New Projects West Harrow Decommissioning
Transcription
New Projects West Harrow Decommissioning
February 2015 West Harrow New Projects Livis were contracted by London Underground to undertake platform lowering and refurbishment works at West Harrow Station. Livis designed and installed a synchronized hydraulic jacking system to lower a 20m section of the existing platform 2. Eighteen computer synchronized 50 tonne jacks were installed on new reinforced concrete bases. The 20m section of platform was lowered by 90mm. The works were required to enable compliance with LU premises standard in relation to cross fall and platform train interface (PTI) step gap requirements. The lowering works were carried out during possession hours on the 22nd November 2014. Following the lowering works a 45 metre section of platform was realigned to the consented horizontal and vertical offsets. Works also include handrail strengthening and painting and installation of new stone mastic asphalt surfacing. Decommissioning This project saw Livis remove five 7.2 tonne transformer switchgear units from multiple locations across Kent and West Sussex. The switchgear was dismantled by hand into sections weighing between 1-3 tonnes, from the substation area via A-frame. Works were severely hampered by the environment and the restricted access to the buildings which hindered the removal of the units Following the safe removal of the heavy plant the substation floors were broken out to remove anchor points and made good with resin to avoid any trip hazards. Surveys were conducted to investigate for the presence of Asbestos and Polychlorinated Biphepyl (PCB’s) which are used as coolant fluids. We also removed non PCB oils. Livis have been awarded the following contracts: Crossrail Sites This contract is for the Civils and Construction works to 8 new sub-station compounds along the Crossrail route. The sites extend from Maidenhead to Shenfield. Works consist of various equipment and transformer bases, trough routes, security fencing, blast walls and retaining walls. Works will run for approximately 18 months from early 2014 to mid 2016. Mornington Terrace These works consist of the stripping of existing adverts from platform walls and make good the walls and cable covers. To complete the project new x-track advert frames will be installed. Leicester Square This project consists of the design, modification and construction of fixing brackets for X-track advert frames to four platforms. Camden Town Livis were awarded 4 RVAR platforms. The works involve installing platform humps in engineering hours to enable step free access to the carriages. Farringdon Livis were appointed the Platform Interface contractor. Works consist of re-aligning nosings stones closer to the train to close the gap between platform and train, by installing bespoke support brackets. Livis Safety Environmental and Business Award The winner of the 2014 award was announced at the Livis Christmas party on the 6th December. This years winner was Lee Petty, seen here receiving his cheque for £250 from the senior management team. Lee, our Stores Manager was nominated for his outstanding performance working to improve the HSEQ standards within the stores facility. Welcome to... The following people have joined our team over the past few months: Abbie Smith - Business Administration Apprentice Calvin Pallace - Senior Construction Manager Gwyn Jones - Quantity Surveyor Katie Lockwood - Projects Administrator Dani Aldridge - HR/Operations Assistant Bring Your Kids to Work Day On Monday 22nd December, Livis welcomed 14 very special little visitors. Often our children have wondered what we do all day whilst they are at school, so we took the opportunity to show them. Karl, Callum, Cam, Robert, Zak, Tom, Lucas, William, Kobe, Amelia, Bradley, Ashleigh, Saskia and Sienna arrived to be shown a short presentation delivered by Barry Coulson-Smith. The children then had a tour of our facility by Andy Cuthbertson. The morning was rounded off with pizza in the board room and goody bags to take away. It was an informative and fun morning with the children thoroughly enjoying the chance to see what Livis does and how their parents contribute to our success. Fundraising - Movember Barry Coulson-Smith rallied the men of Livis to participate in last years Movember, raising money for MAGIC (Medway Autistic Group & Information Centre). A wonderful charity, close to Barry’s heart that gives so much support to his and many other families with Autistic children. Three departments entered their teams of four, Estimating, Stores and Projects/Commercial. Barry set himself a target of £500.00, but with monies still coming in from friends, family and work colleagues the final figure will be circa £600.00. Barry would like to thank everyone for their generosity. With photo’s taken of each team in the Bohemian Rhapsody pose, (which Estimating took literally) Livis staff then voted for their favourite, with 47% of the vote, the winners were the Projects/Commercial team with Stores and Estimating coming in a joint second. What a wonderful effort made by all participants. Opportunities - Quantity Surveyor - Dumper Drivers - Steel Fixers - Concrete Finishers - 360 Machine Operators - Groundworkers If you know anyone who would be interested in applying for these roles please refer them to us. Further information on the job roles can be found on our website. Please contact Lauren Jones or Dani Aldridge Livis Limited Livis House Springhead Enterprise Park Springhead Road Northfleet, Kent DA11 8HJ Phone +44(0)1322 220 058 Email hr@livis.co.uk Web www.livis.co.uk Farewell to... Craig Hadley Richard Mico Who have decided to move on to pastures new. Projects/Commercial Estimating Stores 10 Year Service The following site employees celebrate10 years (or more) service with Livis. Dave Martin Martin Staunton Jason Kirby Stuart Smith Richard Tolhurst Warren Fitzpatrick Les Horlor Paul Paine Peter Corcoran Peter Fromm William Jolin Clifford Bromley Livis Limited Livis House Springhead Enterprise Park Springhead Road Northfleet Kent DA11 8HJ Phone +44(0)1322 220 058 Email info@livis.co.uk Web www.livis.co.uk
Similar documents
February 2014
can be seen here receiving their cheques for £250 from the senior management team.
More informationNew Projects Northwood Bridge MR61 Constructionline
Livis Safety Environmental and Business Award This quarter we are pleased to announce that Rob Mayatt has been nominated to be put forward for the award at the end of the year. Rob Pooley (Head of ...
More information