Datasheet Pelton - Global Hydro Energy
Transcription
Datasheet Pelton - Global Hydro Energy
smarT PTH horizontal Peltonturbine The Instant Power Plant Proven technology, the compact construction and the integrated design and manufacturing guarantees a short delivery time. The unit is prefabricated and assembled on a single skid. It is fully tested in our workshop. At site it is a matter of connecting the water and the electricity to the unit and a short and simple commissioning before power is generated. www.global-hydro.eu H [m] 500 Operation Range 2, 0 W m 1, Pelton-Turbines are used for high heads and low flow rates. They are simple, easy to control and offer an excellent efficiency in part load The smarT Pelton solution is suitable for the following conditions: 0 W m smarT PTH Peltonturbine 100 50 0 KW 0 20 KW KW 0 10 KW KW 50 50 20 50 100 Head Durchfluss Power Speed Runner Ø 70 - 245 m 70 - 660 l/s ca. 100 - 500 kW 500 - 1500 rpm 300 - 900 mm 1000 Q [m³/s] smarT - Turbines All the core components are manufactured in our workshop in Austria with the latest manufacturing technologies. Using CFD optimization we guarantee high efficiencies. We use a unique manufacturing technology for all of our Pelton runners which results in the highest quality for our customers, long life and high output. smarT Turbines are fully assembled and tested at our workshop in Niederranna (2 hours from Vienna). Scope of supply > horizontal Peltonturbine > Inlet Valve with counterweight > Synchronous Generator with direct coupled runner > Turbine Control System HEROS3 > Low Voltage Cubicle with circuit breaker > Fully assembled and tested Austria´s best Quality Global Hydro Energy GmbH | www.global-hydro.eu 4085 Niederranna 41 | Austria | T +43 7285 514-0 | E-Mail: info@global-hydro.eu