WQRK.ING CLEARANCES:" - Magic Valley Electric Cooperative
Transcription
WQRK.ING CLEARANCES:" - Magic Valley Electric Cooperative
~ 21 (2001 ) WQRK.INGCLEARANCES:" SUFFICIENT ACCESS AND WORKING SPACE (SHADED AREA) SHALL BE PROVIDED AND MAINTAINED ABOUT ALL METERING EQUIPMENT TO PERMIT READY AND SAFE OPERATION AND MAINTENANCE OF SUCH EQUIPMENT. THE DIMENSION OF THE WORKING SPACE IN THE DIRECTION OF ACCESS TO LIVE PARTS OPERATING AT 600 VOLTS OR LESS AND LIKELY TO REQUIRE EXAMINATION. ADJUSTMENT SERVICING. OR MAINTENANCE WHILE ALIVE SHALL NOT BE LESS THAN 30" WIDE IN FRONT OF THE ELECTRIC EQUIPMENT. IN NO CASE SHALL HEADROOMBE LESS THAN 1'. OR STORE EQUIPMENT. PLANTS. ETC. WITHIN PLEASE DO NOT INSTAll WORKING SPACE. 6' 22 (2001 ) POINT OF DELIVERY LOCATION METER BASE LOCATION IS AN IMPORTANT CONSIDERATION TO BOTH THE COOPERATIVE AND THE MEMBER. (A) C8} SERVICE WIRE SHALL NOT BE OVER OR UNDER BUILDINGS (RESIDENTIAL. COMMERCIAL BUILDINGS. ETC. IC) METER BASE 11) /2) /3) /4) REQUESTED LOCATION TO BE ACCESSIBLE TO W.V.E.C. - ------...-PERSONNEL ALTERNATE LOCATION IN THE SHAOEO AREA UNDER OVERHA~ BAD LOCATION FOR METER DUE TO TREE IN THE PATH OF SERVICE WIRE MEMBER DISCONNECT REQUESTED LOCATION NOTE: ADDITIONAL POLE MAY BE NEEDED METER LOCATION IS FURTHER THAN 80 FEET FROM OVERHEAD FACILITI (E) SEPTIC TANKS ~ IDENTIFY LOCATION OF BURIED SEPTIC TANKS FOR THE SAFETY OF M.V.E.C. PERSONNEL AND PREVENTION OF VEHICLE DAMAGE TO THE SEPTIC TANKS AND LINES (A) 23 (2001 ) OVERHEADMETER INSTALLATION THE METHOD SHOWN SHOULD GENERAllY BE SATISFACTORY. THE MEMBER MUST CONSULT THE ARCHITECT. CONTRACTOR. OR ELECTRICIAN CONCERNING ELECTRICAL LOAD AND THE ABILTIY OF THE HOUSE TO SUPPORT TENSION OF SERVICE WIRE (MAX. 500 LBS. PER SERVICE) PROVIDE ELECTRICAl lOAD INFORMATION TO MVEC FOR PROPER ELECTRICAL SERVICE AND CONTACT MVEC ON LOCATION OF METER. COOPERATIVE WILL: INSTALL SERVICE DROP. MEMBER WILL: FURNISH & INSTALL METER BASE AND FURNISH AND INSTALL WEATHER HEAD. RISER. PIPE CLAMPS. AND OTHER REQUIRED MATERIALS. ALL BASES & DEVICES SHALL BE BONDED TO GROUND. (.U SERVICE (8) c DROP WEATHER HEAD AND SERVICE ENTRANCE WIRE MINIMUM LENGTH 18" AND MINIMUM NO.6 COPPER OR AL. EQUIVALENT IS RISER CONDUIT SIN: : DEPENDENT UPON ELECTRICAL LOAD AND STRENIGTH. ALSO SEE SERVICE ENTRANCE WAST DRAWING (0) PIPE CLAMPS MINIMUM 2 EACH 4' INTERVALS (EI METER BASE (SEE METER BASEl IF) MINIMUM 2" CLEARANCE BETWEENALL ENCLOSURES (G) MEMBER DISCONNECT LOCATION EITHER BELOW. BEHIND. SIDE OF METER BASE OR (H) NON METALLIC CONDUIT; OR METALLIC CONDUIT WITH (E) BOTH ENDS BONDEDTO GROUND; NO.6 COPPER (F) GROUNDWIRE- CONTINUOUSFROM ~ METER BASE TO GROUNDROD. C) (NEC 250-92-B) (I) (f) ) F I HAl APPROVEDGROUNDING ELECTRODE:5~HX 8' COPPER WELD GROUNDROD (J) (J) REQUIREDCFCI RECEPTACLEOR CFCI PROTECTIONWITH WEATHERPROOF COVER; 120 VOLTSOUTLET. (IF OUTLET IS INSTALLED) GRADE ~ 24 (2001 ) SERVICE ENTRANCE MAST THE MEMBER MUST THE METHOD SHOWN SHOULD GENERALLY BE SATISFACTORY. CONCERNING ELECT R ICAL CONSULT THE ARCHITECT. CONTRACTOR. OR ELECTRICIAN LOAD AND THE ABILTIY OF THE HOUSE TO SUPPORT TENSION OF SERVICE WI RE (MAX. 500 LBS. PER SERVICE) PROVr DE ELECTRICAL LOAD INFORMATION T 0 MVEC FOR PROPER ELECTRICAL SERVICE AND CONTACT MVEC ON LOCATION OF METER MEMBER WILL: FURNISH & INSTALL METER BASE AND FURNISH AND INS TALL WEATHER HEAD. RISER. PIP E CLAMPS. AND OTHER REOUIRED MATERIALS. ALL BASES & DEVICES SHALL BE BONDED TO GROUND. COOPERATIVE WILL: FURNISH AND INSTALL METER DROP. AND SERVICE SERVICE DROP DR 0P TO ROOF CLEARANCE VO L TS 0 R LES s o. 36 IN CH" MINI IF BY MUM 12" ROOF STANO ARD 4 SLOPE b. 18 INCHES IF NO MORE THAN 4 FEET OF SERVICE OROP CONDUCTORS PASS SERVICE I. 300 I I. (A} ABOVE ROOF OVERHANG. 300 VO L TS OR MORE o. 8 FEET CLEARANCE IS REOUI RED. WEATHER HEAD AND SERVICE ENTRANCE WIRE MINIMUM LENGTH 18" AND MINIMUM NO.6 COPPER OR AL. EQUIVALENT (8) SERVICE ATTACHMENTOR DEADENDBY MVEC (C) RISER MINIMU M 2/1 RIGID STEEL EXPOSED CONDUIT WHEN MAST DOES NOT EXTEND MORE THAN 5' ABOVE ROOF ANO SERVICE ENTRANCE DOES NOT EXCEED 200 AMPERE CAPACITY CDJ PIPE CLAMPS MINIMUM 2 EACH INTERVALS (E) METER BASE (SEE METER DETAIL) (FJ MINIMUM 2" CLEARANCE BETWEEN ALL ENCOSURES <GJ MEMBER DISCONNECT LOCATION EITHER BELOW. BEHIND. OR SIDE OF METER BASE (I) (HJ REQUIRED GFCI RECEPTACLE OR GFCI PROTECTION WITH WEATHER PROOF COVER; 120 VOLTS OUTLET. (IF OUTLET IS INSTALLED) (I) FINAL GRADE NON METALLIC CONDUIT; OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND: NO.6 COPPER GROUNDWIRE - CONTINUOUSFROM METER BASE TO GROUND ROD. (NEC 250-92-6) (J) APPROVED GROUNDING ELECTRODE:5'6 X 8' COPPER WELD GROUND ROD 25 (2001 1 PHASE DR3 PHASE SELF-CONTAINED UWD£RGROUNll'.ME Tt~ COOPERATIVE WI LL: INSTALL METER SERVICE CABLE. CONNECTIONS INSIDE OF TRANSFORMER SECONDARY OR DIP POLE ARE INSTALLED BY MVEC . ,t8$JAL "." - .c....L A T I ON MEMBER WIll: FURNISH & INSTALL METER BASE AND BOND IT to GROUND. FURNISH AND INSTALL ALL REQUIRED MATERIALS. NOTE: All NOTE: MVEC WILL DO THE WIRE INSTALLATION INSIDE THE TRANSFORMER. PEDESTAL OR FROM THE DIP POLE. ) BASES AND DEVICES SHAll BE BONDED TO GROUND ~afNCH. BACKFILL. FURNISH AND INSTALL 2 "CONDUIT (SCHEDULE 40 PVC)TO ACCOMMODATE1/0 TO 350 MCM SERVICE FURNISH PULL STRING FROM THE METER AS REQUIRED TO THE UNDERGROUND TRANSFORMER. PEDESTAL OR DIP POLE. (A)METERBASE (SEE METER BASE DETAIL) (B) MEMBER DISCONNECT (C)MINIWUM 2N CLEARANCE BETWEEN ALL ENCLOSURES. MINIMUM 200 AMPERE ENTRANCE (D)REOUIRED GFCI RECEPTACLE DR GFCI PROTECTION WITH WEATHER PROOF COVER; 120 VOLTS OUTLET. (IF OUTLET IS INSTALLED) (E)NON METALLIC CONDUIT; OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND; NO.6 COPPER GROUNDWIRE (NEC-250-92-B) (FJAPPROVED ~8 X 8' CROUNDING ELECTRODE: COPPER WELD GROUND ROD (G) MINIMUM 21~H RIGID CONDUIT (PVC OR GALVANIZED METAL) (VISIBLY EXPOSED) AND SERVICE ENTRANCE DOES NOT EXCEED 200 AMPERE (H) MEMBER SHALL NOT TRENCH BEYONO THIS POINT; STOP 2' FROMUNDERGROUND TRANSFORMER OR PEDESTAL; MARK ABOVE GROUND. THE END OF THE CONDUIT; IF UNDERGROUNDCONDUIT EXTENDS 26 (2001 ) TEMPORARY 1 PHASE OVERHEAD METER-no'I NSTALLAT rON COOPERATIVE WILL: FURNISH AND INSTALL METER AND SERVICE DROP. MEMBERWILL: FURNISH & INSTALL METER BASE FURNISH AND INSTALL ALL OTHER REQUIRED MATERIALS. ALL BASES AND DEVICES SHALL BE BONDED TO GROUND DROP TOP RECOMMENDED NON METALLIC I UIT WITH OR METALL IC CONDI BOUNDED TO CRaUNID; NO.6 CROUNDWIRE - CONT I NUOUS , ur TF"R RA<;'F" Tn GRIOUND ROD (NEC 250~92=e) (J)APPROVED GROUNDING ELECTRODE:5~H X 8' COPPERWELDGROUNDROD - VIEW ~ 27 (2001 ) TEMPORARY / PERMANENT 1 PHASE UNDERGROUNDMETER INSTALLATION MEMBER WILL: FURNISH & INSTALL METER BASE AND BOND IT TO GROUND. FURNISH AND INSTALL ALL REQUIRED MATERIALS. COOPERATIVEWILL: FURNISH AND INSTALL METER SERVICE WIRE. ALL CONNECTIONS INSIDE OF TRANSFORMER. PEDESTAL OR DIP POLE NOTE: ALL BASES AND DEVICES SHALL BE BONDED TO GROUND. NOTE: MVEC WILL DO THE WIRE INSTALLATION INSIDE THE TRANSFORMER. PEDESTAL OR FROM THE DIP POLE. TRENCH. BACKFILL. FURNISH AND INSTALL CONDU I T ( SCHEDULE40 PVC) TO ACCOMMODATE1/0 TO 350 MeW SERVICE. FURNISH PULL STRING FROM THE METER AS REQUIRED TO THE UNDERGROUND TRANSFORMER. PEDESTAL OR DIP POLE. 21/2' (A) METER BASE (SEE METER BASE DETAIL) (B) 2- CLEARANCEBETWEEN ALL ENCLOSURES.MINIMUM WIRE MINIMUM SIZE NO.6 COPPER OR AL EQUIVALENT (C) MEMBER DISCONNECT (DIREOUIRED GFCI RECEPTACLEOR GFCI PROTECTION WITH WEATHER PROOF COVER; 120 VOLTS OUTLET. (IF OUTLET IS INSTALLED I IE) MINIMUM 4"X4"X 9' TREATED TIMBER WITHOUT SPLICES (F 1 RECOMMENDED NON METALLIC CONDUIT; OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND; NO.6 COPPER GROUNDWIRE CONTINUOUS FROM METER BASE TO GOUND ROD. (NEC 250-92-BI X 8 '. , NOTE: NO UNDERGROUNDCONDUIT IS REQUIRED FROM METER POLE TO TRANSFORMEROR PEDESTAL IF METER POLE IS 3' MAXIMUM FROM TRANSFORMER ROO OR PEDESTAL. 28 (2001 ) OVERHEADGROUP METERING (MAXIMUM 5 METERS) M VE RTI CA L CLEARANCE B E A S REO UIRED BY NATIONAL E LECTR ICAL SAFETY CODE. BU T IN NO CASE LESS THAN 1 2' 6". ( SERVICE ( ~ ATTACH ME NT OR DEADEND BY MVEC) MINIMU SHALL (AI -, I SERVICE ENTRANCE ABOVE TROUGH -, I I I I I I 11 I I ~J I I ~J I I I I bJ I I N I I I I bJ I I N SEALABLE RAIN TIGHT WIRING TROUGH L FOR UNMETERED WIRES ONLY 2" ~ 2"~:g (0) r- ,.j 8000 No.1 No.4 z ~ ~ N ~ \ y~~ :IT " " METER BASE MAY BE I ~~~ I I I I I I 1 I ,"If I' ( MEMBER / S GONDUC TORS) \ a COOPERATIVE WILL: MEMBER WILL: METERS AND SERVICE DROP. REQUIRED SERVICE ENTRANCE MATERIAL. ALL BASES AND DEVICES SHALL BE BONDED INSTALL CoOPERATIVE(G) FURNISH METERBASE FURNISH AND INSTALL . FURNISH AND INSTALL SEALABLE RAIN TIGHT TROUGH.AND ALL FURNISHED METER BASE. IDENTIFY METER BASE IN ACCORDANCE WITH "IDENTIFICATIONS. PAGE 16. (A) WEATHER HEAD WITH SERVICE ENTRANCE CONDUCTORSMINIMUM NO.6 COPPER OR ALUMINUM EQUIVALENT; MINIMUM LENGTH 18" 16) RISER CONDUIT SIZE IS UPON ELECTRICAL LOAD DEPENDENT AND STRENGTH. ALSO SEE SERVICE ENTRANCE MAST DRAWING (CI PIPE CLAMPS - 4/ INTERVALS CO) STEEL CONDUIT BOND BOTH ENDS. (BETWEEN TROUGH AND METER BASEl (EI METER BASE (IDENTIFY No. OF . APARTMENT OR BUILDING ON BASE) (SEE METER BASE DETAIL) {FJ IG) (H' MEMBER DISCONNECT (H) ALL METER BASES AND DEVICES SHALL 5"e" X 8' BE BONDED WITH A CONDUCTOR OF GRD. ROD No.6 COPPER OR LA RGER RECOMMENDED NON METALLIC CONDUIT; OR METALLIC CONDUIT WITH BOTH E NOS BONDED TO GROUND; NO.6 COPPER GRQUNDWIRECQNTINOUS FROM METER BASE TO GROUND ROD. (NEC 250-92-6) APPROVED GROUNDING E LECTRODE: r 5/8' X 8' COPPER WELD GROUND ROD ~ ~ 29 (2001 J UNDERGOUND GROUP METERING (MAXIMUM 6 METERS) COOPERATIVE WILL: CONNECTTHE SERVICE CONDUCTOR TO THE -- MEMBER'S - --- CONDUCTORS -- --. - IN THE .-- JUNCTION - BOX AND ONLY TO A SINGLE SET OF CONDUCTORS. AND INSTALL SERVICE IN ACCORDANCEWITH THE COOPERATIVE'S STANDARD UNDERGROUNDSERVICE POLICY. MEMBER WILL: FURNISH AND INSTALL SEALABLE RAIN TIGHT TROUGH. JUNCTION BOX AND ALL REQUIRED SERVICE ENTRANCE MATERIAL. INSTALL AND FURNISH METER BASE. ALL BASES AND DEVICES SHALL BE BONDED. FURNISH AND INSTALL CONDUIT (F&I J FROM JUNCTION BOX TO UNDERGROUND TRANSFORMER. PEDESTAL. OR DIP POLE. UNDE (SEE DRAWING UNDERGROUNDMETER INSTALLATION FOR LIMITS) IDENTIFY METER BASE IN ACCORDANCEWITH HIDENTIFICATIONS" PAGE 16. IDEN I (H) APPROVED ~8 X 8' GROUNDING ELECTRODE: COPPER WELD GROUND ROD (I ITO UNDERGROUNDTRANSFORMER OR PEDESTAL: IF UNDERGROUNDCONDUIT EXTENDS TO DIP POLE. CONDUIT MUST BE RAISED UP THE DIP POLE 2' ABOVE FINAL GRADE AND TEMPORARILY CAPPED. 30 (2001 I CONSUMEROWNED SERVICE POLE INSTALLATION COOPERATIVEWILL: FURNISH AND INSTALL WETER AND SERVICE DROP. MEMBER WILL: FURNISH & INSTALL METER BASE. FURNISH AND INSTALL ALL OTHER REQUIRED WATERIALS. ALL BASES AND DEVICES SHALL BE BONDED TO GROUND (AIPOLE PREFERED1" CLASS 6 OR 7 OR 4" X 6" X 18 TREATED TIMBER ACCEPTABLE. NO CLOSER THAN 10' FROMM.V.E.C POLE. 3' 12001) 1 PHASE UNDERGROUND METERING (DESIGN uAu) . COOPERATIVE WILL: FURNISH & INSTALL METER AND SERVICE CABLE; CONNECTIONS INSIDE TRANSFORMER. SECONDARY PEDESTAL OR DIP POLE ARE INSTALLED BY MVEC. MEMBERWILL: FURNISH & INSTALL METER BASE: FURNISH AND INSTALL ALL OTHER REQUIRED MATERIAL. ALL BASES & DEVICES SHALL BE BONDED TO GROUND. FURNISH AND INSTALL CONDUIT (G) TO UNDERGROUNDTRANSFORMER. PEDESTAL OR DIP POLE (SEE DRAWING UNDERGROUNDNETER INSTALLATION FOR LIMITATIONS). (A1 >MQUNTING PLATE FOR STABILITY (B> METERhtUST BE ACCESSIBLE IC) SEALTITE CONDUIT OR EQUIVALENT 10) MEMBER DISCONNECT (EIRECOMMENDED NON METALLIC CONDUIT OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND NO.6 COPPER GROUND WIRE - CONTINUOUS FROM METER BASE TO GROUND ROD. (NEC 250-92-B) (FI APPROVED GROUNDING ELECTRODE: 5~. X 8' COPPER WELD GROUND ROO (GI CONSTRUCTED FROM GREY SCHEDULE 80 PVC; WHITE PVC PIPE NOT ACCEPTABLE IF I 5'8" X 8' GRD. ROD MOBILE HOME SERVICE CABLE TO TRANSFORMER. PEDESTAL. DR DIP POLE 32 C2001 » 1 PHASE UNDERGROUND MOBILE HOME METERING AND SERVICE PEDESTAL (DESIGN C OOPERATIVE WILL: F URNISH & INSTALL METER AND SERVICE CABLE: CONNECTIONS INSIDE T RANSFORMER. SECONDARY PEDESTAL. 0 R DIP POlE ARE INSTALLED BY MVEC. "B") MEMBER WILL: FURNISH AND INSTALL METER BASE AND ALL OTHER REQUIRED EQUIPMENT. ALL BASES & DEVICES SHALL BE BONDED TO GROUND (A) COATED ALUMINUM DR PAINTED GALVANIZED STEEL METER BASE WITH STAINLESS STEEL LOCKING RING AVAILABLE IN DOUBLE METERING POSITIONS. SERVICE ENTRANCE WIRE MINIMUM NO.6 COPPER DR AL EQUIVALENT. (B)NON METALLIC CONDUIT. OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND; NO.6 COPPER GROUNDWIRE -r CONTINOUS FROM METER BASE TO GROUND ROD. (NEC 250-92-B) c ) APPROVED GROUNDING ELECTRODE:5~H X 8' COPPER WELD GROUND ROD GRADE 33 (2001 ) 3 P HASE POLE MOUNTED METER INSTALLATION COOPERATIVE WILL: FURNISH AND INSTALL METER. METER BASE AND SERVICE DROP. MEWBERWILL: INSTALL METER BASE FURNISH AND INSTALL ALL OTHER REQUIRED MATERIALS. ALL BASES & DEVICES SHALL BE BONDED TO GROUND METER BASE DETAil REFER TO PAGE 41 FOR 4W DELTA OR 4W WYE INSTALLATION (AI POLE SHALL BE 18' CLASS 6 OR 7 (BININIMUN VERTICAL CLEARANCE SHALL BE AS REQUIRED BY NATIONAL ELECTRICAL SAFETY CODE: BUT IN NO CASE LESS THAN 12'-6-( SERVICE ATTACHMENT OR DEADEND BY NVECI ICI WEATHER HEAD AND SERVICE ENTRANCE WIREI MINIMUM LENGTH 18" AND MINIMUM NO.6 COPPER OR ALUMINUM. EQUIVALENT 10) RISER CONDUIT SIZE IS DEPENDENT UPON ELECTRICAL LOAD AND STRENGTH. SEE ALSO SERVICE ENTRANCE MAST DRAWING IE) PIPE CLAMPS - ,,° INTERVALS (FI METER BASE (SEE METER BASE DETAilS) (GIMEMBER'S DISCONNECT (HI MINIMUM 2H CLEARANCEBETWEEN All ENCLOSURES. MINIMUM WIRE NO.6 COPPER OR AL. EQUIVALENT (fJ NON METALLIC CONDUI TJf OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND; NO.6 COPPER GROUNDWIRECONTINUOUS FROM METER BASE TO GROUND ROD. (NEC 250-92-8) (J) APPROVED GROUNDING ELECTRODE: ~. X 8' COPPER WELD GROUND ROD 34 (2001 ) CURRENT TRANFORMER- CT METERING OVERHEAD METERING EQUIPMENT TRANSFORMERSMOUNTED ON MAST MEMBER WILL: INSTALL METER BASE AND CT BRACKET. FURNISH AND INSTALL ALL OTHER REQUIRED MATERIALS. ALL BASES AND ENCLOSURES BONDED TO GROUND. COOPERATIVE WILL: FURNISH CT EQUIPMENT. FURNISH METER BASE & INSTALL METER AND SERVICE DROP. I(AI A > WEATHER MAXIMUM TWO> WHEN WEATHER HEAD HEAD I(MAXIMUM SERVICE SERVICE ENTRANCE ENTRANCE CONDUCTORS ceND EXCEEDS EXCEEDS 350MCM 350MCM COPPER COPPER OR EQUIVALENT; MINIMUM MINIMUM LENGTH LENGTH 1818* (B) CURRENT TRANSFORMER (CT) ON IBICURRENT TRANSF CT BRACKET CT BRACKET: BRACKET: (ALTERNATE: (A MAY BOND MAY BE BE MOUNTED MOUNTEDON BUILDING) METERING METERING PLATE PLATE TO METER BOX WITH NO.6 COPPER NO.6 COPPER (C>FOR CT APPLICATIONS RISER CONDUIT SHOULD EXCEED 3M RIGID CONDUIT (D)PIPE CLAMPS 4' INTERVALS - IE)RISER MIN. 1- GALVANIZED RIGID CONDUIT (FURNISHED AND INSTALLED BY MEMBER) (F> METER BASE WITH SHUNT BYPASS TO BE USED ON ALL CT INSTALLATIONS. IG> MEMBERDISCONNECT (H) NON METALLIC CONDUIT: OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND: NO.6 COPPER GROUNDWIRE CONTINUOUS FROM METER BASE TO GROUND ROD. II) (NEC 250-92-8) APPROVEDGROUNDINGELECTRODE: ELECTRDOE: 5~NX 8'COPPER WELD GROUND GROUNDROD ROD 35 12001 ) CURRgNT TRANSFORMER - CT METERING OVERHEAD METERING EQUIPMENT TRANSFORMERS MOUNTED ON POLE MEMBER WILL: W INSTALL tMETER BASE AND CT COOPERATIVE WIll: FURNISH CT EQUIPMENT. FURNISH METER BASE. INSTAll METER AND SERVICE DROP. . BRACKET. FURNISH AND INSTALL ALL OTHER REQUIRED D MATERIALS. ALL BASES & DEVICES SHALL BE E BONDEO TO GROUND. VERTICAL CLEARANCE SHALL BE AS REQUIRED BY NATIONAL ELECTRICAL SAFETY CODE. BYT IN NO CASE LESS MINIMUM THAN12 - 6- (A) POLE PREFERED18' (B) WEATHER HEAD (MAXIMUM TWO) WHEN SERVICE ENTRANCE CONDUCTORS EXCEEDS MINIMUM 350MCM LENGTH CLASS 6 OR 7 COPPER OR EQUIVALENT; 18- (~) CURRENT TRANSFORMER (CT) ON CT BRACKET' BOND METERING PLATE TO METER BOX WITH NO.6 COPPER (0) FOR CT APPLICATIONS RISER CONDUIT SHOULD EXCEED 3* RIGID CONDUIT (EI PIPE CLAMPS oi-' 4' (FJ RISER MIN. 1- GALVANIZED RIGID CONDUIT (FURNISHED AND INSTALLED BY MEMBER) INTERVALS COt METER BASE WITH S~ WITH SHUNTBYPASS TO BE USED ON ALL CT INSTALLATIONS. MENSER DISCONNECT CHJ MEMBER (II NON METALLIC CONDUIT: OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND: NO.6 COPPER GROUNDWIRE -CONTINUOUS FROM METER BASE (NEC 250-92-81 (J. TO GROUND ROD. APPROVED GROUNDING ELECTODE: 5~X 8' COPPER WELD GROUND ROD 36 (2001 ) CURRENT TRANSFORMERS- CT METERING (TRANSFORMERS MOUNrE~D~J.)N au I LD I NG: MOUNTEDON BUILDING) MEMBER WILL: FURNISH. INSTALL AND MAINTAIN SERVICE ENTRANCE AND ALL OTHER REQUIRED MATERIALS. FURNISH. I NSTALt L AND MAINTAIN 1" MIN 1MUM CONDUI T AND AND FFII TT I NGS BE' T WEEN INSTRUMENT TRANSF' MER AND INSTALL CT BRACKET. TRANSFeR AND WIRE WII SPOOL. AND u: (A)WEATHER HEAD WITH SERVICE ENTRANCE WIRE MINIMUM LENGTH 18". (D)SERVICE DRDP (EJt(F) CONDUIT METER ENCLOSURE (FURNISHED BY COMPANY INSTALLED BY CUSTOMER) IGIAPPROVED GROUNDING ELECTROOE: !;e" X 8' COPPER WELD GROUND ROD #6 COPPER GROUND WIRE AND CONDUIT. X 8' ROD 31 (2001 ) UNDERGROUNDCURRENT TRANSFORMER METERING INST ALLAr.! ON COOPERATIVE WILL: INSTALL METER FURNISH AND INSTALL CABLE. CIT AND CONNECTIONS INSIDE OF TRANSFORMER OR SECONDARY ENCLOSURE (A) MEMBER WILL: FURNISH & INSTALL METER BASE FURNISH AND INSTALL ALL OTHER REQUIRED MATERIALS. 1" PVC CONDUIT AND PULL STRING TO BE FURNISHED BY MEMBER FROM THE METER BASE TO THE UNDERGROUNDTRANSFORMERDR PEDESTAL, INSTALL TRENCH & BACKFILL SPECIAL ARRANGEMENTSWILL BE MADE IF CIT CANNOT BE INSTALLED IN TRANSFORMERSEE PAGE 43-46 METER BASE (SEE METER BASE DETAIL (B) METER BASE WITH SHUNT BYPASS BYP~ TO BE USED ON ALL CT INSTALLATIONS (C) PIPE CLAMPS- 4' (D) MINIMUM INTERVALS 1" CONDUIT FROM METER BASE TO UNDERGROUND TRANSFORMER. PEDESTAL OR DIP POLE (E>NON METALLIC CONDUIT; OR METALLIC CONDUIT WITH BOTH ENDS BONDED TO GROUND; NO.6 COPPER GROUNDWIRE- CONTINUOUSFROM METER BASE TO GROUND ROD. (NEC 250-92-8> IF) x APPROVED GROUNDING ELECTROOE:5~H X S' COPPER WELDGROUNDROO 8' ROO 36" 38 (2001 ) OVERHEAD lPH~.$E MET ER>8 A$E12()~'~"~(1...X/JJlLT .. 3W 1. 120/240 VOLT SERVICE J';"~'",--l1:ti::1';N.\1'.3'-""""."'" .. L MAXIMUM 2 CONDUCTORS PER HOT TERMINAL ALL DIMENSIONS ARE NOMINAL 100 AMPERE METER BASE H=1 0", MAXIMUM MINIMUM 200 AMPERE METER BASE 320 AMPERE METER BASE W=8", D=35'8". HUB=1'~l 2/0 WIRE SIZE WIRE SIZE 6 H=14", W=8", MAXIMUM WIRE MINIMUM WIRE 0=43;8". SIZE HUB=2" 250MC... SIZE 6 H=26". W=161,4'.D=51,2". HUB=3" MAXIMUM WIRE SIZE 600MCM OR PARALLEL 350 MCM MINIMUM WIRE SIZE 6 NOTE: NO.6 COPPER- CONTINUOUS GROUND WIRE FROMMETERBASE (CONNECTIONHAH) L .f,...' " ..' ",;"5.- TO GROUND ROO. . ."' n~.c~~~.';l.,~:::;i;:.:~~"'1 3'9 (2001 ) UNDERGROUND 1 PHASE METER BASE 1lcfJ/2.~HJV()t.T 1} 2) 2<tOY 3) 3W 1.,. 120/240 VOLT SER\'I CE MAY EXIT REAR. SIDE. ALL DIMENSIONS ARE NOMINAL 200 AMPERE METER BASE H=14". W=11". 0=4" MAXIMUM WIRE SIZE 250"'C'" NOTE: NO.6 COPPER- CONTINUOUS GROUNO WIRE FRON METER BASE (CONNECTION NAN) TO GROUND ROO. 40 (2001 ) OVERHEAD3W 3 PHASE 5 TERMINAL METER BASE WITH 4th 480 VOLT 24000 WIRE H .> SERVICE 480 VOLT GROUNDED SERVICE CENTER PHASE MUST BE OPENED WHEN DISCONNECTING UNDERGROUND SERVICE. TO MENSER'S DISCONNECT DEVICE REMOVE JUMPER FOR UNGROUNDED SERVICE. LOAD WIRES MAY EXIT SIDE. BOTTOM. OR REAR. ALL DI~NSIONS ARE NOMINAL 200 AMPERE METER BASE 240 VOLT W-10", D-SI,~", HUBa2" 350MCM MAXIMUM75HP W/BYPASSAND JAW RELEASE 200 AMPERE METER BASE 480 VOLT H=17". W=10", D=5I'l. HUB=2" MAXIMUM WIRE SIZE 350MCM MAXIMUM 150HP W/BYPASS AND JAW RELEASE NOTES: 1 . 2. H=17", MAXIMUM WIRE SIZE . WHEN WHEN USED USED ON ON 480 VOLT. THIS METER BASE WILL B BE IDENTIFIED AS PER PER USE USE ON 480 VOLT ONLY. IDENTIF lED AS NO.6 COPPER- CONTINUOUS GROUNDWIRE FROMMETERBASE (CONNECTION-A-) TO GROUNDROO. 41 (2001 ) '5 UNDERGROUND3W 3 PHASE; T ERMI NALMEIER BASE204().t1~: 4,BO .VOtT . WITH 4th WIRE (OVERHEAD TRANSFORMER ONLY WITH UNDERGROUND SERVICE.) LOAD WIRES MAY EXIT BOTTOM. OR REAR. ALL DIMENSIONS ARE NOMINAL 200 AMPERE SOCKET 240 VOl T H=191,4". MAXIMUM W=131,4". D=51,i' WIRE SIZE 350MCM MAXIMUM 75HP W/BYPASS AND JAW RELEASE 200 AMPERE SOCKET H-t9t,4" ~. W=13"4'. 0=51,.." 480 VOLT MAXIMUM WIRE SIZE 350MCM MAXIMUM 150HP W/BYPASS AND JAW RELEASE NOTES: 1. WHENUSED ON 480 VOLT. THIS SOCKET WILL BE IDENTIFIED AS PER USE ON 480 VOLT ONlY. 2. NO.6 COPPER-CONTINUOUSGROUNDWIRE FROMMETERBASE (CONNECTION-AN) TO GROUNDROD SIDE. 42 (2001 ) OVERHEAD4W3 PHASE 7 "TERMI NALM£TER BASE ~W 3 PHASE 120/2~O VOlT SERVICE 4W ~. PHASE 120/208 VOLT SERVICE 4W ! PHASE 211/480 VOLT SERVICE MAY BOTTOM. ALL DIMENSIONS ARE NOMINAL 200 AMPERE METER BASE H=17", W=10", D=53~", MAXIMUM WIRE SIZE 350MCM BYPASS AND JAW RELEASE 320 AMPERE METER BASE H=261/4" , W=173//, 0=7", MAXIMUM WIRE SIZE 600MCM BYPASS AND JAW RELEASE 320 AMPERE METER BASE H=28 I/~II , MAXIMUM WIRE W=13';z". 0-6". SIZE 600MCM OR PARALLEL 4/0 - 350MCM PER TERMINAl WITH BYPASS ANO NOTE: NO.6 COPPER- CONTINOUS GROUND WIRE FROM METER BASE (CONNECTION NAN) TO GROUND ROD. RELEASE 43 UNDERORODND4W 3 PHASE f2001) METER BASE 7 ..reRMINALME TEN BASE 4W 3 PHASE 120/240 VOLT SERVICE 3 PHASE120/208 4W OVERHEAD TRANSFORMER ONLY WITH UNDERGROUNDSERVICE 4W 3 PHASE VOLT SERVICE 217/410 VOlT SERVICE MAY EXIT REAR. SIDE. ALL DIMENSIONS ARE NOMINAL 200 AMPERE METER BASE H=191;{. W=12'3;4". 0=51;4" MAXIMUM WIRE SIZE 350MCM BYPASS AND JAW RELEASE 320 AMPERE METER BASE H=261;4"' W=17'3;4"' D=7". HUB=3" MAXIMUM WIRE SIZE 600MCM BYPASS AND JAW RELEASE 320 AMPERE METER BASE H=28 I,{. W=131,~II. D=6" MAXIMUM WIRE SIZE OR PARALLEL 4/0 - HUB=4 " 600MCM 350MCM PER TERMINAL WITH BYPASS AND JAW RELEASE NOTE: NO.6 COPPER- CONTINOUS GROUND WIRE FROM METER BASE (CONNECTION "AN) TO GROUND ROD. 44 (2001 ) TR4N.5FOHMER RATED METER BASE WITH TEST SWITCH COMPARTMENT ALL KNOCKOUTS ARE 11'4" ALL DIMENSIONS ARE NOMINAL MEMBER WILL: COOPERATIVE WILL: FURNISH C/T. METER WIRING. INSTALL METER AND FURNISH AND INSTALL ENCLOSURE ALL OTHER REQUIRED MATERIALS AND FURNISH ~ INSTALL METER BASE' AND C/T. AS DIRECTED BY COOPERATIVE 4S (2001 ) TRANSOCKET {~A T LNG FACTOR 3.0) . N9RWAL HUB SIZES ALL DIM£NSIONS ARE NOMINAL 3 . 31~2"..." KNOCKOUTS THRU 31'2" UNITS: COOPERATIVE WILL: 300 AMPERE 120/240 VOLT 4W DELTA 300 AMPERE 120/240 VOLT 4W WYE MAXIMUM WIRE SIZE PARALLEL 350MCM FURNISH CIT AND METER. FURNISH AND INSTALL METER AND METER WIRING. MEMBERWILL: FURNISH AND INSTALL ENCLOSURE AND ALL OTHER REQUIRED MATERIALS FURNISH & INSTALL METER BASE AND C/T. AS DIRECTED BY COOPERATIVE 46 {2001) WALL MOUNT ED METElit NrG TRANSF ORMER'E.N(;lQSUREUS[l1 PH IMAfflt.:.~,r(l:i.}i~LGS'.E. MEIE:~RINGTRANSFORMERS ALL DIMENSIONS ARE NOMINAL XXAN-25 H=24'/4". W=2S'/4"' 0=12'/4', XXAN-35 H=34 XXAN-48 H:o48". Wz48". ~t2". COOPERATIVE WILL: FURNISH CIT AND METER. FURNISH AND INSTALL METER METERWIRING. 1,,2' . W=34 AND 1"2" . Y=19", 2-2"" o-nf"..If. Y~6". Z-3SY=29". Z=501;{ MEMBER WILL: FURNISH AND INSTALL ENCLOSURE AND ALL OTHER REQUIRED MATERIALS FURNISH & INSTALL METER BASE AND C/T. AS DIRECTED BY COOPERATIVE 0111 (2001.) METERING TRANSFORMERENCLOSURE (DOUBLE. ODOR) MEMBER WILL: COOPERATIVE WIll: FURNISH CIT AND METER. FURNISH AND INSTAll METER WIRING. METER AND FURNISH AND INSTALL ENCLDSURE AND ALL OTHER REQUIRED MATERIALS FURNISH & INSTALL METER BASE AND C/T. AS DIRECTED BY COOPERATIVE 48 (2001 ) 1 PHASE OVERHEAD POLE MOUNT4aOVE METER I~STALl;..~TION FLOO£l>I,:{E~:el;~/PLATFORM PLATFORM SHALL SAFELY WITHSTAND A 500 POUND WORKINGLOAD. TOP VIEW GROUNDING REQUIREMENTS SEE PAGE 12-F. RAILING REQUIRED WHEN PLATFORM IS ABOVE48" FROMGROUND LEVEL. PLATFORMMINIMUM SIZE 36" FROM FRONT OF METER SOCKET AND 15" FROM EITHER SIDE. WIN RAILING 42" FROM PLATFORM. BUILT FROM 2"x4" MINIMUM. LEVEL 49 (2001 ) 1 PHASE OVERHEADMETER INSTALLATION WALLMlJtJNTABOVEFWQOO"t.!~:\f:ll. W/PLATFOHM PLATFORM SHALL SAFELY WITHSTAND A 500 POUND WORKING LOAD. TOP VIEW 50 (2001 ) DET AlL OF CONDUIT INST ALLATION AT PRIMARY .OR SECONDARY RISER POLE 2" 2- ( CAP SPARE) NOTES: TOP VIEW .c" .-". ' 1. 2. 3. 4. 5. MVEC TO INSTALL RISER POLE PRIOR TO CONDUIT INSTALLATION. ~V EC TO INSPECT & APPROVECONDUITfOR PROPER INSTALLATION PR lOR TO CONCRETE ENCASEMENT. CONDUITS TO BE INSTALLED FLUSH AGAINST POLE ABOVE FINISHED GRADE. USE 36- RADIUS ELBOWS FOR 4- CONDUITS. SPARE CONDUIT NOT REQUIRED FOR LOOP SYSTEM OR SECONDARY. tlTIL In CONCRETE ENCASEMENT PRIMARY ONLY) 51 ... SIDE V1EW ~ 51 f2001) CONGfRETEPAD ASSEMBLY THREE FOR PHAit: .PAD:MOUNT TRANSFORMER A TOP VIEW c- xZ :::E::E -:::E Z SECTION VIEW A-A INCH. INCHES. 52 (2001 ) THREE PHASE PADMOUNTTRANSFORMER FOUNDATION AND BARRIER DETAIL ~ BARRIER .<::) ISOMETRIC VIEW 0 TOP VIEW 0 BARRIER BARRIER NOTES: 1. BAARIERSAAE NEEDEDONLYif' TRANSfORMER ~ ACCESSElE TO VEHICLE DAMAGE. 2. BARRIERS ARE PLACED TO ALLOW OPEN ACCESS TO fRONT Of TRANSFORMER. SECONDARY PRIMARY 3. TRANSfORMER DOORS OPEN AS SHOWN ABOVE. FRONT VIEW c. T METER INSTALLJ\T1ON UND[RGROUNP~: . 53 (2001 ) (NOTE: DO NOT ATTACH METER BASE DIRECTLY x 8' ROD OTHERSKETCHES PROPERGROUNDING MINIMUM DEPTH 36" METHOD 1 X 8' ROO CONDUIT MINIMUM DEPTH3'~ METHOf)2, NOTES: METHOD 1: 1. PREFERRED METHOD FOR INSTALLATION OF METERING IS TO MOUNT METER SOCKET OR CABINET ON BUILDING WALL. 2. METER HEIGHT SHALL BE 5'_ON TO CENTER OF METER. 3. METER SOCKET MUST NOT BE ATTACHED DIRECTLY TO PADMOUNT TRANSFORMER. 4. CONDUIT SHALL BE USED FOR SECONDARYCONTROL WIRES TO METER SOCKET. METHOD 2: 1. METHOD TO USE IF METER SOCKET OR CABINET MUST BE MOUNTED FREE STANDING. 2. METER SOCKET MUST NOT BE ATTACHED DIRECTLY TO PADMOUNT TRANSFORMER. 3. 5'-ON MINIMUM HEIGHT TO CENTER OF METER. 4. CONDUIT SHALL BE USED FOR SECONDARYCONTROL WIRES TO METER SOCKET. 54 (2001 ) .SiNGLE . . PAD ASSEMBLY FOB PHASE P AQMOUN1;TRANSF0${ME R SECTION VIEW A-A * Slot side of trench for coble conduit entrance GROUND ROD (SUPPLIED BY MVEC) (INSTALLED BY CONSUMER) MAX. 2-1/2# ABOVE PAD NOTES: 1- PAD ASSEMBLIES INCLUDE SITE PREPARATION. BEDDING AND DRAINAGE. 2. 3. 4. A CLEAR AREA SHOULD BE MAINTAINED FOR 10 FEET IN FRONT OF PADMOUNT. CONDUITS SHOULD BE IN FRONT BUT NOT UNDER WEIGHT OF TRANSFORMER. PRIMARY CONDUIT IS 48" BELOW FINAL GRADE SECONDARY CONDUIT IS 36" BELOW FINAL GRADE 55 < ','" ",'", ,'" ,(Z001) tLEARANCE I REMENTS OIL... :~ILLED -TRANS REQU FORME ~$" AT auFOR I lllING~': ,. WINDOW OR VENT DUCT DOOR FIRE 'tTI jw:J B MAINTAIN A MINIMUM OF 10' CLEARANCE IN FRONT OF TRANSFORMERFROM LANDSCAPEAND STRUCTURES FOR ACCESS. LIFTING 2. 3. ADEQUATE EQUIPMENT. SPACE REQUIRED FOR TRUCKS AND DRAINAGE FLOW AROUND TRANSFORMER SHOULDBE AWAY FROM BUILDING. NO COOLING TOWERS. 4. 5. 6. 7. RIGHT VIEW 8. t. MINIMUM DIMENSIONS- FROM BRICK <SEE GUIDANCE IN NFPA-255-1990 A. B. C. D. 5' 8' CONDUIT. PAGES (50-59) OR MASONRY BUILDING: AND IEEE STANDARDS) 12' IN FRONT OF A WALL WITHOUT A WINDOW OR WITH A WINDOW 12' IN FRONT OF A WALL WITH A FIRE SAFETY GLASS WINDOW AND WINDOW LESS THAN 12' ABOVE GROUND. IN FRONT OF A WALL WITH A WINDOW LESS THAN 12' HIGH 8' 5' 20' ON THE SIDE OF DOORS. ON THE SIDE OF WINDOWS OR VENTS IF LESS THAN 12' AWAY FROM BOTTOM OF THE FIRE ESCAPE. HIGH. ABOVE GROUND. II. MINIMUM DIMENSIONSFROMBUILDING THAT IS NOT BRICK / MASONRY: (SEE GUIDANCEIN NFPA-255-1990 AND IEEE STANDARDS) A. 1. (TRANSFORMER SIZE 75KVAOR LESS) 10' 10' 12' IN FRONT OF IN FRONT OF IN FRONT OF 20' IN 30' 2. WALL WITH WINDOW OR WITH A WINDOW 12' HIGH OR HIGHER WALL WITH FIRE SAFETY GLASS WINDOW & WINDOW IS BELOW 1~' WALL WITH A WINDOW LESS THAN 12' HIGH (TRANSFORMER SIZE FRONT OF A WALL IS BETWEEN 100KVA- 333KVA) 3. (TRANSFORMER SIZE IS LARGERTHAN333KVA IN FRONT OF A WALL 56 (2001 ) PR IMAHY.. .TRE~'CHDE.TAIL G1)~l1f:{~¥S.T gM - (~L FIG. 1 F,tC. 2 1. THE SEPARATION BETWEEN MVEC CONDUIT SYSTEM AND OTHER UNDERGROUND STRUCTURES PARALLELING IT SHOULD BE AS LARGE AS NECESSARY TO PERMIT MAINTENANCE OF THE SYSTEM WITHOUT DAMAGE TO THE PARALLELING STRUCTURES. A CONDUITWHICHCROSSESOVER OTHER SUBSURFACE STRUCTURES SHALL HAVEA SEPARATION SUFFICIENT TO PREVENT DAMAGE TO EITHER STRUCTURE. THESE SEPARATIONS SHOULD BE DETERMINED BY THE PARTIES INVOLVED. 2. MVEC CONDUIT SYSTEM SHOULD BE SEPARATED FROM CONDUIT SYSTEMS TO BE USED FOR COMMUNICATIONS CONDUCTORS (PHONE. CATV) BY A MINIMUM OF 12 INCHES OF WELL TAMPED DIRT. 3. (FIG. 1) IF CONDITIONS REQUIRE MVEC CONDUIT SYSTEM TO BE INSTALLED PARALLEL TO AND DIRECTLY OVER A SANITARY OR STORM SEWER. IT MAY BE DONE PROVIDED BOTH PARTIES ARE IN AGREEMENTAS TO THE METHOD. WHEREA CONDUIT RUN CROSSES A SEWER. IT SHALL BE DESIGNED TO HAVE SUITABLE SUPPORT ON EACH SIDE OF THE SEWER TO PREVENT TRANSFERRING ANY DIRECT LOAD ONTO THE SEWER. ~. 5. MVEC CONOUIT SYSTEM SHOULD BE INSTALLED AS FAR AS PRACTICAL FROM A WATER MAIN IN ORDER TO PROTECT IT FROM BEING UNDERMINED IF THE MAIN BREAKS. WHERE TRENCH IS TO BE USED F 0 R OTHER UTILITIES IN ADDITION TO TELEPHONE SPECIAL AND/OR TELEVISION CABLES SUCIfi AS WATER. GAS. OR SEWER LINES. T HE FACILITIES MUST BE MADE. THE VARIOUS ARRANGEMENTS ON LOCATIONOF UTILITIES MUST BE ARRANGED Su CH THAT THE SEWER. GAS. AND WATER LINES AT THEIR RESPECTIVE LEVELS. oce u PY ONE SIDE OF THE TRENCH AND THE ELECTRIC. THE TRENCH TELEPHONE. AND TELEVISION DCc UPY THE OTHER SIDE (SEE FIG. 2). DIMENSIONS SHALL BE INCREASED IN WIDTH OR DEPTH AS NECESSARY TO MAINTAIN MINIMUM HORIZONTAL AND VEATIcAL SEPARATIONS BETWEEN UTlllTtES. 6. INSTALLATION FINAL GRADE. OF YELLOW UNDERGROUND MARKING TAPE SHOUlD 8E ,"-12" BELLOW S1 (2001 R£.OUIREM£NTS FOR MINIMUM CONCR.Er~ ENCASED CONDUIT FEE0 tZ C.OJ.4.QU;l'T~~AOI,AL (>~1 CtiN DtjIT;",bOOP ) ) FEED) DMMENDED CONCRETE ENCASEMENT SEE NOTE 1 FINAL GRADE ~.<.~ fA, WARNING TAPE MINIMUM 12" BELOW FINAL GRADE LOCATION OF FOREIGN CABLES IF SHARING TRENCH a" min. '~2B STEEL TIE RODS TO PREVENT FLOATING OF CONDUIT. TIE TOP ROD TO SIDE RODS WITH STEEL WIRE. (D) PVC CONDUIT GREYSCHEDULE 40 12" min. APROVED FOR ELECTRICAL (SIZED BY MVEC) CE) NYLON PUlL INSTALLED IN (F) NOTES: 1. CONCRETETO BE 1:3:6 j~" 2. - MVEC 3" ALL STRING. BY CONSUMER. CONDUITS. PLASTIC CONDUIT SPACER CLAMPS MIX WITH NO AGGREGATELARGER THAN MINIMUM COVER REQUIRE AROUND ALL CONDUITS. REPRESENTATIVE TO INSPECT AND APPROVE CONDUIT INSTALLATION PRIOR USE. TO CONCRETE ENCASEMENT. 58 {~OQ1 ~ -MINIMUM REQUIREMENTSFOR CONCRETE ENCA$EOeDDU.IT (r::oo'i.eOOOUI TS ) . '--': . ./'" ~."~..-: .:;~~ " /RECOMMENDED CONtREtt ENCASEMENT JC SEE NOTE 1 " "' " ' F I HAL GRADE WARNING TAPE MINIMUM 12" FINAL GRAOE BELOW LOCATIONOf FOREIGNCABLES IF SHARING TRENCH I,{ STEEL TIE RODS TO PREVENT FLOATING OF CONDUIT. TIE TOP ROO TO SIDE RODS WITH STEEL WIRE. PVC CONOUIT GREY SCHEDULE40 APROVED FOR ELECTRICAL (SIZED BY MVEC) NYLON USE. PULL STRING. INSTALLED BY CONSUMER. IN ALL CONDUITS. tF> PLASTIC CONDUIT SPACER CLAMPS NOTES: 1. 2. CONCRETE TO BE 1:3:6 MIX WITH NO AGGREGA TE LARGER THAN 3"4" 3" MINIMUM COVER REQUIRED AROUND ALL CONDUITS. MVEC REPRESENTATIVE TO INSPECT AND APPROVE CONDUIT INSTALLATION PRIOR TO CONCRETE ENCASEMENT. 59 $ELL (2001 ) END COUPLING INSTALLATLOt..J CONDUIT TERM't1t.*T-IQNS - PREFABRICATED PAD BELL END ~ TO BE INSTALLED ON CONDUIT CONDUIT TO BE CUT 3" ABOVE ~PAD OR FOUNDATION BEFORE BELL END IS INSTALLED NOTE: PLACE BELL COUPLING ON END OF CONDUIT. (EXCEP TlON METER ENCLOSURES) COVER ENDS Of UNUSED CONDUITS. (BELL COUPI. IN G DESIGNED TO PREVENT DAMAGE TO WI RE WHEN PULLED) - . - - UNtJER~ROUNDROAD CRO$$lNG- .OEf,41l -to, N 0 UJ N lM VJ DEVELOPER OR CONTRACTOR I INSTALL PLEASE CONDUIT WITH PULL EXTEND STRING IN SPECIFIED STREET CROSSING LOCAnONS. PAST RIGHT OF WAY WITH TEMPORARY WHEN WATER LINE. GAS LINE. AND SEWER LINE EASEMENTS CONDUIT FIVE FEET CONDUIT END CAPS. CROSS ELECTRICAL EASEMENTS. ENCASE CONDUIT IN CONCRETE (- I' FOOT COVERING>. PLEASE EXTEND CONDUIT THREE FEET BEYOND EASEMENTS. PLEASE USE A WOODEN 2X4 OR OTHER VISIBLE UTILITY MARKERS (PVC OR S TEEU TO LOCATE TWO FEET CONDWT CROSSING ENDS. THE UTILITY ABOVE FINAL GRADE. MARKERS ARE A MINIMUM OF