PEJABAT BURSAR UNIVERSITI PUTRA MALAYSIA (ARAHAN

Transcription

PEJABAT BURSAR UNIVERSITI PUTRA MALAYSIA (ARAHAN
SOK/KEW/DF041/BUY
PEJABAT BURSAR
UNIVERSITI PUTRA MALAYSIA
(ARAHAN PERBENDAHARAAN NO. 170)
DOKUMEN SEBUT HARGA B PERKHIDMATAN
No. Rujukan Sebut Harga
:
SHB/ZKB/20/2016 (14001)
Tajuk Sebut Harga
:
PERKHIDMATAN PENYELENGGARAAN GENERATOR
SET BAGI TEMPOH DUA (2) TAHUN DI FAKULTI
PERUBATAN DAN SAINS KESIHATAN, UNIVERSITI
PUTRA MALAYSIA, SERDANG SELANGOR DARUL
EHSAN
Kod Bidang
:
CIDB : ME | SIJIL SURUHANJAYA TENAGA |
KKM : 140201 / 140202
Tarikh Tutup
:
19 OGOS 2016 | 12.00 TENGAHARI
Pusat Tanggungjawab (PTJ)
:
FAKULTI PERUBATAN DAN SAINS KESIHATAN
PERKARA AM
1.
Tawaran adalah dipelawa untuk melaksanakan bekalan di atas tertakluk kepada syaratsyarat sebut harga.
2.
Sila nyatakan tempoh hantaran bagi bekalan dan tempoh penyiapan bagi perkhidmatan
yang ditawarkan.
3.
Tempoh sah laku tawaran sebut harga hendaklah tidak melebihi 90 hari (3 bulan) dari
tarikh tutup sebut harga.
4.
Penyebutharga hendaklah menyerahkan Dokumen Sebut Harga ini kepada Pusat
Tanggungjawab yang mengeluarkan sebut harga ini pada atau sebelum tarikh dan masa
yang ditetapkan.
5.
Jika diminta, penyebutharga hendaklah menyediakan katalog bagi alat-alat yang telah
ditetapkan untuk sebut harga berkenaan.
6.
Jika ruangan pada dokumen yang disediakan tidak mencukupi, penyebutharga bolehlah
menggunakan lampiran dan lampiran hendaklah ditandatangani dan dicop dengan cop
penyebutharga.
UNIVERSITI PUTRA MALAYSIA
SYARAT-SYARAT AM SEBUT HARGA
1.
Keadaan Barang
Barang-barang yang dibekalkan hendaklah tulen, baru, belum digunakan dan menepati
mutu yang telah ditetapkan.
2.
Harga
Harga yang ditawarkan hendaklah dalam Ringgit Malaysia (RM) dan merupakan harga
bersih meliputi semua kos perbelanjaan termasuk pengangkutan, pemasangan,
pembungkusan, cukai-cukai berkaitan atau lain-lain KECUALI Cukai Barang dan
Perkhidmatan (CBP/GST). Bagi penyebutharga yang berdaftar dengan JKDM, sila
asingkan harga bersih dan CBP/GST dalam Borang Tawaran Harga yang disediakan.
3.
Persetujuan
a) Universiti Putra Malaysia tidak terikat untuk setuju terima sebut harga yang terendah
atau mana-mana sebut harga;
b) Tiap-tiap satu butiran akan ditimbangkan sebagai suatu sebut harga yang
berasingan; dan
c) Keputusan UPM ke atas sebut harga ini adalah muktamad.
4.
Perakuan Menyatakan Spesifikasi Telah Dipatuhi
Penyebutharga adalah dikehendaki membuat perakuan bahawa perkhidmatan yang
dilaksanakan adalah mengikut spesifikasi atau piawai (jika ada) yang dinyatakan di
dalam pelawaan ini.
5.
Penolakan
a)
Universiti Putra Malaysia berhak menolak/menamatkan perkhidmatan yang
tidak memuaskan atau yang berlainan daripada spesifikasi yang telah
dipersetujui.
b)
Jika
Kontraktor
gagal
melaksanakan
kerja-kerja
Perkhidmatan
Penyelenggaraan itu dengan memuaskan dan sempurna UPM berhak
mengenakan penalti yang akan dikenakan dari Bayaran Perkhidmatan pada
kadar berikut:-
(i)
satu per dua puluh enam (1/26) daripada Bayaran Perkhidmatan bagi
setiap Penyelenggaraan Harian yang tidak dilaksanakan dengan
sempurna dan memuaskan.
(ii)
satu per empat (1/4) daripada Bayaran Perkhidmatan bagi setiap
Penyelenggaraan Mingguan yang tidak dilaksanakan dengan
sempurna dan memuaskan.
(iii)
kesemua Bayaran Perkhidmatan bagi setiap Penyelenggaraan
Bulanan yang tidak dilaksanakan dengan sempurna dan memuaskan.
Tidak tertakluk kepada penalti yang dikenakan di bawah Fasal 15.1 di atas
UPM boleh mengenakan denda tidak melebihi dari Ringgit Malaysia: Lima
ratus sahaja (RM500.00) jika Kontraktor gagal melaksanakan Perkhidmatan
Penyelenggaraan Setengah Tahunan atau secara berterusan gagal
melaksanakan Perkhidmatan Penyelenggaraan dengan sempurna dan
memuaskan.
6.
Tafsiran
Sebut harga ini dan apa-apa kontrak yang timbul daripadanya hendaklah diertikan
mengikut dan dikawal oleh undang-undang Malaysia dan penyebutharga bersetuju
tertakluk hanya kepada bidang kuasa Mahkamah Malaysia sahaja dalam apa-apa
pertikaian atau perselisihan yang mungkin timbul mengenai Sebut harga atau apa-apa
kontrak yang timbul daripadanya.
7.
Surat-Menyurat Dari Penyebutharga Yang Tidak Berjaya
Universiti tidak akan melayan sebarang surat-menyurat daripada penyebuthargapenyebutharga mengenai sebab-sebab sebut harga mereka tidak berjaya.
8.
Insurans
Sebelum memulakan perkhidmatan yang dipersetujui, Kontraktor hendaklah di atas kos
dan perbelanjaannya sendiri, telah mengambil insurans, dipihaknya perlu mengambil
demi menjaga kepentingannya sendiri, pekerja-pekerja dan/atau perkhidmatan yang
akan dikendalikan, di bawah kontrak ini dengan nilai yang mencukupi dan munasabah
dan seperti berikut:i)
Insurans Pampasan Pekerja dan/atau
Keselamatan Sosial (PERKESO).
berdaftar
dengan
Pertubuhan
ii)
Insurans Liabiliti awam dan harta benda, dan/atau memastikan Kontraktor telah
menepati syarat yang ditetapkan di sini, dan UPM adalah berhak dan boleh
menganggap Kontraktor telahpun mematuhi kehendak fasal ini sebaik sahaja
Kontrak ini ditandatangani.
DENGAN SYARAT LAGI Kontraktor hendaklah dan memberi akujanji dan jaminannya di
sini untuk membuat pampasan, mengganti rugi UPM, dan/atau mengecualikan UPM dari
sebarang tuntutan, perbelanjaan dan pembayaran yang mungkin dituntut oleh pihak
ketiga dan/atau mana-mana pihak sekalipun dan yang berpunca daripada kemungkinan
Kontraktor berkaitan fasal di sini.
9.
10.
Cukai Barang dan Perkhidmatan (CBP/GST)
a)
Bagi perkhidmatan, CBP/GST yang dikenakan perlu dinyatakan pada ruangan
Borang Tawaran Harga (sekiranya penyebutharga berdaftar dengan JKDM);
b)
Bagi perkhidmatan yang layak di bawah Perintah Cukai Barang dan
Perkhidmatan (Pelepasan) 2014 (P.U. (A) 273), penyebutharga yang berjaya
wajib mengemukakan Sijil Di Bawah Perintah Cukai Barang dan Perkhidmatan
(Pelepasan) 2014 bagi pelepasan pengenaan CBP/GST.
Surat Akuan Pembida
Penyebutharga dikehendaki menandatangani Surat Akuan Pembida semasa
menghantar dokumen tender ini seperti di Lampiran A. Sila lampirkan Surat Perwakilan
Kuasa bagi wakil syarikat yang menandatangani Surat Akuan Pembida.
11.
Penyerahan Sebut Harga
a)
Dokumen sebut harga yang telah dilengkapkan hendaklah dihantar ke Pusat
Tanggungjawab yang mengeluarkan tawaran.
b)
Dokumen sebut harga hendaklah sampai pada atau sebelum tarikh dan masa
yang telah ditetapkan. Dokumen yang diterima lewat daripada tarikh dan masa
yang telah ditetapkan tidak akan dipertimbangkan.
Pengesahan Penyebutharga
Syarat-syarat di atas kesemua keseluruhan daripada perkara 1 hingga 11 telah dibaca dan
saya/syarikat ini bersetuju dengannya.
…………………………………
Tandatangan & Cop Syarikat
Nama Penuh :
……………………………………………..
No. K/P
:
………………………………………….....
Alamat
:
………………………………………….....
SENARAI SPESIFIKASI SEBUT HARGA B
____________________________________________________________________________
TAJUK
PERKHIDMATAN PENYELENGGARAAN GENERATOR SET BAGI
TEMPOH DUA (2) TAHUN DI FAKULTI PERUBATAN DAN SAINS
KESIHATAN, UNIVERSITI PUTRA MALAYSIA, SERDANG SELANGOR
DARUL EHSAN
____________________________________________________________________________
A
:
INSPECTION AND MAINTENANCE SCHEDULE
1. STANDBY GENSET
MADE
: PERKINS
MODEL : 4008TAG2A
KVA
: 1000
LOCATION: BLOK MAKMAL B/ARAS 1
2. STANDBY GENSET
MADE
: CUMMINS
MODEL : QSK 23G ESN 00319891
KVA
: 800
LOCATION: PARKING AREA BLOK MAKMAL B/ARAS 1
3. STANDBY GENSET
MADE
: VOLVO PENTA
MODEL : TAD 733 GE
KVA
: 200
LOCATION:(PUSAT PENGIMEJAN & DIAGNOSTIK NUKLEAR)
1.
The contractor shall inspect, service, and testing of the complete once at every month,
except where otherwise directed by Superintending Officer. The Contractor shall also
provide emergency repair service during normal working hours and also during
overtime hours if required to do so by the UPM officer.
2.
Details Of Routine Checks :
To service, inspection, test and report on the condition of the following items:__Descriptions Work
Remarks__
a) Air cleaner Element (filter).
[
]
b) Air cleaner precleaner
[
]
c) Air cleaner restriction
[
]
d) Air intake hoses, pipes and clamps
[
]
e) Air tanks
[
]
f) Coolant level
[
]
g) Drive belts
[
]
h) Drain-Fuel water separator
[
]
i) Lubricating oil level
[
]
j) Belt tesion
[
]
k) Belt tensioner
[
]
l) Fan hub, Belt-driven
[
]
m) Coolant fiter
[
]
n) Air cleaner element
[
]
o) Cooling fan
[
]
p) Crankcase breather tube
[
]
q) Engine wiring
[
]
r) Change Fuel filters
[
]
s) Change Lubricating oil & oil filters
[
]
t) Supplemental coolant additive
[
]
u) Battery Water Level
[
]
v) Battery Terminal
[
]
i)
At every 250 hours of run OR (6 months)
To checking, test and report on the condition of the following items:a) Belt tension
[
]
b) Belt tensioner
[
]
c) Fan hub, belt(driven)
[
]
d) Coolant filter
[
]
e) Air cleaner element
[
]
f) Cooling fan
[
]
g) Crankcase breather tube
[
]
h) Engine wiring
[
]
i) Fuel filters
[
]
j) Lubricating oil and oil filters
[
]
k) Supplemental coolant additive
[
]
ii)
At every 1500 hours of run or 1 Year
To service, test and report on the condition of the following items:a) Batteries
[
]
b) Cold stard aids (seasonal)
[
]
c) Crankcase Breather (external)
[
]
d) Crankshaft end clearance
[
]
e) Engine mounting bolts
[
]
f)
Hoses, engine
[
]
g) Steam clean engine
[
]
iii) At every 6000 hours of run OR 12 Years
To service, test and report on the condition of the following items:a. Clean the cooling system
[
]
b. Check the Fan hub belt driven
[
]
c. Fan idler pulley assembly
[
]
d. Vibration damper, viscous
[
]
e. Water pump
[
]
iv) At every 10000 hours of run
To service, test and report on the condition of the following items:a. Fuel injectors-Replace
*Replace all applications with mechanically actuated
[
3.
]
Duration Period:
a) Maintenance inspection and testing will be perfomed on every month basis at flate rate
or RM……………… (RM ………………………………………………………………………
Only) per unit which cover only for workmanship and transportation.
4.
Material Need to Be Changed:
4.1.
GENERATOT SET 1000KVA, PERKINS
Item
Quantity
a) Lube Oil Filter (SFO 7570)
3 pcs
b) Air Filter (Sakura S/F A-7985)
2 pcs
c) Fuel /Water Separator (SFC-5707)
1 pc
d) Water Coolant
4.2.
Rate/Unit
Total (RM)
Rate/Unit
Total (RM)
4 bottles
GENERATOR SET 800KVA, CUMMINS
Item
Quantity
a) Lube Oil Filter(LF670)
2 pcs
b) Air Filter(AF25593)
1 pc
c) Water Filter(WF2076)
1 pc
d) Fuel Saparator (FS1006)
2 pcs
e) Water Coolant (DCA65L)
2 bottles
4.3.
GENERATOR SET 200KVA, VOLVO PENTA
Item
a) Lube Oil Filter (SFO 6214)
1 pc
b) Air Filter (C 24820)
1 pc
c) Fuel Filter (FT-731)
1 pc
d) Water Coolant
5.
Quantity
Rate/Unit
Total (RM)
1 bottle
Additional Charges /(Breakdown Services Rates):
Normal Working Hours (Standard Time) : RM………………………per hour
Overtime (Hourly)
: RM………………………per hour
Double Time
: RM………………………per hour
Mileage Charges
: RM………………………per km
Allowance
: RM………………………per man/day
B.
OTHERS ITEM
1.
Insurance/EPF and SOCSO will be responsibility of the Contractor.
2.
All workers and the supervisors shall be identified in full company uniforms.
3.
The Contractor shall provide each of its staff with security passes approved by the
UPM.
4.
The Contractor will allowed to store his belonging and tools meant for use within
UPM but the UPM bear no responsibility regarding their safety in whatever respect
at any time.
5.
All defective parts already replaced, must be produced to the Engineer or his
officers before further action are taken.
6.
Commencing and completion of work will only be recognized as done if instruction
and certifications are recorded in writing.
7.
Exemption of fine above mentioned can be granted by the Engineer or his officers
if justification can be produced by the Contractor.
8.
The Contractor shall be deemed to have visited and examined all the Airconditioning units satisfies himself as to the local conditions, accessibility, the full
extent and character of the operation, supply and conditions effecting labour and
materials, transportation of labour, materials, equipment etc.
9.
The Contractor shall at all times have in their employment sufficient numbers of
competent employee to effectively perform this contract. The Contractor shall
complied only skilled workmen to ensure the proper and efficient execution of the
work.
10. The Contractor shall, before the commencement of the contract, provide the UPM
with a list of names of the engineering staff employed for the contract. The
Contractor must encourage his staff to behave in the best manner and at all times
maintain good relations with UPM staff.
11. The Contractor shall supply all the necessary equipment, machines, instruments,
tools any materials, for the efficient execution of the work including specialized tools.
12. The UPM reserves the absolute right to engage other contractors to execute works
and / or services which in his opinion are specialized in nature or in which the
Contractor has failed to perform in accordance to the specifications. In such an
event the UPM reserves the right to deduct money due to the Contractor as
provided for in the contract.
13. All water and electricity required for the works shall be provided free of charge. The
Contractor shall exercise every effort to prevent the abuse of this privilege and to
economize in the use of water and electricity.
14. The Contractor must ensure that his staff switch off all lights and turn off taps as
soon as their work is completed.
15. Proper connections must be made to power point accordance in to the prevailing
rules and safety precautions. The Contractor shall be made liable for damages to
electrical circuits and installations of designated buildings.
16. The UPM shall have the right to instruct the Contractor to remove any of his
employees who in opinion of the UPM is considered to undesirable of unfit for
employment in the buildings or compound for security reasons.
17. The Contractor must remove all rubbish arising from the repair work and all
defective parts replaced must be shown to UPM Engineer or his officers before
permission to bring them out.
18. The Contractor shall be responsible to take all safety precautions to eliminate
danger to his workmen, the general public and property of others.
19. The Contractor must immediately notify the UPM of any damages or accident
occurring in their areas of work.
20. Servicing and the maintenance as herein provided shall be furnished by the
Contractor per two (2) years, which sum shall be paid every one (1) month after
inspection and service have been performed, and a report there on has been
submitted to the UPM.
21. This contract shall remain effective until the end of two years contract unless
terminated by either party giving one (1) month notice to the other.
22. Injury to persons – The Contractor shall indemnify government in respect of any
liability, loss, claim for proceedings whatsoever whether arising at common law or by
the statue in respect of personal injuries to or death of any person whatsoever
arising out of or in the course of caused by the execution of the works unless due to
any act or neglect of government or its servants.
23. Injury to property– The Contractor shall be liable for and shall indemnify government
in respect of any liability, loss, claim or proceedings and of any injury or damage
whatsoever arising out of or in the cause of or by reason the execution of the works
to any immovable property due to any negligence, omission or default of himself, his
agent or his servants or any authorized sub-contractor or to any circumstances
within his control.
24. The proper Stamp Duty, if any, on this contract will be borne by contractor.
SCHEDULE OF RATES:
THE SERVICING AND PREVENTIVE MAINTENANCE CONTRACT AGREEMENT OF
GENERATOR SET PER TWO (2) YEARS AT FACULTY OF MEDICINE & HEALTH
SCIENCES, UNIVERSITY PUTRA MALAYSIA, SERDANG SELANGOR DARUL EHSAN
SCHEDULE OF RATES FOR SUPPLY AND INSTALLATION OF SPARE PARTS INCLUSIVE
LABOUR CHARGE AND TRANSPORTATION.
For the case where spare parts are to be charged separately, the following schedule of rate
shall be applicable and shall be hold good during the service and maintenance contract.
Item
Description
1
Intake manifold
2
Crankcase breathers
3
Intake manifold pressure sensor
4
Intake manifold temperature sensor
5
Coolant filter
6
Engine speed sensor
7
Fuel timing pressure sensor
8
Fuel rail pressure sensor
9
Wiring harness
10
Barometric pressure sensor
11
Fuel rail dampening hose
12
Fuel rail actuator
13
Fuel shutoff valve
14
Fuel temperature sensor
15
Fuel timing actuator
16
Fuel pump pressure sensor
17
Fuel pump actuator
18
Oil pressure sensor
19
Turbocharger
20
Exhaust manifold (3-piece)
21
Rocker lever cover
22
Thermostat
Rate (RM) /each/lot/nos
Item
Description
23
Coolant temperature sensor
24
Coolant bypass tube
25
Water pump
26
Stater
27
Flywheel
28
Alternator
29
Blowby tube
30
Cooling fan drive belt
31
Drive pully
32
Oil pan
33
Oil filter catridge
34
Vibration Damper
35
(others parts, please state)
Rate (RM) /each/lot/nos
JENAMA/MODEL/BUATAN
YANG DITAWARKAN :
----------------------------------------------1.
Sila tanda
:
[ / ] jika memenuhi spesifikasi
[ x ] jika tidak memenuhi spesifikasi
2.
Sekiranya terdapat aksesories tambahan sila kemukakan keterangan spesifikasi yang
lengkap secara berasingan.
UNIVERSITI PUTRA MALAYSIA
BORANG TAWARAN HARGA
No. Rujukan Sebut Harga : SHB/ZKB/20/2016 (14001)
Tajuk Sebut Harga
: PERKHIDMATAN PENYELENGGARAAN GENERATOR SET
BAGI TEMPOH DUA (2) TAHUN DI FAKULTI PERUBATAN
DAN SAINS KESIHATAN, UNIVERSITI PUTRA MALAYSIA,
SERDANG SELANGOR DARUL EHSAN
Ukuran/
Keluasan
Bil.
Perihal
Kekerapan
1.
PERKHIDMATAN
PENYELENGGARAAN
GENERATOR SET
BAGI TEMPOH DUA
(2) TAHUN
-
1 BULAN
SEKALI
2.
PENYELENGGARAAN
MAJOR
-
6 BULAN
SEKALI
Jumlah Sebulan Tanpa CBP/GST
Jumlah Keseluruhan Tanpa CBP/GST
6% CBP/GST
Jumlah Keseluruhan Termasuk CBP/GST
Tempoh Penyiapan: ...............................................
……………………………………...
(Tandatangan Penyebutharga)
Nama dan Kad Pengenalan : ……………………………
Alamat Syarikat
: ……………………………..........
Cop Syarikat :
Tarikh :........................................................
Harga Tanpa
GST (RM)
Harga Dengan
GST
(RM)
Lampiran A
SURAT AKUAN PEMBIDA
Bagi
(PERKHIDMATAN PENYELENGGARAAN GENERATOR SET BAGI TEMPOH DUA (2) TAHUN
DI FAKULTI PERUBATAN DAN SAINS KESIHATAN, UNIVERSITI PUTRA MALAYSIA,
SERDANG SELANGOR DARUL EHSAN - SHB/ZKB/20/2016 (14001))
(Tajuk dan Nombor Sebut Harga)
Saya,……………………………………….
nombor K.P……………………………….yang
(Nama Wakil Syarikat/Nama Pemilik Syarikat)
*mewakili/memiliki………………………………….……………………………….nombor
(Nama Syarikat)
Pendaftaran……………………………..…………dengan ini mengisytiharkan bahawa
(MOF/PKK/CIDB/ROS/ROC/ROB)
saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau
memberi rasuah kepada mana-mana individu dalam Universiti Putra Malaysia atau
mana-mana individu lain, sebagai sogokan untuk dipilih dalam sebut harga seperti di
atas. Bersama-sama ini dilampirkan Surat Perwakilan Kuasa bagi saya mewakili
syarikat seperti tercatat di atas untuk membuat pengisytiharan ini.
2.
Sekiranya saya atau mana-mana individu yang mewakili syarikat ini didapati
bersalah menawar atau memberi rasuah kepada mana-mana individu dalam Universiti
Putra Malaysia atau mana-mana individu lain sebagai sogokan untuk dipilih dalam
sebut harga seperti di atas, maka saya sebagai wakil syarikat bersetuju tindakantindakan berikut diambil:
2.1
2.2
2.3
penarikan bilik tawaran kontrak bagi sebut harga diatas; atau
penamatan kontrak bagi sebut harga di atas; dan
lain-lain tindakan tatatertib mengikut peraturan perolehan Kerajaan.
3.
Sekiranya terdapat mana-mana individu cuba meminta rasuah daripada saya
atau mana-mana individu yang berkaitan dengan syarikat ini sebagai sogokan untuk
dipilih dalam sebut harga seperti di atas, maka saya berjanji akan dengan segera
melaporkan perbuatan tersebut kepada pejabat Suruhanjaya Pencegahan Rasuah
Malaysia (SPRM) atau balai polis yang berhampiran.
Yang Benar,
…………………………….
(Tandatangan)
Nama dan No. K.P.:
Cop Syarikat:
Catatan* Potong mana yang tidak berkaitan.
SENARAI SEMAKAN
(BEKALAN/PERKHIDMATAN)
Sila tandakan ( / ) Bagi Dokumen-dokumen Yang Disertakan
Bil
Perkara/Dokumen
1
Salinan Sijil Akuan Pendaftaran Dari Kementerian Kewangan
(Bekalan/Perkhidmatan)
2
Salinan Sijil Akuan Bumiputera Dari Kementerian Kewangan
(Bekalan/Perkhidmatan)
3
Salinan Sijil Akuan Pembuat Dari Kementerian Kewangan
(Bekalan/Perkhidmatan)
4
Salinan Sijil Pendaftaran CIDB
5
Surat kelulusan daripada JKDM yang menyatakan nombor pendaftaran CBP/GST
(jika berkaitan)
6
Borang Sebut Harga Telah Diisi Dengan Lengkap (termasuk nilai tawaran dan
tempoh siap) dan Ditandatangani
7
Borang Penyerahan Contoh Dan Katalog (jika berkaitan)
8
Cadangan Penyelenggaraan /Penyenggaraan (jika perlu)
9
Surat Pengesahan Dari Pengeluar/Pembuat
10
Salinan Penyata Bulanan Akaun Bank Bagi Tiga (3) Bulan Terakhir
11
Lain-lain Sekiranya Ada:....................................................................................
PENGESAHAN OLEH SYARIKAT
Dengan ini saya mengesahkan bahawa saya telah membaca dan memahami semua
syarat-syarat dan terma yang dinyatakan di dalam dokumen sebut harga. Semua
maklumat yang dikemukakan adalah benar
Tandatangan :
Nama :
Jawatan :
Tarikh :
Untuk
Ditanda
Oleh
Syarikat