with Schwing Equipment

Transcription

with Schwing Equipment
Volume : 4
Issue : 11
Q4 2014 & Q1 2015
Leading the Change
with Schwing Equipment
2
Project in Progress
4
8
Notable Projects
Achievements
10
New Launch
Follow us on
1
VC & MD’s Message
Dear Customer,
A very warm greeting to all the readers of Concreting Times.
The last six months were not very eventful. Market continued to be flat even though sentiments continued
to be positive. The recently announced budget brought some cheer amongst the construction industry
and the equipment manufacturers with the announcement on increase in infrastructure investments,
setting up of 5 new ultra mega power projects of 4000 megawatts and announcement of issue of
infrastructure bonds.
For the concreting equipment manufacturers, there is added hope as the highways minister has been
repeatedly hinting at more and more concrete road projects. There is an urgent need that government
implements all these projects as quickly as possible.
At SSI, we are heavily banking on the implementation of these projects and in anticipation, are
further investing on mechanization. In the last six months, we also launched two new products
viz., tower cranes and self-loading mixers. Our team is working very hard to localize these
products and be a substantial contributor to developing India.
Finally, I would like to take this opportunity to wish all the readers a very Happy and
Prosperous New Year 2015.
All the best,
Vice Chairman & Managing Director - SSI
Projects in Progress
Chenab Bridge Project, Jammu & Kashmir
The Chenab Bridge is an arch bridge under construction in Jammu &
Kashmir, India. It spans the Chenab River between Bakkal and Kauri,
in Reasi district of Jammu and Kashmir. When completed, the bridge
will be 359 meters (1,178 ft) above the river Chenab and it will be the
Highest Bridge in the World. The bridge is part of several bridges and
tunnels which makes up the Katra - Laole Section of the JUSBRL
Project in Jammu and Kashmir.
Northern Railway owns the total Project, Konkan Railway Corporation
is executing the project on behalf of Northern Railways and the
Chenab Bridge project undertaking a joint venture company of
AFCONS Infrastructure Limited, Ultra and VSL bagged the prestigious
project.
The project which is constructed using Schwing concreting
equipment have done 17,000 m3 of Concrete till date. It is expected
to be a total of 66,000 m3 of concrete for the project. M25 and M40
grade of concrete is produced in which M25 Grade is used for
Shotcreating and M40 is used in foundations.
2
Machine
Model
Quantity
Batching Plant
CP 30
2 Nos
Concrete Pump
BP 350
2 Nos
Transit Mixer
AM 6
7 Nos
Shotcrete Machine
TSM 30.14
2 Nos
CT News
“Person of the Year” Award
from Equipment India
Stetter Self Loading Mixer unveiled
Shri.Venkaiah Naidu, Minister of Urban Development today along
with Mr. Anand Sundaresan Managing Director, SCHWING Stetter
India and Mr. V.G. Sakthikumar, Managing Director, SCHWING Stetter
Sales & Services Pvt. Ltd unveiled the SCHWING Self-Loading Mixer at
the BAICON 2015. Other dignitaries present during the unveiling
were Mr. B.Seeniah, Chief Patron BAICON 2015 and Mr.
Sushanthakumar Basu, President, BAI. SCHWING Stetter India, one
of the pioneers of concrete construction equipment in India, has
displayed the Self Loading Mixer, a miniature concrete mixing
equipment that will revolutionize construction activities in urban and
rural construction sites.
Mr. Anand Sundaresan, Vice Chairman& Managing Director, Schwing
Stetter India was awarded the "2nd Equipment India Person of the
year" by Pratap Padode, Editor-in-Chief Equipment India Managing
Director, ASAPP Media Information Group, in the presence of Samir
Bansal, General manager, Off Highway Research during the 2nd
Equipment India Annual Award held on15th Dec at India Expo Mart
Noida.
SCHWING Stetter India lauched
SCHWING-XCMG Tower Crane
SCHWING Stetter India with its
expertise in concrete construction
equipment in India, has brought
expertise from group company
XCMG, one of the Top 5 World
Renowned Construction
Equipment manufacturing
companies to launch an exclusive
range of SCHWING-XCMG Tower Cranes in India today. This marks
the entry of SCHWING Stetter into the material handling industry.
SCHWING Stetter has always drawn emphasis on understanding
customer needs and the SCHWING concrete pumps and the
SCHWING-XCMG Tower crane will work in synergy to suit their
requirements. The SCHWING-XCMG Tower Crane can withstand
extreme conditions in construction sites. These highly adaptable fast-
BuiltMat 2015- Coimbatore
Schwing Stetter India recently participated in BuiltMat 2015
exhibition held between 5 to 8th February 2015 at CODISSIA Trade
Complex, Coimbatore. The event which is one of the largest
Construction and Interior fair was jointly organized by Association of
Consulting Civil Engineers (INDIA), Builders Association of India and
The Indian Institute of Architects. During the event Schwing Stetter
displayed its newly launched Self Loading Mixer – SLM 4000 and
Concrete Pump 1807 and received huge
customer appreciations.
erecting Tower Cranes are designed with several features to handle
high-rise projects. The Tower Cranes made by SCHWING-XCMG
comes in various capacities and types ranging between 5 tons and 6
tons.
3
Notable Projects
630 meter Pumping by
21 year old Concrete Pump
My Home Vihanga - Hyderabad.
My Home Vihanga, residential project is located on top a hillock in
Gachibowli, near Wipro Junction. This project will give the Hyderabad
a full view of the IT and Financial District. The 21-acre mega project
houses 1996 apartments measuring 1115 ft to 2160 ft in area. The
project consists of 20 block of 18 floors each and has a total concrete
volume of 1.7 Lakhs m3. The project is designed for RCC shear wallframed structure. The project has various grades of concrete
requirement like M20, M25, M30, M40& M50. Till date around
70,000m3 of concreting has been completed.
Schwing Stetter BP 4000 (160 kw) a 21 year old concrete pump has
recently done a long distance pumping of 632 meters horizontal in a
single pour of 26 hours continuously at Ghodbunder, Thane, Mumbai.
The pump was hired by Amar Construction (India Crete RMC) and
was used for raft foundation of Electrical Transmission Tower
(dedicated line for Mumbai Metro) situated on island at Varsova
Creek, Ghodbunder Road, Thane. L&T Constructions who are the
main contractor of this project have appreciated the support & service
provided by the team of Schwing Stetter India for this record pour.
The Project is owned by My Home Constructions Pvt. Ltd. and
concrete work is being done by SVS Projects Pvt. Ltd. Hyderabad.
Schwing Stetter India has contributed with its entire range of
concreting equipments in this project. The project has Schwing
Stetter Equipments like Batching Plant CP 30 – 3 nos, Concrete Pump
SP 1800 – 1no, Boom Pump S36X – 1no & KVM32XL – 1no, Separate
Placing Boom SPB 35 – 2 nos and Concrete Mixers – AM6SHN – 8 nos.
Relay Pumping at Bangalore Metro
Schwing Pumps at
Omkar Project- Mumbai.
Schwing SP1400 has done relay pumping of 18 meters vertical and
620 meter horizontal at Bangalore Metro Project. The pumping was
done by Vijaynirman Company, which has taken subcontract for track
concrete pumping from SOMA. A total of 120 m3 of M 30 Grade
concrete was pumped in 6 hour for this concrete pour.
Schwing Stetter SP4800 pump
along with SPB35 is concreting
Omkar 1973 one of the
prestigious residential projects
coming up in Worli, Mumbai.
The current height of core wall
is at 170 meters in tower-3 and
70 meters in tower-2 and it is
expected to reach a maximum
height of 340 meter. The
project also has Stetter M2.25
Batching Plants and has
produced and pumped various
grades of concrete like M80,
M70, M60 & M50.
4
Customer Speaks
An Interview with
Jitender Sandhu
Managing Director – Sandhu Construction Equipment & Services. (Ghaziabad , Uttar Pradesh)
About Customer
Before entering in to the Ready-mix Concrete business, Mr. Jitender Sandhu, Managing Director
of Sandhu Construction Equipment and Services worked as an Electrical Operator. In 2002 he
joined Anand Machinery and handled all Batching Plant Setup for the company. After completion
of five years there in 2007, he started his own firm called Sandhu Construction Equipment &
Services.
As a result of his hard work & quality of service, Sandhu Construction Equipment & Services is
now a renowned name in manufacturing/trading of Construction/Infrastructures related
business in the National Capital territory of Delhi. In 2013 Mr. Sandhu purchased Schwing Stetter
Equipment after which, he had replaced all his other equipment with Schwing machineries
including Batching Plants, Concrete Pumps & Transit Mixers.
Landmark Projects
Galaxy Vega
Exotica Dream Valley
Panchsheel –Exotica fresco
Victory's India Habitat Center
Schwing Equipments:Batching Plant - CP 30 Star Batcher
Concrete Pump - SP 1400 D
Transit Mixer - AM6SHC
Why Schwing Stetter India?
When you talk about quality &reliability in concrete machinery, the only name which I can recall
is Schwing Stetter India. After getting associated with Schwing Stetter I got to know,how much
maintenance cost and difficulties we have reduced in our company.
I personally used to visit all my old non Schwing machinery & batching plants on daily basis due
to down time,halting & spare parts issue but after getting associated with Schwing Stetter's
Machinery I am relaxed. I visit the sites with Schwing Stetter's Machinery once in a month or
two, it's been more than 18 Months,and there is no single downtime with Schwing Stetter's Plant
& Pump.
My Experience with Schwing Stetter Concrete
Pumps.
The ease of operations in Schwing Stetter Concrete Pumps has no
match in the Concrete Industry. I strongly believe Schwing Stetter
is the real master when it comes to Concrete Pumping.The
machines are so operator friendly that I have trained four of my
helpers who are working in Delhi NCR as professional
operators.With Schwing's Rock Valve the choking & Maintenance of
the pumps has reduced. The spares parts availability and the
service support are always there to back us.
Gyanender Kumar Rai
My Message
GirdhariLal Construction Pvt Ltd.
Delhi
I highly recommend everyone to go for Schwing equipment only, if
you expect a hassle free & reliable Concrete Pumping. My message
to fellow operators is if you want to take the best out of the
machines, please maintain & clean the machines regularly & then
no one can stop you to achieve success in Life by your hard work.
Thank you.
My History & Nature of Work:I started working in2007 as a helper of Stationary Concrete Pump
and in 2009 began operating Boom pump. I have a total Experience
of 7 year in Concrete Pumps operation I can also operate machines
like Concrete Pumps SP 1200 , SP 1400,SP 1800 , Boom Pumps 32X
& S36X.Currently I have being posted in Andaman & Nicobar
Island.
5
Leading the Change
SCHWING Stetter India as one of the pioneers in concrete equipment
manufacturer in India, has always stood in toes for manufacturing
advanced technology equipment for the Construction Industry in
India. With the aim to provide a high quality equipment with
uninterrupted customer service and support the company is
expanding its wings to introduce world class construction equipment
in India.
SCHWING Stetter India unveiled 5 new products in ready-mix
concrete technology: concrete mixing equipment, truck mixers,
concrete pumps as well as Tower cranes at BC India exhibition, which
took place from December 15 to 18, 2014 in the India Expo Centre in
Greater Noida / Delhi.
Speaking on the occasion, Mr. Anand Sundaresan, Managing Director,
SCHWING Stetter India said, “SCHWING Stetter is delighted to showcase
5 exclusive products for the Indian concreting industry. These innovative
and advanced products are designed for providing the necessary
concreting solutions to all our customers. This year at bcIndia we are also
displaying our SCHWING-XCMG Tower Crane.”
Mr. V.G. Sakthikumar, Chief Operating Officer, SCHWING Stetter India
said, “We focus on innovative technologies that save time; money and
increase performance standards. This exhibition will provide customers a
chance to explore construction equipment technologies at bc India
exhibition”.
The new products were unveiled by Mr. Anand Sundaresan, Managing
Director, SCHWING Stetter India, and Mr. V.G. Sakthikumar, Managing
Director, SCHWING Stetter Sales & Services Pvt. Ltd. SCHWING
Stetter also showcased its latest Tower Crane product range in the
material handling segment. These highly adaptable fast-erecting
Tower Cranes are designed with several features to handle high-rise
projects. The Tower Cranes made by SCHWING-XCMG comes in
various capacities and types ranging between 5 tons and 6 tons.
The new range of products will cater to all segments like batching
plants for concrete preparation; transit mixers for concrete
transportation; concrete pumps for concrete placement; shotcreting
pumps for tunnel application and recycling plants for recycling of
concrete.
The International Trade Fair bC India 2015 which had exhibitors from
Construction Machinery, Building Material Machines, Mining Machines
and Construction Vehicles manufactures is said to have a total of 26,000
visitors and 635 exhibitors from 25 countries.
6
Leading the Change
7
Events
Schwing Stetter at ConMac 2015
Schwing Stetter India participated in CONMAC 2015 held between 27th, 28th February & 1st March 2015 at Maniram Dewan Center, Guwahati,
India. The first edition of ConMac 2015 was organized in association with the Confederation of Indian Industry (CII) and Indian Construction
Equipment Manufacturer’s Association (ICEMA) which had a focus on the North-East Region. During the exhibition Schwing Stetter India launched 4
new products in the truck mixers and concrete pumps category.
Schwing Stetter is catering concreting equipment’s to Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura.
The new range of products will be supply to all segments like batching plants for concrete preparation; transit mixers for concrete transportation;
concrete pumps for concrete placement; shotcreting pumps for tunnel application and recycling plants for recycling of concrete. Schwing Stetter
thanks all its customers in North East region & Government Officials who visited us and made the exhibition successful.
Schwing Equipment around the World
Oil Well Platform, Toronto, Canada
3rd Bosporus Bridge, Istanbul.
I-75 Modernization Project, Dayton, Ohio, USA.
Belo Monte Hydroelectric Plant, Brazil
8
Project Abroad
Deep Caissons Pumped w/ Separate Placing Boom
Replacing the Hwy 70 bridge over Caney Fork River between Sparta
and Smithville, TN is anything but normal. Because the State has
plans to widen the route in the future, the design calls for a support
structure of cast-in-place concrete that could accommodate four
lanes of traffic. The current $38 million contract held by Massman
Construction, Kansas City, MO calls for a two-lane welded steel bridge
on the four-lane substructure. And because the Caney Fork River was
dammed in the late 1950s the Caney Fork River forms Center Hill Lake
at the Hwy 70 crossing.
“Because the reservoir is not navigable, we had to truck everything to
the site – cranes, barges, pumps,” according to Massman Senior
Project Manager, Dale Helmig. It took over 250 trailer loads to bring in
five cranes up to 300-ton capacity, barges large enough to support
the massive lifting equipment, a Schwing SP 4800 concrete pump and
31-meter separate placing boom. The process of pinning together 10ft x 40-ft modular barge sections, assembling five cranes and support
equipment took two months beginning in April 2013.
movement. “We have to maintain a 190-foot open channel at all times
which is why we have pumped from both sides of the river, “ according
to Helmig.
The SP 4800 is maintaining volume and distance requirements on the
job with a 443-hp diesel powering an open loop hydraulic system with
eight-inch diameter pumping cylinders. The pump features highvolume and high-pressure settings that can be switched depending
on the application. A high pressure Rock Valve with dual shifting
cylinders complements the 2020-5 150/90 pump kit that can
generate 2364 psi on the concrete. “We have several Schwings that
have performed well with very little maintenance which is essential in
these out-of-the-way locations,” says Helmig.
The new bridge is being
built 60-feet north of the
existing bridge which spans
1200-feet of the lake.
Caissons up to 150-feet
deep and 11.5-feet in
diameter were drilled to
bedrock and the resulting
piers formed from concrete
pumped with a tremie pipe.
The SP 4800 is pumping
from both sides of the river and up to 1150-feet of five-inch pipeline
has been assembled to reach the pier work at times. “Some of the
piers took more than 575-yards of concrete just to break water,”
Helmig states, “From there we add a 30-foot shaft extension of
poured-in- place concrete, then we pump the strut that ties a set of
three piers together, add an eight-foot diameter column and eightfoot cap. At that point we are 90-feet above the water.” There are
three sets of three piers being constructed in the channel and one set
of piers on land to support the new bridge. Concrete abutments on
both banks are also being pumped as part of the contract.
“We have been able to pump up to one hundred yards per hour at
times, but we average sixty-five to eighty yards per hour most of the
time,” Helmig notes, “Some of the larger volume piers have taken ten
hours of continuous pumping.” Pumping through the cranesupported tremie pipe puts the end in fresh concrete so that the rising
concrete from the bottom displaces the water without washing out
the cement content. After
priming the pipeline, a ball
is inserted which pushes
out any water in the line
and concrete follows.
Because of the depth of
some of the caissons, the
tremie pipe is in two
sections. As concrete rises
in the caisson, the placing
boom's tip section
connected to the pipe also
rises. When the junction in
the tremie pipe emerges
from the concrete, the
pump is stopped, the top
section of tremie pipe is
disconnected and
removed, the tip section of
In order to reach to the top of the piers, Massman utilizes a bargemounted Schwing three-section 31-meter pacing boom. The
hydraulic boom mounts on a pedestal that is bolted to an X-frame
welded to the barge. A diesel power pack accompanies the boom. The
pipeline from pump to boom is laid over the existing bridge and
barges in 10-foot lengths with heavy-duty clamps. A one cubic-yard
thrust-block near the pump embeds the first section of pipe to reduce
9
New Product Launches
Mobile Batching Plant - M21Z
Tower Crane XGT63YD (5013-5)
Mobile Version Plant suitable for Transit Mixer discharge with output
of 21 Cu M per hour. This plant is ideally suited for small medium
volume construction. We are offering wider selection option (to
choose) to meet customer's specific needs.
5ton, 50m boom(with free standing height of 35 meters). Both
internal climbing and external climbing mechanisms can be offered.
This will eventually be indigenized in next few months. We can offer
6ton Tower Cranes.
Self-Propelled TSR30.14
S43SXSBR02 on 6x4 Chassis
14m long Concrete Sprayer boom with proven SCHWING concrete
Pump. Dozing output is controlled from the operator held console
electronically liking it to the concrete pump strokes.
Longest Boom for a Three Axle Chassis. SCHWING RZ boom
combines roll and Z fold at the tip to offer better flexibility for the
boom operation. This can also be mounted on 8x4 chassis. 5 section
boom enables overall vehicle length to be under 12m for ease of
maneuverability and accessibility.
Self Loading Mixer 4000
SP1807 - Concrete Pump
SLM 4000
SLM
4000
The SLM 4000 has an engine capacity of 110hp created to meet the
requirements of the tier 2 and tier 3 towns. Self-Loading Mixers are
miniature machines that can automatically load sand and other
aggregates required for mixing concrete, blend the raw materials,
transport and unload the mixture. This smart machine can help
construction companies to monitor their consumption pattern by
exporting data and the firmware used in the SLM can be constantly
upgraded based on customer requirements.
New Concrete Pump with High pressure rock valve is suitable for
Concrete Sites of medium high rise construction. New aesthetic
aerodynamic design will be dedicated for all Models Trailer Pumps in
the future. This pump is launched to meet the requirements of higher
volume output meeting the demand of customers to increase the
speed of construction.
10
Weigh Bridge
Tech
Project Solution
Automatic Lubrication System
Use our Automatic Lubrication
System for your Concrete/Boom
Pump to get maximum trouble free
pumping time. We have observed
that maximum breakdown of your
Pump is due to non-Lubrication of
the Machine. We offer Automatic
Lubrication System for your Pump,
which is capable to Pump
Lubrication in working time for
maximum penetration. You can
save grease up to 60% of your
total present consumption, if you
start using this system.
Water Chilling Plant
Exclusively designed for weighing of high axle load vehicles at
RMC Infrastructure, Construction, Ports and Project sites with
highest accuracy, greater reliability and less maintenance.
Out standing resistance to wear and corrosive atmosphere at
project sites.
Web Camera Integration option, Pre-cast civil foundation option.
One stop solution for real time material reconciliation and
Inventory Planning at RMC and Construction sites.
Multiple batching plants can be integrated at project sites. Real
time cross checking of accuracy of batching plant and truck scale.
Stand alone usage for all other non concrete material weighment
like steel etc., at project sites.
Customized inventory inward and material outward reports
Composite design of steel and Concrete. Concrete to stay in
compression and tensional forces are handled by the high
strength steel structure below the concrete top deck.
Schwing Stetter provides solution for temperature controlled
concrete by providing water chilling plant of different models to meet
the requirement of 30M³/Hr and 56M³/Hr output batching plants.
This Water chilling plant is constructed with tank and coil which is fully
automated and does not require any additional manpower for control
of valves and chiller. Batching Plant Operator himself can control the
operation of chiller, valves through a single touch on Mimic Screen
Provided in plant control room. For higher output capacity plants,
chiller can be made based on requirements.
Complete Bolted design ensures quick and easy assembling,
dismantling, transporting and re-assembling at project sites.
Self checking & center loaded swing link mounted and
hermitically sealed heavy duty Double Ended Shear Beam Load
cells.
Recycling Plant
Bag Cutting System
Concern for our environment and an increased awareness of costs
are the main reasons for worldwide efforts to solve the concrete
industry's disposal and recycling problems. Profiting from extensive
experience gained with sieve / Cyclone separation system, Stetter
has developed this concrete recycling plant. Our systems have proved
to be more reliable, economical and highly wear-resistant. Our
permanent development efforts have made the Stetter
concrete recycling plant an exceptionally strong
product.
We offer Bag Cutting System for feeding Cement, Fly ash, Micro Silica
etc in high speed. In this System wastage of Material is almost nil,
Involvement of labour is also not required to operate this machine. It
comes with an electrical panel with mimic display. It can be operated
by one operator. Since the bags can be taken for pouring to the Silo
directly from the vehicle which has transported the material, the
wastage of Cement will be nil.
11
The Last Word
Dear Customer,
We stay hopeful, like you in the revival of Construction activities on ground and we are preparing to come out with more Products, Services
and Technical Solutions for Sites in the near future.
Two Launches namely, Tower Crane and Self Loading Mixer were done successfully. Tower Cranes are now available as fully imported
machine and Self Loading Mixers are available for demonstration & trials.
We are proud to be part of “Chenab Bridge Project” of AFCONS Infrastructure Limited. Notably, our Shotcreting Machine TSM 30.14 in this
Project, is also becoming popular in various other Tunnel Projects in India.
Thanks to BC India, Delhi and Conmac, Guwahati Exhibitions,we had wonderful opportunity to meet many of you
and interact personally. We appreciate the valuable inputs, you had given on the 6 (Six) New Products that, we
launched during this Exhibition.
This Magazine also brings, informations on some of our Project Solutions like Weigh Bridge, Chilling Plant,
Bag Cutting Machine, Recycling Plant and Automatic Lubrication System.
We sincerely hope the days to come, are busy for every Stakeholders in the Construction Industry.
Happy reading!!!
With best regards,
V.G. Sakthi Kumar
Managing Director - SSSSPL
For any feedback regarding this newsletter, email at editor.ct@schwingstetterindia.com
Reach New Heights with
rane
SCHWING - XCMG Tower C
SCHWING - XCMG introduces range of Tower Cranes which
withstands the extreme conditions in construction sites. These
highly adaptable fast-erecting Tower Cranes are designed with
several features to handle high-rise projects. For further details,
please contact us.
Batching Plants I Concrete Pumps I Transit Mixers I Concrete Recycling Plants I Belt Conveyors I Separate Placing Booms I Shotcrete Pumps I Tower Cranes
ISO 9001:2008 :: OHSAS 18001: 2007 :: ISO 14001:2004
F 71 - 72, SIPCOT Industrial Park, Irungattukottai, Sriperumpudur Taluk, Kancheepuram District,Tamil Nadu - 602105.
Phone : 044 2715 6780 / 781, 47108100 / 33555588 Fax : 044 27156539 Visit us at www.schwingstetterindia.com
MUMBAI 022 25624863 / 64, 30718300 / 33555588 I NEW DELHI 011 3092 8500 / 33555588
HYDERABAD 040 6615 1783 / 33555588 I BANGALORE 080 4243 8400 / 33555588
KOLKATA 033 3322 3300 / 33555588 I COCHIN 0484 4055984 / 3355558 I AHMEDABAD 079 40244200 / 33555588
PUNE 020 26055651 / 2 / 33555588 I MOHALI 0172 3957500 / 3957503
BHUBANESWAR 0674 2463999 / 3355558 I GUWAHATI 0361 2234738 I RAIPUR 0771 2562325
Published by Schwing Stetter India in Chennai. All Correspondence to be sent to editor.ct@schwingstetterindia.com
Designed and Printed by A.L. Senthil Kumar :: For private circulation only, not for sale.
Many more to come...
January 2015

Similar documents

concrete - SCHWING Stetter

concrete - SCHWING Stetter The project is owned by Bengal NRI Housing Complex Ltd., and the construction contract was awarded to L&T ECC. The project will have facilities like its own sewage pumping station and sewage treatm...

More information

Metro Rail Projects

Metro Rail Projects 55th floor [240 meters] at Ahuja Tower Project in Mumbai. The pump which was deployed for concrete pouring at 52 floor did till the maximum tower height of 55 floors [240 meters]. The tower is cons...

More information