Journal - BACnet
Transcription
Journal - BACnet
BACnet Europe ISSN 1614-9572 Journal Energieeffizienz in BACnet Projekten Energy Efficiency in BACnet Projects 11 10/09 Krankenhaus-Erneuerung mit BACnet Hospital Renovation with BACnet 11 Energieeffiziente Begegnungsstätte Energy-efficient Community Center 21 BACnet bei Heidelberger Druckmaschinen BACnet at Heidelberger Druckmaschinen 26 Bessere Qualität von BACnet Projekten Higher Quality of BACnet Projects 33 BACnet auf „GebäudeEffizienz 2009“ BACnet at “GebäudeEffizienz 2009”48 DESIGO – saves energy efficiently through intelligent building automation Flexible for use in any building or application With the DESIGO™ building automation system, you can significantly reduce energy consumption while at the same time optimize comfort. The system’s high control quality reduces energy consumption and ensures an especially pleasant room climate. Innovative energy saving functions allow you to sustainably preserve resources and therefore to lower costs. And an intelligent, easy-to-operate energy management system identifies saving potentials for all integrated building systems. For you, that means a system that really pays off and that can be used for all applications and expanded as needed – thanks to its high degree of flexibility. For more information, please visit www.siemens.com/desigo Answers for infrastructure. Pictures used show the new court house in Gent, designed in 2007 by the architects Stéphane Beel and Lieven Achtergael from Beel-Achtergael architecten F.V and by Technum. Inhalt – Content Editorial Notes 5Bill Swan: BACnet bringt effiziente Gebäude – More BACnet – more efficient buildings 6 BACnet auf der AHR Expo 2010: Europäische Gebäudetechnologie BACnet at the 2010 AHR Expo: European Building Technology 7 BACnet Controller werden global gelistet – BACnet controllers to be globally listed Anwendungen – Solutions BACnet Europe Journal 9 O2 Arena ist hochflexibel für multifunktionale Nutzung – High Flexibility for multipurpose O2 Arena ISSN 1614-9572 11 Krankenhaus-Erneuerung mit BACnet – Hospital Renovation with BACnet The BACnet Europe Journal is the European magazine for building automation based on BACnet technology. Experts, practitioners and professionals show the way in applying and developing the BACnet standard – from building automation trends to devices and application projects; from qualification and training to testing and certification; from who’s who in the BACnet community to useful information on events and publications. Special attention is given to members and activities of the BACnet Interest Group Europe (BIG-EU). 14 Kontinuierliche Modernisierung im Universitätsklinikum Würzburg On-going Modernisation at Würzburg University Center 16 Erstes Energieeffizienz-Restaurant von Mc Donald’s – First energy-efficient Mc Donald’s restaurant 18 Klinikum Wolfsburg mit BACnet stufenweise modernisiert Gradual Modernisation of Wolfsburg Hospital with BACnet 21 Energieeffiziente Begegnungsstätte im Südstadtforum Nürnberg Energy-efficient Community Center in the Nuremberg “Südstadtforum” 24 Klinik Kirchheim-Nürtingen setzt auf BACnet – Kirchheim-Nürtingen Hospital opts for BACnet 26 Offenes Gebäudemanagement bei Heidelberger Druckmaschinen Open building management at Heidelberger Druckmaschinen Distribution This bi-annual and bi-lingual Journal (English/German) can be ordered free of charge by partners, members, media representatives and friends of the BACnet Europe Interest Group (BIG-EU) – registered society. Order the BACnet Europe Journal by E-Mail from info@big-eu.org 28 BACnet für mehr Energieeffizienz und Umweltschutz BACnet for More Energy Efficiency and Pollution Control 30 SNMP-Integration in BACnet beim Landschaftsverband Rheinland SNMP integration into BACnet at the Rhineland Regional Council Online distribution The BACnet Europe Journal is posted as a Portable Document Format (PDF)-File to www.big-eu.org and www.bacnet.de BACnet insight 33 Bessere Qualität von BACnet Projekten – Higher Quality of BACnet Projects 36 Zeitschaltfunktionen in BACnet – Teil 2: Wie sind die Zeitschaltfunktionen in BACnet realisiert? Schedule-integration in BACnet – Part 2: How are the Scheduling Functions Realized in BACnet? Editor BACnet Europe Interest Group (BIG-EU), registered society, Droste-Hülshoff-Straße 1 44141 Dortmund Germany Phone: +49-2 31-56 77 72 69 Fax: +49-2 31-42 78 67 32 E-mail: info@big-eu.org URL: www.big-eu.org 38 Planung der Gebäudeautomation mit BACnet – wesentliche funktionelle Vorgaben Building Automation Planning with BACnet – Essential Functional Requirements Produkte – Products 41 Alle BACnet-Daten auf einen Blick – die neuen L-VIS Touch Panels All BACnet Data at a Glance – the New L-VIS Touch Panels 43 Produkte zur einfachen BACnet Integration – Products for Easy BACnet Integration Executive Board Volker Röhl, Strabag Property and Facility Services GmbH (President), Bill Swan, Alerton/Honeywell (Vicepresident) Gijs de Koning, Regel Partners B.V. Roger Braun, Siemens Schweiz AG (Treasurer) 44 Steigerung der Energieeffizienz durch novaPro Open Increasing Energy Efficiency with the Aid of novaPro Open 45 Universeller Dolmetscher und mehr für BACnet – Universal Translators not more for BACnet BACnet Interest Group Editorial Office MarDirect Marketing Direct GbR Bruno Kloubert (Editor in chief), Carolin Grehl, Eva-Maria Erps Phone: +49-2 31-42 78 67 31 E-mail: kloubert@mardirect.de 46 BACnet in Multivendor-Systemen testen – Plugfest in Helsinki war ein Erfolg BACnet in multivendor-systems – 2009 Plugfest Event Deemed a Success 48 Mit intelligenter Gebäudetechnik zu mehr Gebäudeeffizienz Using Intelligent Building Automation for Greater Building Efficiency 51 BACnet France auf der Interclima+elec Paris – BACnet France at Interclima+elec Paris Advertising MarDirect Marketing Direct GbR Britta von Helden Phone: +49-2 31-56 77 72 69 Fax: +49-2 31-42 78 67 32 E-mail: vonhelden@mardirect.de 51 Italienisches BACnet Journal am Start – BACnet Italy Journal on the Move 54 Willkommen in der BIG-EU – Welcome to the BIG-EU 55 BACnet Kalender – Calendar of BACnet Events Picture credits BIG-EU, MarDirect and specified companies Copyright © BIG-EU 2009 – Further editorial use of articles in the BACnet Europe Journal is encouraged (!) with reference to the source. Please send a specimen copy to the editor, or if published online, send the URL per mail to kloubert@mardirect.de BACnet® is a registered trademark of the American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. (ASHRAE) BACnet Europe ISSN 1614-9572 Journal Energieeffizienz in BACnet Projekten Energy Efficiency in BACnet Projects 11 10/09 Titelbild Cover picture Energieeffizienz-Restaurant von McDonald´s in Achim bei Bremen Energy-efficient Mc Donald´s restaurant in Achim near Bremen Krankenhaus-Erneuerung mit BACnet Hospital Renovation with BACnet 11 Energieeffiziente Begegnungsstätte Energy-efficient Community Center 21 BACnet bei Heidelberger Druckmaschinen BACnet at Heidelberger Druckmaschinen 26 Bessere Qualität von BACnet Projekten Higher Quality of BACnet Projects 33 Alle Ausgaben sind als Download im Servicebereich von www.big-eu.org verfügbar All issues can be downloaded from the service area of www.big-eu.org © Mc Donald’s Deutschland Inc. BACnet auf “GebäudeEffizienz 2009” BACnet at „GebäudeEffizienz 2009“ 48 BACnet Europe Journal 11 10/09 3 BACnet Room Controllers Lower Your Total Installed Cost! VT7200 PIR Chilled Beam Controller Viconics Electronics Inc. 9245 Langelier Blvd. • St-Leonard , Quebec • Canada • H1P 3K9 • Tel. : 1. 514 . 321-5660 • Fax: 1. 514 . 321-4150 sales@viconics.com • www.viconics.com • www.communicatingthermostats.com VT7300 PIR Fan-Coil Controller BACnet bringt effiziente Gebäude More BACnet – more efficient buildings Liebe Leser, Die Energieeffizienz von Gebäuden zu verbessern ist heute wichtiger denn je. Ursache hierfür sind nicht nur die hohen Energiepreise, sondern auch die Notwendigkeit, schädliche Umwelteinflüsse durch Gebäude zu reduzieren. Diese Auswirkungen gehen weit über die Mauern eines Gebäudes hinaus, nicht zuletzt durch den hohen Energieverbrauch können Kohlendioxide und Quecksilber-Strahlungen aus Kohle-Verbrennungsanlagen freigesetzt werden. Dem Ziel einer erhöhten Effizienz steht das Bedürfnis einer komfortablen und gesunden Umgebung für die Bewohner des Gebäudes gegenüber. Es ist einfach ein energieeffizientes Gebäude zu erstellen, das ungesund ist oder eins, das komfortabel ist aber einem gesteigerten Energieverbrauch benötigt. Aber es ist weitaus schwieriger beide Ziele gleichzeitig zu erreichen. Zu diesem Zweck haben sich Gebäude Verbände einschließlich der „Deutschen Gesellschaft für nachhaltiges Bauen“ (DGNB); und den sogenannte „Green Building“ Verbänden in den Niederlanden, Polen, Rumänien, England, Italien und Spanien zusammengeschlossen. Gemeinsam entwickeln sie Schulungen für qualifizierte Fachkräfte und ein System für die Zertifizierung nachhaltiger Gebäude, die sowohl energieeffizient als auch komfortabel sind. Dieses System definiert Messwerte zum Erreichen eines Energielevels, die über die Basiswerte der ASHRAE Standards 90.1 und 100 hinausgehen. Wesentlicher Bestandteil zum Erreichen dieser Werte ist die Integration verschiedener Gebäudesysteme, einschließlich der Heizungs-, Lüftungs- und Klimasysteme sowie der Lichtsysteme. BACnet Technologien haben eine entscheidende und wachsende Bedeutung in der Erbauung und Steuerung nachhaltiger Gebäude. Ein einheitliches Protokoll vereinfacht und fördert die Integration verschiedener Systeme, die die Gesundheit und den Komfort der Bewohner steigern und gleichzeitig den Energieverbrauch auf ein notwendiges Minimum reduzieren. Eine einheitliche Gebäudeautomation wird außerdem eine spätere Erweiterung des Systems und das Hinzufügen neuer Komponenten erleichtern, auch wenn diese von anderen Herstellern kommen. BACnet ist die Zukunft nachhaltiger, gesunder, komfortabler und energieeffizienter Gebäude. Darum ist das Thema dieser Ausgabe des BACnet Europe Journal: „Energieeffizienz in BACnet Projekten.“ Viel Spaß beim Lesen des neuen BACnet Journals! Dear Reader, Improving the energy efficiency of buildings is more important today than ever. This need is driven not only by high energy prices but by the need to reduce the building’s impact on its environment. This impact can reach far beyond its walls, and not least through its energy consumption which can, for example, result in undesirable carbon dioxide and mercury emissions from coal-fired plants. But this goal of increased efficiency is countered by the need to provide a comfortable and healthy interior environment for the buildings’ occupants. It is easy to provide an energy-efficient building that is unhealthy, or one that is comfortable but which requires major amounts of energy; it is far less easy to attain both goals simultaneously. To this end building organizations including the German Sustainable Building Council (DGNB); the Dutch, Polish, Romania and UK Green Building Councils; GBC Italia and GBC España have produced and use education and rating systems for sustainable buildings, buildings that are both energy-efficient and healthy. These systems define measures for achieving energy-efficiency that go beyond the basic levels established by ASHRAE standards 90.1 and 100. A key part of those measures is the integration of various building systems, including but not at all limited to the HVAC and lighting systems. This is where BACnet will have an increasing role in the construction and operation of sustainable buildings. Having a common protocol used by the various building systems not only simplifies but encourages the integration of those systems, to maintain occupant health and comfort while reducing the building’s energy consumption to the minimum necessary to sustain that health and comfort. But even more than that, having a unified building automation system will also simplify the addition of future devices and future strategies, even those provided by manufacturers not represented in the initial installation. The future of sustainable, healthy, comfortable and energy- efficient buildings lies with BACnet. And so to that end, the theme of this issue of the BACnet Europe Journal is “Energy Efficiency in BACnet Projects.” Enjoy reading the new BACnet Journal! Bill Swan Honeywell/Alerton USA Vizepräsident der BIG-EU Vice-President of the BIG-EU BACnet Europe Journal 11 10/09 5 BACnet Interest Group BACnet auf der AHR Expo 2010: Europäische Gebäudetechnologie BACnet at the 2010 AHR Expo: European Building Technology Nach dem Erfolg der letzten beiden Jahre werden die Mitglieder der BACnet Interest Group Europe (BIGEU) auch 2010 wieder auf der AHR Expo vertreten sein. Diese findet vom 25. bis 27. Januar 2010 in Orlando, Florida, statt. Die AHR Expo als traditionsreiche Messe für Heizung, Lüftung, Klimatisierung und Kühlung ist der Marktplatz für die Gebäudeautomation und die HLK-Industrie in Nordamerika. Von Jahr zu Jahr präsentieren sich mehr Fachleute auf der zunehmend internationalen Messe und nutzen die Gelegenheit zum Verkauf und Networking mit Vertre- tern aus aller Welt. Mehr als 1800 Aussteller, mehrere Industrieverbände und über 25.000 Besucher aus aller Welt werden erwartet. Auch immer mehr europäische Anbieter nutzen den amerikanischen Markt erfolgreich für ihren Export. Ihre Produkte sind den Produkten der Konkurrenz überlegen, wie die Fachzeitschrift IKZ Haustechnik 7/09 berichtet: „Die europäischen Hersteller sind ihren USWettbewerbern hinsichtlich Energieeffizienz, System orientierung, Nachhaltigkeit und Kundenfortbildung um 10 bis 15 Jahre voraus.“ Eine Einschätzung, die nicht nur die Amerikaner beeindruckt. Organisiert wird der europäische BACnet Stand wie schon in den letzten Jahren von dem BIG-EU Marketing Büro MarDirect. Den BIGEU Mitgliedern wird auch für die kommende AHR Expo wieder ein umfassendes Servicepaket angeboten. After the success over the last two years, the members of the BACnet Interest Group Europe (BIG-EU) will be represented once again in 2010 with a BACnet stand at the AHR Expo. This will take place in Orlando, Florida Skyline von Chicago: Hier präsentierte sich die BIG-EU erfolgreich auf der AHR Expo 2009. Skyline of Chicago: Here, the BIG-EU was present at the AHR Expo 2009. 6 BACnet Europe Journal 11 10/09 from 25-27 January, 2010. As a trade fair for heating, ventilation, air conditioning and refrigeration with a long tradition, the AHR Expo is the marketplace for building automation and the HVAC industry in North America. Every year, more and more industry professionals showcase their products at this growing international trade fair and take the opportunity to sell and network with representatives from all over the world. More than 1800 exhibitors, multiple industry associations and more than 25,000 visitors are expected from around the world. Additionally, more and more European suppliers are successfully taking advantage of the American market for their exports. Their products are superior to those of their competitors, as reported in July 2009 by the German building services trade magazine, “IKZ Haustechnik”. “The European manufacturers are around 10 to 15 years ahead of their U.S. competitors in terms of energy efficiency, system orientation, sustainability and customer training.” This estimation impresses not only many Americans. As in years past, the European BACnet booth is being organized by the BIG-EU marketing office, MarDirect. BIG-EU members will once again be offered a comprehensive service package for the upcoming AHR Expo. BACnet Interest Group BACnet Controller werden global gelistet BACnet controllers to be globally listed BACnet Anwender aus Europa und USA unterzeichnen Abkommen für gemeinsames Testing und Listing. BACnet users in Europe and the U.S. sign cooperative testing and listing agreement. Die BACnet Interest Group Europe (BIG-EU) und die amerikanische BACnet Inter national (BI) führen ihre BTL Produkt-Listings zusammen. Damit entsteht eine einzige globale Liste von BACnet Produkten mit BTLMarke – dem Zeichen, das weltweit die Konformität zum BACnet Standard ISO 16484-5 bestätigt. BIG-EU und BI unterzeichneten ein Abkommen, das die gemeinsame Spezifika tion des Listing regelt. Alle gelisteten Produkte werden auf der Website www. bacnetinternational.org/ btl/veröffentlicht. Die BIGEU bringt auf ihrer Website www.big-eu.org zusätzlich eine Übersicht der Produkte, die nach europäischen Vor gaben zertifiziert sind. Unterschied von BTL-Marke und Zertifikat Im Vorgriff auf die strengen europäischen Regelungen zur Gebäudeeffizienz lassen viele europäische Hersteller die BACnet Konformität ihrer Produkte seit 2008 von akkreditierten Stellen zertifizieren – zusätzlich zum BTLListing. Im Unterschied zur BTL-Marke, die von den BACnet Testing Laboratories (BTL) verliehen wird, werden die Zertifikate nur von unabhängigen Instanzen ausgestellt. Die Zertifizierung setzt in Europa den höchsten Standard für Produkttests. Nutzer gehen damit sicher, dass die erforderlichen Funktionen enthalten und getestet sind. Darüber hinaus führt die BIG-EU auch den offenen Produktkatalog weiter. Diese Marktübersicht von BACnet Produkten enthält die Selbsterklärungen und Datenblätter der Hersteller – unabhängig von Tests, Listings und Zertifikaten. Er ist unter www.big-eu.org/catalog/ index.php zu finden. Hersteller können wählen „BACnet ist die bevorzugte Wahl für integrierte Gebäudesysteme, die Kontrolle von Energiekosten und für zukunftssichere kommerzielle und institutionelle Einrichtungen“, erklärt Volker Röhl, der BIG-EU Präsident. „Daher ist es so wichtig, dass wir einerseits das BTL Listing über alle Länder hinweg gleich gestaltet haben und andererseits mit der Zertifizierung eine Lösung anbieten, die höchsten europäischen Anforderungen genügt.“ Nun müssten die Hersteller entscheiden, ob sie für ihren Zielmarkt den einen, den anderen oder beide Konformitätsnachweise benötigen. Mit dem Abkommen zum gemeinsamen Listing und der Rücksicht auf europäische Anforderungen konnten die europäischen und amerikanischen „BACneteers“ ihre Partnerschaft weiter ausbauen. Andy McMillan, Präsident der BI, resümiert: „Vergleicht man unsere früheren Vereinbarungen mit dem neuen Abkommen, sind unsere Beziehung und auch den Wert des BACnet Protokolls zweifelsohne weiter gestärkt worden.“ BACnet Interest Group Europe (BIG-EU) and BACnet International have combined their BTL product listings. This creates a single global list of products with the BACnet BTL logo – the global sign of conformance to the BACnet standard ISO 16484-5. BIG-EU and BI signed an agreement that governs the common specification of the listing. All listed products will be published on the BI website at www.bacnetinternational.org/btl/. The BIGEU will also give an overview of products that are certified according to European standards on its website: www.big-eu.org. The difference between the BTL logo and certificate In anticipation of the strict European regulations on building efficiency, many European manufacturers have been certifying their products’ BACnet conformity through accredited bodies since 2008 – in addition to the BTL listing. In contrast to the BTL logo, which is awarded by the BACnet Testing Laboratories (BTL), the certificates are issued only by independent authorities. The certification sets the highest standard for product testing in Europe. Users can thus be sure that the necessary functions are included and tested. In addition, BIG-EU will also continue with its open catalog. This market overview of BACnet products contains the self-declarations and datasheets of manufacturers – regardless of testing, listings and certificates. Online at www.big-eu.org/catalog/ index.php. “BACnet is the preferred choice for integrated building systems that control energy costs as well as for sustainable commercial and institutional facilities”, explains Volker Röhl, the BIGEU president. “This is why it is so important that on the one hand we have uniformly designed the BTL listing across all countries, and on the other hand with certification we provide a solution that meets the highest European standards.” Now manufacturers must decide whether their products will need proof of conformity for one or the other target markets, or even for both target markets. With the agreement for common listing and the consideration for European requirements the European and American “BACneteers” are able to strengthen their partnership. Andy McMillan, president of BI, sums it up: “If we compare our previous agreements with the new agreement, our relationship, and even the value of the BACnet protocol, has without a doubt been strengthened.” BACnet Europe Journal 11 10/09 7 ABB standard drives for HVAC – fluent in native BACnet – IP & MS/TP Frequenzumrichter für die Gebäudetechnik – beherrschen fließend BACnet – IP & MS/TP ABB standard drives for HVAC. 20 000 BACnet installations worldwide. HKL-Frequenzumrichter von ABB. 20 000 BACnet Installationen weltweit. Here’s why ABB standard drives for HVAC applications really Das sind die Gründe, warum HKL-Frequenzumrichter von ABB wirklich make a difference: den Unterschied machen: • Suitable for standard induction motors rated from 0,75 to • Für Standard-Asynchronmotoren mit einer Nennleistung von 355 kW (1 to 550 HP) 0,75 bis 355 kW (1 bis 550 HP) geeignet • Native BACnet embedded as standard • BACnet standardmäßig integriert • Direct connection to BACnet MS/TP networks – • Direkte Ankopplung an BACnet MS/TP-Netzwerke - kein Gateway no add-ons needed • Snap-on router as option - enables integration to BACnet/IP networks • BTL approved B-ASC (Application Specific Controller), conforms to ISO 16484-5:2007 Visit us at www.abb.com/drives notwendig • Aufsteckbarer Router ermöglicht Anbindung an BACnet/IP-Netzwerke • BTL-Zulassung B-ASC (Application Specific Controller), erfüllt ISO 16484-5:2007 Besuchen Sie uns im Internet unter www.abb.de/motors&drives E-Mail: motors.drives@de.abb.com Anwendungen Solutions O2 Arena ist hochflexibel für multifunktionale Nutzung High Flexibility for multipurpose O2 Arena In der Berliner O2 World Arena stellen eine BACnet-basierte Gebäudeautomation und ein BACnet-basiertes Gebäude management sicher, dass die multifunktionale Location schnell für die jeweiligen Events umgebaut werden kann. Die ABB Standard Drives für HLK sichern dabei die hohe Flexibilität der Einrichtungen. At the O2 World Arena in Berlin, BACnet based building automation and facility management ensure that the location can be quickly configured to meet the demands of a broad spectrum of events. ABB standard drives for HVAC ensure high flexibility of its facilities. Im September 2008 nach nur zweijähriger Bauzeit eröffnet, ist die O2 World Arena heute eine der größten und flexibelsten Multifunktionsarenen Europas für Konzerte, Sport und Unterhaltung. Ein Umbau der Arena von Konzert- zu Sportveranstaltungen in wenigen Stunden ermöglicht eine höchsteffiziente Nutzung des Gebäudes. Die Daten und Fakten sind beeindruckend: 17.000 Sitzplätze, 59 Entertainment-Suiten, über 100 Verkaufsgeschäfte, zu regelndes Innenraumvolumen von 230.000 m³ Luft. Die Gebäudeautomation und das Gebäudemanagement wurde von der GFR Gesellschaft für Regelungstechnik und Energieeinsparung mbH geplant und realisiert. Einfache BACnet/ IP-Anbindung Für die Drehzahlregelung der Lüftermotoren des HLK-Systems wählte GFR den ABB Standard Drive ACH550 für Die O2 World Arena ist die neue Bühne für Entertainment und Sport in Berlin. O2 World Arena is the new venue for entertainment and sports events in Berlin. BACnet Europe Journal 11 10/09 9 Anwendungen Solutions Mit dem neuen BACnet-Router können die ABB Standard Drives für HLK an BAC-net/IP angeschlossen werden. The new BACnet router enables ABB standard drives for HVAC to be connected to BACnet/IP. und Konfiguration über einen Standard-Browser erfolgen. HLK-Anwendungen. Der entscheidende Vorteil dieser Frequenzumrichter ist der problemlose Anschluss an das BACnet/IP-Netz über einen optionalen, aufsteckbaren BACnet/IP-Router, der in den Frequenz umrichter eingebaut werden kann. Die 36 Frequenz umrichter im Leistungsbereich von 7,5 kW bis 45 kW wurden in mehrere BACnet MS/TP-Teilnetze zusammengefasst. Die serielle Kommunikation erfolgt über EIA-485. Jedes Teilnetz ist über einen BACnet/ IP-Router an das BACnet/ IP-Netz angeschlossen. Jeder Router arbeitet für zwei bis acht Frequenzumrichter, so dass Teilnetze auf kostengünstige Weise eingerichtet werden können. Hohe Transparenz Der ACH550 ist standardmäßig mit BACnet MS/TP ausgestattet. BACnet/IP ist über den optionalen Router verfügbar. Verglichen mit den aufwändigeren Buskopplerlösungen, die einen erheblichen Parametrierungsaufwand erfordern, ermöglicht der BAC-net/ IP-Router eine reale Transparenz zwischen dem Gebäudeautomationsund Managementsystem von GFR und den Frequenz umrichtern von ABB. Der BACnet/IP-Router RBIP-01 ist leicht zu installieren. Dank der Web-Server-Funktionalität können Zugriff In der O2 World Arena haben die Routermodule die Integration der ACH550Frequenzumrichter in das BACnet-Konzept von GFR erheblich vereinfacht. Die problemlose Integration der Antriebe hat Zeit gespart und einen besseren Zugriff auf die Antriebsparameter ermöglicht. Aufgrund des BACnet-IP-Protokolls stehen die E/A der Frequenzumrichter auch anderen BACnet-Geräten, wie Direkten Digital-Controllern (DDCs) zur Verfügung. Die Zählerstände der Wartungsund Energiesparzähler werden über das BACnet-Netz angezeigt, und der Zugriff darauf kann z. B. von den BAC-net-Bediens tationen (OWS) aus erfolgen. Normenkonformität Der ABB Standard Drive für HLK-Anwendungen erfüllt die internationale Norm BACnet DIN EN ISO 16484-5:2007 und die europäische Norm für Oberschwingungen IEC/EN 61000-3-12, welche strenge Grenzwerte für die Oberschwingungen von Geräten, die an das öffentliche Stromnetz angeschlossen sind, festlegt. Die „Swinging Choke“ des Frequenzumrichters reduziert die Oberschwingungen im Teillastbereich um bis zu 25%. Die Einhaltung der europäischen Norm bietet Sicherheit und vereinfacht die Projektierung sowie das Gebäudemanagement. Inaugurated in September 2008 after a construction period of only two years, O2 World Arena is one of the largest and most versatile multipurpose venues for concerts, sports events and entertainment in Europe. The ability to convert O2 10 BACnet Europe Journal 11 10/09 World Arena from a concert venue to a sporting arena in only a few hours ensures that it can be used with maximum efficiency. The facts and figures are impressive: 17,000 seats, 59 entertainment lounges, more than 100 shops, and a total indoor air volume of 230,000 m³ to be controlled. The building automation and building management systems were designed and implemented by GFR Gesellschaft für Regelungstechnik und Energieeinsparung mbH. Easy connection to BACnet/IP GFR selected ABB ACH550 standard drives for HVAC, to control the speed of the HVAC system’s fan motors. A key benefit of these drives is their straightforward connection to the BACnet/IP network through an optional snapon BACnet/IP router module, which can be mounted inside the drive. A total of 36 ABB standard drives, ranging from 7.5 to 45 kW, are arranged in multiple BACnet MS/TP sub-networks using EIA-485 serial communication. Each subnetwork is connected to the BACnet/IP network through a BACnet/IP router. Each router serves two to eight drives, which enables cost-effective sub-networking. High Transparency The ACH550 is supplied with BACnet MS/TP as standard, and BACnet/IP is available with the optional router. Compared to more elaborate gateway solutions requiring a significant parametrization effort, the BACnet/IP router enables true transparency from GFR’s BACnet based building automation and facility management system to the ABB drives. The RBIP-01 BACnet/IP router module is easy to in- stall. Web server functionality enables access and configuration using a standard web browser. At O2 World Arena the router modules considerably facilitated the integration of the ACH550 drives into GFR’s BACnet concept. Smooth integration of the drives saved time and ensured wider access to the drive parameters. Thanks to the BACnet protocol, drive I/Os are freely available to other BACnet units, such as direct digital controllers (DDCs). Maintenance and energy savings counters are visible to the BACnet network and accessible, for instance, from BACnet operator work stations (OWS). Conformance with standards The ABB standard drive for HVAC meets the international BACnet DIN EN ISO 16484-5:2007 standard and conforms to the European standard for harmonics, IEC/EN 61000-3-12, which sets stringent limits with regard to current harmonics for devices connected to the public mains. In fact, the drive’s “swinging choke” feature reduces harmonics in partial load operation by up to 25%. Conformance with the European harmonics standard helps to promote safety and streamline tasks related to planning and facility management. Klaus Allgaier ABB Automation Products GmbH klaus.allgaier@de.abb.com www.abb.com Anwendungen Solutions Krankenhaus-Erneuerung mit BACnet Hospital Renovation with BACnet Die gesamte Gebäudeautomation im Krankenhaus von La Chaux-de-Fonds in der Schweiz wird bis Ende 2009 erneuert. Mit BACnet als Basis wird der Wunsch des technischen Dienstes umgesetzt, in Zukunft über ein offenes System zu verfügen. By the end of 2009, the entire building automation of La Chaux-de-Fonds Hospital in Switzerland will have been renovated. With BACnet as its basis, the technical service’s wish to have an open system for the future will become reality. Die Anforderungen an die gebäudetechnischen Einrichtungen in Spitälern nehmen stetig zu. Integrale Gebäude- und Raumautomation ermöglicht die umfassende Kontrolle über den im Krankenhaus beträchtlichen Energieverbrauch, erhöht den Komfort und verbessert viele Prozesse. Luciano Vermot, der technische Leiter der Hôpital neuchâtelois, hatte für die umfassende Erneuerung der Gebäude automation eine klare Ziel vorgabe: Die neue Plattform sollte auf einem offenen Standard basieren. Als er 2008 an der Fachmesse Hilsa die neue BACnet-Lösung von Saia Burgess in Kombination mit ControlMaestro 2008 als SCADA kennen lernte, war für ihn eine entsprechende Auftragsvergabe an den Mitaussteller DPC SA als Systemintegrationsfirma klar. Erneuerung bei laufendem Betrieb Die Herausforderung bestand u.a. darin, die gesamte Erneuerung bei laufendem Betrieb in Etappen durchzuführen, wofür pro Schaltgeräte-Kombination jeweils genau zwei Tage Auswechslungszeit zur Verfügung standen. Alle Funktionsbeschriebe und Schemata mussten neu erstellt werden. DCP erstellt jeweils pro Etappe die gesamte Schaltgerätekombination in ihrer Werkstatt, die Anlagen werden fertig programmiert und ausgetestet, bevor der Einbau vor Ort erfolgt. Bis Ende 2009 soll die Erneuerung abgeschlossen sein und ca. 3.000 Datenpunkte sowie 1.500 Meldungen und Alarme aufweisen. (Quelle: BUS-House) La Chaux-de-Fonds liegt rund 1.000 Meter über dem Meeresspiegel und ist damit eine der höchstgelegenen Städte Europas. Die Stadt gehört zu den bekanntesten Uhrenstädten der Schweiz und verfügt über ein Krankenhaus mit 150 Betten, das seit 2006 zur Gruppe der Hôpital neuchâtelois gehört. Das jetzige Hauptgebäude wurde 1966 errichtet. Außenansicht des Krankenhaus La Chaux-de-Fonds. External view to the La Chaux-de-Fonds Hospital. 5,7-Zoll-Webpanels als lokale Bedienelemente. Die Saia BACnet Building Controller sind universell einsetzbare, offene Automationsstationen, welche sich nahtlos in ein BACnet-Netzwerk integrieren lassen. Die Applikation kann wie gewohnt mit dem Programmier-Tool PG5 Controls-Suite erstellt werden. Der darin enthaltene erEingesetzt werden Saia- BACnet-Konfigurator Burgess SPS Typ PCD3 sowie möglicht die völlig freie Pa- rametrierung aller BACnetObjekte. Somit lassen sich alle erdenklichen Aufgaben smart lösen. Einfaches BACnet-Engineering „Mit dem BACnet-Konfigurator im PG5 lassen sich ganz einfach EDE Dateien erstellen und importieren. Damit können wir alle BACnet- Objekte der Unterstationen in elektronischer Form an BACnet Europe Journal 11 10/09 11 das Managementsystem ControlMaestro 2008 übergeben“, lautet das überzeugende Fazit des erfahrenen Automationspraktikers Alexandre Mottas von PDC SA. Auch komplexe Kommunikationsaufgaben lassen sich schnell und fehlerfrei bewältigen. Ein BACnet Building Controller verarbeitet bis zu 1.200 BACnet-Objekte. Neben den üblichen Objekten wie Analog, Digital, Mittelwert, Zähler und Pulskonverter stehen auch komplexe Objekte wie Scheduler und Kalender, Alarm, Event und Trendlog zur Verfügung. Somit verfügt das Krankenhaus von La Chauxde-Fonds über ein leistungsfähiges und offenes Gebäudemanagement. La Chaux-de-Fonds is situated around 1,000 metres above sea level, placing it among Europe’s highest cities. It is one of Switzerland’s best known centres for the clock and watch-making industry. The town has a 150 bed hospital which, since 2006, has belonged to the Neuchâtel Hospital Group. The existing main building was constructed in 1966. Ever greater demands are placed on hospital buildings with regard to their technical facilities. Integral building and room automation allows comprehensive control of the considerable energy consumption in a hospital, while increasing comfort and improving many processes. Luciano Vermot, the Technical Manager of Neuchâtel Hospital Group, had a clear objective for the complete renovation of the building automation. The new platform had to be based on an open standard. In 2008 when he attended the Hilsa Exhibition and learned about the new BACnet solution, SCADA, from Saia Burgess in conjunction with ControlMaestro 2008, he was ready to place a corresponding contract with the co-exhibitor DPC SA as the system integration company. Renovation while hospital business proceeds The challenge included, among other things, carrying out the entire renovation in stages while business proceeded as usual, with exactly two days changeover time available per switchgear combination. All function descriptions and diagrams had to be reedited. For each stage, DPC creates the entire switchgear combination in its own workshop. The installations are fully programmed and tested before they are assembled on site. By the end of 2009, renovation should be complete, comprising arround 3000 data points and 1500 messages and alarms. (© DPC) Anwendungen Solutions Prinzipschema der neuen Gebäudeautomationsanlage mit BACnet im Krankenhaus La Chaux-de-Fonds samt Integration aller Energiemessungen. Pictorial schematic of the new building automation system with BACnet in La Chaux-de-Fonds Hospital, including the integration of all energy measurement. PCD3 type PLCs from SaiaBurgess are used, together with 5.7-inch web panels as local control elements. Saia BACnet Building Controllers are general purpose, open automation stations and can be seamlessly integrated into a BACnet network. The application is produced as usual with the PG5 Controls-Suite programming tool. It includes a BACnet configurator that allows complete freedom to set the parameters of all BACnet objects. As a result, a smart solution can be found for any conceivable task. Simple BACnet engineering Alexandre Mottas of DPC SA, an experienced automation practitioner, convincingly sums it up this way: “With the BACnet configurator in the PG5, EDE files are very easy to edit and import. We can therefore transfer all BACnet objects from substations electronically to the ControlMaestro 2008 management system.” Even complex communications tasks can be handled speedily and without errors. A BACnet Building Controller processes up to 1200 BACnet objects. Alongside the usual ones (such as analogue, digital, average, counter and pulse converter), complex objects are also available, e.g. scheduler and calendar, alarm, event and trendlog. As a result, La Chaux-de-Fonds Hospital has powerful, open building management at its disposal. (© DPC) Richard Staub richard.staub@bus-house.ch www.bus-house.ch Saia Building Controller mit nativer BACnet-Kommunikation in einer Schaltgerätekombination. Saia Building Controller with native BACnet communication in a switchgear combination. Oliver Greune Product Manager Saia-Burgess Controls AG oliver.greune@ saia-burgess.com www.start-controls.com BACnet Europe Journal 11 10/09 13 Anwendungen Solutions Kontinuierliche Modernisierung im Universitätsklinikum Würzburg On-going Modernisation at Würzburg University Center Gebäudeautomation von Johnson Controls sorgt für den effizienten und sicheren Betrieb des Universitätsklinikums Würzburg. Building automation by Johnson Controls takes care of efficient, reliable operation at Würzburg University Hospital. Würzburg zählt neben Heidelberg, Köln und Erfurt zu den ältesten Universitätsstädten in Deutschland. Auch im Bereich der Gebäudeautomation nimmt Würzburg eine Vorreiterrolle ein, denn hier entschied man sich frühzeitig dafür, in allen neuen Bauvorhaben nur noch das genormte BACnet Protokoll zuzulassen. So führte Johnson Controls bereits 1996 eine Managementebene mit Me- sten. Dabei wurden sowohl die homogene DDC-Technik als auch die neuste BACnetTechnik unter der neuen Management-Ebene zusammengeführt und die 25.000 Datenpunkte des historisch gewachsenen N1 Netzwerks in die Gebäudeleittechnik eingebunden. Zudem bauten die Experten einen zweiten MPlus Server als Rückfallebene auf, der es erlaubt, Generierungs- oder Wartungsarbeiten durchzufüh- tasys N1 Netzwerk und OWS Bedienstationen ein und schaltete bis 2003 über 25.000 Datenpunkte auf. 2004 schalteten die Johnson Controls Techniker im Zentrum Operative Medizin weitere BACnet Controller von Siemens mit 20.000 Datenpunkten auf und installierten 2006 das Managementsystem MPlus mit N1und BACnet OPC-Servern, um die Zukunftsfähigkeit des Systems zu gewährlei- Die GLT-Struktur der Uniklinik Würzburg. The system architecture of Würzburg University Hospital. 14 BACnet Europe Journal 11 10/09 ren, ohne den Betrieb zu beeinflussen. Leichte Bedienung und Überwachung Im Rahmen der Umsetzung stattete Johnson Controls die Gebäudeleittechnik mit Metasys® Web Access inklusive SQL Datenbankserver und insgesamt fünf festen und zwanzig mobilen Bedienplätzen aus. Das integrierte Softwarepaket des MPlus Systems ermöglicht die zentrale und komfortable Steuerung des Systems und eine moderne SQL Datenbank dient zur Historisierung von Alarmund Trenddaten. Zudem generiert das System bei jedem Alarm zusätzlich zur Datenpunktbeschreibung und zum Alarmzustand ein dynamisches Dokument mit einer ausführlichen Beschreibung. So hat das Bedienpersonal jederzeit Zugriff auf alle wichtigen Informationen und kann schnell und ohne Zeitverlust angemessen auf eine Störung reagieren. Universelle Gebäude leittechnik 2007 wurden die Ablage der dynamischen Anlagenbilder, die Datensicherung und die dynamische IP-Vergabe über den DNS-Server zentralisiert. Zur besseren Nutzung in der IT Infrastruktur wurde MPlus zudem Bestandteil der IT-Domäne des Klinikums. Anwendungen Solutions Universal building automation system In 2007, archiving of the dynamic plant diagrams, data back-up and dynamic IP allocation was automated using the DNS server. In addition, MPlus was integrated as a component of the hospital’s IT domain for better use of the IT infrastructure. At the same time, interfaces were provided to the hospital’s SAP R/3 system and energy management system. The innovative MPlus technology lets users work with a uniform address code for all data points, while also giving them the possibility of using original address codes still featured on some older documents. This protects the capital expenditure invested in the system while integrating a BACnet-capable management level. Luftaufnahme des Zentrums für Operative Medizin des Universitätsklinikums Würzburg. Bird’s eye view on the Centre for Operative Medicine of the Würzburg University Hospital. Gleichzeitig wurden Schnittstellen zum eingesetzten SAP R/3 System sowie zu Energiemanagementsystemen realisiert. Dank der innovativen MPlus Technik können die Betreiber mit einem einheitlichen Adressschlüssel über alle Datenpunkte arbeiten, haben aber auch die Möglichkeit, Ursprungsadress-Schlüssel zu verwenden, die noch auf einigen älteren Unterlagen zu finden sind. Damit gelingt es, die getätigten Investitionen zu schützen und in eine BACnet-fähige Managementebene einzubinden. Bis Mitte 2009 wurden im Rahmen der Errichtung des Zentrums für Innere Medizin weitere Systeme mit insgesamt 37.000 Datenpunkten via BACnet aufgeschaltet, so dass das Gesamtsystem heute mehr als 100.000 Datenpunkte umfasst. Gegenwärtig werden mehr als 6.000 Datenpunkte über die Trendfunktionalität historisiert. Damit verfügt das Universitätsklinikum in Würzburg über ein zukunftsfähiges System, das die Bewirtschaftung der Gebäude sicherer und wirtschaftlicher macht. Würzburg is one of Germany‘s oldest university cities, alongside Heidelberg, Cologne and Erfurt. It also plays a leading role when it comes to building automation, following a decision taken in the early stages to use only the standardised BACnet Protocol for all new construction projects. It was as early as in 1996 that Johnson Controls introduced a management level with a Metasys N1 network and OWS work stations, connecting up more than 25,000 data points by 2003. In 2004, Johnson Controls technicians then connected up further BACnet controllers by Siemens in the Centre for Operative Medicine with 20,000 data points, followed in 2006 by installation of the MPlus management system with N1 and BACnet OPC servers to warrant the viable sustainability of the system. In doing so, the new management level combined the homogeneous DDC system with the very latest BACnet technology, also integrating the 25,000 data points of the historically evolved N1 network in the building auto- mation system. At the same time, the experts installed a second MPlus server as fallback level for performing generation or maintenance work without affecting ongoing operation. Easy control and monitoring During the implementation phase, Johnson Controls equipped the building automation system with Metasys® Web Access including an SQL database server, together with five stationary and twenty mobile workstations. The integrated software package of the MPlus system permits easy to operate central control of the system, and a modern SQL database archives alarm and trend data. In addition, whenever an alarm is triggered the system also generates a dynamic document with a detailed description, in addition to the datapoint description and alarm status. This gives the operating staff access to all important information at all times so that they can react to faults quickly and appropriately without losing any time. By mid 2009, setting up the Centre for Internal Medicine brought about the connection of additional systems with a total of 37,000 data points via BACnet so that today the entire system encompasses more than 100,000 data points. Currently the trend functionality keeps historical records of more than 6,000 data points. And so Würzburg University Hospital has a viable, sustainable system for a more reliable and profitable facility management for its buildings. Stefan Bosch Manager System Product Support & Engineering Johnson Controls Systems & Service GmbH Stefan.bosch@jci.com www.jci.com BACnet Europe Journal 11 10/09 15 Anwendungen Solutions Erstes Energieeffizienz-Restaurant von Mc Donald’s First energy-efficient Mc Donald’s restaurant Eine „adiabate“ Verdunstungskühlung der Menerga GmbH senkt den Strombedarf im weltweit ersten EnergieeffizienzRestaurant von Mc Donald’s in Achim bei B remen. Die Regelung und Steuerung der energieeffizienten Klimageräte und die Kommunikation zur Leitzentrale erfolgt mit BACnet Building Controllern der SE-Elektronic GmbH. An “adiabatic” evaporative cooling system by Menerga GmbH reduces power requirements in the world’s first energy-efficient Mc Donald’s restaurant in Achim near Bremen. The regulation and control of the air conditioning and the communication to the building management system is run by BACnet building controllers from SE-Elektronic GmbH. Für den nachhaltigen Betrieb des weltweit ersten Energieeffizienz-Restaurants (EE-Tec) von McDonald’s kommen unter anderem zwei hocheffiziente Adsolair Klimageräte mit „adiabater“ Verdunstungskühlung der Menerga GmbH zum Einsatz. In der vor kurzem in Achim bei Bremen eröffneten Filiale werden unter realen Bedingungen innovative Umwelttechnologien und alternative Energien wie Erdwärme, Sonnenenergie und Windkraft auf ihr Potenzial für eine nachhaltige Bewirtschaftung des Gebäudes geprüft. Bedarfsgerechte Frischluftzufuhr Um einen Beitrag zum globalen Klimaschutz zu leisten und gleichzeitig die Energiekosten zu senken, setzt das Gastronomie-Unternehmen bei der Raumlufttechnik auf zwei Klimageräte, die das Gebäude neben der Geothermie mit „adiabater“ Verdunstung kühlen. Durch die Nutzung dieses natürlichen Kühlprozesses ist die zur Kälteerzeugung notwendige Leistung der Verdichter um rund 50% reduziert worden. Die hocheffiziente Wärmerückgewinnung der Geräte sorge zudem für eine energiesparende Klimatisierung des Küchen- und des Lobbybereichs. Zum Einsatz kommen dabei außerdem integrierte CO2-Sensoren für bedarfsgerechte Frischluftzufuhr in der Lobby und in der Küche. Die Regelung und Steuerung der Klimageräte erfolgt je Anlage mit einem BACnet Building Controller E-DDC3.1 von der SE- Elektronic GmbH. Firmenneutrale Anlage Bei der Aufschaltung und Kontrolle der Anlagen auf eine BACnetfähige Leittechnik werden alle relevanten Datenpunkte der Anlagen 16 BACnet Europe Journal 11 10/09 Die BACnet Building Controller E-DDC3.1 von SE-Elektronic sind im energieeffizienten Mc Donald’s bei Bremen im Einsatz. The E-DDC3.1 BACnet building controllers from SE-Elektronic are used in the energy-efficient Mc Donald’s near Bremen. Anwendungen Solutions Zu Servicezwecken haben Hersteller und Anlagenbauer den Zugriff zu den Geräten über Modem (ISDN). Die Kommunikation kann wahlweise mit dem Servicetool oder über BACnet PTP (point to point) erfolgen. Das neue EE-Tec Restaurant ist nach Angaben des weltweit aufgestellten Gastro nomie-Unternehmens ein wichtiger Bestandteil des eigenen Nachhaltigkeits-Konzepts. Bei erfolgreichem Einsatz der energiesparenden Umwelttechnologie soll das nachhaltige Gebäudekonzept auf weitere McDonald’s Restaurants übertragen werden. Menerga GmbH als Hersteller von Klimageräten und SE-Elektronic GmbH als Hersteller von Steuer und Regelungstechnik in der Gebäudeautomation arbeiten seit Jahren in Kooperation miteinander und sorgen für optimierte, energieeffiziente Lösungen in der Gebäudeklimatisierung. For the sustainable operation of the world‘s first energy-efficient McDonald’s restaurant (EE-Tec), amongst other things two highly efficient Adsolair air conditioning units with “adiabatic” evaporative cooling are used, made by Menerga GmbH. In the franchise location recently opened in Achim near Bremen, innovative environmentally friendly technologies and alternative energy sources such as geothermal energy, solar energy and wind power are being tested for their potential to sustainably supply the building. Fresh air infeed as required In order to make a contribution to global climate protection and simultaneously reduce energy costs, the restaurant company relies on two air conditioning units for room ventilation which cool the building using “adiabatic” evaporative cooling, alongside geothermal energy. Through the use of this natural cooling process, the capacity of the compressors required for cooling has been reduced by around 50%. The highly efficient heat recovery system of the apparatus also ensures energy-saving air conditioning of the kitchen and lobby areas. Integrated CO2 sensors are used for the infeed of fresh air as required in the lobby and in the kitchen. The regulation and control of each air conditioning unit is run by an E-DDC3.1 BACnet building controller manufactured by SE-Elektronic GmbH. Multivendor system During the connection and regulation of the system equipment by means of BACnet-compatible control technology, all relevant data points relating to the system are transmitted, including analogue measured values (e.g. temperature, humidity, flap position, flow rate in m³/h), and digital values (operational messages, fault messages, maintenance messages). The nominal values (flow rate, nominal CO2 value), are specified by the control centre, timer programmes and the system release. Monitoring and optimisation during running operation are thus guaranteed without any negative consequences for the company. For purposes of servicing, the manufacturer and system engineers are able to access the apparatus via modem (ISDN). The communication can take place either using the service tool or via BACnet PTP (point to point). According to information provided by the global restaurant company, the new EE-Tec (© McDonald’s Deutschland Inc) übergeben: Analoge Istwerte (z. B. Temperatur, Feuchte und Klappenstellung, Volumenstrom in m3/h), digitale Werte (Betriebsmeldungen, Störmeldungen, Wartungsmeldungen). Von der Leitzentrale erfolgt die Vorgabe der Sollwerte (Volumenstrom, CO2-Sollwert), Zeitprogramme und die Anlagenfreigabe. Das Monitoring und die Optimierung während des laufenden Betriebs sind somit firmenneutral gewährleistet. Energieeffizienz-Restaurant von Mc Donald´s in Achim bei Bremen. Energy-efficient Mc Donald´s restaurant in Achim near Bremen. Restaurant is an important component of their corporate sustainability concept. If the utilisation of the energy-saving environmentally friendly technology is successful, the sustainable building concept is to be rolled out in other McDonald’s restaurants. As a manufacturer of air conditioning units, Menerga GmbH has for years been working in cooperation with SE-Elektronic GmbH, a manufacturer of control and regulation technology in building automation, and togeth- er they have been ensuring optimised, energy efficient solutions in building climate control. Bogomir Dajcman Executive Director SE-Elektronic GmbH info@se-elektronic.de www.se-elektronic.de Dr. Jürgen Röben Executive Director Menerga GmbH info@menerga.com www.menerga.com BACnet Europe Journal 11 10/09 17 Anwendungen Solutions Klinikum Wolfsburg mit BACnet stufenweise modernisiert Gradual Modernisation of Wolfsburg Hospital with BACnet Im Klinikum Wolfsburg realisierte die Firma Ebert-Ingenieure ein Multivendor-Gebäudeautomationssystem. Bei der stufenweisen Sanierung und Erweiterung der Gebäudekomplexe kamen die Vorteile des offenen BACnet Standards zum Tragen. In the Wolfsburg Hospital, Ebert-Ingenieure realised a multivendor building automation system. During the gradual modernisation and expansion of the building complexes, the advantages of the open BACnet standard became apparent. Das Klinikum der Stadt Wolfsburg behandelt jährlich rund 28.000 Patienten stationär. Um den Patienten einen Aufenthalt in einem modernen Klinikum zu bieten und das Patientenaufkommen bewältigen zu können, hat man seit 2001 sukzessive die Bestandsgebäude modernisiert und durch neue Gebäudekomplexe ergänzt. Ein wichtiger Meilenstein dieses Sanierungs- und Ausbaukonzeptes war der Neubau des Betten- hauses G mit seinen kleineren, patientenfreundlichen Raumeinheiten, das 2005 eröffnet wurde. Der anschließende Umbau von Haus C 2007 und die Verbindung der beiden Gebäude fanden nicht nur aus herkömmlich bautechnischer Sicht statt, sondern auch hinsichtlich der Gebäudeautomation und Anlagensteuerung. Technikausstattung im Bettenhaus Die Systemanforderungen des Das neue Bettenhaus G des Klinikums Wolfsburg. The new ward block G of Wolfsburg Hospital. 18 BACnet Europe Journal 11 10/09 Gebäudetyps Bettenhäuser im Klinikumfeld sind vergleichsweise weniger komplex. Mit der typischen Technikausstattung wie Lüftungszentralen auf dem Dach, kombinierte Technikzentralen mit Lüftungsanlagen, Fernwärmeeinspeisung, Heizungsverteiler, Warmwasserbereitungen, Elektro-Gebäudehauptverteilung im Keller und kleinen Wandschränken in den Etagen, auf die die dezentralen Datenpunkte bspw. der Brandschutzklappen oder Volumenstromregler aufgeschaltet werden, ist er daher eher mit hochwertigen Verwaltungsbauten vergleichbar. Mit 270 Betten auf vier Geschoss ebenen und einer Bruttogrundfläche von 16.397 m² hatte das Projekt die passende Größenordnung und ein ent sprechendes zu steuerndes Anlagenvolumen, um BACnet als eine wirtschaftliche Alternativlösung anzubieten. Neutrale Ausschreibung Während man sich bei dem neuen Bettenhaus im Klinikum erstmalig für den Einsatz von BACnet entschied, stützt sich die Technik der Gebäudeleitwarte weiterhin auf JCI. Diese mit einem engagierten Bauherrn und dem Betreiber für das Projekt gefundene Lösung bedeutet, dass die alte JCI-Gebäudeleitwarte auf die neueste Version mit der Fähigkeit zur Kommunikation mittels BACnet migriert wurde und so die neuen Bauabschnitte neutral mit BACnetAutomationsstationen ausgeschrieben werden konnten. Vor der Vergabe wurden damals sicherheitshalber Systemtests zwischen den Automationsstationen und der Leitwarte durchgeführt, denn BACnet war zu diesem Zeit- Anwendungen Solutions punkt als Standard relativ neu. Bei der Fertigstellung 2005 ist das „Bettenhaus G“ mit dem Fabrikat Kieback&Peter auf die neue BACnet-fähige JCILeitwarte aufgeschaltet worden. Multivendor GA-System Inzwischen sind BACnet-Automationsstationen Standard geworden und im Klinikum der Stadt Wolfsburg 2007 der zweite Bereich im Haus C (Bettenzimmer) mit dem Fabrikat Sauter-Cumulus und 2009 der dritte Bereich im Haus B und Y (OP/ITS) mit dem Fabrikat JCI erfolgreich in Betrieb gegangen und werden auf die bestehende GLT aufgeschaltet. Die Firma Ebert-Ingenieure plant seit Jahren für viele Projekte BACnet als Gebäudeautomationssystem, versucht aber dabei immer die Kosten und Systemanforderungen gegeneinander abzuwägen. Gerade für einen stufenweisen Ausbau separater und unabhängiger Gebäudeteile mit mehreren Bauabschnitten – wie in diesem Fall fast über ein Jahrzehnt – eignet sich BACnet. Man kann jeweils den neuesten Stand der Technik im Bauabschnitt ausschreiben und an die bestehende zentrale Leitwarte andocken. Gleichzeitig begibt man sich nicht in die Abhängigkeit eines Herstellers und hält sich die Optionen für künftige Ausbaustufen offen. Gerade im Bereich der Basisfunktionalität und bei dieser Flächengröße kommen die Vorteile von BACnet eindeutig zur Geltung. Wolfsburg Hospital treats around 28,000 in-patients annually. Since 2001, with the aim of offering patients a stay in a modern hospital and achieving better management of patient throughput, the existing hospital buildings have been successively modernised and extended with new building complexes. An important milestone in this refurbishment and expansion concept was the opening of the new Ward Block G in 2005, with its small, patient-friendly units. The subsequent conversion of Block C in 2007 and the linking of the two buildings were carried out not just for structural building benefits but also for improvements in building automation and equipment control. Technical equipment in ward block buildings In the wider context of hospital infrastructure, the system requirements of ward block buildings are comparatively less complex than most. With typical technical building services equipment such as ventilation plants on the roof, combined building services control rooms with ventilation plant, district heating feeds, heating distributors, hot water tanks, electrical power distribution equipment in the basement and small wall cupboards on each floor, to which local data points, for example fire safety flaps or volume flow regulators, are connected, these buildings have more in common with high quality administration offices. With 270 beds on four floors and a gross Magistrale zur Anbindung an die Bestandsgebäude. Connection to existing building units. Der neue Haupteingang der Klinik. New main entrance of the hospital. floor area of 16,397 m², the project was of sufficient size and had an adequate number of systems requiring control that BACnet could be proposed as an economically attractive alternative. Manufacturer-neutral tender While the decision here in favour of BACnet for the new ward block was its first use in this hospital, the primary control system would continue to be based on JCI equipment. This solution for the project, arrived at by a committed client and operator, means that the old JCI building management control system could be upgraded to the latest version with the capability of communicating with BACnet and the new phase of building specified as manufacturer-neutral with BACnet automation stations. Before the contract was placed, system tests were carried out for safety reasons between the automation stations and the primary control unit, because BACnet was a relatively new standard at that time. On completion in 2005, “Ward Block G” with its Kieback & Peter systems was connected to the new BACnetcapable JCI control room. Multivendor System In the meantime, BACnet automation stations have become standard and were successfully brought into use at the Wolfsburg Hospital in 2007 in a second area in Block C (wards) with Sauter-Cumulus equipment, and in 2009 in a third area in Blocks B and Y (OP/ITS) with JCI equipment and are now connected to the existing BMS. Ebert-Ingenieure has designed building management systems based on BACnet for many projects over the years, always with the aim of balancing costs with system requirements. BACnet is admirably suitable for gradual expansion of separate and independent buildings in several sections – as we have seen here over almost a decade. It is always possible to specify the latest technology in a section of a building and have it dock with the existing central control room. At the same time, the client is not dependent on a single manufacturer and keeps the options open for future expansion projects. The advantages of BACnet are clearly apparent in projects of this size which require a basic level of functionality. Claus Roicke Planer Gebäudeautomation Ebert-Ingenieure c.roicke@eb-ing.com www.eb-ing.com BACnet Europe Journal 11 10/09 19 Anwendungen Solutions Energieeffiziente Begegnungsstätte im Südstadtforum Nürnberg Energy-efficient Community Center in the Nuremberg “Südstadtforum” Trotz der vielen unterschiedlichen Nutzergruppen wird der im Passivhaus-Standard errichtete Neubau des Nürnberger Südstadtforums den hohen Anforderungen an Energie effizienz gerecht. Anteil daran hat die intelligente MSRAnlage mit BACnet Gebäudeautomation von Delta Controls. Despite its many different user groups, the new construction of the “Nürnberger Südstadtforum” – built to the passive house standard – meets the high requirements of energy efficiency. The various systems were implemented with BACnet building automation by Delta Controls. Der Neubau des Südstadtforums Nürnberg (neuer Name: SüdPunkt) ist ein öffentliches und multifunktionales Stadtteilzentrum, das Bildung, Kultur und Freizeit sowie eine Stadtbibliothek in einem Gebäudekomplex vereint. Der viergeschossige Neubau mit einer Gesamtnutzfläche von 3.650 m 2 wurde im Passivhaus-Stand ard errichtet; ein bestehender und denkmalgeschützter Altbau aus dem Jahre 1899 wurde in das Projekt eingebunden und nach dem Standard der Energieeinspar verordnung saniert. Energieeffizienz im Fokus Hinsichtlich der unterschied- Der Neubau des Südstadtforums Nürnberg (links) neben dem denkmalgeschützten Altbau (rechts). The Nuremberg Sudstadtforum’s new building complex (left), adjacent to the existing listed heritage building. lichen Nutzergruppen sollte der Passivhaus-Standard mit einer möglichst einfachen Bedienbarkeit umgesetzt werden. Gleichzeitig bestanden hohe Anforderungen an die thermische, visuelle und akustische Behaglichkeit sowie die Energieeinsparung. Die Wärmeerzeugung basiert auf Fernwärme. Für einen niedrigen Heizwärmebedarf wurde die Passivhaus-Gebäudehülle optimal gedämmt bzw. verglast und luftdicht ausgeführt. Zur Sicherstellung des Luftwechsels sind zentrale Lüftungsanlagen mit hocheffizienter Wärmerückgewinnung eingesetzt. Für Spitzenlasten in den EDV-Schulungsräumen und im Veranstaltungssaal wird die Zuluft mittels einer über Erdsonden rückgekühlten, reversiblen Wärmepumpe auf ein zweites tieferes Temperaturniveau gesenkt. Durch die lange Nutzungszeit von täglich bis zu 14 Stunden spielt auch die Raumbeleuch- tung eine wichtige Rolle. Der Tages- und Kunstlichtanteil sind optimal aufeinander abgestimmt. Solare Gewinne werden über eine mittels LON verbundene Steuerung des außen liegenden Sonnenschutzes sinnvoll genutzt bzw. ausgeschlossen. Messwerterfassung und Steuerung In sechs Referenzräumen werden alle relevanten Daten wie Temperatur, Feuchte und Wärmezufuhr gemessen und erfasst. Die M e s s we r t i n for m at io n e n können dann auf das Gesamtgebäude hochgerechnet werden. Die Steuerung und Regelung der Primäranlagen sowie die Erfassung der Messwerte erfolgt dezentral über offene Bussysteme wie BACnet/IP mit DDC Automationsstationen von Delta Controls und BACnet MS/ TP für Applikationscontroller. Die Zähleraufschaltung erfolgt über M-Bus, der Son- BACnet Europe Journal 11 10/09 21 Another innovative design from the world’s BACnet leader. Anwendungen Solutions nenschutz über LON (Warema) wird mit Gateways von Loytec auf den BACnet GLTRechner von Delta aufgeschaltet. Die Umsetzung und Programmierung der DDC Stationen sowie die Visualisierung der GLT realisierte die Münchner Firma SZ Regel- und Klimatechnik. Alle Informationsschwerpunkte (ISP’s) wurden mit einer Handbedienebene und einem BACnet Touchscreen Display für eine komfortable Vorortbedienung ausgestattet. Nach einer rund zweieinhalbjährigen Bauphase wurde das Projekt Anfang 2009 abgeschlossen. Als multikulturelle und multifunktionale Begegnungsstätte trägt das neue Südstadtforum maßgeblich zur Attraktivität der Nürnberger Südstadt bei. The Nuremberg Südstadtforum’s new construction (new name: SüdPunkt – in English: SouthPoint) is a public and multifunctional regional centre which combines education, culture and recreation, as well as a city library all within one building complex. The new construction with four floors has an entire effective area of 3,650 square meters and was built to the passive house standard. An existing listed heritage build- Das Foyer des Südstadtforums, Blick vom Haupteingang auf den Empfang (links) und das Selbstlernzentrum (Mitte). The Sudstadtforum foyer, as viewed from the main entrance, including the reception area (left) and selflearning centre (middle). Topografie der GLT mit Darstellung der Informationsschwerpunkte (ISPs), Leitebene vor Ort sowie Aufschaltung auf zentrale Warte der Stadt Nürnberg (roter Pfeil). The BMS topology showing the automation and management levels on-site, as well as the remote management level from Nuremberg city’s central monitoring system. ing dating back to 1899 was integrated into the project and refurbished to meet today’s energy efficiency standards. fectly balanced. Solar gains were utilized for heating as required, by integrating the LON-based shade control system. Focus on energy efficiency In light of the many different user groups, the passive house standard had to be implemented on the premise of simple operation. At the same time, demanding requirements were placed on thermal, visual and acoustic comfort, as well on energy efficiency. District heating provided the basis for the generation of heat. To reduce heating demand, the passive house building envelope was optimally insulated, well sealed, and equipped with appropriate window glazing. Central ventilation systems were equipped with high efficiency heat recovery units to ensure effective air changes. The supply air was conditioned using ground source-reversable heat pumps in order to handle the peak loads generated within the IT training rooms and the events hall. The long daily operation of up to 14 hours placed an important emphasis on room lighting. The proportions of daylight and artificial light were per- Measurement and control Six reference rooms were utilized to measure and capture all relevant data such as temperature, humidity and supplied heat. This information was used to extrapolate the requirements of the entire building. The control and operation of the central plant systems, as well as the capture of all measurement data was decentralised via open bus systems such as BACnet/ IP with DDC automation stations by Delta Controls and BACnet MS/TP for application controllers. The heat metering, implemented with M-Bus devices, and the solar protection via LON (Warema), were connected to the Delta Controls BACnet BMS workstation using gateways by Loytec. The implementation and programming of the DDC stations, as well as the graphic visualisation at the operator workstation level was handled by the firm SZ Regel- und Klimatechnik from Munich. All automation centres were equipped with local hand override ca- pability and with a BACnet touchscreen display for extremely user friendly local operation. After a construction phase spanning two and a half years, the project was completed in the beginning of 2009. As a multicultural and multifunctional community center, the new Südstadtforum further adds to the many attractions of Nuremberg city south. Dusko Lukanic-Simpson Managing Director Delta Controls Germany Ltd. sales@deltacontrols.de www.deltacontrols.de BACnet Europe Journal 11 10/09 23 Anwendungen Solutions Klinik Kirchheim-Nürtingen setzt auf BACnet Kirchheim-Nürtingen Hospital Opts for BACnet Der Neubau des Klinikum Kirchheim-Nürtingen setzt auf modernste Gebäudemanagement- und Gebäudeautomationstechnik auf Basis von BACnet mit GFR. The new development at Kirchheim-Nürtingen Hospital will feature modern building management and automation systems provided by BACnet and GFR. Im Rahmen einer Strukturreform im Landkreis Esslingen wurden die Krankenhäuser der Standorte Kirchheim und Nürtingen zusammengelegt und zentralisiert. In beiden existierenden Krankenhäusern waren Kapazitäten von rund 700 Betten für 22.000 stationäre und 40.000 ambulante Patienten pro Jahr vorhanden. Durch die Zu- sammenlegung der zwei Standorte zu einer größeren Klinik konnten verschiedene Vorteile wie eine bessere Verfügbarkeit von Experten, die Erhöhung der medizinischen Qualität sowie Kostensenkungen durch Nutzung von Synergieeffekten erreicht werden. Betrieb während des Baus Am Standort Nürtingen Übersicht über die Klinikanlage: Der Neubau grenzt direkt an das bestehende Krankenhaus. View on the hospitals. The new building is right beside the existing hospital building. 24 BACnet Europe Journal 11 10/09 war es nötig, einen zusätzlichen Neubau neben dem vorhandenen Krankenhaus zu realisieren. Hierzu wurde ein operatives Zentrum mit moderner funktionsorientierter Architektur geplant. Das neue Klinikgebäude wurde als Stahlbetonbau in Spangenbauweise mit sieben Bauteilen errichtet. Beim Bau des Gebäudes lag ein besonderes Augenmerk auf dem reibungslosen Betrieb des angrenzenden Krankenhauses ohne Belastungen und Gefährdungen. Im Bereich des Gebäudemanagements und der Gebäudeautomation hat man sich für den Einsatz des BACnet Standards entschieden. Die Gründe lagen vorrangig in den Möglichkeiten, eine offene Ausschreibung mit weit gefächertem Wettbewerb durchführen zu können und darüber hinaus diesen auch bei eventuell zukünftigen Bauabschnitten beizubehalten. Bei diesem offenen Verfahren konnte sich die GFR Gesellschaft für Regelungstechnik und Energieeinsparung mbH mit einer gut durchdachten technischen Lösung durchsetzen. Anspruchsvolle Gebäudeautomation Die technischen Herausforderungen waren hoch: die gesamte Gebäudeautomation wie auch das Gebäudemanagement sollten auf Basis von BACnet errichtet werden. Dazu kamen verschiedene Ergänzungen auf Basis weiterer BUS-Protokolle. Anbindungen über Profibus ermöglichen die Kommunikation mit Blockheizkraftwerken, Kältemaschinen, Kühltürmen und Wärmerückgewinnungsanlagen. Kessel- und Brennerfunktionen wie auch elektrische Wirkleistungszähler kommunizieren über Modbus, weitere Medienzähler über M-BUS. Ergänzt wurde die GA-Struktur um eine Anbindung auf Grundlage von EIB/KNX, welche Elektroinformationen dem Gesamtsystem zur Verfügung stellt. Grundlage der gesamten Gebäudeautomation ist der BACnet Building Controller (B-BC) ems4.CP03BBAC von GFR. Optional zur Verfügung stehende Schnittstellenmodule integrieren die notwendigen an- Anwendungen Solutions deren BUS-Systeme in die GA-Struktur und bilden damit die Grundlage einer offenen Systemarchitektur. Hier konnte wieder einmal gezeigt werden, dass gerade die Kombination aus BACnet und weiteren gewerkespezifischen BUS-Protokollen das Optimum an Komfort sowie Errichter- und Betriebskostenminimierung darstellt. Gebäudemanagement Ausgangspunkt der offenen und komfortablen Bedienung wie Überwachung der Haustechnik ist die webbasierte Liegenschaftsmanagementsoftware W EBVISION von GFR. Diese ist als BACnet Operator Workstation (BOWS) aufgebaut und erfüllt neben den gängigen GLT Funktionen auch Aufgaben wie die Anbindung an ein DAKS-Server System, dezentral verteiltes und betreiberabhängiges Alarmmanagement wie natürlich auch die Bedienung des gesamten Systems via Internet. Zentrale Server und dezentral verteilte Bedienplätze gehören ebenso zum Umfang wie portable Handbediengeräte zur VorOrt-Überwachung und Bedienung sämtlicher Anlagenfunktionen. In the course of a structural reform in the district of Esslingen, the hospitals at Kirchheim and Nürtingen were amalgamated and centralised. The two existing hospitals had a capacity of around 700 beds for some 22,000 inpatients and 40,000 outpatients per year. The amalgamation of the two sites to create a larger hospital yielded various advantages such as improved availability of experts, better medical quality, and cost reductions through the exploitation of synergy effects. Operation during building phase At the Nürtingen site it was necessary to erect an additional building alongside the existing hospital. A new operations centre with a modern service-oriented architecture was also planned. The new hospital building has Die Systemarchitektur der neuen Klinik Kirchheim-Nürtingen. The system architecture at the new Kirchheim-Nürtingen Hospital. a reinforced concrete frame and consists of seven sections. During the construction work special attention was directed to the smooth running of the existing hospital without disruption and danger. In the area of building management and automation the decision was taken to deploy the BACnet standard. The main reason for this was the opportunity to organise an open tender with broad-based competition, which could also be repeated in any future construction phases. In this open process, GFR Gesellschaft für Regelungstechnik und Energiesparung mbH won with a well thought out technical solution. Ambitious building automation The technical challenges were high: the entire building automation and management system was to be built on a BACnet network. On top of this there were various addons based on other bus protocols. Connections via profibus permit communications with cogeneration units, chillers, cooling towers and heat recovery systems. Boiler and burner functions and electric meters communicate via modbus and other media meters via M-BUS. The BA structure was augmented by an EIB/KNX connection that supplies electrical information to the entire system. The basis of the entire building automation system is an ems4.CP03B-BAC BACnet Building Controller (B-BC) from GFR. Optional interface modules integrate other necessary bus systems in the BA structure and thus form the basis of an open system architecture. This demonstrated yet again that it is precisely the combination of BACnet and other trade-specific bus protocols that delivers maximum convenience and construction and operating cost savings. Building management The starting point for the open and convenient monitoring and control of all mechanical and electrical systems is the web-based property management software WEBVISION from GFR. This is set up as a BACnet Operator Workstation (B-OWS) and in addition to carrying out the usual BMS functions it performs tasks such as connection to a DAKS server system, distributed and operator-independent alarm management and, of course, control of the entire system via the Internet. The package also includes central servers and local operator stations as well as portable hand-held control devices for on-site monitoring and control of all system functions. Olaf Durst GFR – Gesellschaft für Regelungstechnik und Energieeinsparung mbH olaf.durst@gfr.de www.gfr.de BACnet Europe Journal 11 10/09 25 Anwendungen Solutions Offenes Gebäudemanagement bei Heidelberger Druckmaschinen Open Building Management at Heidelberger Druckmaschinen Beim Druckmaschinenhersteller Heidelberg wurden die überwiegend auf Siemens-Systemtechnik basierenden Automations- und Leitsysteme in mehreren Stufen nach dem BACnet-Gebäudeautomationssystem Desigo migriert und zusammen mit einem weiteren Automationssystem mittels OPC-Server mit einem übergeordneten Störmanagementsystem verbunden. The printing press manufacturer Heidelberg has migrated its automation and control systems, which are primarily based on Siemens system technology, to the BACnet building automation system Desigo in several steps and has connected this system with an upstream malfunction management system using another automation system via an OPC server. Bei der Heidelberger Druckmaschinen AG (HDM) machte man sich bereits im Jahr 2001 Gedanken, wie die vorhandenen Gebäudeleitsysteme bzw. Automa- tionsstationen in den beiden Werken Heidelberg und Wiesloch-Walldorf in ein ganzheitliches, zukunfts sicheres Konzept überführt werden können. Dazu wur- Konsequenter Investitionsschutz: Alter Visonik Rechner aus dem Jahr 1982 (links) und neuer Desigo-Server (rechts). Consistent investment protection: old Visonik computer from 1982 (left) and new Desigo server (right). 26 BACnet Europe Journal 11 10/09 den folgende Nutzeranforderungen festgelegt: Aufbau eines eigenständigen Netzwerkes in Ethernet-Technologie Datenübertragung über BACnet Verknüpfung der Gebäudeautomationssysteme mit einem Störmeldesystem in OPC-Technologie; Implementierung über das BACnet-Protokoll Nahtlose Übernahme der bestehenden GLT-Applikationen, wie Prozessreaktions-, Lastspitzen- und Zeitschaltprogramme sowie MSR-Technik in das Desigo System Option auf mindestens zwei Fabrikate auf der Management- und Automationsebene schrittweise Umstellung/ Migration der vor handenen GLT-/DDC-Anlagen bei laufendem Betrieb Verbesserung der Anlagenverfügbarkeit Notbedienebene mit lokalem Vorrang Straffung der System architektur Weiterführung der Gebäudeautomationssysteme an den beiden Standorten Heidelberg und WieslochWalldorf als eigenständige Systeme; Einbindung mittels OPC-Schnittstelle an ein Störmeldesystem in der rund um die Uhr besetzten Noteinsatzzentrale. Frühe Entscheidung für BACnet Obwohl zu Beginn der Migrationsplanung noch nicht sicher war, ob sich BACnet in Deutschland auf breiter Basis durchsetzt und die MSR-/ GA-Industrie es nicht nur bei Gateway-Lösungen belässt, entschied sich HDM schon frühzeitig für das BACnetProtokoll. Ausschlaggebend war unter anderem, dass Anwendungen Solutions Verwaltungsgebäude der Heidelberger Druckmaschinen AG in Wiesloch-Walldorf. Administration building of the Heidelberger Druckmaschinen AG in Wiesloch-Walldorf. Siemens als einer der ersten Hersteller im Jahr 2004 mit Desigo ein natives BACnetGebäudeautomationssystem vorstellte. Nach den positiven Erfahrungen mit den bereits Anfang der 80er Jahre installierten Visonik-Systemen an den HDM-Standorten Heidelberg und Wiesloch-Walldorf war es naheliegend, das auf Rückwärtskompatibilität optimierte Desigo System als Basis für die integrierte Lösung mit BACnet als Übertragungsprotokoll in die engere Wahl zu ziehen. Mit dem damit möglichen sanften Umstieg konnten die Investitionsausgaben gezielt geplant und die Umsetzung im laufenden Betrieb quasi verlust- und unterbrechungsfrei realisiert werden. Damit ist eine langfristige Lebenszyklusplanung gewährleistet. Einfache Bedieung Mit der neuen „DesigoWelt“ vereinfacht sich die Betriebsführung der gebäudetechnischen Anlagen in der Industrie-Liegenschaft ganz wesentlich. Dazu trägt insbesondere die einfache Bedienung auf das beliebige Anlegen von Trendkurven in Desigo und über die ADPSoftware (Advanced Data Processing) bei. Weitere Neuerungen sind Optimierungsprogramme zur Regelung der freien Kühlung in den Produktionshallen sowie Optimum-Start-StopProgramme zur Einschaltund Restwärmeoptimierung von Heizungs- und RLT-Anlagen. At Heidelberger Druckmaschinen AG (HDM) planning was started in 2001 to determine the best solution for migrating the existing building control systems and automation stations in the two plants in Heidelberg and Wiesloch-Walldorf to form an integrated future-oriented concept. The following user requirements were determined: Development of a standalone network using Ethernet technology Data transmission via BACnet Connection of the building automation systems to a malfunction notification system using OPC technology; implementation using the BACnet protocol Smooth transfer of existing GLT applications, such as process response, peak demand and time switching programs as well as MSR technology, to the Desigo system Option of at least two products at the management and automation levels Incremental conversion/ migration of the existing GLT/DDC systems during operation Improving system availability Emergency operation level with local priority Streamlining the system architecture Continued management of the building automation systems at the two locations in Heidelberg and Wiesloch-Walldorf as independent systems; integration via an OPC interface to a malfunction notification system in the emergency center, which is staffed around the clock. Early decision for BACnet Even though at the beginning of migration planning it was not certain that BACnet would gain widespread popularity in Germany and whether the MSR/GA = I&C/ BA industry would continue to use it only for gateway solutions, HDM decided in favor of the BACnet protocol early on. One of the decisive factors was that Siemens was one of the first manufacturers to present a native BACnet building automation system with Desigo in 2004. Based on the positive experience gained with the Visonik systems, which were installed at the HDM sites in Heidelberg and WieslochWalldorf at the beginning of the 1980s, it was a matter of course to take the backward compatible Desigo system into consideration as the foundation for the integrated solution with BACnet as the transmission protocol. The smooth transition that this provided made it possible to plan investments in a targeted manner and perform implementation during operation without notable losses or interruptions. This ensures long-term lifecycle planning. Easy operation The new “Desigo world” very significantly simplifies system management of the building technology systems in the industrial properties. Simple operation with creation of trend curves in Desigo and the ADP software (Advanced Data Processing), are primary components here. Further improvements include optimization programs for regulating free cooling in the production facilities as well as optimum start/stop programs for activating and using the residual heat of the HVAC systems. Michael Leder Siemens Building Technologies GmbH & Co. oHG, Region Rhein-Main michael.leder@ siemens.com www.siemens.de/ buildingtechnologies BACnet Europe Journal 11 10/09 27 Anwendungen Solutions BACnet für mehr Energieeffizienz und Umweltschutz BACnet for More Energy Efficiency and Pollution Control Integrierte Gebäudeautomation sorgt im neuen Schulungszentrum und der neuen Energiezentrale der ViessmannUnternehmensgruppe für Energieeffizienz. Innovative Heiztechnik, Lüftung und Klimasysteme kommunizieren über BACnet. Auch Fremdsysteme, die nicht BACnet sprechen, sind integriert. Integrated building automation provides energy efficiency in the new training center and the new energy headquarters of the Viessmann Group. Innovative heating, ventilation and air conditioning systems communicate via BACnet, even third-party systems that do not speak BACnet are integrated. Die Viessmann-Unternehmensgruppe ist nicht nur Hersteller von innovativen Heiztechnik-Systemen. Sie bietet ihren Kunden auch umfassende Dienstleistungs angebote. Eine wesentliche Säule ist die Viessmann-Akademie. Die Seminare und Schulungen der Akademie werden jährlich von vielen Fachleuten und Mitarbeitern besucht. In den Jahren 2006 bis 2007 wurden am Hauptsitz des Unternehmens in Allendorf/ Eder ein neues Akademiegebäude und eine neue Energiezentrale errichtet. Die von der RSE Planungsgesellschaft aus Kassel geplanten Gebäude ergänzen das vorhandene Ensemble mit Verwaltungsbau und Informationszentrum. MSR, HLK, Versorgungsmedien und Gebäudetechnik wurden von der SCHNEPF Planungsgruppe Energietechnik aus Nagold geplant und umgesetzt. Im Akademiegebäude befinden sich Seminar- und Schulungsräume mit modernster Medientechnik und Büros, außerdem ein weitläufiges Foyer mit Empfangstheke, Restaurant und einem Ausstellungsbereich. Die Energiezentrale versorgt das gesamte Werk mit Energie. Gleichzeitig dient die hier installierte Technik Demonstrationsund Schulungszwecken. Die sieben markanten EdelstahlSchornsteine sind das archi- Die sieben Edelstahl-Schornsteine sind architektonisches Wahrzeichen der Viessmann-Werke. The seven stainless steel chimneys are an architectural landmark of the Viessmann Factory. 28 BACnet Europe Journal 11 10/09 tektonische Wahrzeichen der Viessmann-Werke. Technologie für Energieeffizienz Energieeffizienz und Umweltschutz standen bei Planung und Bau im Vordergrund. Dank Optimierung der Außenhülle und Nutzung von Abwärme hat der Neubau nur einen Primärenergiebedarf von 45,28 kWh/qma sowie einen Heizwärmebedarf von 36,22 kWh/qma. Mo- Anwendungen Solutions are attended by many professionals and employees yearly. In der Energiezentrale wird moderne, umweltfreundliche Kesseltechnik demonstriert. The Energy Center will be demonstrating modern, environmentally friendly boiler technology. derne Kesseltechnologie trägt zusätzlich zur Energieeinsparung bei. In der Energiezentrale sind neun verschiedene Wärmeerzeuger in Kaskadierung installiert. Vier nutzen die fossilen Brennstoffe Gas und Öl, fünf arbeiten mit Biomasse wie Pellets, Biogas und Hackschnitzel. Drei davon sind Anlagen mit Wärme-Kraft-Kopplung, die Wärme und Strom liefern. Zur Unterstützung von Heizung und Kühlung sind auf den Dächern der Energiezentrale und des Akademiegebäudes thermische Solaranlagen installiert. Komplettiert wird das Energiekonzept durch Photovoltaikanlagen, Wärmepumpen und Pufferspeicher. Für die Kühlung sorgt eine Absorptionskältemaschine, die mit der Solaranlage gekoppelt ist. Im Kreislauf zwischen Kältema- schinen, Hackschnitzelkesseln und Solaranlage steht eine Sorptionslüftungsanlage mit Wärmerückgewinnung. Sie kühlt im Sommer und temperiert die Luft im Winter. Komplexe Gebäude automation mit BACnet Die komplexe Haus- und Anlagentechnik stellt allerhöchste Anforderungen an die von Kieback&Peter installierte und betreute Gebäudeautomation. Die Anlagen der Energiezentrale und des Schulungszentrums mit der Kühl- und Lüftungstechnik sind über neun Automationsstationen DDC3000 und DDC4000 vernetzt. Diese kommunizieren untereinander und mit der Gebäudeleittechnik über BACnet. Fremdsysteme, die nicht BACnet sprechen, sind über Protokolle wie TCP/IP oder Profibus integriert. In der Gebäudeleittechnik Neutrino-GLT stehen alle Daten aus den 80.000 Datenpunkten des Werkes zur Verfügung. Die Neutrino-GLT kann auch auf Daten anderer Viessmann-Werke und Verkaufsniederlassungen weltweit zugreifen. The Viessmann group of companies is not just a manufacturer of innovative heating technology systems. They also offer their customers an extensive range of services. A key pillar is the Viessmann Academy. The academy’s seminars and training courses In the years from 2006 to 2007 a new academy building and power station was constructed at the company headquarters in Allendorf on the Eder. The buildings, planned by the RSE planning company from Kessel, complement the existing ensemble with an administrative building and information center. Measuring and control systems, HVAC, supply media as well as building technology were planned and implemented by the SCHNEPF Energy Planning Group from Nagold, Germany. Seminar and training rooms with the most modern media technology and offices are located in the academy building in addition to a large foyer with reception desk, restaurant and an exhibition area. The power station provides the entire plant with energy. At the same time the technology installed here is used for demonstration and training purposes. The seven distinctive stainless steel chimneys are the architectural hallmark for the Viessmann sites. Technology for energy efficiency Energy efficiency and environmental protection were in the foreground of the planning and construction. Thanks to optimization of the outer shell and use of waste heat, the new building has a primary energy demand of only 45.28 kWh per year per square meter and a heating demand of 36.22 kWh per year per square meter. Modern boiler technology also contributes to energy savings. Nine different heat generators are installed in the power station in cascade. Four use oil and gas fossil fuels while five operate with biomass fuels like pellets, biogas and wood chips. Three of them are combined heat and power plants which deliver heat and electricity. Solar heating equipment is installed on the roofs of the power plant and the academy building to support the heating and cooling systems. The energy concept is complemented by photovoltaic equipment, heat pumps and buffer tanks. An absorption chiller coupled to the solar equipment takes care of the cooling. In the cycle between the chillers, wood chip boilers and solar equipment is a sorption ventilation system with heat recovery. It cools in the summer and warms the air in the winter. Complex building automation with BACnet The complex home and facility automation makes all the highest demands on the building automation installed and maintained by Kieback&Peter. The cooling and ventilation systems for the power plant and the training center are networked by nine DDC3000 and DDC4000 automation stations. These communicate with each other via BACnet. External systems that do not speak BACnet are integrated via protocols such as TCP/IP, modbus or profibus. All data from the facility’s 80,000 data points are available in the Neutrino-GLT building management system. The Neutrino-GLT can also access the data from other Viessmann plants and sales branches worldwide. Rüdiger Gans Kieback&Peter GmbH & Co. KG Technisches Büro Kassel www.kieback-peter.de gans@kieback-peter.de BACnet Europe Journal 11 10/09 29 Anwendungen Solutions SNMP-Integration in BACnet beim Landschaftsverband Rheinland SNMP Integration into BACnet at the Rhineland Regional Council Seit der Erweiterung des EDV-Systems im Rechenzentrum des Landschaftsverbands Rheinland in Köln integriert ein Gateway der INH-GmbH wichtige Daten wie Wasser- und Lufttemperaturen sowie Betriebs- und Störzustände in das BACnet-System. Since the expansion of the IT system at the data centre of The Rhineland Regional Council in Cologne, a gateway by INH-GmbH is integrating important data such as water temperatures, air temperatures, operational statuses and error messages into the BACnet system. Der Landschaftsverband Rhein land (LVR) arbeitet als Kommunalverband mit rund 15.000 Beschäftigten für die etwa 9,6 Millionen Menschen im Rheinland. Er erfüllt Aufgaben in der Behinderten- und Jugendhilfe, in der Psychiatrie und der Kul- BACnet-Gateway SMART tur. Der Wirkungskreis des LVR-Fachbereichs Gebäude- und Liegenschaftsmanagement (GLM) umfasst das gesamte Einzugsgebiet des LVR und verantwortet alle Maßnahmen im Lebenszyklus der Immobilien. Die vom LVR betriebene zentrale Gebäudeleittechnik ermöglicht die herstellerneutrale Aufschaltung vorhandener und neu errichteter Mess-, Steuer- und Regelanlagen über Standardschnittstellen. Erweiterung des EDV-Systems Im Zuge einer Erweiterung des EDV-Systems in dem LVR-Rechenzentrum in Köln wurde 2009 eine weitere BACnet-Integration des neu installierten RIMATRIX5-Systems von der Rittal GmbH & Co. KG durchgeführt. Das RIMATRIX5-System von Rittal besteht aus 12 EDV-Schränken zur Aufnahme neuer Serverracks für das EDV-System. Die Schränke sind zur Regelung der serverseitigen Wärmelasten mit dem Liquid Cooling Package (LCP Plus) ausgerüstet. WasserLuft-Wärmetauschersysteme sorgen hierbei für geregelte Schaltschrank-Temperaturkonditionen. 30 BACnet Europe Journal 11 10/09 Alle Schränke sind mit einem Regel- und Überwachungssystem von Rittal ausgerüstet. Das Computer Multi Control Top-Concept (CMC-TC) von Rittal bietet ein komplettes Security-ManagementKonzept welches jeweils die Luft-Wasser-Regelung und Überwachung mit örtlicher Display-Anzeige und Bedienung pro Schrank realisiert. Dieses Überwachungssysteme kommunizieren mit dem in der IT/EDV-Welt weit verbreiteten SNMP-Protokoll (Simple Network Management Protokoll). Hiermit werden im örtlichen Netzwerk (TCP/IP) wichtige Schrankfeldbetriebsdaten wie Wasserund Lufttemperaturen sowie Betriebs- und Störzustände übertragen. Smart Gateway Ein SNMP/BACnet-Gateway der INH-GmbH/HHO_Automation integriert diese Daten in das BACnet-System. Die Felddaten werden über SNMP-Protokoll mittels standardisierter Datenstrukturen MIB’s (Management Information Base) zyklisch ausgelesen. Im Gateway werden diese Daten auf BACnet-Objekte bzw. deren Properties abgebildet und im BACnet- Netzwerk (TCP/IP) zur Verfügung gestellt. Die GatewayKonfiguration erfolgt durch standardisierte EDE-Files über einen integrierten Konfig-Webserver und/oder mit BACnet File-Mechanismen und -diensten. Das Gateway verfügt standardmäßig über weitere Feldbus-Schnittstellen, wie z.B. MODBUS UDP/TCP/RTU, welche im EDE-File abgebildet werden und steht in verschiedenen Größen (Anzahl BACnet-Objekte) für Integrationen verschiedener Protokolle nach BACnet zur Verfügung. Der zusätzlich integrierte Lua-Interpreter ermöglicht dem Benutzer direkte Lese- und Schreibzugriffe auf alle Devices im BACnet-Netzwerk. Durch die Lua-Syntaxerweiterungen sind Abhängigkeiten und Verknüpfungen unterschiedlicher BACnet-Objekte und deren Properties frei programmierbar. Das Gateway stellt zusätzlich einen Field-Webserver zur direkten Feldbeobachtung zur Verfügung. Hier erfolgt eine übersichtliche, tabellarische Darstellung aller integrierten Daten zur Inbetriebnahme Anwendungen Solutions Datentabelle der integrierten Betriebsdaten pro Schrank (exemplarisch): Table with the integrated operating data for each cabinet (example): LCPxx: Kommunikationsstatus SNMP LCPxx: Alarm Water_Out_Temperature LCPxx: Server_In_Temperature LCPxx: Alarm Durchfluss Kühlmedium LCPxx: Server_Out_Temperature LCPxx: Alarm Lüfterüberwachung LCPxx: Water_In_Temperature LCPxx: Alarm Lufttemperatursensor Hardware LCPxx: Water_Out_Temperature LCPxx: Alarm Wassertemperatursensor Hardware LCPxx: Waterflow LCPxx: Systemwarnung Durchflussmesser o. Regelventil LCPxx: Leakage LCPxx: Hardwaremäßiger Modulfehler LCPxx: Setpoint Warning LCPxx: Rauchmelder LCPxx: Setpoint High LCPxx: Leckage Doppelboden LCPxx: Alarm Water_In_Temperature und Diagnose. Mit dieser kostengünstigen Lösung erhält das Amt für Gebäude und Liegenschaften als Betreiber der Anlagen alle notwendigen Informationen über die Betriebszustände der gesamten Serverstation zur Betriebsüberwachung und Wartung. The Rhineland Regional Council (LVR) is a municipal organization with around 15,000 employees which provides services for the roughly 9.6 million people living in the Rhineland region. The LVR‘s Buildings and Property Man- agement (GLM) division covers the entire catchment area of the LVR and is responsible for all measures in the property lifecycle. The central building services management system operated by the LVR enables manufacturer-independent connection of existing and new measurement, control and instrumentation systems via standard interfaces. Expansion of the IT system As part of an expansion of the IT system at the LVR data centre in Cologne, further BACnet integration of the newly installed RIMATRIX5 system from Rittal GmbH & Co. KG was carried out in 2009. The RIMATRIX5 system from Rittal consists of 12 IT cabinets to accommodate new server racks for the IT system. The cabinets are equipped with a Liquid Cooling Package (LCP Plus) to control the heat load from the server. Water/air heat exchanger systems guarantee consistent control cabinet temperatures. All cabinets are fitted with a control and monitoring system from Rittal. The Computer Multi-Control Top Concept (CMC-TC) from Rittal offers a complete security management system which controls and monitors the air and water flows, with a local display and controls for each cabinet. These monitoring systems communicate using the SNMP protocol (Simple Network Management Protocol), which is well established in the IT and computing sector, in order to transfer important control cabinet operating data such as water temperatures, air temperatures, operational statuses and error messages across the local area network (TCP/IP). RIMATRIX5 Serverschrank mit LCP Plus RIMATRIX5 server cabinet with LCP Plus Smart gateway An SNMP/BACnet gateway from INH-GmbH/HHO_Automation integrates this data into the BACnet system. The field data is read out periodically using the SNMP protocol and standardised MIB (Management Information Base) data structures. In the gateway, this data is mapped to BACnet objects and their properties. and made available in the BAC network (TCP/IP). The gateway configuration is performed using standardised EDE files via an integrated configuration web server with or without BACnet file mechanisms and services. The gateway has additional field bus interfaces, such as MODBUS UDP/TCP/RTU, which are mapped in the EDE file, and is available in various configurations (in terms of the number of BACnet objects), for integration of different protocols based on BACnet. The Lua interpreter, also integrated into the gateway, gives the user direct read and write access to all devices in the BACnet network. The Lua syntax extensions make dependencies and relationships between different BACnet objects and their properties freely programmable. The gateway also provides a field web server for direct field monitoring, providing a clearly laid-out tabular display of all integrated data for commissioning and diagnostics purposes. This economical solution provides the Buildings and Property Management department, as the operator of the system, all the information it needs on operating statuses for the entire server station for monitoring and maintenance purposes. Ingenieurgesellschaft N. Hartleb mbH Norbert Hartleb nhartleb@inh-hho.de www.hho-automation.de BACnet Europe Journal 11 10/09 31 TAC is now Schneider Electric Same people Same products Same priorities So what’s different? The name and new possibilities As the global specialist in energy management, Schneider Electric can transform the way you manage, automate, power and secure buildings. With our integrated solutions, saving energy in your building is not just a green policy. It’s a GROWTH policy. For more information, visit www.schneider-electric.com/buildings Make the most of your energy BACnet insight Bessere Qualität von BACnet Projekten Higher Quality of BACnet Projects Uwe Haeseler1 Arien Peterse2 Einleitung Oftmals sind Betreiber von BACnet basierten Gebäudeautomations systemen unzufrieden, da ihre Erwartungen an das System nur unvollständig erfüllt wurden. Das kann folgende Ursachen haben: Die Planung fordert zwar viele Eigenschaften von BACnet Geräten mit einer endlosen Liste von Properties und BIBBs, nicht jedoch was als Aufgabe der Gebäudeautomation realisiert werden soll (Leistungen). Die Planung fordert pauschal „ein Stück BACnet“ Ein Auftragnehmer (AN) führt nur aus, wozu er glaubt, vom Auftraggeber (AG) beauftragt zu sein, ohne das gesamte System aus AS und B-OWS zu berücksichtigen. Bei BACnet-Systemen ist eine Dezentralisierung von Aufgaben (z.B. Alarmgenerierung, Zeitpläne, Trends) üblich. In Aus schreibungen erfolgt die Trennung von Aufgaben der Gebäudeautomation in der Automationsstation unzureichend von den in der B-OWS angesiedelten Aufgaben. Aus praktischer Erfahrung sind nachfolgende Texte entstanden, die den BACnet Teil einer Ausschreibung darstellen können und somit die Qualität von BACnet Projekten erhöhen. Die Diskussion und Erweiterung dieser Texte ist von den Autoren ausdrücklich erwünscht. Das jeweils aktuelle Dokument wird auf Anfrage als Worddokument versandt. Vorsicht bei der Modifizierung der Texte, die Erfahrung hat gezeigt, dass leichte Änderungen der Formulierung zur Änderung des Inhaltes in das Gegenteil geführt haben! 1. BACnet – Allgemeines 1.1. Grundlagen 1.1.1 Allgemeines Der BACnet Standard 2004 ist verbindliche Grundlage für neue Installationen. Als Betriebssystem für Daten server, Bedienplätze usw. sind windowsbasierte Betriebssysteme vorzusehen wie WindowsXP, Windows Vista, Windows Server 2003 oder Windows Server 2008. 1.1.2 Interoperabilität Die PICS für sämtliche Geräte, welche vom AN eingesetzt werden, müssen mit dem Angebot vorab geliefert werden. In den PICS ist aufzuführen, welche Objekteigenschaften beschreibbar sind. Sämtliche Einschränkungen bezüglich der Konfiguration müssen aufgeführt sein. Die Interoperabilität zwischen B-OWS und AS bezüglich der aufgeführten Forderungen hinsichtlich Eigenschaften und Engineering sind vor Auftragsvergabe in einer Testinstallation nachzuweisen oder mit einem vergleichbaren Interoperabilitätstest zu belegen. 1.1.3 Adressierung/Netzwerk Die Planung der Adressen er- Dr. Uwe Haeseler ist Leiter Gebäudeautomation der Axima GmbH (NL Berlin) und Mitglied der Arbeitsgruppe Technik der BIG-EU, uwe. haeseler@axima.de. Dr. Uwe Haeseler is Director of Building Automation of Axima GmbH and member of the working group technique of the BIG-EU, uwe.haeseler@ axima.de. 2 Arien Peterse, Regel Partners B.V., ist Mitglied der Arbeitsgruppe Technik der BIG-EU. a.peterse@regelpartners.nl. Arien Peterse, Regel Partners B.V., is member of the working group technique of the BIG-EU, a.peterse@regelpartners.nl. 1 folgt vom AN B-OWS in Abstimmung mit dem AG mittels B-PAT, siehe BACnet Interest Group Europe (BIG-EU): TCP/IP BACnet Netzwerke BACnet Device Object_Identifier BACnet Device Object_Name Die Planung des BBMD erfolgt vom AN B-OWS in Abstimmung mit dem AG mittels B-PAT. 1.1.4 Ausführung GA-Funktionalität wird in AS und B-OWS mit BACnet Objekten und Properties ausgeführt, es sind keine zusätzlichen Hilfsobjekte zulässig. Die Zeitsynchronisation im System ist nach folgendem Prinzip mit Windows- bzw. BACnetDiensten einzurichten und zu dokumentieren: Ein GLT-Server führt die eigene Zeitsynchronisation mit einem Internet-Zeit-Server oder einer Funkuhr (Windows-Dienst) aus Eine B-OWS synchronisiert alle Automationsstationen, welche BACnet/IP unterstützen (BACnet-Dienst) Die Automationsstationen, welche über BACnet MS/TP angeschlossen sind, werden über die jeweiligen Router bzw. zugeordneten Automationsstationen synchronisiert (BACnetDienst) Es ist darf kein einziges BACnetGerät von mehr als einem anderen BACnet-Gerät mit der Zeit synchronisiert werden. 1.2. Enthaltene Leistungen Der Betreiber erhält Schulungen bis zum Administratorlevel. Der Betreiber erhält eine zeitlich und inhaltlich unbegrenzte Lizenz der Engineering-Tools zur Administrierung von AS und B-OWS (Programme, Applikationen, Grafiken, Parameter, BACnet…). Eine projektangepasste Limitierung bezüglich physikalischer Datenpunkte ist zulässig. Der Betreiber erhält alle Systempassworte für einen zeitlich und inhaltlich uneingeschränkten Zugriff auf AS und B-OWS. Die Steuerung in der Automationsstation muss vollständig engineert werden, so dass kein zusätzliches Engineering auf der Managementebene (BACnet Client) notwendig ist. 2. BACnet – Automations station Der Abdruck von Kapitel 2 erfolgt in einer weiteren Ausgabe des BACnet Journals und kann vorab bei den Autoren angefordert werden. 3. BACnet – Management- und Bedieneinrichtungen (B-OWS) 3.1. Grundlagen 3.1.1 Datenaustausch Die Kommunikation zwischen B-OWS (BACnet Operator Workstation) und Automationsstation muss direkt über BACnet erfolgen, zwischengeschaltete OPC-Server sind nicht zulässig. Die Kommunikation zwischen AS und B-OWS erfolgt über BACnet, auch wenn eine proprietäre Kommunikation seitens des eingesetzten Automatisierungssystems möglich wäre. 3.1.2 Alarmmanagements Beide Formen des Alarmmanagement (Intrinsic Reporting/Algorithmic Reporting) werden als Empfänger unterstützt. Es erfolgt kein automatischer Eintrag von Alarm-Empfängern in die Notification_Class Objects der AS durch die OWS. Alarme von den AS werden mit der B-OWS empfangen, aber nicht auf Grund der Änderung des Present_ Value bzw. Status_Flags in der AS durch die B-OWS generiert. Beim Starten der B_OWS werden alle anstehenden Alarme angezeigt. (BIBB AE-INFO-A notwendig, falls AS dies nicht unterstützt, muss automatisch AE-ASUM-A bzw. AEESUM-A verwendet werden.) BACnet Europe Journal 11 10/09 33 BACnet insight 3.1.3 Zeitpläne Es sind mindestens acht Schaltzeiten (Ein/Aus) pro Tag möglich, die über die OWS einstellbar sind. Die B-OWS muss in Zeitplänen unterschiedliche Typen unterstützen: Binary Analog Multistate Die B-OWS muss in Zeitplänen Sondertage auf zwei verschiedene Arten handeln können: Mit Calendar Objekt mit direktem Sondertag-Eintrag im Schedule Objekt 3.1.4 Trends Die B-OWS muss Trends aus der AS: Anzeigen (Historische Daten über kurze Zeit) aus der AS auslesen und in eine Datenbank archivieren (Historische Daten über lange Zeit) die gespeicherten Daten als csv Datei zum Export bereitstellen können Die Darstellung der Inhalte der Trend_Log’s muss in nachfolgend aufgeführten Formen möglich sein: Grafisch Tabellarisch Das dynamische Erzeugen/ Löschen von Trend_Log‘s mit der B-OWS in der AS muss möglich sein. 3.1.5 Device Management Die B-OWS unterstützt das dynamische Erzeugen/Löschen von Objekten in beliebigen AS. (z.B. wichtig für das Anlegen von Trends, Alarmen… mit der BOWS). Die B-OWS unterstützt Time_Synchronization. UTC 3.2. Enthaltene Leistungen Der unberechtigte Zugriff wird über Passwortebenen der B-OWS geschützt, mindestens in der Abstufung: Administrator Programm- und Grafikerstellung Bedienung mit Sollwertverstellung Gast Das Passwortkonzept wird vom AN dokumentiert. Die B-OWS ist in der Lage, BACnet Devices zu finden und die enthaltenen Objekte auszulesen. Die Generierung der Datenbasis der B-OWS erfolgt auf diesem Wege und nicht durch den Import von EDE Files. Introduction Users of BACnet based building automation systems are often dissatisfied because their expectations have not been fully met. This can be a due to any of the following reasons: The specification laid out extensive requirements of BACnet devices with an endless list of properties and BIBBSs, but failed to describe the actual operational requirements of the building automation system (performance). The specification simply stated “it must be BACnet”. The “contracted supplier” (CS) only delivered what they interpreted in the contract issued by the “contracted client” (CC), without taking the complete system comprising the automation stations and the B-OWS. The various tasks such as alarm generation, time schedules, trends, etc. are typically decentralized in BACnet systems. Instead, the specification failed to clearly separate the tasks to be performed in the automation stations from the tasks to be performed at the B-OWS level. The following texts (Sections 1, 2 and 3) are based on practical experience and define the BACnet section of specifications, which will result in a higher quality BACnet system. The authors encourage further discussion and additions to these texts. To this end, the respective document will be provided as a 34 BACnet Europe Journal 11 10/09 Word document upon request. A word of caution must be issued, however, when modifying the texts because even minor changes can sometimes work against the intent of the modifications. 1. BACnet - General 1.1. General Requirements 1.1.1. General The 2004 BACnet Standard is the obligatory basis for any new installations. The operating system for servers, workstations, etc. shall be MS Windows-based operating systems such as Windows XP, Windows Vista, Windows Server 2003 or Windows Server 2008. 1.1.2. Interoperability The PICS for the various devices to be included by the CS must be provided in advance together with the proposal. The PICS must detail which object properties are writeable. Various limitations with respect to configuration must also be detailed. The functionality between the BOWS and automation stations in terms of the fulfilled requirements and consequent performance and engineering must be demonstrated prior to the contract being awarded in a test installation or in an equivalent interoperability test. 1.1.3. Addressing/Network The design scheme of addresses is given by the CS B-OWS, see BACnet Interest Group Europe (BIGEU): TCP/IP BACnet Networks BACnet Device Object_Identifier BACnet Device Object_Name The design scheme of the BBMD is given by the CS B-OWS in coordination with the CC using B-PAT. 1.1.4. Execution BAS functionality shall be performed within the automation stations and B-OWS using only BACnet Objects and Properties. Sup- plementary objects to achieve this shall not be accepted. Time synchronisation thought out the system shall be implemented and documented using the respective Windows and BACnet services according to the following principle: A BAS server obtains its time synchronization from an internet time server or a radio signal clock (Windows service) A B-OWS synchronizes all automation stations that support BACnet/IP (BACnet service) automation stations connected via BACnet MS/TP are synchronized from the respective router or designated higher order automation stations. No BACnet device shall be time synchronised by more than one other BACnet device. 1.2. Deliverables The Owner shall receive training up to administrator level. The Owner shall receive all engineering tools up to administrator level to administrate automation stations and B-OWS (programs, applications, graphics, parameters, BACnet...), which are to be unlimited in both scope and activation time. A project related limitation with respect to the number of physical data points shall be allowed. The Owner shall receive all system passwords for access to the automation stations and B-OWS, which are unlimited in both scope and activation time. The operating sequences of the automation stations shall be engineered to completion without requiring any additional engineering on the management level (BACnet client). 2. BACnet – Automation Station Section 2 will be published in a future edition of the BACnet Journal and can be provided by the authors upon request. 3. BACnet – Management and Operator Requirements (B-OWS) 3.1. Basic Requirements 3.1.1. Data Exchange The communication between BOWS (BACnet Operator Workstation) and the automation stations shall be direct using BACnet protocol; intermediary OPC server(s) will not be accepted automation stations. The communication between the automation stations and B-OWS shall be required to utilize BACnet protocol, even when proprietary communication supported by the implemented automation systems could be possible. 3.1.2. Alarm Management Both types of alarm management (intrinsic reporting/algorithmic reporting) shall be supported by the Subscriber. There is no automatic entry of alarm subscibers in the Notifiction_ Class objects in the automation station by the B-OWS. Alarms from automation stations shall be received by the B-OWS, but not as a result of he change of Present_Value or status flags in automation stations generated by the B-OWS. The B-OWS shall display all existing alarms upon start-up. (BIBB AE-INFO-A required, if not supported in the automation station then AE-ASUM-A or AE-ESUMA must automatically be utilized). 3.1.3. Time Schedules A minimum of 8 switch times per day shall be possible, which can be programmed from the B-OWS. The B-OWS shall be able to support the following Object types: Binary Analog Multistate The BOWS shall be able to handle exception days in two different ways: using Calendar Objects exception day entry directly in Wo von offener Gebäudeautomation die Rede ist, spricht man von BACnet. Wo diese auch modular, mitwachsend und energieeffzient ist, von SAUTER. the Schedule Object 3.1.4. Trends The B-OWS shall: display trends resident in the automation station (near term historical data) retrieve Trends from the automation station and archive them in a database (long term historical data) be able to export the stored data as a csv file The presentation of the Trend_ Log contents shall be possible in following formats: graph tabular It shall be possible to dynamically create and delete Trend_Logs in any automation station from the B-OWS. 3.1.5. Device Management The B_OWS shall support dynamic creation and deletion of Objects in any automation station (e.g. important for setting up trends, alarms... using the BOWS). The B-OWS shall support UTC Time_Synchronisation. 3.2. Deliverables Unauthorized access shall be protected by password levels in the B-OWS, which shall provide the following levels as a minimum requirement: administrator creation of programs and graphics operator with set point adjustment guest The password structure is to be documented by the CS. The B-OWS shall be able to find BACnet devices and read the objects contained therein. The B-OWS shall generate the data through this method and not through the import of EDE files. SAUTER EY-modulo 5: Mit BACnet/IP. Energieeffizienz, Offenheit und Wirtschaftlichkeit. Modul für Modul für Modul. Modulare, native BACnet-Stationen der SAUTER EY-modulo 5 Familie sind in jeder Hinsicht die intelligente Lösung für alle Anforderungen im Gebäudemanagement und bei Raumautomationen. Mit optimalen Funktionsmodulen, integrierter Einzelraumregelung, Web-Anbindung setzt SAUTER sowie neue komfortabler Massstäbe. Frei programmierbar, sorgt SAUTER EY-modulo 5 für optimale Systemintegration (z.B. M-Bus, Modbus) und reibungslosen Betrieb. Erfahren Sie mehr über seine vielfältigen Möglichkeiten: www.sauter-controls.com Systems Components Services Facility Management BACnet insight Zeitschaltfunktionen in BACnet Teil 2: Wie sind die Zeitschaltfunktionen in BACnet realisiert? Schedule-Integration in BACnet Part 2: How are the scheduling functions realized in BACnet? Frank Schubert1 Im ersten Teil dieses Grundlagenartikels über Zeitschaltfunk tionen wurden die Objekte Calendar und Schedule anhand ihrer Eigenschaften vorgestellt (BACnet Europe Journal 10 S. 42-43). Dieser Artikel beschreibt nun die applikationsbezogene Funktionsweise von Zeitschaltprogrammen. Generelle Arbeitsweise des Schedule-Objektes Zeitschaltpläne werden anhand von Tagen referenziert, als Wochenplan (Weekly Schedule, 7 Tage) oder als Ausnahmeplan (ExceptionSchedule, Reihe von Sondertagen). Der aktuelle Wert des Zeitschaltplans wird über die Eigenschaft „PresentValue“ repräsentiert, wobei jede Änderung auf die in der „List_of_Object_Property_References“ eingetragenen Eigenschaften geschrieben wird. Wenn es sich um externe Geräte handelt, wird hierzu der Dienst WriteProperty oder WritePropertyMultiple verwendet, handelt es sich um Objekte im selben Gerät wie der Zeitschaltplan, werden diese intern übergeben (lokale Aufgabe der Anwendung). Jedem Tag des Wochen- oder Ausnahmezeitplans ist eine Liste von Zeitpunkt-/Werte-Pärchen (TimeValue) zugeordnet. Diese stellen die Schaltzeiten und den gewünschten Wert zum jeweiligen Zeitpunkt dar. Erreicht die aktuelle Uhrzeit einen Schaltpunkt, so wird der zu diesem Zeitpunkt gültige Wert auf die in der Liste enthaltenen Referenzen geschrieben. Ist es aufgrund kommunikativer Fehlfunktionen nicht möglich, einen einzelnen Wert zu schreiben, so wird die Liste dennoch bis zum Ende abgearbeitet. Mit dem Zeitschaltplan ist es ebenfalls möglich, einen Wert auch wieder zurück zu nehmen, hierzu wird die Konstante NULL verwenden (vergl. hierzu Insight Artikel zum Thema Kommandopriorisierung). Ermittlung des Wertes Die Ermittlung des jeweils gültigen Wertes ergibt sich durch folgendes vorgegebene Verfahren: 1)Es wird die höchste relative Priorität des Ausnahmezeitplans des jeweiligen Tages ermittelt und der Wert (sofern ungleich NULL) auf den PresentValue geschrieben. Dazu hat jeder Eintrag im Ausnahmeplan eine Ereignispriorität von 1-16, die relativ zu den anderen Einträgen des Ausnahmeplans betrachtet wird. Diese Ereignispriorität steht jedoch in keinem Zusammenhang zur Schreibpriorität, welche als separate Eigenschaft festgelegt ist. 2)Wenn in Schritt 1 kein Wert gefunden wurde, wird der Wochenschaltplan nach Einträgen ungleich NULL durchsucht und ggf. geschrieben. 3)Als Vorgabewert wird als letzte Möglichkeit der Wert der Eigenschaft „ScheduleDefault“ verwendet. Die Methode zur Ermittlung des PresentValue basiert auf der Evaluierung desjenigen TimeValues, der vor oder zur aktuellen Zeit gültig war, andernfalls ist dieser NULL. Die Berechnung kann zu jedem Zeitpunkt erfolgen, muss aber zwingend um 00:00 Uhr jedes Tages, bei Neustart des Gerätes, oder bei Änderung von Werten, die den Zeitschaltplan beeinflussen, bei relevanten Uhrzeitänderungen sowie bei allen Zeitpunkten erfolgen, die für eine korrekte Zeitschaltfunktion erforderlich sind. Aus Kompatibilitätsgründen zu BACnet Revisionen < 4 wurde eine spezielle Behandlung der Uhrzeit 00:00 eingeführt. Grundsätzlich nimmt der Zeitschaltplan um Mitternacht den Wert der Eigenschaft ScheduleDefault an, es sei denn, für den Zeitpunkt 00:00 Uhr des jeweiligen Tages ist ein Eintrag gesetzt (dieser gilt dann für den ganzen Tag als Vorgabe). Soll also der Zeitschaltplan fortlaufend arbeiten, muss ein Eintrag um 00:00 Uhr mit dem gewünschten Wert vorhanden sein. Die Gültigkeit des Zeitschaltplans kann durch die Eigenschaft „EffectivePeriod“ jahreszeitabhängig festgelegt werden (Datum von/ bis), weiterhin ist es möglich, Zeitschaltvorgänge zu simulieren (Outof-Service). Datums- oder Zeitangaben Bei der Festlegung von Datumsoder Zeitangaben sind Platzhalter erlaubt, so könnte zum Beispiel jedes Jahr Heiligabend an beliebigen Wochentagen durch Setzen des Platzhalters für Jahr und Wochentag und der Festlegung Tag=24 und Monat=12 definiert werden, jedoch können sich z.B. bei Datumsbereichen ungültige Kombinationen wie „von Donnerstag bis 2011“ ergeben, zu denen es keine reale Entsprechung gibt. Hierzu ist jedoch bereits eine Ergänzung der Spezifikationen in Vorbereitung. Der verwendete Datentyp ergibt sich aus den Propertyreferenzen, die vom Schedule-Objekt beein- Frank Schubert, MBS GmbH, ist Mitglied des Advisory Board und der Arbeitsgruppe Technik der BIG-EU sowie als Schulungsleiter der BACnet Interest Group Europe aktiv, frank.schubert@mbs-software.de. Frank Schubert, MBS GmbH, is member of the Advisory Board and Working Group Technique of the BIG-EU as well as training-leader of the BACnet Interest Group Europe, frank.schubert@mbs-software.de. 1 36 BACnet Europe Journal 11 10/09 flusst werden. Haben diese durch falsche Konfiguration unterschiedliche Datentypen, nimmt die Verfügbarkeit des Zeitschaltplans den Wert „Configuration_Error“ an und die Statusinformationen werden entsprechend gesetzt. Dies bedeutet, dass sowohl die Werte als auch die referenzierten Eigenschaften vom Datentyp übereinstimmen müssen. Normalerweise werden Analogwerte, Digitalwerte oder mehrstufige Werte zeitgesteuert, jedoch können auch andere Datentypen (z.B. Zeichenketten) zeitgesteuert gesetzt werden. Der PresentValue und ScheduleDefault sind vom Typ „Any (beliebig)“ und können jeden unterstützten primitiven Datentyp abbilden. The first part of this article introduced the object-types Schedule and Calendar by their properties (BACnet Europe Journal 10, p. 4243). This article describes how the schedule application works in BACnet devices. General function of schedule objects Schedules are divided into weekly (7 days) or exception schedules (array of special events). The actual value of the schedule is referenced by it’s property “PresentValue” and each change of this value causes the referenced properties in the “List_of_Object_ Property_References” to be updated. If the reference is set to an external device, the services WriteProperty or WritePropertyMultiple are used to write the value. If both the schedule and the referenced object and property are located within the same device, updating the values is a local matter. Each day of the weekly and exception schedule contains a list of time/value pairs. These are intended to be used as circuit times where the associated value is set at BACnet insight the given point in time. If the time of day reaches a TimeValue, the value is written to the referenced properties. In case of a write error to an entry, the list is processed until the end and all elements have been tried to write. The schedule may also allow withdrawal of a previously written value using the NULL value to write a priority (see Insight article about command prioritization in BACnet). Determination of Value Determination of the currently valid value of the schedule follows these rules specified in the standard: 1)The highest relative priority of the exception schedule is determined and the value (if not NULL) is written to the PresentValue. Each entry in the exception schedule has it’s event priority in the range from 1-16 relative to the other entries in the exception list. This event priority has no relationship to the write priority though. This is a separate property in the schedule. 2)If in Step 1 no value could be determined, the application evaluates the current value from the weekly schedule for the specific day and if it is not NULL, the value is written to PresentValue. ule, schedule-relevant time changes and at all times where it is necessary to assure a valid schedule. Due to compatibility to BACnet revisions < 4 a special function was added at midnight (midnight evaluation). At midnight the schedule is reset to the value in ScheduleDefault except a TimeValue is set for 00:00, which then becomes the default for that day. If the schedule is intended to work continuously over many days, each day requires an entry at midnight with the expected schedule value. be specified by setting wildcards for the year and day of week and setting day to 24 and month to 12. There are invalid combinations possible though especially when using date-ranges, e.g. “from Thursday until 2011”, which has no real-world equivalent. The SSPC is already about to extend the specifications for this. The method to determine the value for PresentValue is based on the evaluation of the TimeValue which was active before or at the time of day, otherwise NULL. The general validity of the schedule within the year may be set using the EffectivePeriod property (date from/to), furthermore it is possible to simulate scheduled values (Out-of-Service). The data-type of the schedule is determined by the property references, in case those are unequal by mistake, the reliability of the schedule changes to “Configuration_Error” and the status flags reflect this state, too. Normally analog, binary or multi-state values are scheduled, but other data-types may be scheduled as well (e.g. Character Strings). Evaluation of the schedule can be performed anytime, but is required at least at midnight (00:00) each day, after device restart, when changes occur that affect the sched- Time or Date Values Wildcards are allowed for certain parts of time or date values, so Christmas Eve each year (regardless which day of the week) may The properties PresentValue and ScheduleDefault have the datatype “Any” so they can support any specified primitive BACnet datatype. 3)As the default value, the value for PresentValue is taken from the property ScheduleDefault. The BAS Router Connecting BACnet MS/TP to Your BACnet®/IP Network • 10/100 Mbps Ethernet • N-Way Routing BACnet/IP to BACnet MS/TP • 24 VAC or VDC powered BACnet/IP to BACnet/Ethernet • Rugged metal enclosure BACnet/Ethernet to BACnet MS/TP • DIN rail mounting BACnet/IP (net 1) to BACnet/IP (net 2) • Optically isolated MS/TP port • BBMD with FDR • MS/TP baud rates 9.6 to 76.8 kbps • BACnet/IP to BACnet/IP for NAT traversal Building Connectivity Over Years In Networked Controls Visit www.ccontrols.com/bro Or call +44 (0)24 7641 3786 or +49 341 5203590 BACnet insight Planung der Gebäudeautomation mit BACnet – wesentliche funktionelle Vorgaben Building Automation Planning with BACnet – Essential Functional Requirements Marius Hartel1 Bei der Planung der Gebäudeautomation hat sich die Forderung nach dem offenen und herstellerneutralen Datenkommunikationsprotokoll BACnet inzwischen durchgesetzt. Bei der Umsetzung der funktionellen Anforderungen der Gebäudeautomation an die Spezifikationen von BACnet fehlt hingegen in den meisten Ausschreibungsunterlagen vielfach die notwendige Planungstiefe. BACnet Der BACnet Standard als Teil der Weltnorm für Gebäudeautomation DIN EN ISO 16484 bietet das umfänglichste und leistungsfähigste Datenkommunikationsprotokoll in der Gebäudeautomation, das ohne Lizenzrechte und ohne herstellerspezifische Hardware für jedermann zugänglich ist. Bei der Planung von Gebäudeautomationssystem mit BACnet wird hingegen die vorhandene Leistungsfähigkeit von BACnet meistens nicht vollständig genutzt. Planungsvorgaben Sofern der beauftragte Gebäudeautomationsplaner nicht bereits als Integrationsplaner im Rahmen der Bedarfsplanung aktiv auf die Gestaltung des GA-Gesamtsystems und der betreffenden TGA-Anlagenkomponenten mitwirken kann, basiert seine Tätigkeit auf den Grundlagen der gültigen Normen und Richtlinien, den Vorgaben des Auftraggebers (z.B. Lastenhefte) und den Vorleistungen der beteiligten TGA-Fachplanung. GA-Funktionsliste Eine der wesentlichen Tätigkeiten des GA-Fachplaners ist die Erstellung der Automationsschemen und der zugehörigen GA-Funktionslisten gemäß DIN EN ISO 164843 bzw. VDI 3814 Blatt 1. Diese Listen enthalten sämtliche erforderlichen physikalischen und kommunikativen Datenpunkte sowie de1 ren Funktionen im GA-System. Die GA-Funktionsliste wird ebenfalls als Kalkulationstabelle zum Addieren von GA-Funktionen genutzt. Beachte: Funktion ≠ Datenpunkt, oder eine hohe Anzahl von Funktionen bedeutet nicht eine gleich hohe Anzahl von Datenpunkten! Obwohl die Vorgaben an die GAFunktionslisten umfangreich sind, werden diese in der Praxis oft nicht umgesetzt und speziell beim Einsatz von BACnet fehlen die wesentlichen Inhalte. Es sollten grundsätzlich nur die erforderlichen Funktionen in diese Liste aufgenommen werden (keine Reservefunktionen). Die einzelnen Funktionen sollten nicht interpretiert sondern gemäß den Vorgaben der Norm verwendet werden. E/A-Funktionen mit eigener Benutzeradresse und Zeilen Nr. Sämtliche Eingabe- und Ausgabefunktionen (physikalische sowie gemeinsame, kommunikative und virtuelle) mit einer eigenen Datenpunktadresse (bzw. Benutzeradresse) sollen in einer eigenen Zeile der GA-Funktionsliste aufgeführt werden. Das gilt auch für sämtliche Datenpunkte eines Aggregates (siehe Abb. 1). Nur so lassen sich die erforderlichen zugehörigen Verarbeitungs-, Management- und Bedienfunktionen eindeutig zuordnen (siehe Abb. 2). Die Zeilen-Nummer muss pro zugehörige Betrachtungseinheit (meistens ISP) fortlaufend und durchgängig verwendet werden. Nur so können die eindeutigen Verweise innerhalb der Bemerkungsspalten angegeben werden (siehe Abb. 3). Gemeinsame Funktionen Im Abschnitt 2 der GA-Funktionsliste müssen alle E/A-Funktionen für gemeinsame, kommunikative und virtuelle Datenpunkte mit einer eindeutigen Datenpunkt- oder Benutzeradresse eingetragen werden. Hierzu gehören neben gemeinsamen E/A-Funktionen von einem anderen System auch eindeutig gemeinsam genutzte E/A-Funktionen aus anderen Automationsstationen des eigenen Systems (siehe Abb. 4). Beachte: Die Kosten für physikalische E/A-Funktionen sind höher als die Kosten für gemeinsame Funktionen! Komplexe Steuerungsfunktionen Die im Abschnitt 4 der GA-Funktionsliste einzutragenden komplexen Steuerungsfunktionen wie Anlagensteuerung und Motorsteuerung bedingen zur Darstellung der gewünschten Steuerungsaufgaben den Einsatz von zusätzlichen erläuternden Unterlagen in Form von Zustandsgraphen bzw. Ablaufdiagrammen (siehe Abb. 5 und 6). Abb. 2: Fig. 2: GA-Verarbeitungsfunktionen BACS processing functions Nur so werden eine Kalkulation und eine Ausführung der geplanten Leistung gemäß den Vorgaben des Planers möglich. Komplexe Objekttypen Gerade bei GA-Systemen mit BACnet sind die planerischen Vorgaben der zu verwendenden komplexen Objekttypen unerlässlich (siehe Abb. 7). Abb. 3: eindeutige Zeilen verweise innerhalb der Bemerkungsspalte Fig. 3: Unique references in the Remarks column Der planende Ingenieur muss alle projektspezifischen Anforderungen an sämtliche (Ein-/Ausgabe-, Verarbeitungs-, Management- und Bedien-) Funktionen mit Zuordnung der zu verwendenden BACnet-Objekttypen in der Bemerkungsspalte spezifizieren. Erst mit der Auswahl der notwendigen Funktionen und der zugehörigen BACnet-Objekte ist eine globale Spezifizierung der BACnet-Anforderungen gemäß Marius Hartel, geschäftsführender Gesellschafter der GA Ingenieurgesellschaft mbH, ist Mitglied der BIG-EU, mh@ga-ing.de. Marius Hartel, Managing Partner GA Ingenieurgesellschaft mbH, is member of the BIG-EU, mh@ga-ing.de. 38 BACnet Europe Journal 11 10/09 Abb. 1: Funktionsliste Einzelzeilendarstellung Fig. 1: BACS function list: single line for each function Abb. 4: GA-Ein-/ Ausgabefunktionen Fig. 4: BACS I/O functions BACnet insight dem Beiblatt 070-12 im STLB-Bau sinnvoll (siehe Abb. 8). Abb. 5: GA-Anlagensteuerung Fig.5: BACS plant control Beispiel: Erst wenn der Einsatz eines Event Enrollment Objektes gemäß der GA-Funktionsliste erforderlich wird, ist eine generelle Forderung dieses Objektes und der zugehörigen Dienste im Beiblatt der Ausschreibungsunterlagen gerechtfertigt. Beachte: Zuerst die erforderlichen GA-Funktionen ermitteln und erst dann übergeordnete Anforderungen an BACnet festschreiben! Abb. 6:zugehöriges Ablaufdiagramm Fig. 6: Corresponding flow chart Bemerkungsspalte Neben den zu verwendenden BACnet-Objekttypen müssen alle zusätzlichen, ergänzenden bzw. nicht zur Norm gehörende Funktionen datenpunktbezogen, zeilenweise in der Bemerkungsspalte erläutert werden (Abb. 9 und 10). Ist der Platz für die erforderlichen Angaben innerhalb der Bemerkungsspalten nicht ausreichend, sind zusätzliche, eindeutig referenzierende Beiblätter zu verwenden. Empfehlung Der beste und kosteneffektivste Weg zur Planung und Überwachung der Ausführung der Gebäudeautomation mit BACnet ist der Einsatz von qualifizierten, neutralen GA-Fachplanern. Abb. 7: GA-komplexe Objekte. Fig. 7: BACS complex Objects In planning the building automation and control systems, the demand for the open and multivendor data communications protocol BACnet is now enforced. However in implementing the functional requirements of the building automation and control systems to the specifications of BACnet, the necessary planning depth in the tender documents is mostly lacking. Abb. 8: STLB-Bau Beiblatt BACnet Fig. 8: BACnet Annex for German master specification for tenders Abb. 9: GA-Datenpunkt Motorstörung Fig.9: Motor failure data point Abb. 10:zugehörige Bemerkungsspalte Fig. 10: Corresponding Remarks column BACnet The BACnet standard, as part of the global standard for building automation and control systems DIN EN ISO 16484, offers the most extensive and powerful communications protocol for building automation and control systems, without the license rights and without the need for specific vendor hardware. However in planning the Building Automation and Control System (BACS) with BACnet, the existing capability of BACnet is usually not fully used. Planning guidelines Unless the instructed building automation planners are already active as integration engineers in the planning of the overall BAC-Systems and the relevant system components of the building services, their work is based on the foundations of the current standards and guidelines, the requirements of the owner (e.g. specification) and the inputs of the participating building services planners. BACS function list One of the main activities of the BACS planner is to create the automation schematic and related BACS function lists in accordance with DIN EN ISO 16484-3 or VDI 3814 Part 1. These lists contain all the necessary physical and communicative data points and their functions in the BAC-system. The BACS function list is also used as a calculation table for adding up automation functions. Note: Function ≠ data point, or a high number of functions does not mean an equal number of data points! Although the guidelines for the BACS function lists are extensive, they are not often implemented in practice and especially in the use of BACnet lack substantial content. In principle, only the necessary functions should be included in that list (no reserve functions). The various functions should not be interpreted but used in accordance with the requirements of the standard. I/O functions with a unique data point address and row No. All input/output functions (physical and for shared, communicative and virtual data points), with a unique data point address (or user address), shall be entered in their own line of the BACS function list. This also applies to all data points of one aggregate (fig. 1). Only then the necessary associated processing, management and operator functions can be clearly assigned (fig. 2). The row No. per associated observation unit (usually set of controllers) continuously and consistently must be used. Only then the unique references in the remarks columns can be indicated (fig. 3). Shared-functions In section No. 2 of the BACS function list all I/O functions for shared, communicative and virtual data points with a unique data point address must be entered. This includes not only such shared I/O functions from another system but also shared I/O functions from other controllers of their own system (fig. 4). Note: The costs of physical I/O functions are higher than the cost of shared functions! Complex control functions The desired complex control functions such as plant control and motor control to be entered in section No. 4 of the BACS function list, require an additional explanatory documentation in the form of state graphs or flow charts (fig. 5 and 6). Thus, a cost estimate and a design of the planned performance in accordance with the requirements of the planner will be possible. Complex object types Especially in building automation systems with BACnet, the planning requirements of the complex object types to be used are essential (fig. 7). The planning engineer has to specify all project requirements for all functions (e.g. I/O, processing, management and operator functions) with an assignment to used BACnet object types in the remarks column. Only with the selection of the necessary functions and the corresponding BACnet objects, a global specification of BACnet requirements according to the BACnet Annex for German master specification for tenders makes sense (fig. 8). Example: only when the use of an Event Enrollment object according to the BAC function list is necessary, a general requirement of this object and related services in the Annex to the tender documents is justified. Note: First identify the necessary BAC functions and then enact the overall requirements of BACnet! Remarks column Besides BACnet object types to be used, all additional, complementary and non-standard functions based on each data point need to be explained in the remarks column (fig. 9 and 10). If the space for the required information within the comment column is not sufficient, additional, clearly referenced separate sheets have to be used. Recommendation The best and most cost effective way of planning and monitoring the performance of building automation and control systems with BACnet is the use of qualified, neutral and professional BAC planners. BACnet Europe Journal 11 10/09 39 buildings under control TM Visualization OPC XML/DA Server Alarming Scheduling Trending Notification Remote Access ������ Calculation LOYTEC offers a suite of Building Management Systems featuring graphical user interfaces, integration platforms, gateways and infrastructure products. Open protocol devices that provide efficient, effective and user-friendly integration for property management. Customers worldwide utilize LOYTEC solutions to manage individual buildings and distributed real estate. Contact us today for details on how we can become your network partner. LOYTEC electronics GmbH, Blumengasse 35, 1170 Vienna, Austria info@loytec.com • Tel.: +43 (1) 40208050 • Fax: +43 (1) 4020805-99 www.loytec.com networks under control TM Produkte Products Alle BACnet-Daten auf einen Blick – die neuen L-VIS Touch Panels All BACnet Data at a Glance – the New L-VIS Touch Panels LOYTEC erweitert die L-VIS Produktlinie. Mit LVISME212 und LVIS-ME215 stehen ab Dezember 2009 zwei Touch Panels für das Bedienen und Beobachten von Informationen aus BACnet Netzwerken zur Verfügung. LOYTEC expands the L-VIS product line. The LVIS-ME112 and LVIS-ME215 Touch Panels are available December 2009 to visualize and control information from a BACnet Network. Die Touch Panels eignen sich hervorragend zur Visualisierung und Bedienung von HLK-Anwendungen (HVAC, Heizung, Lüftung, Klima). Ohne den Einsatz von PC-Hardware übernehmen Sie die Visualisierung in Gebäudeautomationssystemen, wo kein Gebäudemanagementsystem zum Einsatz kommt. Auch in repräsentativen Konferenzräumen machen die L-VIS Touch Panels eine gute Figur. Die geringe Einbautiefe und eine geringe Verlustleistung (Abwärme) erlauben eine Montage an jedem weiteren Ort. Ein eingebauter VNC-Server bietet PCs oder mobilen Geräten mit installiertem VNC-Client Fernzugriffsmöglichkeiten über eine TCP/IP-Verbindung. Ein integrierter Webserver dient zur Gerätekonfiguration und zum Datenpunkt-Monitoring. Integration in ein Ethernet/IP Netzwerk Beliebige Informationen aus einem BACnet-Netzwerk lassen sich darstellen und bedienen. Binary-, Analog- oder Multi-State-Objekte (Ein- und Ausgänge) bilden hierbei die Schnittstelle zum BACnet-Netzwerk. LVIS-ME212 (12”, 800x600) und LVIS-ME215 (15”, 1024x768) können entweder am BACnet MS/TP oder am BACnet/IP (Ethernet/IP) Kanal eingesetzt wer- Zeitschaltprogramme laufen lokal auf den Panels und sind über Fernzugriff konfigurierbar. Alarmzustände werden protokolliert. Trendkurven werden dargestellt. Alarme und Trenddaten können lokal gespeichert (CSV-Datei) und via E-Mail an eine zentrale Datenbank (LWEB-801) übermittelt werden. Per E-Mail wird ereignisab hängig über den Betriebsstatus oder Störungen informiert. LVIS touch panels allow this den. Die Integration in ein Ethernet/IP Netzwerk wird durch zwei Ethernet-Anschlüsse erleichtert, die ein Durchschleifen von Ethernetverbindungen mittels integriertem Switch erlauben. Optional können die Panels auch drahtlos im IP-Netzwerk kommunizieren. Loytec stellt neue L-VIS Produktlinie vor. Loytec presents the new L-VIS product-line. visualization of HVAC automation systems for local operations in a clear manner. LVIS is a graphical interface solution in a building automation system which avoids the use of PC hardware. The L-VIS Touch Panel can be the user interface for individual rooms or larger areas. The small installation depth and the low thermal power loss allow an installation in most locations. vice daisy-chaining with an integrated Ethernet switch. Alternatively, the panels can communicate wireless in an IP-Network. Any information from a BACnet network can be displayed or controlled by the touch panels. Binary, analog, or multi-state objects (input, output, value) represent the interface to the BACnet network. The LVIS contains scheduling access both local and remote. Alarms are recorded. Trend graphs are displayed. Alarms and trend data are stored locally (CSV file) and sent via E-mail to a central database (LWEB-801). Event driven E-mail notifications inform about operating states and alarm conditions. Integration in an Ethernet/IP network The L-VIS can be connected to a BACnet MS/TP or a BACnet/IP (Ethernet) channel. The integration in an IP network is made easy by two Ethernet ports for de- An embedded VNC-Server allows remote access via an IP connection for PCs and mobile devices with a VNCClient installed. Further more, an embedded Web server allows device configuration and data point listing. LOYTEC electronics GmbH info@loytec.com www.loytec.com BACnet Europe Journal 11 10/09 41 Produkte Products Produkte zur einfachen BACnet Integration Products for Easy BACnet Integration Die MBS GmbH aus Krefeld rundet ihre Produktlinie von BACnet-Infrastrukturkomponenten ab. Die neue Serie Universal-Gateways/Compact ermöglicht die unkomplizierte und schnelle Aufschaltung und Integration von Anlagenteilen. The company MBS from Krefeld, Germany completes its productline of BACnet infrastructure components. The new series of Universal-Gateways/Compact allows the uncomplicated and fast integration of plant components. Für die Integration von Nicht-BACnet Gewerken an BACnet-Netzwerke steht die Serie Universal-Gateways/ Compact zur Verfügung. Mit mehr als 60 verschiedenen Kommunikationsprotokollen bieten diese Produkte die Möglichkeit der Aufschaltung und der Integration von Anlagenteilen, die bisher nur mit Hilfe von potenzialfreien Kontakten oder 0-10V Ein-/Ausgängen aufgeschaltet und daher nur mit hohem Aufwand und Kosten integrierbar waren. Die seit mehr als zehn Jahren erfolgreich eingesetzten Universal-Gateways in der Schaltschrankbauform, als Industrie-PC sowie in 19“ Einschubtechnik sind selbstverständlich weiter verfügbar. Die Gateways erfüllen das Geräteprofil B-AAC und erlauben eine zuverlässige Verarbeitung von bis zu 250 BACnet-Objekten. Zur Kopplung von BACnet/ IP, Ethernet und MS/TP Netzwerken stehen die Router der Serie Universal-BACnet Router zur Verfügung. Mit Hilfe des integrierten Webinterfaces wird die Konfiguration zum Kinderspiel, als besondere Funktion stehen insgesamt 200MB zur Ablage eigener Dokumente bereit, die über den Webserver erreichbar sind. I/O-Module Für die Aufschaltung und Integration von digitalen oder analogen Eingangssignalen sowie für die Realisierung von Schaltfunktionen als digitaler Ausgang stehen die BACnet I/O Module bereit. Die digitalen Signale werden durch eine LED pro Kanal zusätzlich optisch angezeigt, eine Handbedienebene für die Schaltausgänge gehört ebenfalls zur Standardausstattung. To integrate non-BACnet plant components to BACnet networks the series of Universal-Gateways/Compact allows connectivity as a universal protocol transla- tor. More than 60 communications protocols are ready to be used to combine BACnet networks with devices which formerly required integration by connecting them over wired contacts or 0-10V I/O, which was often complex and expensive. The series of UniversalGateways as cabinetcontrollers, industry PCs and 19" rack-mount devices are continued as integration products as well. The gateways support the B-AAC device profile and allow highly reliable processing of up to 250 BACnet objects. documentation directly on the device, accessible using the web server. I/O-Modules To integrate digital or analog input signals without any controls function, or to realize digital output switching functions, the series of BACnet I/O modules can be used for integration jobs. The digital signals are locally displayed with a signal LED per channel, a manual override operation for digital output is integrated as a standard function as well. Router To connect BACnet/IP, Ethernet and MS/TP networks, the UBR-01 links these media to form a single BACnetinternetwork. Using the integrated webserver makes the configuration process extremely simple. As a unique feature, a memory space of 200MB may be used to store project MBS GmbH info@mbs-software.de www.mbs-software.de BACnet Europe Journal 11 10/09 43 Produkte Products Steigerung der Energieeffizienz durch novaPro Open Increasing Energy Efficiency With the Aid of novaPro Open Die Software novaPro Open aus dem Hause Sauter ermöglicht ein vollständiges und internetbasiertes Gebäudemanagement. novaPro Open ist eine vollständige Implementation einer BACnet-Operation Workstation (B-OWS). The software novaPro Open by Sauter allows a complete and internet-based building management. novaPro Open is the complete implementation of a BACnet Operating Workstation (B-OWS). SAUTER novaPro Open ist die vollständige, internet basierte Gebäudemanagementlösung für Betrieb, Überwachung und Steuerung. Die neueste Version der Software bedeutet für den Anwender weniger Konfigurationsaufwand, eine komfortable Inbetriebnahme und einheitliche Bedienoberfläche sowohl unter Windows wie auch via Standard Web-Browser. Bei novaPro Open handelt es sich um eine vollständige Implementation einer BACnet-Operating Workstation (B-OWS). Der native BACnet-Treiber ermöglicht die direkte Einbindung an ein BACnet-Netzwerk. Ein besonderes Highlight ist der Object-Browser. Dieser gestattet dem Anwender einen sofortigen Zugriff auf alle Automationsstationen und die Übersicht aller verbundenen Objekte und deren Eigenschaften. BACnet Alarm Routing Eine wertvolle Eigenschaft ist auch das BACnet Alarm Routing: Alle BACnetAlarme aus den Automationsstationen werden ohne Konvertierung direkt in der Alarmliste dargestellt; dies zusammen mit Alarmen anderer Kommunikationsprotokolle. Es erfolgt eine durchgehende Alarmierung von der Automations- bis hin zur Managementebene. Trend Objects sorgen für die Aufzeichnung, das Auslesen, Archivieren und die Darstellung der Daten entweder im Online- oder im historischen Modus. Mit Hilfe des Web-Browsers können Schedule- und Calendar-Objekte erstellt und parametriert werden. Der Benutzer konfiguriert die Zeitschaltbefehle somit direkt im BACnet Schedule- bzw. CalendarObject. Eine Besonderheit stellt die integrierte Symbolbibliothek (Cluster) dar. Sie visualisiert die BACnet-Eigenschaften und erlaubt dem Benutzer die Bedienung ohne spezifische BACnet-Kenntnisse. SAUTER novaPro Open is a complete, internet-based building management solution for operation, monitoring and control. For the user, the latest version of the software means less time spent on configuration, easier com- 44 BACnet Europe Journal 11 10/09 Vertikale und horizontale Systemintegration ohne Grenzen: für ein individuelles System. Vertical and horizontal system integration with no limits: for an individualized system. missioning and a uniform user interface, using either Windows or a standard web browser. SAUTER’s novaPro Open is the complete implementation of a BACnet Operating Workstation (B-OWS). The native BACnet driver enables direct integration to a BACnet network. A special highlight is the object browser, which provides the user with immediate access to all automation stations and an overview of all the linked objects and their properties. BACnet alarm routing Another valuable feature is BACnet alarm routing: all BACnet alarms from the automation stations are presented, without conversion, directly in the alarm list; this includes the alarms of other communication protocols. There is continuous notifica- tion from the automation level up to the management level. Trend objects provide for the recording, retrieving, archiving and presentation of data in either online or historical mode. Schedule and calendar objects can be created and parameterised with the aid of the web browser. Therefore, the user configures the timeswitch commands directly inside the BACnet schedule or calendar object. One special feature is the integrated symbol library (cluster), which visualises the BACnet properties and enables the user to operate the system without having any specific know ledge of BACnet. Fr. Sauter AG peter.schoenenberger@ch. sauter-bc.com www.sauter-controls.com Produkte Products Universeller Dolmetscher und mehr für BACnet Universal Translators and more for BACnet Der JACE (Java Application Control Engine) ist eine flexible web-basierte Gatewayplattform auf Basis Power PC und QNX für Anwendungen in der Gebäudeautomation. Tridium´s JACE (Java Application Control Engine) is a flexible, web-based gateway platform using a Power PC under QNX for applications in building automation. Mit dem Treibermodell der NiagaraAX-Plattform von Tridium stellt der JACE standardmäßig folgende offene Protokollschnittstellen zur Verfügung: BACnet/IP und MS/TP LON-TP/FT10 (über LONSchnittestellenmodul) und LON–IP852 EIBnet (per EIB-Router kann auch KNX aufgeschaltet werden) MODBUS/IP und RTU M-BUS oBIX Mit dem Serial-Flex-Treiber, einem universellen frei konfigurierbaren seriellen Treiber, lässt sich der JACE auch für andere serielle Protokolle anpassen. Ein Entwicklungs-Kit für kundenspezifisch JAVA-Treiber ist verfügbar. Je nach Leistungsanforderungen unterstützen die Varianten JACE-200 und JACE-600 eine unterschiedliche Anzahl von Protokollen und Datenpunkten. Die IP-Adressierung ist für IPv6 ausgelegt. Der Zugriff auf den JACE als Gateway erfolgt über die im JACE integrierte ManagementSoftware „WorkplaceAX“ via Web-Browser. Zusätzliche PCKonfigurationstools sind nicht nötig. Steht eine installierte Sun Java-Virtual-Machine (JVM) zur Verfügung, so ist eine besonders komfortable Nutzung möglich. Abstraktion der Datenmodelle Zentrales Element in den Protokolltreibern ist die Abstraktion der unterschiedlichen Datenmodelle in eine normalisierte Form (Proxy Points), die auf den Datentypen numerischer Wert, Wahrheitswert, Aufzählung und Text basiert. Datenpunkte besitzen zusätzlich die Eigenschaften Nur-Lesen oder Lesen + Schreiben und können durch Anfügen sogenannter Facetten beliebig skaliert werden (z.B. °F in °C umwandeln). Im NiagaraAX-Framework wurde großer Wert auf eine verlustlose Abstraktion der Datenmodelle gelegt, so dass sich alle Datenpunkte eines Protokolls vollständig auf die eines anderen Protokolls umsetzen lassen. Das ist die entscheidende Voraussetzung für die Nutzung des JACE als universelles Gateway. Zusätzlich verfügt der JACE über alle Funktionen, um ihn zu einem kompletten frei programmierbaren dezentralen Systemmanager zu erweitern. Zeitsteuerung (Calendar, Schedule), Trendaufzeichnung (History), Alarm-Handling, ein ausgefeiltes Benutzermanagement sowie das in den Protokolltreibern integrierte Geräte-Management (z.B. BACnet-Server-Konfiguration im JACE) und die umfangreichen grafischen Visualisierungsmöglichkeiten erlauben es, aus dem Gateway einen leistungsstarken, interoperablen Multiprotokoll-Automations- Der Java Application Control Engine JACE -200 von Tridium The Java Application Control Engine JACE-200 by Tridium server zu machen. JACE ist somit die leistungsfähige und anwendungsfreundliche Alternative zu anderen Gateway lösungen. With the driver model of Tridium´s NiagaraAX platform, the JACE provides the following open protocol interfaces by default: BACnet/IP and MS/TP LON-TP/FT-10 (via LON interface module) and LON– IP852 EIBnet (KNX can be connected via EIB router) MODBUS/IP and RTU M-BUS oBIX A development kit for programming customer specific Java drivers is available. Covering different performance requirements, the models JACE-200 and JACE-600 support a different number of protocols and data points. The IP addressing supports IPv6. The JACE is accessed as a gateway by the built-in management software “WorkplaceAX” via any standard web browser. Additional PC tools are not necessary. An installed Sun Java-Virtual-Machine (JVM) allows for especially easy operation. Abstraction of data models A key element of the protocol drivers is the abstraction of dif- ferent data models into a normalized form (proxy points), which is based upon the data type’s numerical value, boolean value, enumeration and text. Data points have the additional properties of read-only or readwrite, and can be freely scaled by attaching so-called facets (for instance to convert °F to °C). In the NiagaraAX framework great emphasis has been placed on a lossless abstraction of the data models, which allows conversation of convert all data points of one protocol completely to those of another protocol. This is the crucial precondition for using the JACE as universal gateway. Additionally, the JACE has all functions to extend it to a complete, freely programmable, distributed system manager. Time control (calendar, schedule), trend logging (history), alarm handling, a sophisticated user management, as well as device management which is integrated in the protocol drivers (i.e. BACnet server configuration in the JACE), and extensive options of graphical visualization allow this gateway to turn into a powerful, interoperable, multi-protocol automation server. JACE is therefore the powerful and user-friendly alternative to other gateway solutions. Sysmik www.sysmik.de service@sysmik.de BACnet Europe Journal 11 10/09 45 promote your technology Mit uns überzeugen Sie Ihre Kunden. Egal wo. Weltweit. Persuade your customers with us. Globally no matter where. MarDirect spricht die Sprachen Ihrer Kunden. MarDirect speaks your customers’ languages. Um technologische Produkte und Dienstleistungen zu bewerben, muss man sie verstehen. Unsere Mitarbeiter bringen diese Qualifikation mit. Sie verfügen über technologisches Know-how in Automation, Software sowie technischer Kommunikation und verbinden diese mit Expertenwissen in Marketing, Öffentlichkeitsarbeit sowie Messe- und Kongressorganisation. One must understand technological products and services in order to promote them. Our employees are equipped with these skills. They have technological know-how in automation, software and technical communications, and they connect them with expertise in marketing, public relations as well as trade fair and congress organization. Muttersprachler aus vielen Ländern Europas, USA und China sorgen dafür, dass man Ihre Technologie weltweit versteht. Native speakers from many countries in Europe, the USA and China ensure that your technology is understood around the world. Möchten Sie international aktiv werden? Sprechen Sie mit uns, wir lassen uns an Ihrem Erfolg messen. Do you want to become an international player? Talk to us. We measure ourselves by your success. MarDirect Marketing Direct GbR Droste-Hülshoff-Str. 1 44141 Dortmund Tel. + 49 231 / 42 78 67-31 Fax + 49 231 / 42 78 67-32 info@mardirect.de www.mardirect.de Produkte Products Technische Symbiose in der Gebäudeautomation – BACnet und EnOcean verbinden Technical Symbiosis in the Building Automation – conjoin BACnet with EnOcean Warum nur eine der zahlreichen Netzwerktechnologien in der Gebäudeautomation nutzen? Thermokon kombiniert mit dem neuen BACnet-EnOcean-Gateway SRC65BACnet zwei etablierte Netzwerktechnologien, um energieeffiziente, umweltfreundliche „Green Buildings“ zu ermöglichen. Why only using one of the numerous network technologies in the building automation? By means of the new BACnet EnOcean gateway SRC65-BACnet Thermokon combines two established network technologies to enable energyefficient and environmentally friendly “green buildings”. Bei der Entwicklung im Hause Thermokon wurde großer Wert auf die Einhaltung der BACnet-Standards gelegt. Dies gewährleistet eine einwandfreie Interoperabilität und bereits existierende Projekte sind mühelos erweiterbar. Der SRC65-BACnet fungiert als Gateway zwischen der drahtlosen LowPower-Technologie aus dem Hause EnOcean und BACnet. Die Funktion des Gerätes umfasst einen Funkempfänger für EnOcean Funktelegramme und wird stets gemeinsam mit anderen BACnet-Automationsstationen betrieben. Alle Parametrier- und Konfigurationseinstellungen sind über das BACnet-Netzwerk möglich. Anschluss an Automationsstationen oder GLTs Das verwendete und international standardisierte BACnet MS/TP Protokoll ermöglicht den Anschluss an Automationsstationen oder GLTs. Die Baudrate ist frei wählbar und über DIP-Schalter einstellbar. Als Schnittstelle auf Bus-Seite dient der RS485-Standard. Die maximale Anzahl an Busteilnehmern wird durch den verwendeten RS485 Transceiver vorgegeben und ermöglicht 128 Geräte pro Segment. Die Adressierung der Geräte zur Identifikation im Netzwerk erfolgt ebenfalls über DIP-Schalter und wird jedem Gerät individuell vergeben. Das Gateway arbeitet mit dem Geräteprofil B-ASC und stellt eine Vielzahl an BIBBs zur Verfügung. Es lassen sich bis zu 32 EnOcean-basierte Geräte einlernen und verwenden. Nach dem erfolgreichen „Bekanntmachen“ von Sensoren und SRC65-BACnet ist unmittelbar ein kombiniertes Arbeiten mit beiden Netzwerktechnologien möglich. During the indoor development at Thermokon great importance was given to the compliance with the BACnet standards, thus, guaranteeing a smooth interoperability as well as an easy modification of already existing projects. The SRC65-BACnet is designed as Der SRC65-BACnet fungiert als Gateway zwischen der drahtlosen EnOcean-Technologie und BACnet. The SRC65-BACnet act as a gateway between the wireless EnOcean-technology and BACnet. a gateway between the wireless LowPower-technology by EncOcean and BACnet. The function of the SRC65BACnet includes a radio receiver for EnOcean radio telegrams and is always operated with other BACnet automation systems or control technologies, such as BACnet operating work stations. All parameterization and configuration properties can be set over the BACnet network. Connection to automation stations or BMS The used protocol is the international standardized BACnet MS/TP enabling the connection to automation stations or BMS. The baud rate is arbitrarily and adjustable via a DIP switch. The RS485 standard works as an interface on the bus side. The maximum number of bus sharing units is preset by the RS485 trans- ceiver and enables 128 devices per bus segment. The addressing of the devices for the identification in the network is also realized with a DIP-switch and is individually assigned to each device. The gateway works with the device profile BACnet Application Specific Controller (BASC) which offers a multiplicity of the BIBBs described above. It is possible to seamlessly connect and to use up to 32 EnOcean based devices. After a successful “learningin” procedure of the sensors to the SRC65-BACnet, a combined operation with both network technologies is possible immediately. THERMOKON Sensortechnik GmbH www.thermokon.de email@thermokon.de BACnet Europe Journal 11 10/09 47 BACnet Interest Group BACnet in Multivendor-Systemen – Plugfest in Helsinki war ein Erfolg BACnet in Multivendor Systems – 2009 Plugfest Event Deemed a Success Im April 2009 organisierte ABB den vierten BIG-EU Interoperabilitäts-Workshop, bekannt auch als Plugfest, in seiner Niedrigspannung Antriebsfabrik in Helsinki, Finnland. Dreißig internationale Anbieter von BACnet-Geräten nahmen an diesem Event teil, mit dem Ziel individuelle Produkte und neue Funktionalitäten miteinander in Multivendor-Systemen zu testen. In April 2009, ABB organized the 4th BIG-EU Interoperability Workshop at its low voltage AC drives factory in Helsinki, Finland. About 30 global vendors and suppliers of BACnet devices attended the event with the aim of testing individual products and new functionalities with each other in multivendor systems. “Die Veranstaltung war ein voller Erfolg“, so Teemu T. Heikkila von ABB. „Vertreten waren 16 führende BACnet Anbieter aus Euro pa, den USA und Kanada nebst 33 Entwicklern aus der ganzen Welt, von Australien, über die USA bis hin nach Indien und Finnland.“ Das Highlight der Veranstaltung war das Testen der neuesten Produkte in SystemSessions, wobei alle Anbieter und die meisten ihrer Geräte miteinander in einem BACnet System verbunden waren. Das „RoundTable Testing“ gibt allen Unternehmen die Möglichkeit einen zielgerichteten Test durchzuführen, wie etwa das Sub-Netzwerk Testing oder das MS/ TP Interoperabilitäts Testing. „Die Idee von BACnet ist es, mehrere Gebäude im gleichen System zu vereinen. Dies können aktuell bis zu 4,2 Millionen Geräte sein. Jedes Gebäude hat für gewöhnlich sein eigenes Netzwerk, das von oben betrachtet als SubNetzwerk angesehen wird, so wie das MS/TP ein Sub-Netzwerk von BACnet/IP ist“, erklärt Teemu T. Heikkila. Ein neues Konzept bei den diesjährigen Meetings war die Nutzung von Tischen auf Rollen, so konnte sich jeder Teilnehmer frei zwischen zwei Test-Sessions bewegen, ohne Werkzeuge zur Trennung der Geräte verwenden zu müssen. Die BACnet-Schnellstraße „Wir haben eine BACnet,Schnellstraße‘ gebaut, mit Tischen an der linken und rechten Raumseite und mit Anwendern, die mit ihren Tischen in vorgegebener Richtung um diese BACnet-Straße herumliefen”, berichtet Frank Schubert von der MBS GmbH, Krefeld. „Bei den vorangegangenen Plugfests saßen wir an ,festen‘ Tischen und mussten die Geräte abklemmen. Nun klemmen wir einfach die Controller ab, dies verursacht lediglich eine geringe Betriebsstörung und es steht mehr Zeit zum Testen zur Verfügung. Wir müssen dieses Format für weitere Veranstaltungen adaptieren.“ Der letzte “All in” Test, bei dem die Geräte aller Anbieter miteinander verbunden sind und Informationen über die Zusammenarbeit der verschiedenen Geräte austauschen, wurde von den Vertretern als „gut funktionierend“ beschrieben. Die Veranstaltung wurde von Panu Virolainen, dem 48 BACnet Europe Journal 11 10/09 Vize-Präsident Technologie der ABB Niedrigspannung Antriebsfabrik, eröffnet. Dabei hob er die Wichtigkeit von BACnet für ABB´s Niedrigspannung Antriebsgeräte, die in HVAC-Systemen im Gebäudesektor verwendet werden, hervor. „BACnet wächst schnell“, sagt Virolainen, „dank dem exzellenten zugrundeliegenden Produkt, der internationalen Förderung von BACnet durch die BIG-EU und durch den enormen Marketingaufwand durch Newsletter, Kampagnen und Ausstellungen wie der Light&Building. Dies ist definitiv eine große Chance für uns alle.“ Mit BACnet in die Zukunft Während des Meetings umriss Bill Swan von Alerton die ambitionierte Zukunftsrichtung von BACnet, die sich allein daran ablesen lässt, dass derzeit etwa 120 Änderungsanträge in der Warteschlange sind. Der Umfang der Arbeit spiegelt sich in der Anzahl der aktiven Working-Groups, welche unter anderem Licht-Anwendungen, Sicherheit und Schutz, MS/TP LAN oder serielle Kommunikation, Integration und XML-Anwendungen beinhaltet. BIG-EU Plugfest Helsinki 2009 Andere Anwendungen, die derzeit für BACnet studiert werden, u.a. CCTV zu überwachen. Um diese und die Gebäude-Energieversorger mit BACnet zu integrieren, finden aktive Gespräche zwischen den Versorgungsunternehmen der USA und dem BACnet Komitee statt. Darüber hinaus stellte Frank Schubert von der MBS GmbH die Neuigkeiten des nächsten BTL Testplaners vor, der im Sommer 2009 veröffentlicht wurde. Er umfasst auch Tests und Profile von Workstations, Advanced Workstations, Life Safety Workstations, Operator Workstations und Operator Displays. “The event went very well,” says Teemu T. Heikkila of ABB. “There were 16 lead- BACnet Interest Group ing BACnet vendors from Europe, US and Canada along with 33 developers from Australia to the US and India to Finland.” with wheels, so that each participant could move freely between each test session without having to use tools to disconnect devices. The highlight of the event was testing the latest products in system sessions where all vendors and most of their devices were connected together within the same BACnet system. Round table testing gave all the companies the opportunity to do some specific testing, like sub-network testing or MS/TP interoperability testing. “The idea of BACnet is to combine multiple buildings to the same system, which actually can be up to almost 4.2 million devices. Each building usually has its own network, which is seen as a sub-network from the top, in such as way that MS/ TP is a sub-network to BACnet/IP,” explains Heikkila. The BACnet highway “This created a BACnet highway, with tables down the left and right side of the room and with users travelling with their table along the highway, in an agreed direction to the next session,” says Frank Schubert from MBS GmbH. “Previously we used permanent tables and had to disconnect devices. Now we simply disconnect the controllers and as laptops use batteries, there is minimal disruption, while maximizing time. We need to adopt this format for future Plugfest events.” A new concept at this year’s meeting was the use of Plugfest tables, or stations, The last “all in” test was described by delegates as “going very well,” with all devices and vendors connected together and sharing valuable information about how each other’s devices work together. The event was opened by Panu Virolainen, Vice President, Technology, of ABB’s low voltage AC drives business, who highlighted the importance of BACnet for ABB’s low voltage AC drives used in HVAC systems within the building sector. “BACnet is growing fast,” Virolainen said, “thanks to an excellent underlying product, BIG-EU’s promotion of BACnet globally; and the enormous marketing efforts through newsletters, campaigns and exhibitions like Light & Building. This is definitely a big opportunity for all of us.” Other applications being studied for BACnet include CCTV monitoring, with proposals already submitted from China and Germany; elevator monitoring, where Hong Kong is planning to monitor the alarms and status of thousands of elevators; and building energy utility integration within BACnet, with active discussions taking place between the US utilities and the BACnet committee. The future with BACnet During the meeting Bill Swan of Alerton outlined the ambitious future direction of BACnet, indicating that some 120 change proposals are in the pipeline. The extent of the work is reflected in the number of active working groups which include lighting applications, safety and secu- Meanwhile Frank Schubert of MBS GmbH outlined what was new in the next BTL test plan which was released in the summer of 2009 including workstation tests and profiles such as advanced workstation, lifesafety workstation, operator workstation and operator display. rity, MS/TP LAN and serial communications, utilities integration and XML applications. BACnet Interest Group Mit intelligenter Gebäudetechnik zu mehr Gebäudeeffizienz Using Intelligent Building Automation for Greater Building Efficiency Wie sich durch Gebäudeautomation und Energiemanagement eine größtmögliche Energieeffizienz in Gebäuden erreichen lässt, zeigt die Kongressmesse „GebäudeEffizienz 2009“ am 12. November im Congress Center der Messe Frankfurt am Main. Die BACnet Interest Group Europe (BIG-EU) unterstützt die Veranstaltung aktiv. Volker Röhl, BIG-EU Präsident und Mitglied des Programmkomitees: „Mit fünf parallelen Betreiberforen bieten wir ein Programm für den Bedarf der Entscheider.“ How to achieve the greatest possible energy efficiency in buildings by means of building automation and energy management will be shown at the “GebäudeEffizienz 2009” congress and trade show on 12 November at the Messe Frankfurt Congress Center. The BACnet Interest Group Europe (BIG-EU) i s actively supporting the event. According to Volker Röhl, BIG-EU president and a member of the program committee, “With five parallel user forums, we offer a program to meet the needs of decision makers.” Die diesjährige „Gebäude Effizienz 2009“ ist eine facettenreiche Plattform für nachhaltiges Planen, Bauen und Betreiben energieeffizienter Immobilien. Betreiber stellen nicht nur neue Best-Pratices für verschiedene Gebäu- detypen vor – für Bildung, Gesundheit, Verwaltung, Industrie und Infrastruktur. Auch modernes Energiema- nagement, aktuelle Förder programme, neue Trends und Visionen rund um das Thema Automation und Energie effizienz werden praxisnah präsentiert. Erstmals verleiht das Pogrammkomitee dieses Jahr den „GebäudeEffizienz Award“. Ausgezeichnet werden das beste Produkt, das herausragendste Produktdesign und die effizientesten Services. Bewertungskriterien sind neben der Dokumentation die Funktionalität, die Energieeffizienz, die Kommunikationsfähigkeit sowie der wirtschaftliche Nutzen. Teilnahmeberechtigt sind alle Aussteller und Sponsoren. Letztes Jahr erfolgreich als „GebäudeSysteme 2008“ gestartet, wird die „Gebäudeeffizienz 2009“ dieses Jahr aktiv von Planern und Architekten unterstützt. Successfully initiated as „GebäudeSysteme 2008“, the „Gebäudeeffizienz 2009“will this year be supported actively by planners and architects. 50 BACnet Europe Journal 11 10/09 Mit ihrem abwechslungsreichen Programm richtet sich die „GebäudeEffizienz 2009“ an „Endnutzer“ wie Betreiber, Investoren, Technisches Management, Facility Manager, Liegenschaftsverwaltungen, aber vor allem Fachliche Diskussion auf der „GebäudeSysteme 2008“ in Frankfurt. Professional discussion at the „GebäudeSysteme 2008“ at Frankfurt. auch an Planer und Architekten. Neben der BIG-EU, LonMark Deutschland und der enocean alliance unterstützen dieses Jahr erstmalig auch der VBI (Verband Beratender Ingenieure) und der BDA (Bund Deutscher Architekten) das Event. Darüber hinaus konnten die Veranstalter TEMA Technologie Marketing und MarDirect auch die Messe Frankfurt und den VDMA (Deutscher Maschinen- und Anlagenbau e.V.) als Partner gewinnen. Information und Anmeldung unter www.gebaeudeeffizienz2009.de This year’s “GebäudeEffizienz 2009” is a multifaceted platform for the sustainable design, construction and operation of energy-efficient properties. Operators will not only present new best-practices for different building types, such as education, health care, administrative, industrial and infrastructure, but modern energy management, current support programs, new trends and visions relating to the theme of automation and energy efficiency will also be presented in practical terms. This year for the first time, the program committee will Whenever open building automation is under discussion, talk turns to BACnet. And if it has to be modular, extensible and energy efficient as well, talk turns to SAUTER. give the “GebäudeEffizienz Award”. The best product, the most outstanding product design and the most efficient services will be recognized. Besides documenting product functionality, the evaluation criteria include energy efficiency, ability to communicate, as well as economic benefits. The competition is open to all exhibitors and sponsors. With its diverse program “GebäudeEffizienz 2009” is aimed at “end users” such as operators, investors, technical management, facility managers, property management companies, and especially planners and architects. Besides the BIG-EU, LonMark Germany and the enocean alliance, this year the VBI (Association of Consulting Engineers) and the BDA (Association of German Architects) will also support the event for the first time. Furthermore, event organizers TEMA Techno logie Marketing and MarDirect were also able to obtain Messe Frankfurt and the VDMA (German Machinery and Plant Manufacturing Association) as partners. Information and registration can be found at www.gebaeudeeffizienz2009.de. SAUTER EY-modulo 5: with BACnet/IP. Energy efficient, open and economical – module for module for module. Modular, native BACnet stations of the SAUTER EY-modulo 5 series are the intelligent solutions in every respect for any needs relating to building management and room automation. With its optimal function modules, integrated web connection and comfortable intelligent unitary control, SAUTER sets new standards. Because it is freely programmable, SAUTER EY-modulo 5 provides perfect system integration (e.g. M-Bus, Modbus) and smooth operation. Find out more about its versatility: www.sauter-controls.com Systems Components Services Facility Management BACnet Interest Group BACnet France auf der interclima+elec Paris BACnet France at interclima+elec Paris Interclima+elec, die größte Messe für Automations lösungen und Energie in Industrie und Infrastruktur Frankreichs, findet vom 9. bis 12. Februar 2010 in Paris statt. Zum zweiten Mal seit Gründung der französischen BACnet Organisation wird auch BACnet France mit seinen Mitgliedern vertreten sein. Sie zeigt die Integration der verschiedenen Gewerke mit BACnet. Bereits auf der vergangenen interclima+elec im Jahr 2008 präsentierte sich BACnet France mit einem institutionellen Stand. Der Stand weckte auf Anhieb großes Interesse und wurde an allen vier Messetagen von zahlreichen Planern, Integratoren und Beratern besucht. Inzwischen hat der weltweite Kommunikationsstandard BACnet viele Marktanteile in Frankreich gewonnen und die meisten Hersteller bieten jetzt BACnet kompatible Komponenten und Lösungen an. BACnet France zählt mittlerweile ein Dutzend Mitglieder, die abwechselnd den Stand besetzen werden, um Fachauskünfte zu erteilen und über die nächsten Trainings oder BACnet France Aktionen zu berichten. BACnet France wird auffällig im Zentrum der Automationsanbieter platziert, in einem eigens für offene Standards reservierten Bereich. Interclima+elec, France’s largest exhibition for automation solutions and energy in industry and infrastructure is taking place in Paris from 9-12 February, 2010. For the second time since the foundation of the French BACnet organization, BACnet France and its members will be represented. They will show how the various trades are integrated with BACnet. BACnet France was showcased at a joint stand at the 2008 interclima+elec. The stand immediately aroused great interest and was visited by many planners, integrators and consultants on all four exhibition days. Plattform zur Netzwerkbildung und zum Informations austausch: Der Messestand der BACnet France Organisation auf der interclima+elec. Platform for networking and exchange of information: The joint stand of the BACnet France community at interclima+elec. In the meantime, BACnet has won a large market share in France as a global communication standard, and most manufacturers now offer BACnet compatible components and solutions. By now BACnet France has more than a dozen members who will alternately oc- cupy the joint stand in order to provide specialized information and to report on the next trainings or BACnet France projects. BACnet France will be conspicuously situated in the center of the automation vendors in a special area reserved for open standards. Italienisches BACnet Journal am Start BACnet Italy Journal on the Move I n Kürze erscheint das erste BACnet Italy Journal – in italienischer Sprache: Für Antonio Catalano, den die Gründungsmitglieder der italienischen BACnet-Gruppe zu ihrem Vertreter wählten, steht jetzt schon fest, dass dieses Magazin sich in Kürze zum Informationsund Werbeträger der BACnet Hersteller und Anwender in Italien entwickeln wird. Als sein Stellvertreter wurde Sal- vatore Cataldi von der ESAC gewählt. Das BACnet Italy Journal bestätigt die Bedeutung des Standards auf dem italienischen Markt und wird den Lesern – Anwendern, Herstellern und allen Interessierten aus den Bereichen Gebäudeautomation, Facility Management, Energiemanagement und Energy Services – als Kommunikati- 52 BACnet Europe Journal 11 10/09 onsmedium dienen. Neue Produkte und Best Practices werden vorgestellt, technische Fragen erläutert, und die News informieren über Entwicklungen aus allen europäischen und internationalen BACnet Interest Groups. Bedeutende Unternehmen aus dem Bereich der Gebäudeautomation haben sofort zugesagt und das neue Ma- gazin mit Anzeigen, Anwenderartikeln und Produktberichten unterstützt. „Wir wissen alle, dass andere Kommunikationsprotokolle ihr eigenes Journal haben, jedoch nicht in verschiedenen Landessprachen. Das BACnet Italy Journal setzt auf die italienische Sprache, um damit die Kommunikation innerhalb einer eigenständigen BACnet Community keep cool! It's cool to be green The Vacon 100 HVAC begins a new wave of fresh green thinking in HVAC matters. Vacon 100 HVAC AC drives excel in efficient investment, installation, operation and maintenance. Es ist cool Grün zu sein Der neue Vacon 100 HVAC Frequenzumrichter bringt eine neue Dimension von umweltbewusstem Denken in den HKLBereich. Der Vacon 100 HVAC ist allemal eine gute Investition, denn er überzeugt auch durch Installationsfreundlichkeit, Zuverlässigkeit und Wartungsarmut. BACnet Version Standard BACnet/IP (Ethernet) ✔ BACnet MS/TP (RS-485) ✔ www.vacon.com BACnet Interest Group in Italien zu stärken und ein echtes ‚BACnet Kompetenzzentrum’ in Italien zu gründen“, so Antonio Catalano, der das italienische BACnet Markting auch als Business Manager von Delta Controls Italy unterstützt. Wir wünschen den italienischen Kollegen viel Spaß beim Lesen und dem BACnet Italy Journal viel Erfolg! The first BACnet Italy Journal will appear shortly – purely in Italian. For Antonio Catalano, chosen as representative by the founding members of the Italian BACnet group, it is now already clear that the magazine will develop into the information and advertising medium for BACnet manufacturers and users in Italy. Salvatore Cataldi of ESAC was also chosen by the members of the Italian BACnet group to be the deputy representative for Mr. Catalano. The BACnet Italy Journal confirms the importance of the BACnet standard on the Italian market, and it will serve as a communication medium for its readers - users, manufacturers and all those interested in the fields of building automation, facility management, energy management and energy services. New products and best practices will be presented, technical questions discussed, and news on developments from all European and international BACnet Interest Groups will be covered. Major companies in the building automation field have already confirmed their participation and will support the new magazine with ads, user articles, and product reviews. “We all know that other communication protocols have their own journal, but not in various languages. The www.bacnetitalia.org BACnet Italy 1614-9572 ISSN ISSN 1614-9572 Journal Benvenuti alla prima edizione del BACnet Italy Journal! 01 10/09 Un esempio perfetto d’integrazione Bus 7 La più grande rete BACnet in un edificio pubblico italiano! 10 BACnet: oggetti virtuali per sistemi reali 23 BACnet Italy Journal is published in Italian in order to strengthen communication within the autonomous BACnet community in Italy and to form a true ‘BACnet expertise center’ in Italy ”, said Mr. Catalano, supporting Italian BACnet marketing in his role as business manager for Delta Controls Italy as well. We wish our Italian colleagues enjoyable reading and we wish the BACnet Italy Journal every success! Innovation by integration Does your organisation enjoy the advantages of BACnet? Interoperable system integration; a one-time investment that provides supplier independence; no licensing costs and freedom to choose hardware technology. Remote access utilizing BACnet over Ethernet makes systems operation from any location a reality. The result: low-cost investment + optimal ease-of-use = an innovative building management system. Regel Partners does it right! 54 BACnet Europe Journal 11 10/09 System Integrators with Content Regel Partners B.V. Hogebrinkerweg 8 3871 KN Hoevelaken P.O. Box 86 3870 CB Hoevelaken T. +31 (0)33 254 48 48 F. +31 (0)33 254 48 44 info@regelpartners.nl www.regelpartners.nl BACnet Interest Group Willkommen in der BIG-EU Welcome to the BIG-EU Danfoss GmbH Tobias Dietz Tobias.dietz@danfoss.com www.danfoss.com/Germany Danfoss, gegründet 1933, ist ein internationaler Konzern. Das Produktprogramm umfasst Wärmetechnik, Kälte- und Klimatechnik sowie Elektrische Antriebstechnik. Bereits 1968 lieferte Danfoss den ersten in Serie gefertigten Frequenzumrichter und verfügt über mehr als 25 Jahre Erfahrung in der Antriebsregelung für die Gebäudeautomation, gekennzeichnet durch die Einführung des ersten darauf spezialisierten Umrichters. 2006 stellte Danfoss den VLT® HVAC Drive vor, der sich durch sein modulares Systemdesign optimal an die jeweilige Anwendung anpassen lässt. Er verfügt über ein Optionsmodul für die einfache Integration in BACnet-Netze. Ein umfassendes Dienstleistungsangebot rundet das Portfolio ab. Dazu zählen eine 24-Stunden-Hotline, die mit hoch qualifizierten Technikern besetzt ist, sowie das dichte Servicenetz mit den Danfoss Systempartnern. Danfoss is an international concern, founded in 1933. The product program consists of heating, refrigeration and air conditioning technology as well as electrical drives. In 1968 Danfoss delivered the first serially pro- duced frequency converter and has more than 25 years experience in drives control for building automation, characterised through the introduction of the first HVAC specialised drive. In 2006 Danfoss introduced the VLT HVAC Drive. The modular concept of the drive makes it easy to adapt to particular applications. It also offers an optional module for easy integration into BACnet networks. The broad range of services offered makes the portfolio complete. This includes a 24 hour. hotline with qualified engineers and a close service network with Danfoss system partners. Hosch Gebäudeatuomation Holger Schaefe GmbH Jörg Balow jbalow@hosch-ga.de www.hosch-ga.de/ Die HOSCH Gebäudeautomation ist ein Spezialist für Gebäudeautomation und Systemintegration. Ein großes Team von Mitarbeitern projektiert, erstellt und verknüpft Systeme der Gebäudeautomation. HOSCH ist ein markenunabhängiger Systemintegrator und verwendet auch in vielen Projekten das Protokoll BACnet. Durch Mitwirkung in verschiedensten Arbeitskreisen des DIN und des VDI im Bereich der Elektrotechnik und der Gebäudeautomation ist eine kompetente Be- ratung unserer Kunden auf höchstem Niveau gesichert. Markenunabhängige Systemintegration und maßgeschneiderte Anwendung des BACnet-Protokolls sorgen für sichere, energiesparende und komfortable Nutzung von Gebäuden und Anlagen. Auch ist die HOSCH bäudeautomation ein fahrender Dienstleister Bereich des technischen bäudemanagements. Geerim Ge- HOSCH setzt die Gebäudeautomation für kundengerechte Energieeffizienz ein und berät Kunden mit Contractingmodellen. HOSCH Gebäudeautomation is a specialist for building automation and system integration. A large team of employees designs, prepares and connects building automation systems. HOSCH is a brand-independent system integrator and uses the BACnet protocol in many projects, too. Participation in the most diverse study groups for DIN and VDI in the area of electrical engineering and building automation guarantees competent consultation for our clients on the highest level. Brand-independent system integration and tailor-made use of the BACnet protocol provide for safe, energysaving and comfortable use of buildings and installations. HOSCH Gebäudeautomation is also an experienced service provider in the area of technical building management. HOSCH applies building automation for customeroriented energy efficiency and advises clients in the use of contracting models. Stefan Seyfarth s.seyfarth@thermokon.de www.thermokon.de Thermokon Sensortechnik GmbH ist ein mittelständisches deutsches Unternehmen mit Niederlassungen in Österreich, Schweden und Polen und hat sich auf die Produktion von Sensorik für die Klima- und Gebäudeleittechnik spezialisiert. Dank modernster Sensortechnologie sorgt Thermokon dafür, dass hier Einsparpotenziale optimal ausgeschöpft werden durch individuell zugeschnittene Lösungen, die eine Anpassung von Heizung, Klimatisierung und Lichtsteuerung an die tatsächliche Nutzung des Raumes ermöglichen. Ideal für Neubauten als auch zur Nachrüstung sind dabei die innovativen Erfolgsprodukte des EasySens Funksensor-Systems. Thermokon is a mediumsized company in the middle of Germany with three branches in Austria, Sweden and Poland and specializes in the production of sensors for HVAC and building control technology. Thanks to the latest sensor technologies Thermokon ensures an ideal utilization of saving potentials, e.g. by of- BACnet Europe Journal 11 10/09 55 BACnet Interest Group BACnet Kalender Calendar of BACnet Events Datum Date fering individually matched solutions for the adaptation of heating, air-conditioning and light control to the actual use of a room. The innovative and proven wireless sensor system EasySens is specially designed for new buildings and retrofitting. Die nächste Generation der Controller-Produkte von Viconics werden sich fast vollständig auf den bestehenden Gebäudesanierungs-Markt konzentrieren. Produkte, die leichter zu installieren sind und bestehende Verdrahtungs-Infrastrukturen verwenden während sie gleichzeitig großen Kontrollkomfort, große Energieeinsparungen und einen schnellen Return on Investment unterstützen. Ort Location Viconics Inc. wurde 1981 in Montreal, Kanada als Quantum Electronics gegründet. Die Gründung war Antwort auf die Forderung des Marktes nach kostengünstiger industrieller Prozessund Temperaturausrüstung. Anfang der 90er Jahre erweiterte Viconics seine Produktions- und R&D Einrichtungen. Dieses Wachstum wurde durch die Einführung eines kompletten Sortiments der microcontrollerbasierten HLK-Temperatur und Feuchtigkeits-Controller angetrieben. Mit der Verbreitung offener Kommunikationsstandards wie BACnet hat Viconics seine Produktlinien weiter ausgedehnt. Dabei wurde die komplette Produktlinie der Controller entwickelt, um Gesamtkosten, traditionell arbeitsintensive Inbetriebnahme Prozeduren und komplizierte Programmiertechniken verbunden mit programmierbaren DDC-Steuerelementen zu verringern. Viconics Inc. was founded in 1981 in Montreal, Canada as Quantum Electronics in response to a market demand for cost-effective industrial process and temperature controls equipment. In the early 1990s Viconics Inc. expanded its manufacturing and R&D facilities. This growth was fueled with the introduction of a complete line of microcontrollerbased HVAC temperature and humidity controllers. With the proliferation of open communication standards like BACnet, Viconics has further expanded its product line. This complete line of controllers has been developed to reduce overall costs, traditional labor-intensive commissioning procedures, and complicated programming techniques associated with programmable DDC controls. The next generation of control products from Viconics will focus almost entirely on the existing building retrofit market. These are products that are easier to install, using existing wiring infrastructure while providing exceptional comfort control, energy savings and return on investment. 56 BACnet Europe Journal 11 10/09 Kontakt Information BACnet Forum Bejing MarDirect, china@mardirect.de, www.bacnetforum.org 2009 20.10.2009 Beijing, CN 27.10.2009 Schiphol Airport Amsterdam, NL BACnet Academy Europe Britta von Helden, MarDirect, vonhelden@mardirect.de 05.11.2009 Hoevelaken, NL Smart Buildings 2009 BIG-EU Office, info@big-eu.org, www.smart-buildings.nl 09.11.2009 Zürich, CH Green Building 2009 BIG-EU Office, info@big-eu.org, www.tage-der-technik.ch 12.11.2009 Frankfurt, D GebäudeEffizienz 2009 Bruno Kloubert, MarDirect, Dortmund, D., kloubert@mardirect.de, www.gebaeudeeffizienz2009.de 17.18.11.2009 Tours, F BACnet Training Association BACnet France, Paris F, info@mardirect.de, Tel. Paris: 01 46 89 67 25 23.26.11.2009 Dubai, UAE Joint BACnet booth at the Big 5 MarDirect, Dortmund, D., info@mardirect.de 25.27.01.2010 Orlando, USA AHR Expo 2010, Common Booth MarDirect, Dortmund, D., info@mardirect.de 09.12.02.2010 Paris, F BACnet booth interclima + elec home&building Association BACnet France, Paris F, info@mardirect.de, Tel. Paris: 01 46 89 67 25 Beyond Comfort Viconics Inc. Trevor Palmer tpalmer@viconics.com www.viconics.com Veranstaltung Event 2010 23.24.02.2010 Mannheim, D BACnet VDI Training Frank Schubert, MBS GmbH, Krefeld, D., frank.schubert@mbs-software.de Hans R. Kranz, HAK-Ingenieurberatung Haustechnik Automation Kranz, Forst, D., hans.kranz@vdi.de 23.27.03.2010 Milan, I BACnet booth Mostra Convegno MarDirect, italy@mardirect.de, BIG-EU Office, info@big-eu.org 11.16.04.2010 Frankfurt, D BACnet booth MarDirect, Dortmund, D., Light+Building 2010 info@mardirect.de 09.10.06.2010 Frankfurt, D BACnet VDI Training Frank Schubert, MBS GmbH, Krefeld, D., frank.schubert@mbs-software.de Hans R. Kranz, HAKIngenieurberatung Haustechnik Automation Kranz, Forst, D., hans.kranz@vdi.de 20.09.2010 Zug, CH WG-T and WG-M meetings BIG-EU Office, info@big-eu.org 20.09.2010 Zug, CH General Meeting BIG-EU Office, info@big-eu.org 21.09.2010 Zug, CH Advisory Board meeting BIG-EU Office, info@big-eu.org BACnet VDI Training Frank Schubert, MBS GmbH, Krefeld, D., frank.schubert@mbs-software.de Hans R. Kranz, HAKIngenieurberatung Haustechnik Automation Kranz, Forst, D., hans.kranz@vdi.de 19.20.10.2010 Düsseldorf, D w GebäudeEffizienz nachhaltig planen und wirtschaftlich nutzen Intelligente Lösungen Effiziente Technik Best Services Kongressmesse für energieeffiziente Immobilien Top Themen Anwendung von Effizienztechnologien Energetische Anforderungen an Planung, Bau und Betrieb Optimierung durch Energiemanagement und Services Trends und Visionen für die Stadt von morgen Nachhaltige Schulsanierung Hochkarätige Referenten Tarek Al-Wazir, MdL Bertram Canzler, Canzler Ingenieure Dr. Michael Bauer, Drees & Sommer Advanced Building Technologies Gemeinde Beckerich aus Luxemburg Hans-Dieter Hegner, Bundesministerium für Verkehr, Bau und Stadtentwicklung Prof. Dr. Rainer Hirschberg, FH Aachen Fraunhofer InHaus Zentrum Dieter Leipoldt, Ebert-Ingenieure Richard Weller, makon GmbH & Co. KG GebäudeEffizienz Award Das beste Produkt, das herausragendste Design und die effizientesten Services werden mit dem GebäudeEffizienz Award 2009 ausgezeichnet. Funktionalität, Energieeffizienz, Kommunikationsfähigkeit und wirtschaftlicher Nutzen sind die Kriterien. Donnerstag, 12. November 2009 Congress Center der Messe Frankfurt Information. Bewerbung. Anmeldung. www.gebaeudeeffizienz2009.de Partner VERBAND BERATENDER INGENIEURE
Similar documents
Journal - BACnet
(BIG-EU) – registered society. Order the BACnet Europe Journal by E-Mail from info@bigeu.org Online distribution The BACnet Europe Journal is posted as a Portable Document Format (PDF)-File to www....
More informationReferenzkatalog 2016
sie sich zur Aufgabe gemacht, die Verbreitung in Europa zu fördern, die europäischen BACnet-Aktivitäten zu koordinieren und die Anwender mit Informationen über die Einsatzmöglichkeiten und den Nutz...
More informationJournal - BACnet
31 Verbesserte individuelle Kontrolle – Individual Control Upgraded
More information