131211_SHHS_Aud_DD_Facilities Com Presn_FINAL
Transcription
131211_SHHS_Aud_DD_Facilities Com Presn_FINAL
Saint Helena Auditorium Facilities Committee: Design g Development Updates 12/11/2013 1 Planning Committee Bill McGuire Eloy Vento Todd Lee & Jack Lee Cindy Smith Ben Scinto Craig Bond Alba Arredondo Patti Coyle Pam Nadeau Alexandra Haslip Jeff Jaeger Jeff Smith Michael Rada District Superintendant Di t i t F District Facilities iliti Greystone CM District Board Member Principal Music Choral Music Drama/Music Band Director C Community it M Member b Community Member Community Member Community Member 2 II. Design Development Overview 3 Saint Helena Auditorium: First Floor Plan 4 Saint Helena Auditorium: Technical Gallery Floor Plan 5 Saint Helena Auditorium: Technical Gallery Section 6 Saint Helena Auditorium: Reflected Ceiling Plan 7 Saint Helena Auditorium: Exterior Elevations 8 Saint Helena Auditorium: Exterior Elevations 9 Saint Helena Auditorium: Exterior Elevations 10 Saint Helena Auditorium: Building Sections 11 Beringer Brothers – Old Winery, 1887 Images from Los Carneros Inn Interior Concept: Napa County Reserve 12 Saint Helena Auditorium: Interior Image - Lobby 13 Saint Helena Auditorium: Interior Image - Lobby 14 Saint Helena Auditorium: Interior Image - Lobby 15 Saint Helena Auditorium: Interior Image - Auditorium 16 Saint Helena Auditorium: Interior Image - Auditorium 17 Wall Sconce Seeded Glass/Bronze Metal Finish 33” H x 6.8” W x 4.6” D Halogen MR-16 Pedant Light Fixture Seeded Glass/Bronze Metal Finish 21 6” H x 4 21.6” 4.8” 8” L x 4 4.8” 8” W Halogen MR-16 Decorative Lighting: Lobby 18 OHR Lighting Tan ania 36 Pendant Chandelier Tanzania Clear Ripple Glass Decorative Lighting: Audience House Chandelier 19 Saint Helena Auditorium: Interior Spaces 20 Saint Helena Auditorium: Interior Image – Drama Classroom 21 Saint Helena Auditorium: Interior Image – Drama Classroom 22 Saint Helena Auditorium: Interior Image – Women’s Restroom 23 Saint Helena Auditorium: Site Plan 24 St Helena St. H l High Hi h S School h l – Field Fi ld H House Site Plan: Vicinity Aerial View 25 VII. Project Cost TOTAL APPROVED BUDGET (MEASURES B & C) $13,000,000 SCHEMATIC DESIGN PHASE COST ESTIMATE: 1ST PASS SCHEMATIC DESIGN COST ESTIMATE (EAE) $14,400,000 VALUE ENGINEERED ITEMS - $1,000,000 OPTION CONSIDERED - EAE $13,400,000 RECOMMENDATION - PAE $13,800,000 TOTAL ADDITIONAL COST OF ALTERNATES 1-4 + $1,280,000 Alt Altl Alt Alt #1 – #2 – #3 – #4 – Band Room Shell Band d Room Interior Build-out ld Storage Rooms Chiller Plant HVAC system POSSIBLE ADDITIONAL FUNDING: Donation From Public + $ 500,000 Transfer from General Bond Contingency or Developer Fees + $ 300,000 POSSIBLE REVISED PROJECT BUDGET $13,800,000 26 VII. Schedule SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS 1/24/2014 –4/24/2014 13 Weeks DSA 4/25/2014 – 8/28/2014 18 Weeks BID 2014 2013 8/29 – 10/10/2014 7 Weeks CONSTRUCTION 10/13/2014 – 1/6/2016 64 Weeks 2016 10/11/2013 – 1/24/2014 15 Weeks 2015 5/13/13– 10/10/2013 21 Weeks MOVE-IN! January 2016 27 VII. Questions 28