTM Zone Distance 14N 11376 m Potential Effects: Wabowden Woodland Caribou Range Sensitive Area Specific Mitigation: • Harvest within caribou range boundary will not include shear blading except for access, conductor stringing trails, and tower footprints • No shear blading to clear the right of way (ROW) in the sensitive range. Selective cutting methods will only be used to remove danger trees , vegetation within tower footprint, access route, and helicopter access points, to maintain low plant communities • Maintenance trails to be maintained to reduce line of sight for hunters and predators. • Annual ground inspection of towers to occur late in winter season to avoid creating packed snow trails that facilitate predator use of the ROW • Any Manitoba Hydro constructed or improved access routes used to access the ROW for construction that will not be needed for future maintenance will be decommissioned on completion of construction • Any culverts or road improvements will be removed and the first 100 m from of the trail dug up to the extent possible. Available slash MAP NUMBER: 111