Buklet Mezhdunarodnaya Eng.indd
Transcription
Buklet Mezhdunarodnaya Eng.indd
JSC “Technopromexport” Founded in 1955 Mezhdunarodnaya TPP Commissioning in 2007-2008 2 3 We are proud of technical solutions and perfect structures when a creative view catches irreproachability of lines 5 6 7 8 9 10 11 Laconism Purity Lightness 13 14 15 16 17 18 Chaos Potential Harmony 20 21 22 23 Man City Power 25 26 27 28 29 30 Shape Color Space 32 onstruction of a unique Moscow City International cycle technology and elaborated configuration of the main Business Center is carried out in Moscow. It equipment allow to reach efficiency up to 54%. C is planned that the area of 100 hectares will The first unit of the power plant is constructed on the accommodate up to 5 mln sq. m. of offices, hotels, stores, basis of two SGT-800 gas turbines produced by Siemens with recreational areas. For the first time in Russia and Eastern electric capacity of 45,6 MW each, steam turbine MP-16DH Europe the business zone combining business, residential and with capacity of 30 MW (Siemens), as well as busy and back- recreational activities is created. Moscow’s primary task is to up water boiler KVGM-151,2-150 with capacity of 130 Gcal/hr provide supply of electric power for this grand project. manufactured by ZAO “Energomach” (Belgorod). The second Under Moscow authorities’ initiative the first investment IPP project in Russia’s capital was launched. Technopromexport as a construction investor of unit is identical to the first one as far as the main equipment is concerned with a slight difference in capacity of gas turbines (116 MW total) and the boiler output (120 Gcal/hr). Mezhdunarodnaya TPP for the first time not only in Moscow Technical parameters of the first unit: Electric but also in Russia built the power plant under BOO (Build-Own- capacity operation – 8150 hrs., Annual electric power output Operate) scheme. – 932,46 mln kW·hr, thermal capacity operation – 2629 hrs., In 2007 the first generating unit was put into operation in a record time for this kind of projects – 18 months. With Annual heat output – 539,00 thousand Gcal, Annual fuel consumption – 271,95 thousand tons. completion of the second unit by the end of 2008 the power The main building of the first unit is characterized by plant will start operating as an unified power generating facility. space-saving placement of the main and auxiliary equipment. The power plant with electric capacity of 236 MW and thermal Dry air coolers to feed out the excess heat as well as cooling energy of 490 Gcal/h will allow to sufficiently provide Moscow systems of various equipment such as oil systems of gas City Business Centre with power and heat supply. turbines, steam turbines, boosters are located on the roof of The design of Mezhdunarodnaya TPP is provided for the most cut-edge solutions in electric power sector. Combined- the turbine room. 33 34 2008 © фото и дизайн: griffel.ru ry air cooler is equipped with automatic operations are required during the start-up and operation of turning blinds controlling a flow of cooling the plant. The management and control over the equipment is air against the temperature of cooling water. done through computer network by operators from the main D These design and technical solutions helped to significantly decrease a number of circulation system pipes, cables, as well as reduce the noise. control room. Due to the hard construction conditions in a densely built-up urban area Technopromexport had to face a number The electro-mechanical equipment at the power plant of difficulties such as lack of on-site storage facilities, handling is controlled by frequency control system allowing to increase of the oversize loads. Technopromexport introduced an hourly operation period and reduce auxiliaries power consumption. equipment delivery schedule and carried out installation of the The up-to-date water treatment membrane technology provides the sufficient quality of water considering the spacesaving size of the power plant’s treatment unit. equipment under just-in-time system. Mezhdunarodnaya TPP is the best possible solution for utility power sector of big cities and regional centers as the The electric power transmission voltage is 20 kV and construction site space meets the most demanding require- 110 kV. The complete SF6 breaker switchgear is one of the ments of urban densely built-up area. The 120 MW power plant latest and requires very small operational costs. For the first construction site and facilities occupy the area of 1.11 and 0.635 time small-size solid three-phase polymeric filler buslines hectares correspondingly which is comparable with a regional were installed at Mezhdunarodnaya TPP. thermal power plant for a big residential area. The important The plant’s main equipment has local control systems thing is that CCGT-120 can be installed in a direct vicinity of the united in one control system. Due to the high automation level consumers and be part of new residential areas. The ecological of the main and electro-technical equipment very few manual indices of the power plant meet the strictest world standards. 35