SHL Presentation

Transcription

SHL Presentation
Seaway Heavy Lifting
Beatrice supply chain event – Wick 9th September 2015
Agenda
•
•
•
•
Safety
Company background
Beatrice scope of work
Supplier registration
SHL Safety philosophy
Company Safety Statement
• All injuries can be avoided. All at Seaway Heavy Lifting are
relentless in their pursuit of an Incident & Injury free (IIF)
environment.
• We are all responsible for creating and maintaining our Incident &
Injury free environment, and lead our company towards that
objective.
Safety performance and culture is a key aspect of our supplier selection process
Seaway Heavy Lifting - Background
•
•
•
•
Formed in 1991 and jointly owned by Subsea
7 and private investment Company.
Long track record in Transportation and
Installation of offshore structures in Oil and
Gas Industry
Entered Offshore Wind business in 2009 with
the installation of monopile foundations for the
SSE Greater Gabbard project in UK
Owner of 2 high specification Heavy Lift
Vessels
•
Oleg Strashnov
•
Stanislav Yudin
Seaway Heavy Lifting – Offshore Wind Experience
•
Offshore wind installation experience
•
Over 400 foundations
•
14 AC substation jackets and topsides
•
3 met masts
•
2 HVDC converter station jackets
•
1st HVDC float-over deck completed in
2014
•
Current backlog of projects in offshore
wind:
•
•
•
•
•
Statoil Dudgeon foundations and
substations
Dong Energy Race Bank, Burbo Bank
and Walney substations
Energienet substation
Iberdrola Wikinger substation
Vattenfall sandbank substation
Consolidation of Subsea 7 Renewables into SHL
In January 2013 SHL shareholders
decided to consolidate Subsea7 renewable
activities in Seaway Heavy Lifting.
• Subsea 7 personnel
seconded into SHL
• Subsea 7 will provide Project
Management, engineering and technical
expertise into SHL on a long term basis
• SHL Management team expanded
Subsea 7 Capability
Beatrice - Contracting Structure and scope
PACKAGES – 3 LOTS SPLIT EPCI
Siemens Wind
Power
WTGs
DESIGN
SUPPLY
INSTALL
DESIGN
SUPPLY
INSTALL
ARRAY CABLES
DESIGN
SUPPLY
INSTALL
OSP, POWER SYSTEMS, ELECTRICAL BOP
DESIGN
SUPPLY
DESIGN
SUPPLY
FOUNDATIONS & SUBSTRUCTURES
SHL
Scope
EXPORT CABLES
Siemens
Energy
Management
INSTALL
INSTALL
- SHL Beatrice project locations
- Glasgow – co-located in SSE Waterloo street office
- Aberdeen – based in Subsea 7 Westhill campus
- Zoetermeer NL – main SHL corporate office
Title Presentation
21 September 2015
7
Procurement and Subcontracting
SHL Procurement strategy is mainly centered around the procurement of cable supply & installation
services and foundation supply & fabrication services.
•
Time scale: cable and fabrication services have been tendered and are under evaluation.
•
SHL is always interested, especially for the Beatrice Project and the other Scottish projects, to make
use of suppliers in the region where possible and convenient for SHL.
•
In order to become involved as a local supplier SHL advise you to visit our stand for a short
introduction chat.
•
You can introduce your company and explain how to contribute your companies value to SHL
project(s).
•
We therefore would like to invite you to fill in all necessary (key) information about your company, such
as: Company name, contact persons, (core) business, etc..
•
Depending on your core business SHL could invite you to provide us with information, prices, etc., or
introduce you to our principle subcontractors.
9