londra – lavori di adeguamento dell`immobile demaniale da
Transcription
londra – lavori di adeguamento dell`immobile demaniale da
Direzione Generale per l’Amministrazione, l’Informatica e le Comunicazioni Ufficio III Unità Tecnica LONDRA – LAVORI DI ADEGUAMENTO DELL’IMMOBILE DEMANIALE DA DESTINARE A NUOVA SEDE DEL CONSOLATO GENERALE Documento Preliminare di Progettazione (DPR 554/99 art. 15 c. 4 e 5 DPR 207/2010 art. 15 c. 5 e 6) SOMMARIO 1. PRECISAZIONI DI NATURA PROCEDURALE............................................................ 4 1.1. a) la tipologia di contratto individuata per la realizzazione dell’opera o del lavoro .. 4 1.2. b) se per l’appalto si seguirà una procedura aperta, ristretta o negoziata................... 4 1.3. c) se il contratto sarà stipulato a corpo o a misura, o parte a corpo e parte a misura. 4 1.4. d) se in relazione alle caratteristiche dell'oggetto del contratto, verrà adottato il criterio di aggiudicazione al prezzo più basso o dell’offerta economicamente più vantaggiosa............................................................................................................................. 4 2. INDICAZIONI COMPLEMENTARI................................................................................ 4 2.1. a) della situazione iniziale e della possibilità di far ricorso alle tecniche di ingegneria naturalistica .......................................................................................................... 4 2.2. b) degli obiettivi generali da perseguire e delle strategie per raggiungerli ................ 5 2.3. c) delle esigenze e bisogni da soddisfare ................................................................... 5 2.4. d) delle regole e norme tecniche da rispettare............................................................ 6 2.4.1. Leggi italiane...................................................................................................... 6 2.4.2. Principali leggi del Regno Unito........................................................................ 7 2.4.3. Norme tecniche .................................................................................................. 7 2.5. e) dei vincoli di legge relativi al contesto in cui l’intervento è previsto .................... 7 2.6. f) delle funzioni che dovrà svolgere l’intervento ....................................................... 7 2.7. g) dei requisiti tecnici che dovrà rispettare ................................................................ 7 2.7.1. requisiti inerenti la sicurezza.............................................................................. 7 2.7.1.1. security ....................................................................................................... 7 2.7.1.2. safety .......................................................................................................... 8 2.7.2. requisiti di sostenibilità ...................................................................................... 8 2.7.2.1. strategie per il risparmio energetico ........................................................... 8 2.7.2.2. strategie per ridurre l’impatto ecologico dell’attività costruttiva............... 8 2.7.2.3. strategie per migliorare la salubrità e qualità ecologica dell’ambiente costruito 8 2.7.3. strutture............................................................................................................... 9 2.7.4. impermeabilizzazioni ......................................................................................... 9 2.7.5. impianti tecnologici............................................................................................ 9 2.7.5.1. impianto elettrico........................................................................................ 9 2.7.5.1.1. fem........................................................................................................... 9 2.7.5.1.2. illuminazione......................................................................................... 10 2.7.5.2. impianti meccanici ................................................................................... 10 2.7.5.2.1. idrico-sanitario ...................................................................................... 10 2.7.5.2.2. produzione acqua calda ......................................................................... 10 2.7.5.2.3. distribuzione gas.................................................................................... 10 2.7.5.2.4. riscaldamento e condizionamento ......................................................... 10 2.7.5.2.5. impianti elevatori................................................................................... 10 2.7.5.2.6. gru per pulizia facciate .......................................................................... 10 2.7.5.3. impianti speciali ....................................................................................... 10 2.7.5.3.1. antincendio ............................................................................................ 10 2.7.5.3.2. telefonico ............................................................................................... 10 2.7.5.3.3. LAN....................................................................................................... 10 2.7.5.3.4. accessibilità ........................................................................................... 11 2.7.5.4. sicurezza ................................................................................................... 11 2.7.5.4.1. gestione degli accessi ............................................................................ 11 2.7.5.4.2. serrature con badge................................................................................ 11 -2- 2.7.5.4.3. allarme................................................................................................... 11 2.7.5.4.4. TV circuito chiuso ................................................................................. 11 2.7.5.4.5. illuminazione esterna............................................................................. 11 2.7.6. finiture .............................................................................................................. 11 2.7.6.1. rivestimenti interni ................................................................................... 11 2.7.6.2. rivestimenti esterni ................................................................................... 12 2.7.6.3. infissi ........................................................................................................ 12 2.7.6.4. arredi......................................................................................................... 12 2.7.7. requisiti funzionali di particolari destinazioni d’uso........................................ 12 2.7.7.1. sale riunioni .............................................................................................. 12 2.7.7.2. sale attesa.................................................................................................. 12 2.7.7.3. caffetteria.................................................................................................. 12 2.7.7.4. archivi....................................................................................................... 12 2.7.7.5. servizi igienici .......................................................................................... 13 2.7.8. abitabilità.......................................................................................................... 13 2.7.9. sicurezza del luogo di lavoro............................................................................ 13 2.7.10. accessibilità ...................................................................................................... 13 2.7.11. requisiti inerenti la cantierizzazione................................................................. 13 2.8. h) degli impatti dell’opera sulle componenti ambientali e nel caso degli organismi edilizi delle attività ed unità ambientali ............................................................................... 13 2.9. i) delle fasi di progettazione da sviluppare e della loro sequenza logica nonché dei relativi tempi di svolgimento................................................................................................ 14 2.10. l) dei livelli di progettazione e degli elaborati grafici e descrittivi da redigere ... 14 2.11. m) dei limiti finanziari da rispettare e della stima dei costi e delle fonti di finanziamento ....................................................................................................................... 14 2.12. n) del sistema di realizzazione da impiegare (DPR 207/2010 Parte II Titolo V). 16 3. ALTRE INFORMAZIONI............................................................................................... 16 3.1. fonti .......................................................................................................................... 16 3.2. modifiche del quadro esigenziale ............................................................................. 16 3.3. categorie e classifiche: ............................................................................................. 16 3.4. requisiti dell’impresa esecutrice:.............................................................................. 16 3.5. elaborati da produrre (a cura dell’impresa ) successivamente all’approvazione del progetto esecutivo ................................................................................................................ 16 3.5.1. elaborati costruttivi........................................................................................... 16 3.5.2. elaborati as-built............................................................................................... 17 3.6. proprietà dei progetti e tutela del diritto d’autore .................................................... 17 3.7. direzione lavori e collaudo ....................................................................................... 17 3.8. varianti in corso d’opera........................................................................................... 17 3.9. informazioni generali ............................................................................................... 17 3.10. allegati .................................................................................................................. 17 -3- 1. PRECISAZIONI DI NATURA PROCEDURALE 1.1. a) la tipologia di contratto individuata per la realizzazione dell’opera o del lavoro Contratto di appalto pubblico di lavori, di cui all’art. 53 del Decreto legislativo 12 aprile 2006, n. 163: Codice dei contratti pubblici relativi a lavori, servizi e forniture in attuazione delle direttive 2004/17/CE e 2004/18/CE (d’ora in avanti: Codice), come definito all’art. 3. 1.2. b) se per l’appalto si seguirà una procedura aperta, ristretta o negoziata Procedura ristretta di cui agli articoli 54 e 55 del Codice, come definita all’articolo 3. 1.3. c) se il contratto sarà stipulato a corpo o a misura, o parte a corpo e parte a misura Il contratto sarà stipulato a corpo. 1.4. d) se in relazione alle caratteristiche dell'oggetto del contratto, verrà adottato il criterio di aggiudicazione al prezzo più basso o dell’offerta economicamente più vantaggiosa In relazione alle caratteristiche dell'oggetto del contratto, verrà adottato il criterio di aggiudicazione dell’offerta economicamente più vantaggiosa. 2. INDICAZIONI COMPLEMENTARI 2.1. a) della situazione iniziale e della possibilità di far ricorso alle tecniche di ingegneria naturalistica In considerazione dell’assoluta inadeguatezza, ampiamente documentata in atti, della sede attuale del Consolato d’Italia a Londra (38 Eaton Place, 134/136 Buckingham Palace Road), e della prossima scadenza (2018) del long lease che ne costituisce titolo di possesso, nonché in vista della prossima chiusura del Consolato d’Italia a Manchester, lo Stato Italiano (Ministero degli Esteri) ha proceduto all’acquisto, sul libero mercato, della piena proprietà (freehold) di un edificio sito in 83-86 Farringdon Street, London EC4 di 7 elevazioni fori terra più un piano interrato, di superficie lorda complessiva pari a circa 2.000 m2 (superficie netta uffici m2 1.285,9). L’edificio, costruito nel 1954 e ristrutturato nel 1986, ha una struttura intelaiata in ferro e calcestruzzo, che non presenta segni visibili di sofferenza o affaticamento. Dalle informazioni acquisite presso il locale City District Surveyors Office, la struttura è tutt’ora rispondente alle vigenti norme applicabili, e le capacità di carico risultano adeguate alle funzioni da insediare, anche con riferimento alle norme italiane (NTC08). A titolo di massima garanzia è in corso di svolgimento un test di carico su due orizzontamenti tra quelli che si prevedono maggiormente sollecitati. Le finiture, al contrario, si presentano nella massima parte fortemente degradate e non più utilizzabili: pavimenti, rivestimenti, controsoffitti, pareti divisorie, infissi interni devono essere rimossi e sostituiti. Anche degli infissi esterni, degradati e deficienti sotto il profilo energetico, è consigliata la sostituzione. -4- Relativamente alle impermeabilizzazioni aeree e contro terra, benché non si rilevino importanti infiltrazioni in atto, è auspicabile un intervento complessivo di manutenzione straordinaria. Da un’analisi specifica condotta in sede di acquisto è risultata la presenza sporadica di materiali nocivi, che sono stati mappati con precisione e dovranno essere rimosse in accordo alle norme locali di settore. Per quanto concerne gli impianti tecnologici, sono al termine del ciclo vitale tutti gli apparecchi (lampade, prese elettriche, fan-coils, sanitari ecc.) e le reti di distribuzione. Sono in corso approfondite indagini per valutare la possibilità di mantenere e riutilizzare le centrali impiantistiche (punti di erogazione, quadro generale, caldaia, torri di raffreddamento, ecc.). In corso di istruttoria di acquisto è stato acquisito un certificato di efficienza energetica dell’edificio, che ha attestato l’appartenenza alla classe G (punteggio: 153 cfr. www.communities.gov.uk/epbd). L’edificio è pertanto da ritenersi totalmente carente sotto il profilo dell’efficienza energetica dell’involucro. L’edificio non dispone di superfici esterne non edificate. Possibilità di far ricorso alle tecniche di ingegneria naturalistica: non pertinente. 2.2. b) degli obiettivi generali da perseguire e delle strategie per raggiungerli L’obiettive dell’intervento è di rendere l’edificio in oggetto idoneo allo svolgimento delle attività consolari cui è destinato, rispondente alle norme tecniche vigenti applicabili e adeguato alla sicurezza degli utenti. La strategia individuata prevede l’effettuazione di lavori di manutenzione straordinaria e ristrutturazione, previa effettuazione di un progetto che ne preveda la messa a norma con riferimento alle norme tecniche e procedurali italiane e britanniche, in quanto applicabili. Si auspica un miglioramento dell’efficienza energetica dell’involucro edilizio; indicativamente si ritiene conseguibile una prestazione collocabile in classe C (51-75), salvo una richiesta di migliore performance in sede di approvazione del progetto da parte delle autorità locali preposte. Particolare attenzione dovrà essere riservata alla manutenibilità dell’edificio e delle sue parti, nonché alla comodità di pulizia, anche dell’esterno e delle facciate. 2.3. c) delle esigenze e bisogni da soddisfare L’edificio dovrà ospitare postazioni di lavoro e spazi di ricezione al pubblico adeguati ai servizi consolari resi dal Consolato Generale a Londra, che riceverà nel corso del prossimo autunno personale e utenza del Consolato d’Italia a Manchester. Nel dettaglio sono previsti i seguenti servizi: Ufficio del Console Generale: 4 unità di personale, pubblico occasionale con invito, sala riunioni e attesa; Ufficio amministrativo e informatico: 7 unità di personale, pubblico occasionale con invito; Ufficio passaporti + cassa: 9 unità di personale, circa 100 utenti/g con picchi di 35 in attesa; Ufficio visti: 5 unità di personale, circa 30 utenti/g con picchi di 10 in attesa; Ufficio notarile/aire/stato civile: 19 unità di personale, circa 80 utenti/g con picchi di 15 in attesa; alcuni dei servizi necessitano di privacy; Servizi sociali: 3 unità di personale, circa 10 utenti/g con picchi di 4 in attesa; Ufficio scuole e dirigente scolastico: 6 unità di personale, pubblico occasionale con invito; Archivio: 4 unità di personale, nessun pubblico, 800 ml di scaffalature; Controllo, centralino, accoglienza: 6 unità di personale; Personale di pulizie, manutenzione, guardiania, autisti hanno stanze di appoggio. Locali impiantistici, servizi igienici pubblico e personale, cucina/sala pausa, depositi. -5- Occorre prevedere ingressi e percorsi quanto più possibile separati per il pubblico e il personale; l’Ufficio del Console Generale è area riservata e chiusa con ingresso controllato, e così pure l’archivio. Il back-office dei servizi passaporti e visti è permanentemente interdetto all’accesso al pubblico. Ulteriori dettagliate misure di sicurezza standard degli uffici periferici del MAE saranno comunicati da parte del RUP in sede di stesura delle varie fasi di progetto, oppure saranno ordinate dagli enti (italiani e britannici) preposti all’approvazione. Possono essere collocate al di sotto del piano di campagna le seguenti funzioni: archivio, depositi, locali impiantistici, locali di appoggio (pulizie guardiania ecc.), cucina. Le restanti funzioni devono essere collocate fuori terra. 2.4. d) delle regole e norme tecniche da rispettare In caso di discrepanza tra la norma italiana e quella britannica, ove le relative quantità siano confrontabili si assumeranno i valori a vantaggio di sicurezza o confort o sostenibilità. Ove invece le previsioni normative siano palesemente conflittuali, sarà redatto a cura del progettista apposito studio analitico, da sottoporre al Responsabile del procedimento, che provvederà ai necessari approfondimenti, se del caso interessando le competenti autorità (organi di vigilanza, autorità sanitarie, urbanistiche, vigili del fuoco ecc.) sino alla definizione di una risoluzione pienamente soddisfacente per la qualità dell’opera. 2.4.1. - - - Leggi italiane L. 20 marzo 1865, n. 2248: Legge fondamentale opere pubbliche (Allegato F). R.D. 18 novembre 1923, n. 2440: Nuove disposizioni sull'amministrazione del patrimonio e sulla contabilità generale dello Stato; R.D. 23 maggio 1924, n. 827: Regolamento sulla contabilità generale dello stato; D.M. 16 febbraio 1982: Elenco attività soggette a certificato di prevenzione incendi; L. 7 dicembre 1984, n. 818: Norme sulla prevenzione incendi; L. 9 gennaio 1989, n. 13: Disposizioni per il superamento e l'eliminazione barriere architettoniche; D.M. 14 giugno 1989, n. 236: Regolamento per il superamento eliminazione barriere architettoniche; L. 5 marzo 1990, n. 46: Norme per la sicurezza degli impianti; L. 9 gennaio 1991, n. 10: Norme per il Piano energetico nazionale e il risparmio energetico; D.P.R. 6 dicembre 1991, n. 447: Regolamento di attuazione legge n. 46 del 1990; D.P.R. 26 agosto 1993, n. 412: Regolamento recante norme per la progettazione, l'installazione, l'esercizio e la manutenzione degli impianti termici degli edifici ai fini del contenimento dei consumi di energia; D.P.R. 12 gennaio 1998, n. 37: Regolamento recante disciplina dei procedimenti relativi alla prevenzione incendi; Ministero dei lavori pubblici - Decreto 19 aprile 2000, n. 145: Regolamento recante il capitolato generale d'appalto dei lavori pubblici, ai sensi dell'articolo 3, comma 5, della legge 11 febbraio 1994, n. 109, e successive modificazioni; D.P.R. 6 giugno 2001, n. 380: Testo unico delle disposizioni legislative e regolamentari in materia edilizia; D. Lgs. 19 agosto 2005, n. 192: Attuazione della direttiva 2002/91/CE relativa al rendimento energetico nell'edilizia; Decreto legislativo 12 aprile 2006, n. 163: Codice dei contratti pubblici relativi a lavori, servizi e forniture in attuazione delle direttive 2004/17/CE e 2004/18/CE; D.M. 14 gennaio 2008: Approvazione delle nuove norme tecniche per le costruzioni; D.M. 22 gennaio 2008, n. 37: Regolamento in materia di attività di installazione degli impianti all'interno degli edifici; -6- - D.Lgs. 9 aprile 2008, n. 81: Attuazione dell'articolo 1 della legge n. 123 del 2007, in materia di tutela della salute e della sicurezza nei luoghi di lavoro; D.P.R. 2 aprile 2009, n. 59: Regolamento sul rendimento energetico in edilizia; d.P.R. 5 ottobre 2010, n. 207: Regolamento di esecuzione ed attuazione del decreto legislativo 12 aprile 2006, n. 163, recante «Codice dei contratti pubblici relativi a lavori, servizi e forniture in attuazione delle direttive 2004/17/CE e 2004/18/CE (in vigore dal 9 giugno 2011); 2.4.2. - Building Act 1984; Town and Country Planning Act 1990; Control of Substances Hazardous to Health (COSHH) Regulations 2002; Disability Discrimination Act (DDA) 2004; Statutory Instrument 2005 No. 1541 The Regulatory Reform (Fire Safety) Order 2005; The Climate Change and Sustainable Energy Act 2006; 2.4.3. - Principali leggi del Regno Unito Norme tecniche Norme tecniche europee (CEN); Norme tecniche italiane (UNI, CEI); Standard internazionali (ISO); British Standards (BS). 2.5. e) dei vincoli di legge relativi al contesto in cui l’intervento è previsto - norme e strumenti urbanistici della città di Londra e del municipio di City of London. Dalle indagini condotte in fase di acquisto risulta che l’edificio non è sottoposto a vincolo culturale né è ricompreso in una conservation area. Il necessario cambio di destinazione d’uso urbanistica (sui generis secondo la legislazione locale) è stato richiesto in sede di acquisto dell’immobile. 2.6. f) delle funzioni che dovrà svolgere l’intervento L’edificio dovrà ospitare il Consolato Generale d’Italia a Londra. Sono da prevedersi indicativamente i seguenti uffici e servizi consolari: ufficio del Console Generale, ufficio amministrativo, ufficio passaporti, ufficio visti, ufficio notarile, anagrafe italiani residenti all’estero, stato civile-cittadinanza, servizi sociali, ufficio scuole e dirigente scolastico. 2.7. g) dei requisiti tecnici che dovrà rispettare 2.7.1. requisiti inerenti la sicurezza Per “sicurezza” in questa sede si intende sia la protezione da intenzioni aggressive altrui (“security”), sia la prevenzione di rischi da incidenti (“safety”). 2.7.1.1. security L’edificio è concepito per ricevere grandi quantità di pubblico ed essere “aperto” alla città. Ciò nonostante, la necessità di assicurare al personale ed agli utenti stessi un adeguato livello di protezione, l’edificio dovrà disporre di adeguate misure di sicurezza passiva (blindature, infissi di sicurezza) e attiva (allarme, controllo accessi, TV a circuito chiuso), idonee a garantire la -7- sicurezza dello stabile nelle ore di chiusura (anche parziale) nonché la sorveglianza rispetto ad eventi anomali nelle ore di apertura. 2.7.1.2. safety L’edificio dovrà rispettare le disposizioni di cui al D.Lgs. 81/08 inerenti la sicurezza dei luoghi di lavoro, con riferimento alla protezione antincendio (detezione, estinzione, allarme, segnaletica sonora e visiva, vie di fuga, luoghi sicuri, partizioni REI), all’accessibilità a persone diversamente abili (L. 13/89 e D.M. 236/1989), ai rischi di caduta, alla salubrità degli ambienti ed ergonomicità delle installazioni, ai rischi derivanti dagli impianti tecnologici, ecc. 2.7.2. requisiti di sostenibilità Con il termine “sostenibilità” si intende in questa sede un insieme di tecniche e accorgimenti miranti a conseguire un complesso di obiettivi molto diversificati, riassumibili per semplicità in 3 tematiche principali: - strategie per limitare il consumo di risorse non rinnovabili: rientrano in questo gruppo le tecnologie per il contenimento dei consumi e il ricorso a energie rinnovabili; - strategie per ridurre l’impatto ecologico dell’attività costruttiva, quali l’uso di materiali di riciclo e/o di provenienza controllata e certificata, il controllo della durabilità dei componenti, l’attenzione allo smaltimento degli scarti; - strategie per migliorare la salubrità e qualità ecologica dell’ambiente costruito, quali il ricorso a materiali non tossici, il controllo del microclima, della luce naturale, del colore, ecc.. Fatta salva l’obbligatorietà delle misure di legge (D.M. 185/2003, D. Lgs., 192/2005, D.P.R., 59/2009, ecc.) si richiede al progettista di prevedere una pluralità di strategie volte a conseguire gli obiettivi di cui sopra, quali: a titolo di esempio: 2.7.2.1. strategie per il risparmio energetico Tecnologie per il contenimento dei consumi: rientrano in questo gruppo l’uso di vetrate ad alta efficienza climatica, la ventilazione naturale forzata, ed in generale tutti i sistemi di condizionamento passivo; l’uso di apparecchi impiantistici ad alta efficienza, uso di apparecchi che riducono il consumo di acqua (scarichi wc a doppia cacciata, ecc.). Uso dell’acqua e di elementi vegetali autoctoni per controllare la temperatura, umidità e qualità dell’aria sia all’interno che all’esterno dell’edificio. Ricorso a energie rinnovabili (prodotte in proprio ovvero disponibili dalla rete urbana). 2.7.2.2. strategie per ridurre l’impatto ecologico dell’attività costruttiva Uso di materiali di riciclo: plastica, alluminio, vetro, isolanti, ecc. Uso di materiali di provenienza controllata e certificata: in particolare legnami da costruzione. Controllo della durabilità e manuenibilità dei componenti. Privilegiare i materiali naturali di produzione locale. Attenzione allo smaltimento degli scarti: riduzione al minimo e controllo della certificazione delle discariche, prevedere materiali che potranno a fine ciclo essere riciclati. 2.7.2.3. strategie per migliorare la salubrità e qualità ecologica dell’ambiente costruito Tossicità dei materiali: vernici, isolanti, funghicidi. Metalli pesanti. Materiali con sostanze volatili in genere. Scelta di materiali con “Ecolabel”. Controllo del microclima, prevenzione della formazione di muffe. Controllo del rumore. Controllo dei campi magnetici. Controllo della luce naturale, incrementando i livelli invernali e riducendo i livelli estivi. -8- Controllo del colore. Cura della qualità dell’ambiente in termini percettivi: senso di sicurezza, privacy, contatto con la natura, chiarezza dei percorsi, qualità estetica degli ambienti. Il progetto dovrà altresì prevedere un’adeguata pubblicità, a scopo educativo, degli interventi di sostenibilità in esso attuati, da collocare (visibile ma discreta) presso l’ingresso principale. 2.7.3. strutture L’intervento non prevede interventi strutturali, se non accessori e limitati a interventi limitati e puntuali in relazione all’adeguamento funzionale distributivo. La normativa locale prevede una verifica strutturale (structural appraisal) in alcuni casi di modifica della destinazione d’uso (cfr. BRE Digest 366: Structural Appraisal of Existing Buildings for Change of Use). In ogni caso, gli eventuali interventi sulle strutture portanti dell’edificio devono essere calcolate secondo quanto previsto dal DM 14/01/2008. Per quanto concerne i carichi di esercizio, fatta salva l’applicazione dei coefficienti di combinazione di cui alla tabella 2.5.I del citato Decreto, e l’applicazione dei carichi concentrati e/o carichi orizzontali quando previsti, i carichi variabili uniformemente distribuiti sono disciplinati dalla tabella 3.1.II come segue: - uffici, locali accessori degli uffici e relativi servizi e disimpegni: 3,00 kN/m2; - ambienti suscettibili di affollamento: A: caffetteria, sale attesa, sale riunioni: 3,00 kN/m2; B: balconi, ballatoi, terrazze praticabili, scale e pianerottoli: 4,00 kN/m2; archivi, magazzini e depositi: 6,00 kN/m2; - coperture non praticabili: 0,50 kN/m2; - locali tecnici degli impianti: da valutarsi caso per caso secondo carichi effettivi. Per quanto concerne la protezione sismica, si considera la scarsa sismicità della regione (peak ground acceleration: 0.2-0.4 m/s2 10% prob. in 50 years, fonte: Global Seismic Hazard Assessment Program (GSHAP)). Ciò nondimeno, le norme locali relative alle strutture prevedono particolari disposizioni per la protezione dai possibili movimenti del terreno (Ground movement – Requirement A2b). 2.7.4. impermeabilizzazioni Nella realizzazione delle impermeabilizzazioni aeree e contro terra, nonché nell’impianto di smaltimento delle acque meteoriche sarà data massima attenzione alla perfetta efficienza ed alla durabilità del manufatto, scartando tutte quelle soluzioni che, per economicità dei materiali o semplicità di esecuzione, sono soggette a prematura perdita dell’efficienza. 2.7.5. impianti tecnologici 2.7.5.1. impianto elettrico A norma del D.M. 22 gennaio 2008, n. 37 e L. 5 marzo 1990, n. 46. 2.7.5.1.1. fem Gruppi prese in numero adeguato per ciascuna postazione di lavoro e speciali per le utenze di servizio (stampanti, fotocopiatrici), distinti tra circuiti ordinari e preferenziali (serviti da gruppo elettrogeno). Punti di fornitura con quadri dedicati per gli impianti meccanici e per ciascun apparecchio speciale previsto dal progetto (audio-video, sicurezza, ecc.). -9- 2.7.5.1.2. illuminazione Livelli di illuminamento a norma dei piani lavoro e degli ambienti; nel progetto preliminare come requisiti prestazionali, nel progetto definitivo calcoli illuminotecnici. Apparecchi illuminanti ad alta efficienza, graduati nel design rispetto al grado di finitura degli ambienti. 2.7.5.2. impianti meccanici 2.7.5.2.1. idrico-sanitario Servizi igienici, caffetteria, locale pulizie, locali impianti meccanici. 2.7.5.2.2. produzione acqua calda Boilers elettrici, uno per ciascun gruppo di servizi adeguatamente dimensionato, più uno per la cucina. 2.7.5.2.3. distribuzione gas Per caldaia riscaldamento. 2.7.5.2.4. riscaldamento e condizionamento Impianto a fan-coils (riscaldamento-raffreddamento centralizzato e circolazione di liquido; movimentazione aria locale per locale) per gli uffici, integrato da impianto ad aria primaria per i ricambi. Controllo remoto della temperatura per gli ambienti pubblici (sale attesa) e autonomo stanza per stanza per uffici. 2.7.5.2.5. impianti elevatori Due impianti nell’edificio (uno esistente ed uno nuovo), uno per ciascuna scala, a norma UNI EN 81-1, UNI EN 81-2, UNI EN 81, UNI EN 81-70. 2.7.5.2.6. gru per pulizia facciate Esistente, da manutenere. 2.7.5.3. impianti speciali 2.7.5.3.1. antincendio Riferimenti normativi: D.Lgs. 9 aprile 2008, n. 81, D.M. 22 gennaio 2008, n. 37, D.P.R. 12 gennaio 1998, n. 37, D.P.R. 26 agosto 1993, n. 412, L. 5 marzo 1990, n. 46, L. 7 dicembre 1984, n. 818, D.M. 16 febbraio 1982. Le principali componenti del sistema anti-incendio sono così classificabili: - Impianti di rilevazione; - Impianti di estinzione; - Vie di fuga; - luoghi sicuri; - Segnaletica di emergenza (visiva, acustica) - Illuminazione di emergenza. L’implementazione dei sottosistemi citati sarà descritta in dettaglio,per le varie zone, nel progetto definitivo ed esecutivo. 2.7.5.3.2. telefonico Postazioni telefoniche interconnesse in tutto l’edificio. Le caratteristiche specifiche dell’impianto saranno concordate puntualmente con i soggetti responsabili del Consolato Generale. 2.7.5.3.3. LAN Hardware LAN in tutti gli uffici; predisposizione impianti wi-fi. - 10 - 2.7.5.3.4. accessibilità Attrezzature impiantistiche ad hoc per non vedenti (segnaletica braille) e non udenti (altoparlanti) saranno installate nei luoghi opportuni dell’edificio. 2.7.5.4. sicurezza 2.7.5.4.1. gestione degli accessi L’edificio è concepito per essere fruito da un pubblico numeroso. Ciò rende particolarmente delicata e importante le progettazione della sicurezza degli accessi. Gli accessi principali dall’esterno dell’edificio devono essere controllati in remoto da varie postazioni nell’edificio (posizione chiuso / posizione con apertura automatica a sensore). Una volta all’interno, in funzione delle attività in corso nell’edificio, il visitatore dev’essere impossibilitato ad accedere ad aree diverse da quelle pertinenti. Più dettagliate informazioni saranno fornite all’atto della progettazione definitiva. 2.7.5.4.2. serrature con badge Alcune zone a circolazione limitata potranno avere varchi di sicurezza muniti di serrature elettriche attivabili con badge e/o tastierino numerico e citofono. Più dettagliate istruzioni saranno fornite in fase di progettazione definitiva. 2.7.5.4.3. allarme A zone, personalizzabile dall’utente e con attivazione/disattivazione indipendente per ciascun ufficio. Sensori di movimento doppia tecnlogia, contatti magnetici e sensori rottura vetri. 2.7.5.4.4. TV circuito chiuso Telecamere lungo il perimetro e nei principali disimpegni interni. Con controllo dalla reception principale. Registrazione in automatico 7 giorni con possibilità di ricerca e salvatggio su file. 2.7.5.4.5. illuminazione esterna L’edificio sarà munito di adeguata illuminazione esterna di sicurezza e architettonica. 2.7.6. finiture La regola dell’arte per garantire i prescritti livelli qualitativi sarà descritta in dettaglio nel capitolato speciale di appalto del progetto esecutivo. La qualità delle finiture è da prevedere di grado elevato in tutto l’edificio. La diversa destinazione d’uso dei vari spazi, tuttavia, suggerisce una gradazione degli standard di finitura delle superfici (pavimenti, pareti, controsoffitti) e degli apparati (infissi, apparecchi illuminanti), nonché degli arredi fissi e mobili in quattro categorie principali: A) B) C) D) ambenti di elevata rappresentanza ambenti di grado elevato ambienti operativi ambienti di servizio. 2.7.6.1. rivestimenti interni Pareti: intonaco liscio rasato a gesso e tinteggiato con prodotti traspiranti di qualità: per tutti i gradi. Rivestimenti: ceramiche monocottura prima scelta, selezione in base al grado; grado A: boiserie in legni pregiati; Pavimenti: - grado A: marmo di qualità pregiate, parquet di essenze pregiate, ceramiche pregiate per servizi; - 11 - - grado B: pietra naturale, gres porcellanato, parquet, ceramiche; - grado C: gres porcellanato, ceramiche; - grado D: battuto di cemento, mattonelle di cemento prefabbricate, Klinker, linoleum Controsoffitti: - grado A: in cartongesso rasato ispezionabile, controsoffitti di design; - grado B: cartongesso rasato ispezionabile; - grado C: controsoffitti modulari acustici; - grado D: intradosso solaio a vista, solai antincendio per locali tecnici. 2.7.6.2. rivestimenti esterni Esistenti, da manutenere (pulitura, risarcitura parti deteriorate). 2.7.6.3. infissi Infissi esterni: alluminio verniciato di alta qualità; legno-alluminio (A); acciaio (portoni, porte automatiche scorrevoli); Infissi interni: legno massello (A, B), legno tamburato (C), alluminio (D) infissi REI. 2.7.6.4. arredi Gli arredi fissi e mobili – ad integrazione di quelli esistenti da traslocare dalla sede attuale – saranno previsti in sede di progetto secondo le specifiche funzionali di ciascun ambiente e secondo il grado, indicativamente prevedendo: - grado A: legno massello pregiato, acciaio satinato e cristallo, pelle o tessuti pregiati; - grado B: legno pregiato, acciaio e vetro, tessuti pregiati; - grado C: legno tamburato rivestito, acciaio/alluminio, tessuti di qualità; - grado D: alluminio, plastica. 2.7.7. requisiti funzionali di particolari destinazioni d’uso 2.7.7.1. sale riunioni Le sale riunioni sono arredate con elementi di livello adeguato al grado delle finiture. È raccomandabile che i tavoli possano essere assemblati in varie forme e posizioni sì da adeguare la configurazione al profilo della riunione. 2.7.7.2. sale attesa La sala attesa deve essere adeguatamente dimensionata per il numero diario di visitatori. Con riferimento alla media de valori di picco di presenze contemporanee, e senza considerare le zone di transito e di attenzione, si ritiene adeguata una dimensione di circa 1 mq/visitatore. La sala attesa deve essere dotata di sedute in numero adeguato, possibilmente pari al numero medio di presenze contemporanee. 2.7.7.3. caffetteria La caffetteria deve essere dotata di un impianto di ricambio d’aria dimensionato ad hoc per garantire l’assenza di propagazione degli odori nel resto dell’edificio; arà attrezzata per la produzione di bevande (macchina da caffè, ecc.) e di semplici cibi, nonché di spazi e attrezzature (frigoriferi, forni) adeguati per servire cibi e bevande con formula di catering fino a 200 persone. 2.7.7.4. archivi Si prevede di collocare l’archivio al piano interrato, direttamente sul terreno, al fine di garantire adeguata capacità di carico statico (min. 600 kg/mq per archivi ordinari, da calcolare caso per caso per archivi compatti). Gli scaffali devono essere facilmente accessibili. Le postazioni di lavoro nell’archivio devono essere dotate di luce naturale e correttamente attrezzate. - 12 - Il locale adibito ad archivio deve essere dotato di impianto di rilevazioni incendi ed estintori in quantità opportuna. 2.7.7.5. servizi igienici Tutti i bagni, con eccezione di quelli per disabili, devono essere dotati di locale antibagno, nel quale sono ordinariamente collocati i lavabi. Con riferimento al numero di utenti, deve esistere almeno un servizio igienico ogni 30 utenti. 2.7.8. abitabilità L’abitabilità dei locali deve essere conforme al D.Lgs. 81/08, allegato IV L’Altezza minima dei locali destinati alla presenza continuativa di personale e/o utenti è, ove possibile, di m. 3,00; la dimensione minima di una singola stanza destinata alla presenza continuativa è di m2 9. Le aperture destinate all’ingresso della luce naturale devono essere di superficie non inferiore a 1/8 della superficie planimetrica del locale. Le stesse devono essere apribili in misura sufficiente a garantire un adeguato ricambio d’aria. 2.7.9. sicurezza del luogo di lavoro L’edificio deve essere rispondente alle prescrizioni del D.Lgs. 81/08 in materia di sicurezza dei luoghi di lavoro. In particolare, oltre alla prevenzione incendi ed ai requisiti di salubrità e accessibilità, devono essere attuate le misure necessarie a prevenire: - la caduta nel vuoto (altezza dei parapetti); - la scivolosità dei pavimenti; - l’urto contro superfici invisibili; - gradini non segnalati Tutte le postazioni di lavoro e videoterminali devono rispettare la norma in ordine all’ergonomicità e all’orientamento rispetto alla luce naturale. 2.7.10. accessibilità L’edificio deve rispettare le prescrizioni di cui alla L. 13/89 e al D.M. 236/1989 circa l’accessibilità a persone diversamente abili. In particolare, dovrà essere curata la progettazione di: - dislivelli - ampiezza dei percorsi - luoghi sicuri - servizi igienici dedicati. 2.7.11. requisiti inerenti la cantierizzazione Le scelte principali circa la cantierizzazione saranno definite in sede di progetto definitivo ed esecutivo, con particolare riferimento a: - riduzione del disturbo (polveri, rumori) nei confronti dei vicini; - sicurezza dell’organizzazione del cantiere; - economicità ed efficienza della cantierizzazione. 2.8. h) degli impatti dell’opera sulle componenti ambientali e nel caso degli organismi edilizi delle attività ed unità ambientali Non pertinente, in quanto trattasi di lavori di ristrutturazione di un immobile esistente che non modificano, se non in elementi di dettaglio, l’aspetto esterno dell’edificio. - 13 - 2.9. i) delle fasi di progettazione da sviluppare e della loro sequenza logica nonché dei relativi tempi di svolgimento Progetto preliminare: da redigersi a cura dell’Unità tecnica del MAE sulla scorta delle indagini condotte in sede di acquisto, delle ulteriori indagini in corso e con il supporto di un professionista locale per il rispetto delle norme edilizie e urbanistiche locali applicabili. tempo di redazione previsto: 30 giorni. Approvazione del progetto preliminare: DM, previo parere della Commissione Immobili del Ministero Affari Esteri. Progetto definitivo: da affidarsi a progettista esterno, con il supporto di un professionista locale per l’ottenimento dei permessi locali applicabili. tempo di redazione previsto: 45 giorni. Approvazione del progetto definitivo: DM, previo parere del Comitato Tecnico Amministrativo presso il Provveditorato interregionale per le opere pubbliche Lazio Abruzzo - Sardegna; approvazione da parte delle autorità locali secondo le norme applicabili (Department of Planning and Transportation, District Surveyor’s Office, London Fire Brigade ecc.). Progetto esecutivo: da affidarsi a progettista esterno unitamente al definitivo. tempo di redazione previsto: 30 giorni. Approvazione del progetto esecutivo: DM, previa validazione da parte del Responsabile del procedimento ex art. 55 DPR 207/2010. 2.10. l) dei livelli di progettazione e degli elaborati grafici e descrittivi da redigere Gli elaborati di progetto sono quelli previsti dal DPR 207/2010. Per il progetto preliminare, art. 17-23; Per il progetto definitivo, art. 24-32; Per il progetto esecutivo, art. 33-43. Si prevede di affidare il coordinamento della sicurezza in fase di progettazione al medesimo professionista incaricato della redazione dei progetti definitivo ed esecutivo, sicché i relativi elaborati (art. 24 c.2 lett. n) e art. 39) saranno integrati nelle relative fasi del progetto. 2.11. m) dei limiti finanziari da rispettare e della stima dei costi e delle fonti di finanziamento L’intervento è finanziato con fondi ordinari del Ministero degli Esteri; capitolo di spesa 7245/2011/R2009 e R2010 in conto capitale. I limiti finanziari sono quelli fissati nel Quadro Economico dell’intervento approvato con DM 5513/305 del 28/04/2011 che si riporta per esteso: A LAVORI % A1 A2 A3 lavori a misura, a corpo, in economia Oneri per lavoro all’estero oneri della sicurezza, non soggetti a ribasso d’asta IMPORTI € 20,00% € 4,00% € 2.000.000,00 400.000,00 100.000,00 A - Totale stima dei lavori € 2.500.000,00 - 14 - B SOMME A DISPOSIZIONE % B1 lavori in economia, previsti in progetto ed esclusi dall’appalto, ivi inclusi i rimborsi previa fattura 0% € B2 Rilievi, accertamenti e indagini 2% € 50.000,00 B3 Allacciamenti ai pubblici servizi 2% € 37.500,00 B4 Imprevisti 10% € 250.000,00 B5 acquisizione aree o immobili e pertinenti indennizzi € 5.843.852,27 B6 accantonamento di cui all’articolo 133, commi 3 e 4, del codice 0% € spese di cui agli articoli 90, comma 5, e 92, comma 7bis, del codice, spese tecniche relative alla progettazione, alle necessarie attività preliminari, al coordinamento della sicurezza in fase di progettazione, B7 alle conferenze di servizi, alla direzione lavori e al coordinamento della sicurezza in fase di esecuzione, all’assistenza giornaliera e contabilità 10% € 250.000,00 importo relativo all’incentivo di cui all’articolo 92, comma 5, del codice 2% € 50.000,00 spese per attività tecnico amministrative connesse alla progettazione, di supporto al responsabile del procedimento, e di verifica e validazione B9 eventuali spese per commissioni giudicatrici B10 spese per pubblicità e, ove previsto, per opere artistiche B8 IMPORTI 0% € 0% € 0,5% € - - 12.500,00 spese per accertamenti di laboratorio e verifiche tecniche previste dal capitolato speciale d’appalto, B11 collaudo tecnico amministrativo, collaudo statico ed altri eventuali collaudi specialistici 0% € I.V.A., eventuali altre imposte e contributi dovuti per legge (VAT+contributo AVCP) 20,00% € 500.600,00 B - Totale Somme a Disposizione € 6.994.452,27 Totale finanziamento (A+B) € 9.494.452,27 B12 - L’importo indicato per i lavori è soggetto a V.A.T. (20%) applicabile nel caso di affidamento dei lavori ad una impresa con sede legale nel Regno Unito. Ove l’impresa affidataria risulti residente al di fuori del Regno Unito, la V.A.T. sarà applicabile solo a quei costi (materiali, mezzi, mano d’opera, subappalti) sostenuti nel territorio del Regno Unito, mentre i costi sostenuti altrove, non soggetti a V.A.T., saranno remunerati con il supplemento relativo agli “oneri per lavoro all’estero” (trasporti, spedizioni, vitto alloggio e trasferte, ecc.) stimabile nel 20% del prezzo a base d’asta dei lavori. Il risultato pertanto dovrebbe essere equivalente, mettendo in condizioni di parità concorrenziale imprese britanniche e straniere. L’appalto è esente da I.V.A. ex art. 7, DPR 633/72. - 15 - 2.12. n) del sistema di realizzazione da impiegare (DPR 207/2010 Parte II Titolo V) Appalto di lavori. 3. ALTRE INFORMAZIONI 3.1. fonti A parte i riferimenti alle norme conferenti, le analisi e considerazioni che seguono sono basate sui seguenti elementi istruttori: - Informazioni e documentazione tecnica fornita dalla parte venditrice nel corso dell’istruttoria di compravendita dell’immobile; - visure e indagini giuridiche e tecniche commissionate dal Consolato Generale d’Italia a Londra in fase di acquisto dell’edificio; - una missione tecnica del Responsabile del procedimento dal 12 al 13/01/2011, finalizzata alla verifica di idoneità dell’immobile all’uso previsto e di fattibilità dei necessari lavori di adeguamento. 3.2. modifiche del quadro esigenziale Ove il quadro esigenziale risulti modificato in un momento successivo alla pubblicazione del bando di gara, la stazione appaltante disporrà le relative modifiche in funzione dello stato di avanzamento della procedura ed in conformità alle relative prescrizioni normative applicabili. 3.3. categorie e classifiche: Prevalente: OG1 Scorporabili e subappaltabili: OS3 OS28 OS30 confluenti in OG11 OS5 € 2.000.000,00 + V.A.T. € 190.000,00 + V.A.T. € 185.000,00 + V.A.T. € 255.000,00 + V.A.T. € 630.000,00 + V.A.T. € 150.000,00 + V.A.T. 3.4. requisiti dell’impresa esecutrice: a) per le imprese italiane, iscrizione SOA cat. OG1 cl. IV (prevalente), OG11 cl. III ovvero OS3 cl. I, OS5 cl. I, OS28 cl. I, OS30 cl. I (scorporabili e subappaltabili); b) per le imprese stabilite in altri paesi dell’Unione Europea, il possesso di requisiti analoghi a quelli delle imprese italiane, da comprovare ai sensi dell’art. 47 comma 2 e 38 comma 5 del codice e art. 62 D.P.R 5 ottobre 2010, n. 207. 3.5. elaborati da produrre (a cura dell’impresa ) successivamente all’approvazione del progetto esecutivo 3.5.1. elaborati costruttivi Costituiscono gli elaborati di cantiere necessari per l’esecuzione materiale delle lavorazioni. Sono approvati dal Direttore dei lavori e/o dal Responsabile del procedimento secondo l’oggetto e l’eventuale scostamento dalle previsioni del progetto esecutivo validato. - 16 - 3.5.2. elaborati as-built Costituiscono la descrizione dei lavori ultimati, comprensiva di tutte le varianti in corso d’opera, formalizzate o meno. Sono redatti secondo le stesse modalità e specifiche del progetto esecutivo. Il costo per la redazione degli elaborati as-built e costruttivi è compreso nel prezzo a corpo dell’appalto. 3.6. proprietà dei progetti e tutela del diritto d’autore Fatto salvo il diritto d’autore dei progettisti, in quanto tutelato dalla legislazione italiana, britannica e internazionale, i progetti rimangono di proprietà della Stazione Appaltante. Qualsiasi uso dei progetti da parte dell’autore è soggetto ad autorizzazione della Stazione Appaltante. Qualsiasi uso dei progetti da parte di soggetti terzi è escluso. 3.7. direzione lavori e collaudo La stazione appaltante disporrà la direzione lavori e il collaudo in corso d’opera a cura dei propri uffici tecnici interni, ove possibile, ed in caso alternativo l’affidamento della sola Direzione Lavori e sicurezza in corso d’opera a professionista esterno. 3.8. varianti in corso d’opera Le varianti in corso d’opera ordinate dall’amministrazione appaltante saranno trattate in conformità alla normativa applicabile per gli appalti di lavori (codice dei contratti, regolamento, capitolato generale di appalto) ed alle norme speciali di contratto (capitolato speciale di appalto) nonché alle previsioni di cui al punto 3.2 (modifiche del quadro esigenziale) del presente Documento Preliminare di Progettazione. Sarà fatto espresso divieto all’impresa esecutrice di apportare modifiche di qualsivoglia natura, anche se derivanti da circostanze esterne imprevedibili, senza espressa autorizzazione scritta da parte dell’amministrazione appaltante. Eventuali migliorie di iniziativa del dell’impresa esecutrice, anche se approvate dall’amministrazione appaltante, rimarranno a carico esclusivo del concessionario. 3.9. informazioni generali a) Stazione Appaltante: Ministero Affari Esteri, Direzione Generale per l’Amministrazione, l’Informatica e le Comunicazioni, Ufficio III Tel.: 0636913027, Fax: 0636913592 internet www.esteri.it e-mail: dgaa7@esteri.it b) Responsabile del procedimento: Arch. Paolo Ivaldi, P.le della Farnesina, 1 00135 Roma, Tel.: 0636913590, Fax: 0636913592 paolo.ivaldi@esteri.it c) Luogo di esecuzione dei lavori: Londra, Regno Unito 3.10. allegati Planimetrie di tutti i piani dell’edificio Documentazione fotografica Indagini sulle condizioni generali dell’edificio (Condition Report) Indagini sulle condizioni degli impianti tecnologici (Condition Survey Report) - 17 - CONDITION REPORT UPON HARP HOUSE 83 – 86 FARRINGDON STREET LONDON EC4 PREPARED FOR THE CONSUL GENERAL OF ITALY 38 EATON PLACE LONDON SW1X 8AN PREPARED BY MICHAEL A. CORNET FRICS ACIARB 9B SOUTHSIDE COMMON LONDON SW19 4TL TELEPHONE: 020 8944 8668 DATE OF INSPECTION 3RD + 4TH FEBRUARY 2011 Condition Report - Harp House – 3/4 February 2011 EXECUTIVE SUMMARY 1. This Executive Summary is to be read in conjunction with the Condition Report prepared on the 3rd and 4th February 2011 2. This is a post-war office block, dated 1950’s, with a refurbishment carried out internally some 25 years ago 3. The main roof is in reasonable general repair, although approximately one third is now due for asphalt replacement, to the core and water tank room. The roof has been damaged by use, and downpipes are currently blocked. The roofs appear un-insulated and are not thermally efficient 4. The main elevations generally are in reasonable repair for their age, but some localised repointing and repairs are now due, and the property would benefit from professional elevational cleaning 5. To the rear of the building, the window lintels are in gross disrepair, and at best will need professional repair, and at the worst, replacement 6. The basement roof with the barrel lights is leaking and re-covering and possible replacement of the barrel lights is now due 7. To the front of the building at basement level, there is water penetration along the vault area, and this will be difficult to repair. Elsewhere, we anticipate, and you should budget for, penetrating rising dampness, but most of this vulnerable area was hidden behind the existing Tenant’s dead filing systems 8. The windows are in need of a major overhaul, and being single glazed, are not thermally sufficient, and allow condensation or water penetration through various windows. Therefore consideration should be given to upgrading or replacement of the windows with a modern double glazed system 9. The internal fit-out work carried out 25 years ago, is now extremely dated, and we consider beyond reasonable economic life, and depending on the report from Mecserve (Mechanical and Electrical Survey), consider you should budget for complete refurbishment, including the toilets and kitchens 10. The building only has one lift, which we consider to be adverse 11. Whilst the building has, we understand, (but we have not seen) a Fire Certificate, and generally complies to what would be anticipated for a building of its age and type, we believe re-appraisal will be necessary, particularly if comprehensive re-fitting of the offices is undertaken 2 Condition Report - Harp House – 3/4 February 2011 BRIEF AND GENERAL DESCRIPTION In accordance with your instructions, we have now looked at the property and in order to generally advise you on its condition, all as set out in our letter of the 8th December 2010. We confirm that this Report is confidential to the Consul General, and may not be disclosed to a Third Party, and your Surveyor specifically excludes any Third Party Rights under the Contracts (Rights of Third Parties) Act 1999. We are not aware of your proposals for the building, and your Architects will need to advise you on the practicality of any alterations to the existing building, or the existing layout, if this is retained as part of any exit strategy from the existing Tenants, and their Covenants under the Lease. The building is reported as being constructed in the 1950’s with later alterations and cellular subdivision, being carried out some 25 years ago. The Vendor (as both Freeholder and Landlord) has been asked to disclose what documentation they have, but this has been strictly limited and documentation may have been removed and this should be disclosed to you as a matter of urgency. The vendor has not been able to disclose any environmental assessment, and it must be assumed that the building was constructed on a previously occupied site, probably as a result of bomb damage during the last World War. We would recommend that solicitors, as part of their normal enquiries, have a desk top analysis carried out, as such an analysis is not available from the vendors. Our Survey, as agreed, is non destructive, and no material testing has been carried out. Our enquiries of the vendor’s agents, have not been able to obtain any details of testing carried out by the vendor, for deleterious materials, such as calcium chloride, wood wool slabs used as permanent shuttering, sea dredged aggregates or high alumina cement, etc. At the date of the building’s construction, it was probably still covered by restrictive Building Licences and it may be therefore that deleterious materials have been used. If the vendor is unable to give any comfort in this respect, then we strongly recommend that appropriate testing is carried out, otherwise if it is found later, it could be adverse to your investment. We understand that it is your intention to occupy the building for Consulate activities, and that you are applying for appropriate change of use on the building. You have no knowledge of this procedure, and did not comment upon it. 3 Condition Report - Harp House – 3/4 February 2011 The building, according to the vendor’s agents’ particulars, comprises of office space of 13,843 square feet (1,285.9 square metres), spread out over basement, ground and 6 upper floors, generally as offices, with some basement storage. These measurements have not been checked by your Surveyor, and presumably, this will have been carried out by your advising investment agents, as part of their duties. The building has the disadvantage of only one lift. There is no parking facility at the building, and on street parking is aggressively managed by the City of London. There are generous public transport facilities serving the Ludgate Circus area. For the purposes of the Inspection, the Harp Lane elevation was taking as facing north and any handing was taken as facing the subject described. THE LEASE The existing tenant occupies under a Lease dated 6th February 1987, between British Commercial Property Investment Trust Limited and the Secretary of State for the Environment. We understand that the Tenants have given Notice of their intention to vacate the building, at the end of the Lease. We have not carried out a detailed analysis of the Lease, but it is clear, subject to any other side letters or arrangements, that the Tenants have Repairing and other Obligations on the building. We understand that the vendor, as Landlord, has commenced an assessment of the dilapidations responsibility of the Tenant, but this has not been published. We have previously raised the hypothesis as to the benefit of this arrangement, and should the Tenants fail to carry out their Repairing Obligations, which Party (vendor or purchaser) will have the benefit of the dilapidations claim. Our immediate concern is that the Tenant may not carry out their Repairing Obligations, and then settle a sum of money by way of damages on the vendor, leaving the purchaser with a building in disrepair. We believe that full and frank discussion should be had with the vendor, as to how this mechanism would work, and the benefits of the dilapidations, if this has not already been reviewed as part of your purchase strategy. ASBESTOS There is an Asbestos Report and a site Asbestos Management Plan dated September 2006. 4 Condition Report - Harp House – 3/4 February 2011 Reviewing the areas identified as containing asbestos, the amount of asbestos identified is minimal. From an end user point of view, any asbestos within the building must be considered as being adverse, particularly with the psychological effect on employees. We would recommend therefore that asbestos is removed as far as possible, preferably in totality, as part of the fit out works by the Consulate. The original Inspection is only a Type 2 Inspection, which is a non-intrusive inspection. This building being the age it is, and the refurbishment being carried out in 1986, there is a possibility of asbestos still being contained within the building, which has not been identified. Therefore before any fit out work, which would include the stripping out of the existing Tenant’s historic fit-out, a further inspection should be carried out, of an intrusive nature, which was called a Type 3 Inspection, so that any undiscovered asbestos can be identified and dealt with accordingly. SERVICES We are aware that Messrs Mecserve have been employed by you to carry out a Mechanical, Electrical and Services Inspection, including the lift and public health systems. Their Report therefore should be relied upon and any observations made by us are only to assist, and do need replace Mecserve’s Report. SUB AND SUPER STRUCTURE With the lack of building pathology information, we are unable to state categorically how the sub and super structure have been formed. The basement area is formed in concrete, but whether this is off piles, or relies on a mass concrete foundation, is not clear. We have had access to various areas, and there are no significant cracks suggesting that the foundations are failing. This area of London does have underground streams, particularly the River Fleet, but there is nothing to indicate, in the areas that we could see, any adverse penetration or damage from underground water. It may be possible to consult the District Surveyor’s files, but that does not fall within the ambit of this Survey and would require co-operation from the vendor to provide the necessary authority to view. The super structure is formed in a framed construction, with the frame showing on the inside of the finish of the building, and intermediate columns within the building. These will become 5 Condition Report - Harp House – 3/4 February 2011 more obvious when the partition is removed and the columns could restrict any cellular subdivision proposed by you. The vendor did indicate that the frame is in steelwork, but this is encased in concrete, or is reinforced concrete. Without destructive opening up, it is not possible to verify this. We once again draw your attention to our further comments about deleterious materials which may be present. The vendor has indicated that the floor loadings are agreed with the District Surveyor. Solicitors should obtain a copy of such confirmation from the vendor. The loadings indicated are:Basement Ground – 6th 5 KNM2 6.25 KNM2 These figures include 1 KM2 dead load for partitions. The ‘good practice’ for modern floors recommended by the BCO is:3.5 KNM2 generally, Of which 5% should be 7.5 KNM2 for designated heavy load areas. The floors generally are within an acceptable tolerance, with the exception of the heavy load area, and the basement area is surprisingly of a lower category than would be anticipated. THE MAIN ROOF The main roof is in three parts, a central section at main roof level, with the air conditioning units, and housings to the north and south, enclosing the core and lift, in one, and water tanks in the other. (PH.1) There is a lighting conductor system, and we understand from the occupier, but have not been able to verify, that this has been recently tested and found to be satisfactory. No testing is carried out as part of this Survey, but we did note that some of the traces were not fixed, but this is not expensive remedial work. The two upper roofs are formed in asphalt over a filler joist construction. We could not gain safe access to the top of the north roof. The asphalt generally is in need, at least, of a major repair, and preferably renewal. There are extensive splits and solar damage, particularly around the railings and some later felt repairs on the south side, following leaks (which still show internally). (PH 2+3) The roofs originally had some solar protection paint applied, but much of this has eroded, and with the exposed position of the roofs, it is hardly surprising that this has deteriorated. 6 Condition Report - Harp House – 3/4 February 2011 The protective railings are limited, and hawser lines have been provided to allow contractors with a safety harness to access the roof. We suggest, however, that with the position of this roof being exposed, that if the hawser lines are to be retained, that they need a regular inspection and a Health and Safety assessment to ensure that should there be a body fall, there is an adequate recovery procedure. The south enclosure is formed in stone ashlaring and an inexpensive facing brick. We have looked at the ashlaring from an area of safety, and there are some areas that cannot be seen on the east side. The stonework is generally in position, but there has been some thermal movement and loss of pointing. This requires local repairs only. The north housing, enclosing the cold storage tanks, is mainly in brickwork, and there has been some thermal movement where the corners have cracked, but this is not serious and some local repairs only are necessary. The edge areas of the roof are rendered, and the rendering is in poor order and requires repairs. There is a boiler flue behind this housing, and this is fairly crude brickwork with a concrete capping and open vents. There is an extensive amount of water staining around the vent area, and some brick movement. This requires local repairs. Mecserve should give a view on the suitability of the stack as a flue. The main roof is again formed in flat asphalt over a solid roof construction. Once again, we doubt that there is any insulation provided to this roof, which could give problems with interstitial condensation beneath and we will report further on this later. The asphalt is in reasonable order, with some moving and slumping, but no major repairs being necessary. Once again, this has been covered with solar reflective paint, and this has degraded, particularly around the rainwater outlets, where a large amount of debris and dirt has been allowed to accumulate. The roof at least needs cleaning back, the rainwater outlets purged, as they are blocked and the roof re-solar reflective painted. There is a cradle runway fixed to the roof, and Mecserve should report on this. The safety tag expired in 2010 There is a hawser safety line system, but the tag for these, expired in 2010, and therefore recertification is necessary before these are used. This is important from a Health & Safety viewpoint. The joinery generally to the roof, particularly the doors to the lift motor and plant areas, has not been re-decorated, and is in poor order. New doors and frames are necessary. 7 Condition Report - Harp House – 3/4 February 2011 Running around the central plant area, there is an aluminium louvre arrangement, and this is fairly crude, but workable. There is some damage to the gates caused by the window cleaners, and some slats are detached and others are loose. These need re-fixing/replacing, as there is a risk of the slats blowing off the roof into the street. The main roof asphalt has been damaged in some areas by the cradle system, and crude repairs have been carried out. We would recommend these were re-done when the plant room roofs are re-covered. THE ELEVATIONS The Front (East Elevation) The elevation is finished in natural stone ashlaring, with some simple ornamentation around the windows and relieved by a cornice at 5th/6th level. The ashlaring is in good general repair for its age and is free from significant cracking, and as far as could be seen, there is no adverse outward displacement of the blocks. There are some areas of open joints, and these show typically at the head of the main staircase and at various levels down the main elevation. As we have said, we cannot see any adverse rotational movement, and therefore take the view that these are not significant, although they should be inspected when the building is next re-decorated and any localised repairs and repointing carried out. (PH. 4) The one area of criticism, is to the left of the building, where it returns against the office development on the south side. There are various cracked blocks, and these have livid cracking, suggesting that they have contemporary damage, possibly caused by the adjoining property’s rebuilding work and these should have been repaired as part of the party wall works. These need review by a specialist, and we anticipate that they may need to be dowled back, or resin bonded. (PH. 5) The stone used, appears to be of a reasonable quality, but it was noticeable on some of the cut returns, particularly around the windows, that erosion and frost damage has taken place. We tested the areas with a screwdriver, and although there was some surface spoiling, the stone behind appeared to be reasonably hard. There is nothing that can be done about this, but if the elevations are cleaned, it must be assumed that on some of these details, the sharpness of the stone edges will be lost. There is lead capping to the main cornice, and to the projecting windows at 1st storey level. The leadwork is all in place, and whilst there is some corrosion, this is not significant, and with regular maintenance should give a reasonable life. 8 Condition Report - Harp House – 3/4 February 2011 At ground storey to the main part of the building, the elevation is finished in granite and again, we anticipate this will be in ashlaring, rather than in significantly thick blocks. Other than some minor edge damage, there is no significant disrepair. The main entrance to the building is off this elevation, and the doors and opening are finished in aluminium within the building. These finishes are now in need of refurbishment ad overhaul. We also consider that the door arrangement is potentially dangerous. The outer pair of heavy doors swing outwards, and there is not a sufficient step externally, to allow for a proper door swing. It is possible therefore to trip from these steps, and consideration should be given to altering this arrangement, possibly by setting the doors further in and the erection of an external rain screen over the street (subject to permissions). (PH. 6) There is no disabled access arrangement to these doors, and introduction of a ramp would be difficult. The current Tenants, have a bell arrangement, to summon security to assist wheelchair access, or use Harp Lane secondary entrance. Areas of the elevation, and more particularly the window area, are quite dirty, and the elevation would benefit from cleaning in the near future. The elevation is also punctured in various areas by scaffolding fixings and these are unsightly, and should be repaired. There are two City of London street lights fixed to the elevation and solicitors should make enquiries as to the arrangement with the City of London over these. We assume, but have not verified, that there is some sort of Licence or Wayleave. At street level, there is a bus stop directly opposite the front door, and people waiting for the bus could lean against the front elevation and it must be anticipated that the ground floor front users would find this annoying. This is only an observation, as we doubt that the transport arrangements would be easily altered. North Elevation The north elevation facing Harp Alley follows a similar format to the front elevation. Once again, the ashlaring is in reasonable order, although there are areas, in particular, horizontal pointing, which appear to be eroded and these need localised repairs. The upper cornice leadwork is in position as far as we could see, but the wind blowing down the alley appears to blow the rainwater back onto the elevation and this elevation is extremely dirty and is due for cleaning in the short term. To the right of the elevation at 2nd storey level, there is an area which may have been re-built, as the ashlaring and return onto the rear elevation are uneven. If this has been re-built, it appears to be successful, as there is no other adverse movement. 9 Condition Report - Harp House – 3/4 February 2011 To the north-west corner, there is a single storey rear addition, in brickwork, and this is in reasonable condition, with no significant repairs required, and the localised cracking is within acceptable limits. This is a secondary entrance into the building, and there is a door recessed back into the building. This is marked for disabled access. During the Inspection, several people from the adjoining offices used this alcove to smoke in and it was clear from the staining in the entrance, that it is used as a toilet occasionally. You will need to consider putting in a revised entrance or secondary gate arrangement. The West (Rear) Elevation This elevation is in two parts, with a rear addition area up to 1st storey level and the building then steps back in, before rising over another five storeys up to the main roof. The elevation is formed in brickwork, and from the brickwork bond and thickness of the wall, this appears to be a brick and a half thick, in solid construction. Without destructive opening up, we are not able to confirm whether there is an insulation cavity present, but we anticipate that it is highly unlikely. The main drawback of this type of construction is that it is un-insulated, and therefore it takes more heat to raise the room temperature, and it could make it susceptible to interstitial condensation problems from cold bridging from the external lintels and cills. The brickwork is in generally reasonable order for its age, with several exceptions. At 2nd storey level to the main north stair core, there is a vertical crack running from the window head up to the 3rd floor, and there is a suggestion that there is further cracking to the brickwork above. This all appears quite old, and at this stage, all that is required is periodic monitoring, because there is no indication that this brickwork movement is on-going. At high level, in the upper right hand corner, around the parapet, there is some brickwork displacement over approximately one square metre, beneath the parapet. We cannot clearly see this, because there was no safe access and it could only be viewed from low level by binoculars. (PH. 7) The brickwork is not in immediate danger of collapsing, and all we suggest is that when the elevation is next decorated, that this is looked at more closely and some localised re-pointing or epoxy resin repairs may be required. The windows have cut stone cills and these are slightly under-sized, and although they have a rain drip recess, this is quite close to the brickwork. As a result, rain running down the windows is being blown back onto the elevations and marking them. 10 Condition Report - Harp House – 3/4 February 2011 There is nothing that can be done at economic cost to deal with this. Above the windows are concrete lintels, and the concrete lintels are overclad with leadwork. There is a failure to the lintels, and the reinforcing inside them, is too close to the surface, and over a period of time, carbonation has taken place, which is blown off the concrete cover. (PH. 8) This is evidenced by large chunks of concrete laying on the lower roof. Looking at some of the lintels, there may be earlier repairs to them, but clearly further serious failures have taken place. Our recommendations are therefore that these lintels are inspected by a specialist and the extent of the corrosion to the steelwork ascertained. If the corrosion is not to an extent that weakens the lintels, it should be possible to have a specialist remove all loose concrete, treat the steelwork, and make good. However, if the steelwork is terminally corroded, it is difficult to take out and replace this type of lintel. As this is specialist work, it is relatively expensive to undertake as there are 15 windows to the main elevation, and 6 more to the staircase core. At 2nd floor level, there is an asphalt flat roof. This is laid on a solid roof structure, with no insulation beneath it. The roof is in reasonable order, although the asphalt does need re-coating with solar reflective paint. There are some small areas of vapour bubbling, coming through the asphalt, but we deem these capable of repair at reasonable cost. Around the plant area there are some metal louvered enclosures and these require some loose louvres to be re-fixed and re-decoration. At the lower level above the side entrance, there is another small asphalt roof, and again, this requires new solar reflective paint on it. Otherwise, this is in reasonable repair with no immediate maintenance required. The only means of access to these two roofs is from the 1st floor landing area, in the rear core. Although there is a fixed ladder, we recommend this is re-appraised, as it is not particularly well constructed, and is capable of allowing somebody to fall off it. We recommend that further handrails are introduced. The upper roof has no outer protection and obviously will be accessed to service the plant. We recommend therefore that further outer protection is provided, so as to minimise the risk of falling. 11 Condition Report - Harp House – 3/4 February 2011 At ground level, the brickwork returns parallel to the new building on the west side. There is no access to view this closely, but we anticipate that it is in no worse condition than the rear elevations. There is some change in brickwork colour, along the columns of the rear large room and it is not immediately clear why this has been necessary, unless there have been modifications to the openings in the past. There was no access to closely inspect. From the limited amount we could see through binoculars, there was no indication of adverse movement to this area. Laying behind the ground floor and over the basement, was another asphalt roof and we had no safe access onto this. (PH. 9) There are three barrel shaped Perspex, or similar, roof lights, and these are solar degraded, and from what we could see, the seals have started to fail. Adjacent there is extensive active water penetration into the basement rear room beneath. We recommend therefore that these, at least, need overhauling, or consideration should be given to replacing them with modern, double glazed lights to improve the amenity. Repairs are also required to the roof, as there are active leaks internally. THE WINDOWS The windows are of two types. The main ground floor front windows are a “special” for this building design. The frames are single glazed in metal. These appear to be steel, but this could not be verified without damaging the windows. The surrounds externally, are heavily polluted and have not been re-finished for many years. There are areas of loss of the finish, particularly around the glazing edges, where most water run off takes place. These windows need carefully cleaning, preparing, re-finishing and re-sealing and should be capable of a continuing life. The mastic seals between the stone frame and the metalwork generally require new seals to be provided. The remaining windows are a mixture of metal-framed (Crittal or similar) windows, with an occasional openable casement. 12 Condition Report - Harp House – 3/4 February 2011 The glazing is in reasonable repair, with some imperfections in the glass, but this appears to be a problem with quality in production when the glass was first installed. This takes the form of some occlusions and impurities in the glass, but this does not cause us concern. Some glazing is finished with plastic film, but there is no information on its type, but it appears to be anti-bomb blast type. The opening windows are generally in poor order, and have not been maintained. They are stiff to use, have lost their draught seals and generally have missing or broken handles. These will require a major overhaul, loosening and adjusting. The mastic seals between the window frame and stonework or brickwork, are good in some areas, but then are other areas completely missing. Where this occurs around the seal area, it would be possible for rainwater to blow back in underneath the window. (PH. 10) The paint finish to the windows is generally deteriorated, and all of these windows require taking back to base metal, and re-decorating. (PH. 11) Some of the windows have secondary glazing, particularly on the ground floor, where these are two metres high, they are extremely stiff to operate, and if not carefully opened, will jump out of their guides. Some of the brush seals to the windows are worn, but with careful overhaul and cleaning, this system will have a limited further life. The glazing seals of the external windows, particularly where the secondary glazing has been installed, clearly have problems with condensation run off, or possibly water penetration along the seal, as the windows have watermarked areas, and part of the acoustic baffles, which are cut down ceiling tiles in the reveals are deteriorated and falling out. These will need replacement and the windows generally need repair after monitoring. THE OFFICES As we have agreed, we will not be categorising each office’s defects, but giving a general impression as to what has been found. Various offices were locked and no access was available. If, as indicated, the last major fit out was 1986, then all of the finishes are coming to an end of their useful life. The layout is generally in cellular format, along a central corridor, running north/south between the two staircases. The central section of the corridor encloses the air conditioning distribution, and this drops down to, say on the 6th floor, to 2.1 metres and this will obviously become pronounced when the partitioning is removed and the area is returned to open plan. 13 Condition Report - Harp House – 3/4 February 2011 The offices either side of the duct are at a higher level at 2.4, but that is not considered unreasonable in modern offices. The ceilings are in a 600 x 600 lay-in grid, in the office areas, and some of the areas of tiles have actually fallen out off the grid and are generally in very poor repair, others are better and there are some more modern ceilings. (PH. 12) Down the corridors, there is a painted board-type tile, and again, some of this has become detached and there is scuffing and damage. The ceiling and floors are structurally formed in reinforced concrete and there are no raised floor systems. (PH. 13) The partitions are a very old type, probably of a plasterboard sheet material. These are often taken through the suspended ceiling. The partitions are finished in heavy duty paper which has been painted. It is difficult to upgrade these partitions, because removal of the decorative paper, will strip the covering to the plasterboard. Some partitions have been put over the sub-floor wiring conduit ducts, which is a poor detail as wiring cannot be accessed. There is some metal skirting trunking for electrical and comms. wiring, but this is not throughout and is not a flexible system for additional wiring. (PH. 14) In minor areas around the 6th floor, there are areas of staining to the ceiling, typically in the front and rear cores and south lobby, as a result of water penetration through the roof. Further investigation is required. This is in addition to the water penetration at roof level to the secondary staircase core. Those that we could reach with a damp meter, did show damp readings, and it clearly a case that the roof does require overhaul, repair or replacement. The base build skirtings are in timber and these are scratched and damaged, and the partitions are in the normal plastic finish. There are uneven areas of floor screed beneath the carpets, and we recommend that these are investigated and there was some slight undulation on the floor, but no suggestion that the floor has adversely settled, but this needs to be verified. Some re-screeding at the least is required. The carpets are a low quality carpet and these are heavily stained and now at the end of their useful life. The doors are in a Sapele veneer, and they reflect their heavy usage, with impact damage, and delamination, particularly around the bases of the doors. 14 Condition Report - Harp House – 3/4 February 2011 The door handles, push plates, etc., are generally marked and worn, with the occasional lock not working. Whilst it would be possible to obtain a further life from these doors, by repair and refreshment, they would always look dated, and warrant replacement. Some doors are marked as fire doors, by signage, but there were no rating marks on the doors, but we assume, but cannot verify, that they are fire doors. They have been fitted with intumescent seals and smoke brushes and some are on closers. Some of the offices, on the 1st and 2nd floors, have been, to a great degree, upgraded, with the later type of ceiling tile, more modern lights and some replacement carpeting. Once again, whilst these offices are an improvement, they will look dated and grubby when the existing Tenants move out, and we have to suggest that you should look for a general upgrading. At basement level, the ceiling height improves, to approximately 2.6 metres and with a dropped central section, for the air handling. The ceiling tiles have been upgraded, but again, are an old pattern, and there are general areas of damage to them, and parts of the partition have been taken through them and when the partition is removed, the ceiling will effectively require replacement. At ground floor, the ceilings rise to 4.2 metres. Again, the finishes vary from area to area with the exception of the cloakroom area, and are all tired and dilapidated and renewals are necessary. The basement area was restricted, and some of the areas had been locked for security reasons and we were unable to obtain access. We could not identify a formal damp proof course as it is hidden. To the front, the store areas go beneath the road into the vaults, and there is some water penetration towards the south end, but we were unable to locate the source above, and this needs further investigation and appropriate treatment. We consider it highly likely that more damp problems will be found when the Tenant moves their extensive filing cabinets. It would be surprising in a building of this age and type, that there was not some water penetration, particularly on the retaining walls, as the damp proofing is difficult to maintain, but this needs to be remedied, which is an expensive repair and an appropriate budget should be allowed. The floor of the basement is solid construction and we have used our moisture meter on a random basis and there are some low readings, but there are no indications as to whether this is water penetration or sweating beneath the plastic floor finishes. The floor will not be insulated and will suffer from interstitial condensation. 15 Condition Report - Harp House – 3/4 February 2011 The floors in the basement are a mixture of sheet vinyl or several types, with concrete paint in other areas. Given the high capacity storage areas down here, it is hardly surprising that the floors are generally scuffed and marked and some areas are beyond reasonable repair. Additionally, in the central section of the area, there is a distinct and powerful drains smell. The area is covered with filing boxes and we were not able to assess whether there is a drain in this area, causing the problem. This requires further investigation and probably repairs. Generally, there is no modern insulation in the building and heat loss and condensation problems are a problem, and it is recommended that appropriate upgrading is undertaken. COMMON PARTS The toilets, both male and female, are functioning, with the exception of the drinking water taps in the common parts, but the general finishes are poor, with damaged and stained suspended ceiling tiles, and loose and delaminated tiles which have been damaged and have been repaired with discoloured tiles, with chips and scuffing to the worktops, taps, basin and sanitary units and the floor are totally de-grimed. The sanitary appliances have obviously been leaking, particularly the male urinals and generally these toilet areas must count as being in disrepair and due for renewal. There are some kitchen units, which are typically scuffed with damaged units and finishes and from the water marks on the floor, leaking is a problem. Upgrading and replacement of the toilets and kitchens is long overdue. The rear staircase is original, with painted concrete landings and staircases and painted metal handrails, together with painted plaster. All these are now due for re-decoration, at least, if not renewing as appropriate. (PH. 15) The entrance hall has full height marble to the main entrance foyer. This is chipped and impact damaged and de-grimed. (PH. 16) The floor is marble and once again, shows general wear and tear as can be expected in a building of this age, particularly around the main entrance door and route to the lift. The main staircase has been finished in terrazzo and this has areas of cracking along the staircase strings, tread edges and across the larger areas of the landings. A decision will have to be taken whether this is acceptable or whether improvement is required. There are metal handrails and balustrading and these generally were in reasonable repair. 16 Condition Report - Harp House – 3/4 February 2011 MEANS OF ESCAPE IN CASE OF FIRE We understand from the vendor’s agent, that there is a Fire Certificate available. This unfortunately is not at the building as it should be, and we have not been able to have a look at it. On first principles with the two staircases fire doors and a ‘Break Glass’ fire alarm system, the building has the basic requirements for Safe Means of Escape. Having said this, we consider that expenditure is necessary to upgrade it, including the installation of smoke detectors, proper signage and the such like, depending on the report by Mecserve, you must consider totally re-wiring the alarm system and emergency lighting. On the assumption that you will be taking down or moving partitions, many of the fire alarm bells are situated on these partitions, and again major re-wiring would be necessary at the very least. Your use and alterations to any partitions, etc., would need Building Regulation approval and an assessment under the Regulatory Reform (Fire Safety) Order 2005. REPORT LIMITATIONS AND CAVEATS We have not inspected any parts of the structure which are inaccessible, unexposed or covered and our conclusions with regard to these are based on the best information available from our visual inspection. In making the report the following assumptions have been made:- a) That no alumina cement, concrete or calcium chloride additive or other deleterious material was used in the construction or subsequent modernisation of the property. b) The property is not subject to any unusual or onerous restrictions, encumbrances or outgoings and that good title can be shown. c) That the property and its value are unaffected by any matters which would be shown by local search and replies to the usual enquiries or by any other statutory notice against the property. ……………………………………………………… MICHAEL A CORNET FRICS 10th February 2011 17 CONDITION SURVEY REPORT FOR HARP HOUSE 83 – 86 FARRINGDON STREET LONDON EC3 Issue Date of Issue Reference Authorisation : : : : 1 February 2011 MH/SA/C1621 MH CONSULTANT ENGINEER: SERVICES Mecserve Environ Place 106A Stafford Road Wallington Surrey SM6 9AY Tele. 020 8773 7600 Fax. 020 8773 7601 Email. mike.hitchins@mecserve.com HARP HOUSE C1621 CONTENTS ITEM PAGE INTRODUCTION 3 EXECUTIVE SUMMARY 5 OUTLINE DESCRIPTION OF MECHANICAL SERVICES OUTLINE DESCRIPTION OF ELECTRICAL SERVICES OUTLINE DESCRIPTION OF LIFT ENGINEERING SERVICES APPENDIX A – SITE PHOTOS 10 13 15 16 Page | 2 HARP HOUSE C1621 SECTION ONE INTRODUCTION 1.1 Introduction Mecserve Limited were instructed on behalf of The Consul General of Italy to carry out a visual survey of the mechanical, electrical and lift installations at Harp House, 83 – 86 Farringdon Street London EC4. The purpose of the survey and associated report is to establish the general condition of the building services installations and to comment on what works may be required on a pre purchase to suit the possible requirements of the ingoing occupier. The findings, conclusions and recommendations of this report are based on a visual inspection of the mechanical, electrical services and lift installations carried out during 4th February 2011. None of the services were performance tested and some equipment was examined internally. This report is prepared solely for the use of the Client and his Technical and Legal Advisors. It is not intended that a third party should use this report. 1.2 Report Format This report has been broken down into specific sections as follows: 1.3 Section One Introduction Section Two Executive summary Section Three Mechanical services Section Four Electrical services Section Five Lift services Appendix A Photographs Reservations The inspection of the services and conclusions and recommendations made are limited to the visible building services. Items of the services installations are concealed within the building fabric such as riser ducts and shafts, ceiling voids etc. and consequently no observations have been made on these parts of the installations. No design calculations have been made for the building services for items including heating loads, cooling loads, pipe, duct and cable sizing etc. Page | 3 HARP HOUSE C1621 Mecserve disclaim any responsibility in respect of incorrect information imparted to them for the actual performance of the installed building services. The Report does not comment or give advice relating to any spore or fungus that may be contained within the building or any of its services. The Report also excludes any comments or specific advice relating to terrorism. 1.4 The Premises The building comprises of a eight storey office block (basement to sixth floor). Plant is located within basement and externally at roof levels. It is estimated that the building was constructed approximately 65 years ago, however a major refurbishment was undertaken approximately 24 years ago. 1.5 Operation and maintenance documentation Maintenance manuals were not available for inspection. It is understood that routine maintenance has been undertaken on the plant and equipment on a regular basis. However the documentation indicates that little in the way of servicing has been undertaken for the last 6 months 1.6 Deleterious materials The inspection for deleterious materials such as asbestos are not included within the Report and it is recommended that the Client undertakes various inspections and surveys to see if deleterious materials are or have been present, if they have been made safe or have been removed in accordance with the Health and Safety Regulations. 1.7 Life Expectancy of main plant items Where the Report refers to economic plant lives, the estimates are based in accordance with the life factors as recommended by the CIBSE. The life estimates are based upon good standards of plant maintenance. It may be possible to extend the recommended life of plant items with increased maintenance and repairs. It should be noted that as plant and equipment increases with age, the failure rate shall increase together with associated costs. Page | 4 HARP HOUSE C1621 SECTION TWO EXECUTIVE SUMMARY 2.1 General Overview of Building Services Installations Many of the components of the installed building services date back to the 1986 refurbishment, the exceptions being replacement chillers and lighting and ceilings in some specific offices. This being the case much of the plant and equipment is either at the end of its perceived and recommended like expectancy and replacements should be considered in the next 0 – 10 years. The mechanical services are operational throughout although the services do appear to have suffered from a lack of maintenance at the time of the inspection. Consideration should be given to giving all mechanical plant a major service and overhaul, replacing any failed or worn out parts. The chillers and associated pumps appear to have been replaced within the last 10 years and provided they are maintained and serviced regularly should provide another 10 years service. The perimeter heating is via an encased finned tube arrangement. There is minor damage to the casings and it should be proven that all moving parts are fully operational. It was noted that the heating system incorporates weather compensated controls. The fan coil units do not appear to have had the filters cleaned in some time. The fan coils are difficult to fully access and it is not clear if all are fully operational. The main controls for the mechanical services are dated and being some 24 years old it is unlikely that spares can be obtained and the manufacturers are supporting the controls. There is the possibility that the heating and cooling services could be in conflict in mid seasons as there is no interface between the heating and cooling plant. The cold water storage tank has been replaced and appears to be fully compliant and in good condition. The lighting generally within the building although functional and operates is not considered to meet the requirements of a new modern office building. The lighting does not comply with the CIBSE LG 7 recommendations and consideration should be given to its replacement. The main LV switchboard is dated and being 24 years old is approaching the end of its useful life, spares will be hard to come by. Page | 5 HARP HOUSE C1621 No access could be gained to the electrical risers, but from the distribution boards that were located elsewhere in the building, they are also of the same era and suffer from the same issues as the main LV switchboard. The rising busbars could not be inspected due to restricted access. The standby generator appears to be serviceable, however no service records were located on site. No indication as to frequency of starting could be found. Defects in Existing Systems Mechanical Services • • • • • • • • • • • • • • • • • • Main air handling units and ductwork The main supply air handling unit is showing sign of corrosion particularly around the base frame and this should be treated. The supply and extract ductwork should be cleaned internally. All fire dampers need to be dropped and reset and any unit that fails should be replaced. I Corrosion is occurring within the roof mounted external plant including ductwork supports that requires treatment or replacement. Units require internally cleaning and filters changing. If there is air being by passed around the filters and this should be rectified. Fan Coil Units The fan coil units require a major service and overhaul. The filters require replacement. All discharge ductwork from the fan coil units to the plenum boxes should be checked for integrity and repaired as necessary. All ventilation systems should be recommissioned and rebalanced as there appears to be insufficient commissioning data. Heating and Chilled Water Pipework Under the 1986 refurbishment it appears that the heating and chilled systems replaced the pipework. Systems should be analysed and consideration given to cleaning and flushing the closed water systems and rebalancing the water flows. Heating and chilled systems to be rebalanced. The external lagging should be repaired where damaged. The vapour seal on the chilled pipework should be checked to ensure its integrity Cooling plant Page | 6 HARP HOUSE C1621 • The cooling plant is generally in reasonable condition however any areas of rusting on the frame should be treated. • • Heating plant At the time of the inspection the heating plant was operational with no apparent defects. However it should be noted that these particular boilers are subject to failure in a number of areas and will require acid cleaning. • • Toilet ventilation plant The toilet ventilation extract plant is showing signs of deterioration and should be either rectified or replaced. • • Water services All closed water systems should analysed and if there are poor results the systems should be cleaned and flushed and retreated. Bothe the heating and chilled systems should be rebalanced and recommissioned. • • • • • • • • • • • Automatic controls Concern is expressed that the controls system is outdated and will not be supported in the UK therefore recommended that the controls be changed to UK based supplier. Within the system there are a number of 20 year old main control valves. These valves (motor and actuators) are no longer supported by the manufacturers and should be changed. Underslab drainage The existing underslab drainage should have a CCTV survey. The sump in the corner of the boiler room was full which indicated that the pump has failed. General Whilst the plant was seen in an operating condition no intrusive survey was undertaken. The plant rooms generally were in a poor state with the rooms being used as a general dumping ground for old plant and equipment. The roof gutters and gullies require cleaning of leaves and debris. Electrical Services • LV panel and sub main panels • All main and sub main panels should have full NICEIC test and certification issued. Page | 7 HARP HOUSE C1621 • The main LV switchboard is approximately 25 years old and approaching the end of its useful life. Availability of spare parts will be limited. • New schematic drawings required in LV switch room. • Replace missing sections of trunking lidding. Sub main distribution • All sub main distribution boards should have full NICEIC test and certification issued. • The distribution boards are approximately 25 years old and approaching the end of their useful life. Availability of spare parts will be limited. • New circuit charts to be issued. • No access could be gained to the electrical risers on the day of the survey, but the rising busbar and distribution boards are assumed to date back to the 1986 refurbishment. • All risers to be cleaned out of all rubbish and redundant wiring to be removed. • No evidence was found that the building had been rewired since the 1986 refurbishment (save certain localised areas), as such we believe that the majority of the wiring has reached the end of its useful lifespan. Lighting Installation • The luminaries should be cleaned and relamped with the same colour rendering lamps. • Damaged louvers for the office modular lighting to be replaced. • Damaged Perspex Luminaire diffusers should be replaced. Emergency Lighting Installation • The emergency lights should be tested and any defects to the batteries (3 hour duration) should be replaced. Small Power Installation • All floor boxes to be inspected and any damaged trims, sockets, lids etc should be replaced. Telecommunications / Data Installation • The telecommunications / Data multicore cables should be removed completely. Lightning Protection Installation • The lightning protection system should be tested and certificate issued. Lift Services The main lift whilst fully operational is the original unit with very little in the way of upgrades that have been undertaken. It is felt that the controllers should be replaced and all health and Page | 8 HARP HOUSE C1621 safety issues resolved to ensure that the lifts can continue to afford a good service. The main lift car finishes have been replaced and are in poor condition. Consideration should be given to upgrading the lift car finishes to that originally reflected in the development. The current lift is not considered to be fully DDA compliant. Page | 9 HARP HOUSE C1621 SECTION THREE OUTLINE DESCRIPTION OF MECHANICAL SERVICES 3.1 Comfort Cooling Installation General The offices are comfort cooled by means of ceiling mounted fan coil units supplying treated air to ceiling mounted grilles. The fan coil units on floor 2 to 6 are located within a dropped ceiling in the corridors generally in the middle of the floor plates. The air is then ducted to discharge grilles set in the perimeter plaster margins in the offices. On the 1st and ground floors where there is increased height it appears that the fan coil units are located in the false ceilings. Chilled water for the fan coil units is produced via 2 external air cooled packaged units mounted on the roof of the 6th floor and the roof of the fist floor. Water is then circulated to the fan coil units via duplicate direct drive pumps. The building also appears to be served with some simple fresh air handling units located adjacent to the chillers that provides primary fresh air which has be filtered and heated (when necessary) and delivered to the rear of the fan coil units. Exhaust air from the building is via 2 external units again located adjacent to the chillers. All supply and extract ductwork appears to be distributed in galvanised metal ducts. 3.2 Fan coil Units The ceiling mounted fan coil units are cooling only units with no heating coils installed. The only accessible units were the ones on the upper floors in the dropped bulkhead in the corridor. The fan coil units have return air sensors fitted that operate through a controller to adjust the supply air temperature. 3.3 Cooling plant It would appear that the chillers installed in 1986 have been replaced with units which appear to be approximately 10 years of age. The new units were manufactured by Aermec The condition of the chilled water system is not known and nor the quality of the water within the system. From the observations of the dosing pots it appears that little in the way of chemicals have been added to the systems in recent months. Page | 10 HARP HOUSE C1621 It was not possible to access the internal components of the machine but it is highly feasible that there are circulating pumps and a small pressurisation unit / break tank are contained within the units The chilled water is circulated to the fan coil units only via direct drive pumps. 3.4 Main air handling unit The primary air handling units are located at roof level, the units comprises of filter section, heating coil and supply fan section. Tempered air is circulated to the floors and fan coil units via vertical and horizontal duct runs. There are two external units one on the 6th floor roof and the other on the first floor roof, both units are similar in construction and components. The units appear to be those originally installed in 1986. Whilst the unit was working at the time of the inspection, it was not possible to determine the operational state of the internal condition and controls associated with the unit. The unit is nearing the end of its economic life; and consideration should be given to the total replacement of the unit in the longer term. 3.5 Heating Services The heating services comprise a single frame 4 module atmospheric gas boiler located within the basement floor boiler room. It is not possible to give an indication of the internal condition of the boilers. Given the age of the boilers (approximately 10 years old) they should provide a number of year’s further service before replacement is considered. The boilers have been supplied with a direct drive primary circulating pump. A set of directly driven secondary pumps has been installed that supplies hot water to the air handling units, perimeter heating and radiators. The pumps set incorporate auto changeover facilities and are in reasonable condition. It was noted that some pump motors have been changed. The heating system is connected to a pressurisation unit that appears to be in reasonable condition. 3.6 Domestic Water Services Water enters the building at ground floor level and rises to feed the drinking water points and roof level storage tanks. From the water storage tanks the cold water down service supplies the toilet pods at the front and rear of the buildings. Page | 11 HARP HOUSE C1621 Domestic hot water would appear to be supplied via local electric water heaters. 3.7 Automatic Controls The main control panel is located at within the boiler room at basement floor level. The panel is of the wardrobe type with a separate controls section incorporated. It was not possible to conduct a full internal investigation into the panels due to the plant being in operation. It appears that the panel and controls date from 1986 and a number of plant items were in either hand mode or switched off. The controls system is based upon electro mechanical controls throughout the building. The majority of the actuators, controls valves, and sensors associated with the controls system are the original units, it is believed that these are functioning, however a full practical demonstration would be required and replacement of the obsolete units is recommended. 3.8 Toilet Ventilation The toilets are mechanically ventilated by means of extract plant. The extract plant is located on the 6th floor roof. 3.9 Gas Supply A gas supply enters the building at basement floor level and a gas meter is located the meter room at this level. From the gas meter the gas supply is taken to serve the boilers. The gas line incorporates a gas solenoid valve. 3.10 Soil and Waste Systems From a visual inspection it would appear that the systems are a fully ventilated one pipe system installed in cast iron with copper run outs.. Generally the systems appear to be in reasonable condition however it is recommended that a high pressure flush be undertaken and a CCTV survey. At roof level the out let gullies for the rain water appear to be blocked. Page | 12 HARP HOUSE C1621 SECTION FOUR OUTLINE DESCRIPTION OF MECHANICAL SERVICES 4.1 General The electrical services generally comprise: • • • • • • • • • 4.2 Incoming electricity service main distribution. Standby generator. Final circuit cabling. Lighting installation. Emergency lighting installation. Small power installation. Fire alarm installation. Telecommunications installation. Lightning protection installation. Incoming Electricity Distribution Service, Main and and sub main Sub Main The incoming electricity service is derived from the local UK Power Networks network and terminates in a 400A TP&N service head within the main electrical switchroom at lower ground floor level. The main cubicle switchboard generally utilises fuses to serve final loads and 3 phase rising bus bar with tap off units that serve distribution boards on the floors. Other distribution boards around the building are supplied by PVC insulated and sheathed armoured cables. The switchboard itself without internal inspection would appear to be in reasonable condition albeit approaching the end of its useful life. 4.3 Standby Generator A standby generator has been installed in the lower ground floor providing power to essential services. The main switchboard is fitted with load shedding equipment such that only essential loads are supported whilst the building is running on the generator supply. 4.4 Final Circuit Cabling Final circuit wiring throughout the building generally appears to be single core PVC insulated cables drawn into steel conduits and trunkings. 4.4 Lighting Installation Lighting to the office areas generally comprises linear recessed fluorescent luminaires with prismatic diffusers supported in the ceiling grid with the fibre linear tiles. Some office areas have had Page | 13 HARP HOUSE C1621 this lighting replaced with 600 modular recessed fluorescent luminaires with low brightness louvers. The office lighting does not comply with current CIBSE LG 7 recommendations. The corridors have the same luminaires as the generic office lighting but fitted into the plasterboard drop bulkhead. The main staircase lighting is afforded by a decorative Luminaire rising up through the staircase. The rear staircase lighting is generally afforded by surface luminaries. 4.5 Emergency Lighting Installation The emergency lighting is generally self contained battery packs within the main lighting modules and wall mounted circular units on the staircase with battery packs that are integral part of the luminaire. A full functional test of the emergency light fittings is required and replacement battery packs / fittings required ensuring the maintained duration is achieved. 4.6 Small Power Installation Generally the small power is provided via the skirting trunking. Additional surface mounted socket outlets have been provided on walls/partitions. 4.7 Fire Alarm Installation A conventional fire alarm control panel is located within the ground floor entrance lobby and this serves field equipment (break glass units/bells) around the building. 4.8 Telecommunications / Data Installation The building has been fully fitted out with data wiring to all outlets located on the skirting trunking and other points within the building. This has been specifically tailored to suit the current tenant’s requirements and is considered a Category B item. Consideration will have to be given to the removal or adaptation of this data installation. 4.9 Lightning Protection Installation The building is currently served by a lightning protection installation including cross bonding to the roof plant and hand rails. Page | 14 HARP HOUSE SECTION FIVE 5 .1 C1621 OUTLINE DESCRIPTION OF LIFT SERVICES General Currently the lift installation is operational but considered to be approaching the end of its economic life expectancy in terms of the controllers. The main controller for the lift is dated and it is suspected that the any components within the controllers will not be supported by the manufacturers after 20 years. A full health and safety audit of the lifts should be undertaken and any item found to be defective should be addressed. The lifts should be fully certified by an approved insurance inspector and all necessary documentation in terms of 1, 5 and 10 years testing should be supplied by the current building occupiers. The lift car finishes in the main goods lift are in a poor state and require replacement. Page | 15 HARP HOUSE C1621 Appendix A Photographs Heating Boiler Boiler Primary Pump at high level in boiler room Page | 16 HARP HOUSE C1621 Mechanical Control Panel Sump in Boiler room Page | 17 HARP HOUSE C1621 Office Extract Plant Office Supply Plant Page | 18 HARP HOUSE C1621 Cold Water Storage Tank Blocked Roof Outlet Page | 19 HARP HOUSE C1621 Typical Office Discharge Grille Ceilings and Lighting in Typical Office Upper Floors Page | 20 HARP HOUSE C1621 Dropped Bulkhead on Upper Floors Housing Fan Coil Units Fan Coil Unit in Bulkhead Page | 21 HARP HOUSE C1621 Filter on Back of Fan Coil Unit Heater Casing Page | 22