a presentation to - Helmkamp Construction Co.
Transcription
a presentation to - Helmkamp Construction Co.
Principia College Central Academic Building (CAB) Construction Management Services A PRESENTATION TO: Rob Johnes Vice President Helmkamp Construction Co. Ph 314.355.2808 ext. 225 Fax 618.251.5380 Email rjohnes@helmkamp.com www.helmkamp.com Craig Lucas Vice President KWAME Building Group Ph 314.862.5344 F 314.862.1855 Email clucas@kwamebuildinggroup.com www.kwamebuildinggroup.com TABLE OF CONTENTS Executive Summary Page 3 Project Team Pages 4-6 Experience Page 7-12 Current Work Load Page 13 Bonding Information Page 14-16 Management Plan Pages 17-22 Schedule and Phasing Page 23 MBE/WBE Participation Page 24 Sustainability Page 25 Fee Proposal and Matrix Page 26-32 Additional Information Page 33 2 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 EXECUTIVE SUMMARY A Collaborative Approach to Delivering a Quality, Cost-Effective CAB The planned Central Academic Building (CAB) at Principia College captures the essence of Bernard Maybeck’s statement: "If the architectural composition which is to be Principia College lives up to the ideals of the institution and properly expresses them, the physical form of the college will have the power to move the hearts of men and to lift their spirit – and the world will care." Bernard Maybeck’s “Mistake House” on the Principia College campus, where he worked with contractors and crafts persons to test and perfect the use of new materials and techniques, embodies the collaborative approach our team wants to bring to the CAB project. The successful execution of this project will require: 1. Understanding of and respect for Principia College; its students, faculty, and staff; the operational methods of the facilities team; and the campus’ architecture; 2. Project managers, superintendents and crafts persons who can emulate the quality of construction demonstrated on the Principia College’s landmark buildings; 3. Program managers who can integrate this massive undertaking into campus life with an absolute maximum of efficiency and minimum of disruption; 4. Experienced LEED managers who can shepherd Principia through the process of environmental responsibility and energy savings; and 5. A team that is willing and able to practice respect, collaboration and transparency in a complex, highly-visible project environment; 6. Delivering bottom line value, dollar-for dollar. Our Approach: You have requested qualifications for an At-Risk Construction Manager. You have also alluded in your RFQ documents to an interest in Integrated Project Delivery (IPD) We can operate in any environment which you ultimately deem to meet your needs, but feel that some form of an integrated approach will ultimately result in the most cost-effective, and best-quality construction for Principia. In order to effectively address the CM qualification parameters you presented we have formed a project collaboration. The members of our collaborative entity will be: 1. Helmkamp Construction Co.: General conditions, site, civil, carpentry, project management; and 2. KWAME Building Group: Program management, phasing and scheduling, move management, diversity and sustainability management; 3 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 Helmkamp/Kwame will operate in a transparent “open book” environment in collaboration with PrinicipiaCollege facilities staff representing the owner and with other team members. We are willing to explore all methods of project delivery with you – from At-Risk CM, to an Integrated Team Approach, to pure Integrated Project Delivery (IPD), IN which all construction team members (owner, designers, CM, and prime subs) share in the risks and rewards associated with the project, thus making the success of the project the first priority. The Construction Management Association of America explains Integrated Project delivery in these terms: “Organizationally, all IPD projects share at least one thing in common: construction managers and at least some key trade contractors are involved in the project with the owner and designers from the early stages of design. Thus, these CMs and trade contractors are selected on the basis of qualifications and not on price (although fee percentages may be considered). “Bringing the key constructors together with the owner and the designers from the early stages of the project allows the major players to develop a much higher level of common understanding of the project. This has several salutary effects. The design moves forward with continuous input from the constructors about cost, constructability and value, allowing designers to make better decisions with fewer and less intensive negative loop-backs. This affords the constructors some ability to both influence the design and take some psychological ownership of the design. Perhaps just as importantly, the designers and constructors develop a closer, more productive relationship as they work side-by-side, solving problems together and gaining insight into the other’s workings. A new project culture emerges.” How Principia College Benefits from Our Approach You have a living testament to the effectiveness of this approach on the campus of Principia College in “The Mistake House.” This structure is a physical embodiment of Bernard Maybeck’s belief in working collaboratively with his builders to stretch the envelope on what was possible in the built environment. Per the name of the building, some things worked, some things were less successful. But the issues were worked out with the materials, the process, and the roles of the team before they were applied to an actual building. Today we have Building Information Modeling (BIM) to help us test materials and approaches and to avoid clashes. But at the end of the day the best tools are still collaboration, teamwork, and transparency. We have assembled a team with demonstrated ability, inherent trust in one another, and respect for your institution and its past and future. Together we can build a CAB that will carry forward Maybeck’s legacy and vision for buildings that “have the power to move the hearts of men and to lift their spirit”. 4 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 1.0 MINIMUM QUALIFICATIONS 1. 2. 3. 4. 5. 6. 7. 8. 5 Years in Business/Default on Projects a. Helmkamp Construction Co. is a 73-year-old, third-generation, family-owned business. Helmkamp has never been declared in default on a construction project. b. KWAME Building Group has been in business for 20 years. Projects of Similar Size, Scope, and Location a. These projects are addressed in the case studies on pages ?? -?? Bonding a. Helmkamp has aggregate bonding capacity to adequately cover the cost of this project. Additional bonding would be provided by subcontractors to Helmkamp, if necessary. See pages ??-?? GC Superintendent a. Ricky Verdun, will be project superintendent on this project. He joined Helmkamp in 1981 and has many years of experience at The Principia Elsah campus. He will be assisted by Kevin Feldott, who has 21 years of superintendent experience, including a number of projects for Principia. Their biographies are included in the team biographies on pages ??-??. GC Project Manager a. Jeremy Sneddon, project manager, has 12 years experience, including work at Washington University and The Principia’s Elsah campus. . His biography is included in the team biographies on pages ??-??. Schedule Management and Punch List a. KWAME’s reputation has been built on its ability to manage complex project schedules for governmental and private non-profit customers. Helmkamp’s customers – private, professional, repeat buyers of construction in the educational, healthcare, and industrial sectors – have come to recognize and value Helmkamp’s adherence to schedules, customer focus and attention to detail. Some of Helmkamp’s most positive endorsements have come from staff of The Principia. Experience With Non-Profit Entities and Governmental Oversight a. KWAME has a significant amount of experience on government funded and managed projects. Helmkamp has performed work for non-profit entities including schools and universities and has operated under scrutiny of government regulators in the healthcare, environmental safety and other fields. Familiarity with AV and IT and sustainable materials/practices a. Helmkamp has completed a number of projects in the education and healthcare fields which have had significant AV/data requirements. Helmkamp has developed plans for sustainable practices for clients such as Washington University, The Principia, and BJC Healthcare. Helmkamp renovated Old Watson at Elsah to accommodate the IT Department. b. KWAME’s educational projects – such as the Harrison Center at Harris-Stowe and the St. Louis Community College Wildwood Campus have incorporated a high degree of both technology and sustainable practices. | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 2.1.1 GENERAL COMPANY INFORMATION 2.1.1.1 Company name address, phone, and website a.) Helmkamp Construction; 707 Berkshire Blvd, East Alton, IL 62024; 618.251.2600, www.helmkamp.com; b.) KWAME Building Group; 1204 Washington Ave # 6C, St. Louis, MO 63103-2027; 314.862.5344; www.kwamebuildinggroup.com 2.1.1.2 Company point of contact, phone, e-mail a.)Helmkamp: Rob Johnes, vice president, 618.251.2600, ext. 225; rjohnes@helmkamp.com b.) KWAME: Craig Lucas, P.E., vice president, 314.862.5344; clucas@kwamebuildinggroup.com 2.1.1.3.1 Company is a corporation a.) Helmkamp: Incorporated 1996 (to reflect restructuring of subsidiaries) in Missouri. Brad Farrell, president of Helmkamp is sole director. b.) KWAME: 2.1.1.4 Years in business as a GC a.) Helmkamp: 73 b.) KWAME: 20 2.1.1.5 Number of years under present name a.) Helmkamp: 30 b.) KWAME: 20 2.1.1.6 Other, or former, names your company has operated under a.) Helmkamp: G. Helmkamp Trucking and Excavating b.) KWAME: 2.1.1.7 Multiple offices/Responsible for CAB a.) Helmkamp: NA b.) KWAME: St. Louis 2.1.1.8 Number of employees at office responsible for CAB a.) Helmkamp: 20 b.) KWAME: 2.1.1.9 Similar businesses in which firm has financial interest a.) Helmkamp: none b.) KWAME: 6 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 2.1.1 GENERAL COMPANY INFORMATION (CONTINUED) 2.1.1.10 States and categories in which organization is qualified to do business a.)Helmkamp: States – Illinois, Iowa, Indiana, Kansas, Kentucky, Maryland, Minnesota, Mississippi, Missouri, Nebraska, North Dakota, and Ohio. Categories – general contracting. b.) KWAME 2.1.1.1 Type of work normally performed by work forces Helmkamp: Excavation and earth work; demolition; pile driving; concrete foundations and slabs; structural and miscellaneous steel erection; millwright/equipment installations; laser alignment; precision leveling; and rough and finish carpentry KWAME: Program management, phasing and scheduling, move management, diversity and sustainability management 2.1.1.2 Type of work normally subcontracted Mechanical, electrical, plumbing, masonry 7 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 2.1.2.1 – 2.12.9 PERFORMANCE 2.2.2.1 Has company had an liens filed against it by any of its subcontractors or suppliers? No. 2.1.2.2 Has company ever failed to complete a contract, been defaulted, or had a contract terminated? No. 2.1.2.3 Has company had liquidated dames assessed against it on completion of a project? No. 2.1.2.4 Has company or any of its key personnel been a party to a bankruptcy or reorganization proceeding? No. 2.1.2.5 Has company or any of its key personnel been involved in a lawsuit or alternative dispute resolution process arising from a project? No. 2.1.2.6 Has company or any of its key personnel been investigated for or found to have committed a violation of any labor laws? No. 2.1.2.7 Has company or any of its key personnel been investigated for or found to have committed a serious OSHA violation? No. 2.1.2.8 Has company or any of its key personnel been investigated for or found to have been in violation of state, federal, or local laws in any jurisdiction. No. 2.1.2.9 Has company been debarred by an established debarment procedure from bidding or contracting on any state or federal contracts or is your company currently in the process of being debarred. No. 8 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT TEAM Team Leader: Rob Johnes, Vice President, Helmkamp Rob has assisted owners in value-engineering complex renovation/addition projects. Rob Johnes has been the driving force behind Helmkamp’s steady growth in education and healthcare expertise. Joining Helmkamp in 1997 after completing his bachelor’s degree in construction education from SIUE, Rob quickly displayed an ability to creatively address client issues on complex projects, first at Washington University and later at a number of area healthcare facilities. Rob managed Washington University Continuing Services projects for six years. Projects there included numerous laboratories and classrooms with significant amounts of IT, AV, and Mechanical/Electrical/Plumbing technology. At Principia’s Elsah campus he managed the renovation of Old Watson. He managed interior renovations for a Quest Communications hub site. Rob has headed numerous healthcare renovation and new construction projects, ranging from cardiac cath labs, to cancer care facilities, MRI units and PACU facilities. Rob has been the project director for all of Helmkamp’s recent work at Principia’s Elsah & St. Louis campuses. 9 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT TEAM Team Leader: Craig Lucas, PE, Vice President, KWAME Craig heads KWAME’s efforts in the K-12/Higher Ed field. He was project executive for a number of LEED-certified and technologyintensive projects. Craig Lucas heads KWAME’s efforts in the K-12/Higher Education field. Craig Lucas has 30-years of experience in the fields of project management and design engineering. Craig is experienced in the areas of construction, project supervision, total quality management, vendor and client interface, and project scheduling and cost analysis. He is a licensed engineer with a BS in Electrical Engineering from University of Missouri Rolla and an MBA from Webster University, His experience relevant to the CAB project includes: • Project Executive for the $10 million construction of the St. Louis Community College William J. Harrison Northside Education Center in St. Louis. The 30,000-square-foot, LEED Gold-certified, two-story building includes new classroom facilities, wet and dry lab space, and common areas for use by both students and community organizations. • Project Executive for construction of Harris Stowe State University's new $17 million William L. Clay Sr. Early Childhood and Parenting Center. The LEED Gold certified facility contains high-tech audio and video systems, Other amenities include a parents' library and education room, a computer lounge for students, a multipurpose room with full kitchen, smart board technology in all classrooms and a large multimedia classroom/lecture hall • Project Executive for the $15 million, 82,000-square-foot Gillespie Resident Hall and Student Center. The 57,000-square-foot, four-story housing center can accommodate approximately 230 students. Half of the ground floor is devoted to the 25,000-squarefoot student center with such amenities as a computer lab and exercise center. 10 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT MANAGEMENT Project Management: Jeremy Sneddon, Project Manager Jeremy has managed all of the life safety improvements on The Principia’s Elsah campus. Jeremy Sneddon has managed a number of complex education and healthcare projects since joining Helmkamp in 2004. Jeremy has been the project manager on approximately $12 million in life safety updates to residence halls on the The Principia’s Elsah campus, in addition to numerous other projects. He managed the construction of a new Environmental Health and Safety Facility – a sophisticated repository and depot for hazardous laboratory materials – at Washington University in St. Louis, and has managed a variety of other classroom and laboratory projects there. Among his other recent work is a surgery/PACU suite for Gateway Regional Medical Center that was constructed in an active patient tower. That project included the relocation of an ICU. Other recent projects a sprinkler retrofit, also in an operating patient tower, and an emergency room triage. Jeremy is currently managing a cardiac catheterization unit upgrade/remodeling for Gateway Regional. Over the last year he has managed a variety of projects for HMA’s Poplar Bluff Regional Medical Center, including emergency room, procedure areas, code corrections, and various administration areas. He is also managing projects for various data centers for AT&T throughout Southern Illinois. Prior to joining Helmkamp he managed projects at Northern Illinois University for Harn Construction of Freeport, IL. He joined that firm after earning his Bachelor of Science in Construction Management from Southern Illinois University at Carbondale in 1999. 11 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT TEAM Project Superintendent: Ricky Verdun, Project Superintendent Ricky has managed all the life safety projects on the Principia College campus. Ricky Verdun joined Helmkamp in 1981. His education includes the construction management programs at Lewis and Clark Community College and Southern Illinois University at Edwardsville. Ricky has been an integral art of the education construction team at Helmkamp. He managed the continuing service work at Washington University in St. Louis for 15 years. Notable projects include the Givens Hall remodeling, the Presidential Debates sound stage, Simon Hall Auditorium, Simon Hall Food Service and the Waste Management Building. At The Principia projects he has managed include the Howard Center Kitchen Renovation, the residence hall life safety projects, the Old Watson renovation, and the Hexberg Center. Ricky’s two decades of work on college campuses have enabled him to develop an understanding of the intricacies of campus life and the best methods for completing projects with maximum efficiency and minimal impact. 12 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT TEAM Project Superintendent: Kevin Feldott, Project Superintendent Kevin (right) discusses Principia Middle School project with Scott Gerber, director of capital projects. A 21-year industry veteran, Kevin earned his Associates of Applied Science degree in Construction Management and Technology from Belleville Area College. He worked on institutional projects as a superintendent for other Southern Illinois firms, prior to joining Helmkamp in 2001 Most recently at Principia, Kevin has been the project manager on a middle school renovation and addition at The Principia‟s Clayton Road site. On a previous Principia project, completed earlier this year, a member of the Principia staff wrote to Kevin: “As we come down the home stretch I would like to express my gratitude to you and all the Helmkamp guys for the great job you all have done. You have really gone the proverbial „extra mile‟ to meet the time constraints of the tight schedule. We work hard here with the boys at understanding how hard work and excellence go hand in hand and you all with Helmkamp demonstrate that correlation wonderfully.” Kevin’s most recent healthcare project is BJC‟s Chesterfield Orthopedic surgical center. He was the superintendent on the endoscopy/PACU unit at Gateway Regional Medical Center in Granite City, IL, completed in May 2010. The endoscopy/PACU was selected as a finalist in the Associated General Contractors of St. Louis Keystone Awards. Following completion of that project, Damon Brown, CEO of Gateway wrote, “Helmkamp provided quality communication, in-depth understanding and knowledge of the healthcare construction process, and proactively problem-solved issues." On that project Kevin addressed constructing the new unit in an active medical tower. He developed a solution for delivering materials to a staging area on an adjacent rooftop. He also helped to develop a solution for providing access to an adjacent surgery through a sterile tunnel which bisected the work site. 13 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT EXPERIENCE Helmkamp Projects on The Principia Elsah Campus Helmkamp’s has had significant interaction with Principia staff, students, and faculty and has established strong familiarity with The Principia College Elsah campus in recent years. This campus map marks the location of Helmkamp projects at Elsah. 14 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT EXPERIENCE The Principia Elsah Campus – Life Safety Program Project Director: Rob Johnes, Project Manager: Jeremy Sneddon, Project Superintendent: Rick Verdun Construction Value: $13 million Percentage of Change Orders: 0% Value of Change Orders: $0 Initial Date of Completion: 6/30/13 Actual Date of Completion: 12/31/12 Client /Architect Reference: Scott Gerber Director of Capital Projects The Principia One Maybeck Place Elsah, IL 62028 618.374.5098 scott.gerber@prin.edu Project Background: Helmkamp has been awarded the contract for life safety work at Anderson residence hall at Principia College in Elsah, IL. Design work is currently proceeding for life safety work on two more dormitories at Principia College. These projects will represent the tenth through twelfth such projects Helmkamp has undertaken for the college. The work completed to date totals $6.5 million, with the program budget set at $13 million. The total project is currently on pace to be completed ahead of the June 2013 deadline. The completed buildings are Brooks House, Williams Cottage, Howard House, Buck House, Sylvester House, Clara McNabb House and Rackham Court. Lowery House is currently being completed and Anderson House began in December 2010. The state of Illinois has mandated standards for dormitory life safety systems, which includes installing sprinkler systems within dormitories. The dormitories at Principia College reflect a variety of design and construction techniques. Some of them, such as Rackham House, were designed by distinguished architect Bernard Maybeck in the 1930s and are internationally recognized for their design and construction. Others are buildings from the 1960s. But all present unique design and construction challenges in installing state-of-the-art sprinkler systems and reconfiguring certain aspects of the buildings to meet the new standard. Owner’s Requirements 1. A combination of wet, dry, and anti-freeze sprinkler systems has been installed in the dorms. 2. In addition to the sprinkler work, each dormitory has had its fire alarm system and de-vices upgraded to include a voice evacuation system. 15 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 3. During each of the safety projects in the dormitories at Principia College, the students and resident counselors have been relocated to other dormitories during the course of Helmkamp’s work. 4. On the larger dorms, not all the students can be displaced. This has resulted in our doing work in phases and swapping students to the completed half when done. 16 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT EXPERIENCE Early Childhood Education Center at Harris-Stowe State University Total Construction Contract Amount: $13 Million Initial Schedule Duration in Months: 13 Actual Construction Period (including punchlist): 13 Date of Substantial Completion: July, 2009 Date of Punchlist Items: Aug. 2009 Office from Which Project Administered: St. Louis Project Manager: Anthony Simmons Client Contact: Dr. Henry Givens Harris-Stowe State University 3026 Laclede Avenue Saint Louis, Missouri 63103 314.340.3366 The center includes high-tech audio and video systems. Harris-Stowe is seeking LEED silver certification for the building. Architect Contact: Don Koppy Director, Design/Build KAI 211 North Broadway, Suite 1900 St. Louis, Missouri, 63102 314.241.8188 Project Background: KWAME served as construction manager/owner's representative for construction of Harris Stowe State University's new $17 million William L. Clay Sr. Early Childhood and Parenting Center. The 47,000-square-foot facility houses the University's Early Childhood Education unit and a childcare center for children ages six weeks through five years. The center facilitates hands-on experience in early childhood education based on the Reggio Emilio educational model, and also offers a variety of parental guidance services. The facility contains high-tech audio and video systems, and mirrored one-way glass for students and parents to observe the children from the higher education classrooms. Other amenities include a parents' library and education room, a computer lounge for students, a multipurpose room with full kitchen, smart board technology in all classrooms and a large multimedia classroom/lecture hall. The University is seeking silver LEED certification through environmentally friendly features, including a highly energy-efficient mechanical system, a rain garden, pervious pavement and recycled rubber on play surfaces to slow runoff of storm water. 17 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 PROJECT EXPERIENCE Dallas County Community College Richland Campus Improvements Construction Cost: $43 Million Initial Schedule Duration in Months: 26 Actual Construction Period in Months: 26 Date of Substantial Completion: Nov. 2009 Date of Completion of Punchlist Items: Jan 2010 Office From Which Project Administered: Dallas Project Manager’s Name: William Myrick The project included a wide scope of water reclamation features in seeking a LEED platinum certification. Client Contact: Janet James Dallas Community College District 12800 Abrams Road Dallas, TX 75243 JJames@dcccd.edu 972.238.6974 Architect Contact: Tom Reisenbichler Managing Director Perkins+Will Dallas 10100 North Central Expressway Suite 300 Dallas, TX 75231 Tom.Reisenbichler@perkinswill.com 214.283.8704 KWAME served as construction manager on the $41.9 million science building and infrastructure project at the Dallas County Community College - Richland campus in Richardson, Texas. The new 115,000-square-foot facility is home to the Richland College Bookstore and the Health and Science Placement Center programs. The new facility includes labs, classrooms, offices and student study areas to support these programs. The project also includes construction of a new coffee shop, bookstore, expanded parking, and upgrades and improvements to Richland College's mechanical infrastructure. A unique challenge was the scope of water reclamation features, which entailed nearly every aspect of the project, from the green roof and wall design to water cisterns in the parking expansion. The design of the new building is consistent with Richland College's existing architectural style and incorporates concepts from LEED and Universal Design. The college will pursue LEED Platinum certification on the building. 18 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 CURRENT WORKLOAD Customer Name, Address* Work Description Location Percentages Complete Value Start/Stop Dynegy Midwest Generation 604 Pierce Blvd. O-Fallon, IL 62269 Gateway Regional Medical Center 2100 Madison Ave. Granite City, IL 62040 The Principia 13201 Clayton Rd. St. Louis, MO 63131 Scrubber/Baghouse Civil and Concrete Prime Contractor Baldwin, IL 90% $45,000,000 03/2008 to 10/2011 Joe Kimlinger 618.206.5842 Cardiac Cath Lab Renovation Prime Contractor Granite City, IL 80% $1,187,000 05/2011 to 09/2011 Frank Hann 618.798.3842 Joe McNabb Housing Life Safety Upgrades Prime Contractor Elsah, IL 10% $1,236,706 08/2011 to 12/2011 Scott Gerber 618.374.5098 *Projects on this list are major, long-term, representative projects. This is not an all-inclusive list of outstanding work. 19 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 Firm's Contact BONDING INFORMATION 20 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 INSURANCE COVERAGES 21 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 SAFETY EMR 22 • 2009: 0.77 • 2010: 0.63 • 2011: 0.67 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 DIVERSITY Helmkamp has been committed to inclusion for three decades. Helmkamp/KWAME are committed to diversity in all of our business relationships. Specifically for this project, we are setting an objective of attaining 20% MBE/WBE participation. To accomplish this aggressive objective, Helmkamp will actively recruit MBE/WBE participation from a database of qualified contractors that we are updating on an ongoing basis. We will require the MEP&FP contractors that we select to participate have a significant MBE/WBE component, whether that is workforce, JV, or MBE/WBE qualifications of the firms’ principals. In the 1980s, Byron Farrell, father of the current president of Helmkamp and past president of AGC of America, met Sam Hutchinson, founder of Interface Construction at the Shell refinery and encouraged Sam to become a contractor. Byron served as a mentor to Sam, and established a joint venture corporation during the early years of Interface’s operation. In more recent years at Washington University, Helmkamp Vice President Rob Johnes and Project Manager Rod Feree encouraged Marion Hayes of BRK Electric as he left Guarantee Electrical to form his own company. Sandra Marks, who managed Wash U.’s diversity program, credits Helmkamp with helping to establish BRK in business. In 2007-2009 Helmkamp averaged 20% minority manhours on Wash U. projects. Tom Finan, Helmkamp’s director of business development and marketing and publisher of St. Louis Construction News & Review since 1976 has been a strong proponent of industry diversity for over 30 years. Finan, who serves on the St. Louis Council of Construction Consumers Diversity Committee, is working to further develop Helmkamp’s diversity program. As a Minority Business Enterprise (MBE), KWAME knows that a diverse business community and workforce are important to the success and competitiveness of our nation. KWAME has a longstanding commitment to M/WBE success, ensuring diversity within its workforce and among its teaming partners. Diversity has always been at the foundation of KWAME’s mission. 75 percent of our KWAME's workforce is made up of minority and female professionals - construction managers, engineers, architects, attorneys and support staff. The non-profit Kwame Foundation, Inc. has endowed well over $600,000 in academic scholarships, which enable minority students to pursue higher education at some of the nation's finest colleges and universities. 23 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 SUSTAINABILITY Helmkamp is currently recycling materials at The Principia Middle School, located on Clayton Road in West St. Louis County. We know that it is possible to implement sustainability practices without adversely affecting construction costs. For this project we will be utilizing the services of Eco-Recycling for removal of demolition and construction off-fall material. Eco-Recyling has an established partnership with owners and developers seeking LEED certification. Ninety-four percent of the material received by Eco-Rycling can be recycled into new materials or ground as filler for topsoil. Helmkamp is currently working with Eco-Recycling on the renovation and expansion of The Principia Middle School, located in West St. Louis County. We will attempt to source materials from suppliers located in close proximity to the jobsite, wherever doing so makes sound economic sense. We will coordinate on the front end of the project with a sustainability planning session with all stakeholders. We will review sustainability efforts on a regular basis throughout the project duration with BJC PD&C, the project architect, our MEP&FP subcontractors, and other project team members to determine that we are implementing best practices. We will document results. 24 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 ADDITIONAL INFORMATION ABOUT HELMKAMP/KWAME About Helmkamp: A collaborative approach to your construction needs saves you money and delivers more construction for your dollar. Helmkamp’s customer-driven focus on safety, effectiveness, efficiency, and equitable practices has created enduring relationships with our customers, who are private, professional buyers of construction for over 73 years. Helmkamp self-performs a significant portion of the work on many of its projects, which is an anomaly in today’s construction world. We understand the commitment of having skin in the game. • • • • • Safety: The safety of Helmkamp’s employees, subcontractors and customers comes first. Our safety programs, which meet or exceed all healthcare, corporate, and government standards, are constantly evolving to meet the challenges of today’s construction projects. Effectiveness: Our communication, ability to self-perform, in-depth understanding of the construction process, and proactive problem-solving give you the most effective project delivery possible. Client Focus: We understand that we won’t be the people using the project we are constructing. From the pre-construction phase, we focus on the impact of the construction process on your organization and the issues and needs of your project’s end users. Efficiency: Our experienced project management team constantly earns praise from our clients for their proactive approach to project issues. Logical scheduling, timely completion, and costefficiency are the hallmarks Helmkamp projects. Equitable Practices: We treat our clients and team members the way that we would like to be treated. We do what we say we will. Should an issue arise, our project managers deal with it immediately. About KWAME: Founded in 1991 by Anthony Thompson, Kwame Building Group is one of the nation's preeminent providers of pure construction management services. Unlike general contractors or design firms that provide construction management as an afterthought, KWAME dedicates one hundred percent of the firm's resources to ensuring each client receives a high quality project, delivered on time and within the established budget. Construction management services from KWAME provide project leadership and advice that is uncolored by any conflicting interests, on such crucial matters as: • • • • • • • Optimum use of available funds Control of the project scope of work Project scheduling and coordination Optimum use of the design and construction firms' skills and resources Avoiding delays, changes and disputes Enhancing project design and construction quality Optimum flexibility in contracting and procurement KWAME’s 75 construction managers, engineers, architects and administrative staff provide the highest level of technical, professional management services. 25 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011 26 | Principia College Central Academic Building (CAB) – CM Services October 19, 2011