PIPM NewsLetter 1st Issue
Transcription
PIPM NewsLetter 1st Issue
Is s u e # 1, M a r c h 2 0 0 9 THE NEWSLETTER 2 Articles of the Month 3 Updated list of Projects Updated list of Employee Employee of the Quarter 4 5 6 7 8 PIONEER IPM A NEW PIONEER BRANCH: Pioneer International Projects Management has just started the process of establishing of a new branch in Jordan as a part of its preparation for a Potential Mega Project in Amman and AQABA. The operation of this newly established branch is supposed to be activated within the second quarter of this year. OUR NEW PROJECTS: The following projects have been assigned to Pioneer International Projects Management during the 1st quarter of the 2009: 1. P048: Claim Preparation for 5 Commercial buildings related to NTCC 2. P049: Boundary Wall of Grand Mosque in Abu Dhabi 3. P050: Um Ul-Quwain General Hospital INSIDE THIS ISSUE: OF INTRODUCTION TO THE 1ST ISSUE: ( BY THE GENERAL MANAGER) It is my pleasure to write this introduction for our news letter implementation. I hereby encourage every Pioneer Member to participate in the preparation of the coming issue as well as providing constructive comments to the IT section to enrich their vision for the preparation of the new issue. Finally, I would like to thank all the participated members in this issue for their efforts which are the success of this issue to see the light. Project Status Inform Your Self Pioneer Events Knowledge Entertainment 1 Articles of The Month By: Ahmed El Sayed ABDELBAKEY Subject: PROGRAMME CRASHING Defenition: Crashing is decreasing your project duration. e.g.: If I have 2000 m3 excavation and a loader which excavates 500 m3/day then the excavation activity will take 2000/500=4 days the loader rate per day is 600 Dhs. Then the excavation activity will cost me 600 x 4 = 2400 Dhs. If I decide to get 2 loaders per day the productivity will increase to be 1000 m3/day and the excavation activity will take 2000/1000= 2 days the activity cost then will be 600 x 2 x 2 =2400 Dhs. Is this called crashing???? Of course no this is a bad planning from you from the beginning why to do the activity in 4 days instead of doing it in 2 days although both have the same cost. Planning is to use the optimum solution which in this case is using 2 loaders. So why people always says crashing results in extra cost???? I will tell you why just please see the following example e.g.: the same above example if I need to do the same activity in one day and the max loaders that can work in excavation is 2 loaders due to area constrains, then I will get two other loaders and let them work a night shift where the loader rate in the night shift is 700 Dhs , now I can finish the activity in one day but the cost will become (2 x 600) + (2 x 700) = 2600 Dhs., which is more than 2400 Dhs. Now you know why crashing cost you an extra time, in fact night shifts is not only the cause of increasing cost due to crashing but also some times especially in finishing works when you increase number of crews you increase the total productivity but the one crew productivity decrease because or disruption of crowded area, so the crew which produces for example 10 m2/ day and take 100 Dhs will produce 9 m2 and take the same 100 Dhs. (I.e. increase in cost of 1 m2). There is many other factors affects crashing cost and many researches are made in this concern but I hope I give you a good start to know more about crashing. 2 Update Issue Details Updated List of Employee Updated list of Projects For More Details Please Proceed Page 4 Employee of the Quarter Your Name: We encourage everybody to participate in the selection of the “ Employee of the Quarter”. To do so, please cut out the form to the right side of this text, fill it in and then hand it over to the HR and Admin Officer Your No.: Selected Employee: Note: Note: Fill it and give it to HR and Admin Department for submit to General Manager. A minimum 8 votes should be achieve to get the reward 3 Update Project Status Project Code: P040 Description: Princess Tower in Dubai Contractor: Arabian Construction Company (ACC) Project Code: P009 Description: Four no prestigious Commercial and Residential Towers Contractor: Civilco LLC. Project Code: P043 Description: Al Wahda City –1 Project Contractor: Civilco Project Code: P030 Description: Construction of Library & New Research Building for Qatar University Contractor: Tadmur Contracting & Trading Est. Project Code: P025 Description: Landscaping, Irrigation, Paving Marble, Granite, Fountains & Drainage System Works Contractor: Al Jurf Development Projects Project Code: P042 Description: All Road works & Infrastructure for Radat City Abu Dhabi Contractor: Delma Engineering Projects Co. Project Code: P038 Description: Construction of 200 Villas & Terrace Homes Contractor: Al Shaafar Ghantoot Project Code: P035 Description: 2 Building Type E Contractor: Test Contracting Project Code: P033 Description: 72 Buildings with Fully MEP Services Contractor: Group Five Contracting & Al Naboodah Contracting Project Code: P046 Description: Hotel and Resort Project in Abu Dhabi Contractor: MACE 4 Update Inform Your Self Share the Knowledge Software & IT Pioneer is one of the companies that are highly updated in terms of technology, it is currently using the latest Primavera software that is being use by the engineers to record and update the progress or development of every project. This issue is forming a trial to issue our corporate 1st newsletter and the participants are very limited. However, if you wish to participate in the newsletter please send your idea to the IT Department with you text, photo, and your photograph to the following e-mail addresses All the departments are using a high technology machines and programs to ensure the smooth flow of the company’s every day business. Like by checking the employee’s attendance, the company is using a Blue Key Finger Print system to record the log in and log out of every employees. Peachtree accounting system is also one of the programs that are being use by our accountants right now to check the flow of the company’s liquidity and statistics. In the Administration department they are using MS Office 2007 in making some documents. IT is using the latest Photoshop for editing and creating some designs. All computers are having a windows XP, even though this is not the latest processor our IT is making it sure that all computers are powerful and still convenient to use and helpful. info@pioneeripm.com cfranco@pioneeripm.com Thank You. Certification General Issues PIONEER IPM is a Projects Management firm registered in the United Arab Emirates for Management Consultancies Services and is internationally recognized by several regulatory organizations. And it is ISO 9001:2000 certified for the Quality Management System in terms of Provision of Projects, Planning and Scheduling, Financial Planning, Claims & Dispute Management, Contract Administration, Engineering Management, and HSE & Quality Control Management Services for the Construction Project since on June 2008. This is announce to Pioneer Staffs that our IT Department is now producing a telephone directory which will include the required communication numbers and e-mail addresses for all our running projects and clients. It is responsible of Pioneer staffs to give more information and to update especially for On-site Engineers Pioneer is a certified agent for the American MPMM Management Methodology System. And being managed by a league of Project Management Professional (PMP) certified staff from the Project Management Institute (PMI), USA. 5 Update Pioneer Events PIONEER held an IFTAR Party last on Oct. 11, 2008 at Sheraton Hotel. It was a successful event because everybody were able to enjoyed and each other’s company. These are photos of the event. Last Dec. 02, 2008 and March 13, 2009 Pioneer Staffs are get together in Khalidia Park to bonding each employee, to know each other, and to tackle about how to solve and survive the company for the global crisis. 6 Update Knowledge : (By Ahmed ABDULBAKY) I am a Contractor Can I claim against the Engineer or the Employer???? Of course you can, Sheikh Khalifa Bin Zayed Law no 21 for the year 2006 gives you the right to claim the Engineer or the Employer for their failure to comply with their obligations it also gives you the right to claim for an extension of time and extra cost for any reasons that was out of your hand and it affects your project completion date. On what basics contractor built their entitlement to an extra cost claim??? Contractors build their cost claims on the following (prolongation, financial charges, loss of profit, and loss of trade, escalation in material rates, disruptions, and variations ….etc) All versions of FIDIC also give you the right to claim. The FIDIC new version (FIDIC 1999) and its yearly updating is showing a complete clause “clause 20.1” for contractor claims. Even if the engineer or the Employer disagree to your claim you can raise your claim to arbitration or court after failing to solve the issue with amicable settlement, all as per the FIDIC and Sheikh Khalifa Bin Zayed Law. Here below are some clauses showing your right to claim. Clause “Clause 1.9” Description Delayed Drawings or instructions Clause “Clause 8.9” Description Consequences of suspension “Clause 2.1” Rights of access to the site “Clause 12.4” Omissions “Clause 2.2” Permits, licenses or approvals “Clause 13.1” Rights to vary Adjustments for “Clause 13.7” changes in Legislation Adjustments for “Clause 13.8” changes in Cost “Clause 4.6” Co-operation “Clause 4.7” Setting out “Clause 4.12” Unforeseeable Physical conditions “Clause 14.8” Delayed Payments “Clause 8.4” Extension o time for completion “Clause 17.4” Consequences of Employer’s Risks “Clause 8.5” Delays Caused by Authorities “Clause 19.4” Consequences of Force Majeure 7 You are invited to make a slogan for our company and get reward. P.O Box 129590 Abu Dhabi, UAE Telephone No. +971 2 632 2990 Fax No. +971 2 632 2338 E-Mail info@pioneeripm.com www.pioneeripm.com 8