BrandschutzbeitratBeispiel: Werkfeuerwehrmann/-frau
Transcription
BrandschutzbeitratBeispiel: Werkfeuerwehrmann/-frau
Fire in a facade with an exterior insulation and finishing system on 29/05/2012 Tobias Pflüger, M.Sc. Fire Officer Agenda 1. Operational overview 2. Course of the operation 3. Prevailing conditions 4. Findings 5. Next steps 2 04.11.2014 Frankfurt am Main Fire Department Agenda 1. Operational overview 2. Course of the operation 3. Prevailing conditions 4. Findings 5. Next steps 3 04.11.2014 Frankfurt am Main Fire Department Operational overview The property • • • • 4 Adickessallee 63-65 6 full floors, approx. 22m Was being extended and renovated to become student flats Building completely surrounded by scaffolding 04.11.2014 Frankfurt am Main Fire Department Operational overview The property location Hessian Broadcasting Corporation Fire Station Police Station Incident scene 5 04.11.2014 Frankfurt am Main Fire Department Operational overview At the site of operation • • • • • • • Head of the Fire Dept. A unit B1 unit C-1 unit C-2 unit Special units U and "TH Ost" Approx. 80 personnel in total • • • • Site engineer Occupational safety engineer Structural engineer Mainova, gas emergency service 7 04.11.2014 Frankfurt am Main Fire Department Operational overview Deployed • • • • • 8 20 self-contained breathing apparatus 5 fog nozzles 2 foam nozzles 2 turning nozzles (fog nozzles via turntable ladder) 1 water supply via turntable ladder 04.11.2014 Frankfurt am Main Fire Department Agenda 1. Operational overview 2. Course of the operation 3. Framework conditions 4. Findings 5. Next steps 9 04.11.2014 Frankfurt am Main Fire Department Course of the operation Emergency calls 17:05 The following are being trained: • • • • I'm calling from the police station. I can see 5-metre-high flames Andreas Mohn coming from the building site across the way. It's beside the Thomas Koch building and there's plastic burning. There's a lot of heavy smoke Thomas Gruber and, as I said, the flames are 5 metres high. Come quickly. The press officer on duty (PvD) can always be reached at: • There's a building site on fire here in Frankfurt. I'm coming from outside, from Wiesbaden, into Frankfurt, I'm not familiar with the 0170 338see2008 area and I don't any road sign. Yes, right, opposite the police station. 10 04.11.2014 Frankfurt am Main Fire Department Course of the operation Emergency calls 17:06 The following are being trained: • There are polystyrene things on fire here across from the police • Andreas station,Mohn yes opposite on the ground. No, there's nothing on the • Thomas Koch building, the people on the scaffolding are all running towards the • Thomas back, Gruber there's a lot of thick smoke. Please get here quickly. The officer on duty (PvD) alwayssite be pretty reached at: opposite the • press I've just noticed a fire, yes can a building much police station, lots of smoke • 0170 338 2008 Yes there's a building on fire here in Adickesallee, I can see an awful lot of smoke, I can't tell you anything more, I’ve gone past. Between 17:05 and 17:15, there were around 60 emergency calls in total in relation to this incident. 11 04.11.2014 Frankfurt am Main Fire Department 17:06 to 17:11 • Time between the first call to the emergency services and the fire service arriving Course of the operation Arrival of the fire service 17:11 • Arrival of the 1st fire engine at the site of operation. Given the large number of calls to the emergency services, the operational level was raised from a small fire to a major fire (F1, F2 and F3) before the 1st vehicle arrived. • 13 04.11.2014 Frankfurt am Main Fire Department Course of the operation Arrival of the fire service 17:12 • Arrival of the 1st command unit and 1st turntable ladder. 17:13 • Operational level increased to F4 14 04.11.2014 Frankfurt am Main Fire Department Course of the operation Arrival of the fire service From 17:13 • Facade completely on fire • Fireproof barriers no longer discernible • Building site cleared • Fire raging across all floors • Had spread to two parked vehicles 15 04.11.2014 Frankfurt am Main Fire Department Approx. 17:20 • 5 fog nozzles, 2 turning nozzles and 2 foam nozzles deployed • 20 breathing apparatus used Approx. 17:46 • Fire under control From 17:46 • Extinguishing work From 17:46 • Facade opened From 17:46 • Facade opened From 17:46 • Scaffolding secured 20:06 • Fire extinguished Agenda 1. Operational overview 2. Course of the operation 3. Prevailing conditions 4. Findings 5. Next steps 23 04.11.2014 Frankfurt am Main Fire Department Prevailing conditions Why wasn't the outcome worse? Only property damage was incurred for the following reasons: • • • • • • Nobody was in the proximity of the fire. Building was not yet in use. Only construction workers in the building. No fire load in the rooms. Time of the day, the fire was reported very quickly. Location of the site of operation. The first units arrived after just 3 mins. Extensive fire-fighting efforts were possible from the street. • Weather conditions. Smoke from the fire was able to rise up directly. 24 04.11.2014 Frankfurt am Main Fire Department Agenda 1. Operational overview 2. Course of the operation 3. Prevailing conditions 4. Findings 5. Next steps 25 04.11.2014 Frankfurt am Main Fire Department Fire barriers Fire barriers Findings from the point of view of the fire service • These kinds of fires are becoming more common. • The integrated fire breaks were ineffective in this operation. • With an operation like this, there could have been dramatic developments if the prevailing conditions had been different. 28 04.11.2014 Frankfurt am Main Fire Department Agenda 1. Operational overview 2. Course of the operation 3. Prevailing conditions 4. Findings 5. Next steps 29 04.11.2014 Frankfurt am Main Fire Department Next steps/results • Coordination task of the German Fire Services Association (DFV) and German Association of Fire Chiefs (AGBF) with the involvement of the Works Fire Service Association of Germany (WFVD). • Collection of operations with exterior insulation and finishing systems • Discussion with the various technical bodies - particularly in the construction sector • Results • The Conference of Building Ministers discussed the issue • Working Group V of the Conference of Ministers of the Interior looked into the topic. • The VdS is drafting a guideline on this. 30 04.11.2014 Next steps/results 22/03/2013 Press office: Hessian Minister for Economics, Transport and Regional Development There will be more comprehensive testing of the fire risk of polystyrenebased facade insulation systems. This decision was taken on Friday by the State Construction Ministers,…. ….Following analysis of the fires, the experts have confirmed that exterior insulation and finishing systems with polystyrene insulation are sufficiently safe in typical scenarios based on room fires. However, they called for additional tests under conditions which might arise if a rubbish container was to go on fire, for example... 31 04.11.2014 Frankfurt am Main Fire Department Next steps/results Timeline • Define the test condition 32 04.11.2014 • Perform the tests • Analyse and evaluate the tests • Specify any new conditions of installation/use • Integrate into regulations Frankfurt am Main Fire Department Next steps/results Timeline • Define the test condition 33 04.11.2014 • Perform the tests • Analyse and evaluate the tests • Specify any new conditions of installation/use • Integrate into regulations Frankfurt am Main Fire Department Thank you very much! All rights to the images in this presentation rest with the Frankfurt am Main Fire Department. Distribution and publication are not permitted. Please contact the Press Office of the Frankfurt Fire Department in the case of questions. Tel.: 069/720051 Pressestelle.feuerwehr@stadt-frankfurt.de