5-17-2011 LCPC minutes
Transcription
5-17-2011 LCPC minutes
LIBERTY CONSOLIDATED PLANNING Co iMISSION AGENDA ITEMS FOR MAY 17,2011 The meeting begins at 4:30 p.m. in the Courthouse Annex Call to Order----------------------------------------------Donald L. Hartley, Sr., Chairman Approval of Minutes-------------------------------------Donald L. Hartley, Sr., Chairman Final Agenda ---------------------------------------------"Sonny" Timmerman, Secretary 1.0 OLD BUSINESS (PUBLIC HEARING OPEN) 1.1 Old Business Items 2.0 NEW BUSINESS 2.1 Consent Agenda Item (None) 2.2 Ordinances (None) 2. 3 Rezoning Petition Hinesville a) Rezoning Petition 2011-009-H. Request submitted by Thomas J. Ratcliffe, applicant, on behalf of the Michael E. Bryant Life Trust, to rezone 7.82 acres of land, more or less, from RA-l (Multi-family District) to C-2 (General Commercial District) for the purpose of mixed use commercial area for office and restaurant use. This propeliy is located at 730 South Main Street in Hinesville and fUliher described as LCTM-Parcel OS8A 033. Liberty County Rezoning Petition 2011-11-LC and Conditional Use Petition 2011-012-LC- Request submitted Clyde Usher, owner, to rezone 6.74 acres of land , more or less, from A-I (Agricultural District) and AR-l (Agricultural Residential District) to AR-l (Agricultural Residential District). Concurrently with this request is conditional use petition requesting a small retail commercial business (small craft business).This property is fUliher described as LCTM-Parcel 236 010. PUBLIC HEARING CLOSED 2.4 Site Plans, Preliminary and Final Plats a) Site Plans b) Preliminary Plats • Independence Settlement Phase B2 Page 1 of 1 c) Final Plats • Griffin Park Phase 3 d) Other: General Development Plan 3.0 4.0 4.1 5.0 GENERAL PUBLIC COMMENTS OTHER COMMISSION BUSINESS Executive Director' s Report ADJOURN Page 2 of 1 Liberty Consolidated Planning Commission CHAIR Donald L. Hartley, Sr. COMMISSIONERS VICEnlAIR Sarah Baker Don Emmons Marshall Kennemer Lynn Pace Josep h Pittman Durand Standard Jack Shuman ASST. VICE CHAIR AI Padrick SECRETARY Sonny Timmerman The Liberty Consolidated Planning Commission met on May 17,2011 at 4:30 PM in the Liberty County Annex Building. The Meeting was called to ordcr by Chairman Hartley. The agenda was approved as published. The minutes from the previous meeting were approved; Chairman Hartley abstained. COMMISSIONERS PRESENT: Don Hartley Don Emmons Durand Standard Marshall Kennemer Lynn Pace Sarah Baker Joseph Pittman Jack Shuman ABSENT: AI Padrick OTHERS PRESENT: H.E. "Sonny" Timmerman, Executive Director Rachel Hatcher, Transportation and Land Use Planner Gabriel Hartage, Zoning Administrator Alissa Davis, Planning Assistant Abe Nadji, Director of Engineering Curies Butler, Engineering Inspector Jeff Ricketson, FSGMP Director Donna Shives, Recording Secretary OLD BUSINESS (PUBLIC HEARING OPEN).None NEW BUSINESS Rezoning Petition Hinesville Rezoning Petition 2011-014-H. Request submitted by Thomas J. Ratcliffe, applicant, on behalf of the Michael . Br yant Life Trust, to rezone 7.82 acres ofland, more or less, from RA- l (Multi-family District) to C-2 (General Commercial District) for the purpose of mixed use commercial area for office and restaurant use. This property is located at 730 South Main Street in Hinesville and further described as LCTM-Parcel OSSA 033. Gabriele Hartage gave the presentation. This is the very conceptual plan. Traffic issues are discussed. This use conforms to the Comprehensive Plan. Traffic will increase and design of traffic movements and number of access points will be very crucial. Staff recommendation is approval with standard LCPC conditions and special conditions: • Site layout plan needs to be approved by LCPC Commissioners and Hinesville Mayor and Council to ensure the most advantageous traffic circulation, movements and access point(s) especially in regards to traffic on South Main Street. • Preliminary LCPC reviews find a singular access point off of South Main Street and off Frank Cochran Drive to be the most sensible approach; in addition restriction to "right in and right out only" movements onto Main Street also appears to be the most logical and appropriate solution from a traffic standpoint. • Site Plan shall also seriously consider the preference on having commercial buildings closer to the road and parking to the rear as it is emphasized throughout Liberty County Consolidated Comprehensive Plan Agenda. Access to this parcel from Wal-Mart was discussed. This project could warrant a signal. Tom Ratcliffe, trustee for the Michael Bryant Life Trust, stated there is a written agreement with Lowes for access. The ditched right-of-way on Frank Cochran is approximately 200 feet. Marcus Sack, PC Simonton, stated the city is looking at the traffic situation. No one spoke in opposition. After discussion, Chairman Hartley asked for recommendation . MOTION: Joseph Pittman made the Motion to Approve with staff recommended LCPC Standard Conditions (see attached addendum) and Special Conditions. SECOND: Jack Shuman VOTE: Unanimous Liberty County Rezoning Petition 2011-11-LC and Conditional Use Petition 2011-012-LC- Request submitted Clyde Usher, owner, to rezone 6.74 acres ofland, more or less, from A-I (Agricultural District) and AR-I (Agricultural Residential District) to AR-l (Agricultural Residential District). Concurrently with this request is Conditional Use petition requesting a small retail commercial business (small craft business).This property is further described as LCTM-Parcel 236 010. Alissa Davis gave the presentation . There are two actions and should be considered separately. The parcel has two zonings; this will clean up the zoning. The business will only be open I to 2 days per week. Liberty County Zoning Ordinance allows small retail commercial establishments as a Conditional Use upon the approval of the governing authority. Due to the large amount of acreage included with this parcel and the low intensity commercial use, a buffer will not be necessary. Staff recommendation is approval for the Rezoning petition 2011-011 - LC with Standard Conditions. Staff recommendation is approval for the Conditional Use Petition 2011-012 - LC with Standard Conditions. Clyde Usher, Petitioner, stated she currently does crafts in her barn and wants to use the barn to sell her crafts. No one spoke in opposition. After discussion, Chairman Hartley asked for recommendation. MOTION: Jack Shuman made the Motion to Approve Rezoning Petition 2011-011-LC with staff recommended LCPC Standard Conditions (see attached addendum). SECOND: Lynn Pace Unanimous VOTE: MOTION: Jack Shuman made the Motion to Approve Conditional Use Petition 2011-012-LC with Staff recommended LCPC Standard Conditions (see attached addendum). SECOND: Durand Standard VOTE: Unanimous PUBLIC HEARING CLOSED Site Plans, Preliminary and Final Plats Site Plans Vaden Nissan. Flemington Commissioner Standard recused himself; he is representing an affected property owner. Alissa Davis gave the presentation. The proposal is for Vaden Nissan Dealership site and other future commercial development. This proposal is for two parcels of land adjacent to Patriots Trail and US Hwy 84 in the City of Flemington. The Developer is Vaden Automotive Group; Engineer is Thomas-Hutton Engineering. The total Acreage is 4.58. Parcell (Vaden Nissan) is 2.60 acres. Parcel 2 (Future Commercial) is l.98 acres. The disturbed acreage is 4.58. The existing 60 feet access easement along south portion of property will be used by Century Link and Vaden Nissan dealershi p. A large portion of this site is located inside the 100 year flood hazard area. The developer is proposing to mitigate a portion of the site area to compensate for the filling inside flood hazard area. The mitigation area combined with detention will be located on parcel 2. The following approvals are pending: • GDOT • NRCS • Drainage Sonny Timmerman stated this has already been submitted to FEMA to remove this site fro m the flood hazard area. Two ways to mitigate the easement were discussed. Bill Daniel, who prepared site plan for Vaden Nissan, stated they are on a tight time line; there intent is to work out an acceptable change to meet the access concerns. Durand Standard, representing Century Link, stated they did not want to hold the project up. Another option is this was approved contingent on FEMA flood miti gation. The volume of water the pond could handle was discussed. Staff Recommendation is Approval with Standard and Special Conditions: • Flow easement agreement documents between the two properties are required. • The existing access road width should be negotiated with the CenturyLink to be reduced to 40 feet in order to allow portion of the detention/mitigation pond and landscaping remain as designed. • The access easement shared by Nissan and CenturyLink should be recorded. No one spoke in opposition. After discussion, Chairman Hartley asked for recommendation. MOTION: Jack Shuman made the Motion to Approve with staff recommended LCPC Standard Conditions (see attached addendum) and the following Special Conditions: • Flow easement agreement documents between the two properties are required. • The existing access road width should be negotiated with the Century Link to be reduced to 40 feet in order to allow portion of the detention/mitigation pond and landscaping rema in as designed or as agreed to by both parties and LCPC. • The access easement shared by Nissan and Century Link should be recorded. SECOND: Don Emmons YOTE: Unanimous; Durand Standard recused himself from this action item. Preliminary Plats Independence Settlement Phase B2 Gabriele Hartage gave the presentation. The developer is Horse Creek partners, Clay Sikes, Hinesville, Georgia. The engineer is PC Simonton & Associates, Hinesville, Georgia. This Phase B2 is for single family detached homes on 40 lots. The Total Acreage: is 42.17, Disturbed Acreage is 25.50, and Wetland Acreage is 14.38. This is an extension of Marne Boulevard Past existing Pump station at Independence Settlement. There are no utilities in the ground. Access is by turning at the Columns to get to this project. The following approvals have been received for Phase B-2 : ~ NRCS approval on April 06, 2011. • EPD approval on sanitary sewer and NPRL May 10,2011. • EPD approvals on potable water system is still pending. • Storm water drainage approval has not been issued until all required approvals are received . Staff Recommendation is Approval with Standard LCPC Conditions and Special Conditions: • The proposed utilities shall not be installed until all approvals have been obtained. • The developer has agreed to correct the sewer line sags in Marne Boulevard while they install the proposed sewer system. After discussion, Chairman Hartley asked for recommendation. MOTION: Don Emmons made the Motion to Approve with staff recommended LCPC Standard Conditions (see attached addendum) and Special Conditions. SECOND: Joseph Pittman Don Emmons, Joseph Pittman, Durand Standard, Sarah Baker, Lynn Pace, and Jack Shuman YOTE: voted to approve; Marshall Kennemer voted against. Final Plats Griffin Park Phase 3 Gabriele Hartage gave the presentation. The preliminary plat was approved by the City of Hinesville March, 2011. This proposed final plat contains 40 lots. The developer is Dryden Enterprises, Hinesville, GA. The engineer is PC Simonton and Associates. The Total Acreage is 7.65; Total Wetland Acreage is 1.61 . It is located on the North side of Grandview Drive and Wyckfield Way in Griffin Park Subdivision. The developer is requesting approval of a final plat for 40 lots in the Griffin Park Planned Unit Development. The minimum infrastructure; drainage, sewer, water, NPRL has been completed. Prior to final plat approval by the City of Hinesville, all curb & gutter and road base have to be completed and pass final inspection. Staff Recommendation is Approval with Standard LCPC Conditions and Special Conditions: • Prior to consideration by the Governing Authority, the maintenance Bond for an amount of $49,972.50 to be su bmitted . • Prior to consideration by the Governing Authority, a performance Bond for an amount of $46,590.00 to be submitted for Sidewalks, Signage, lighting, and HIC ramps. • Prior to consideration by the Governing Authority, a performance bond for an amount of $15 ,600.00 to be submitted for Street Trees. • Items 2 and 3 must be completed within two (2) years after final approval by the Governing Authority. Chairman Hartley stated the banks are not able to carry some developers bonds. They approve small lot developments and not burden developer with the large amount for bonds. After discussion, Chairman Hartley asked for recommendation. MOTION: Jack Shuman made the Motion to Approve with staff recommended LCPC Standard Conditions (see attached addendum) and Special Conditions. SECOND: Durand Standard VOTE: Unanimous Other: General Development Plan. None GENERAL PUBLIC COMMENTS. None OTHER COMMISSION BUSINESS Executive Director's Report Alissa Davis presented the Commissioners with a possible solution to the dO\\TJ110ading of meeting materials. Staff will work to see if there is a better way to get this information to the Commissioners. Street name changes for Guyett Estates at Griffin Park Sonny Timmerman stated one of the street names was changed to Guyett Avenue . Several staff members will be in Superior Court next week for a civil suit with issues at Sunbury. They are not party to the suit; they wi ll present information only. ADJOURN There being no other business to discuss, a motion was made to adjourn. 2£<:r: ' Attest: H.E . " Sonny" Ti mmerman , Secretary to the Board Addendum Standard LCPC Conditions: 1. The applicant must obtain all required local, state and federal licenses and permits prior to commencement of any construction 2. All plans, documents, materials, and statements contained or implied in this application are considered to be a condition of this action 3. No change or deviation from the conditions of approval are allowed without prior notification and approval of the Director of the LCPC or the Planning Commission, and the approving governmental authority