FOLLETO COMERCIAL 3845 OK Line
Transcription
FOLLETO COMERCIAL 3845 OK Line
5km , oa alb d ay l B a n f ilw n a m rmi t o nal a l Ra r a o i n e a Pa al T e P rm an th c Te a C SA tion o i P t m a cif to erna Pa Pan Int e h t 13km 7km n ow nt ity w C do a to nam a P 28km t or rp i n e lA um na oc atio T to ern Int 80km e re rts n F d n po o l n a Co e a ce he Zon ic O t to de lant a Tr e At th To Colon Free Zone and Atlantic Ports Tocumen International Airport Centennial Bridge North Corridor to Centennial Bridge Panama Canal South Corridor Balboa Port Panama Ports Company Panamerican Highway Downtown Panama City Distances from Panama Pacifico: Rodman Port PSA Panama International Terminal 5 km (3 mi) to Rodman Port - PSA Panama International Terminal Bridge of the Americas 7 km (4 mi) to Balboa Port - Panama Ports Company / Panama Canal Railway 13 km (8 mi) to Downtown Panama City 28 km (17 mi) to Tocumen International Airport • 80 km (50 mi) to Colon Free Trade Zone IDEAL USES: • 80 km (50 mi) to the Atlantic Ports • • • • Regional Headquarters Shared Services Centers Business Process Outsourcing Logistics And Multimodal Services • Offshore Operations • ICT Services & Data Centers • Professional & Retail Services About Panama Pacifico Panama Pacifico is a Special Economic Area (SEA), developed under a public-private partnership between the Panamanian State and London & Regional Panama, its Master Developer. Its Master Plan encompasses a long term vision for development across 40 years, designed to capitalize on Panama´s peerless geographic advantages, in a 1,400 hectare strategically-located area that borders the western Pacific coast of the Panama Canal. Building: International Panama Pacifico is creating 1 million m² for commercial space, 20,000 new urbanist residential units, and 40,000 new jobs, a Greg Norman design golf course, luxury and business hotels, retail and lifestyle centers, medical facilities, universities and schools, public art, cinemas, parks and other amenities. The development, which sets a new standard of excellence not only for Panama, but also Latin America, is set within an ecologically-inspiring landscape of lakes, wetlands, mangroves, rivers, hills and forests. Business Park CONTACT US: About London & Regional Panama 3845 (+507)316-3535 business@PanamaPacifico.com The Republic of Panama selected London & Regional Panama (LRP) to be Panama Pacifico´s Master Developer through a rigorous process coordinated by the World Bank. LRP, which is committed to investing a minimum of $705 million to the creation of Panama Pacifico, is a partnership between two entities: London & Regional Properties (L&R) and Southstone Investment. L&R brings real estate savvy on a grand scale, as developer, owner and manager of more than $20 billion in international real estate on three continents, including the Victoria & Alfred Waterfront in Cape Town, the Fairmont Hotel Monte Carlo in Monaco, and 55 Baker Street in London. Southstone adds the Latin American experience and expertise needed to ensure a successful mix. This financially stable partnership combines unprecedented global credentials and regional as well as local expertise into one of the most respected leaderships in the world. w w w . P a n a m a P a c i f i c o . c o m w w w . P a n a m a P a c i f i c o . c o m Building: International Business Park Building Area: 12,080 m2 (130,028 ft2) 3845 Building Dimensions: 31 m x 64 m (101 ft x 210 ft) Column Spacing: 11.6m x 8.5m and 7.0m x 8.5m • Floor to Floor Height: 4.10 m 1st floor / 3.70 m 2nd -6th Number of Stories: 6 • • Suite Sizes Available: 60 m2 to 11,850 m2 • Employee Parking: One parking space per every 33 m of leased space Electrical System – for tenants: 500 KVA, 1,500 Amp, 208-120 volt, 3 phase, 4 wire Building Façade: Skim coat over cement board sheating for exterior with double pane storefront windows. Building Entry / Exit Doors: Main entry doors to the building are dual .90m x 2.10m (3’-0” x 7’-0”) narrow stile aluminum with 6mm (¼”) tempered glass. Lateral exit door - single 1.00m x 2.10m (3’-3” x 7’-0”) narrow stile aluminum with (¼”) tempered glass. Ramp for moving purposes, tenant improvements, delivery of office supplies, etc. Main Lobby with controlled access • • • • • • • Fire Sprinkler: Two 15cm (6”) risers on each stair supplying water to a 6.35cm (2½”) distribution loop around the core of the building on each floor. This loop serves supervised ball valves for tenant build-out. Full sprinkler coverage in the lobby, common areas, toilet rooms and MEP closets. System supplied by existing IBP fire suppression tank and diesel engine pumps & electric driven jockey pump (tank, diesel fire pump and appurtenances as per NFPA 20 and 24). Elevators: Two passenger elevators with 1,600 Kg load capacity One passenger/freight elevator with 1,600 kg load capacity Doors bi-fold with stainless steel finish Stainless steel interior finishes • • • • • Mechanical: Chilled water system (water cooled condensers with cooling towers mounted on the rooftop). Two variable speed central air handling units (AHUs) serve each floor. All the AHU units served precooled outside air by a dedicated outside air unit on the rooftop with an Energy Recovery System. Chilled water supply and return piping to each floor for central air handling units per floor. Chilled water supply and return piping loop around the core (inside tenant’s space) on each floor for future IT room dedicated fan coils. Design temperature for office and hallways: space temperature of 75ºF and 50% relative humidity, breakroom: 76ºF and 55% relative humidity, restrooms: 78ºF and the relative humidity will not be controlled on this space. All stairwells fully pressurized with roof mounted pressurization fans. Common Areas: Common toilet rooms on each floor. Men’s toilet room 1 toilet, 1 accessible toilet, 2 urinals, 3 sinks; Women’s toilet rooms 3 toilets, 1 accessible toilet and 3 sinks Telecommunications closets on each floor with central ground floor conduit to street One janitor’s closet with mop sink on each floor Two drinking fountains per floor. One standard height, one wheel chair accessible Electric closet on each floor with space for tenant’s meters and disconnect space in main electrical closet HVAC closet on each floor with Air Handling Units for air floor distribution around the core through ductwork All finished common areas lighted with fluorescent or down lighting. One fluorescent fixture in each closet Fully lighted stairwells Emergency lighting in all stairwells and hallways • • • • • • • • • • • • • • • • • LEVEL 02 - 06 FUTURE DEVELOPMENT 3845 3815 3835 3825 3860 w w . CURRENT TENANTS: AFTA Insurance Services • Allied Steel Buildings • Alvarado y During Internationall • APC Buro • Banco General • Compañía Marítima de Panamá • EGSA Panamá • Escarh Panamá • General Energy & Engineering • Gold Data Panamá • Golden Union Shipping Company • Tunneling Services Panama •M Cristy Trucking • NYCO • Osmo Coronado • System One Group • Truckslogic International • White Bay Trading Corp. 3870 3890 3850 w LEVEL 01 P a n a m a P a c i f i c o . c o m w w w . P a n a m a P a c i f i c o . c o m