Perth Dolphin Lowlander
Commercialising stranded oilfields in the Outer Moray Firth
The Perth Dolphin Lowlander Development
DEVEX 2015
AECC
Thursday, 21 May 2015
12:20-12:45hrs
Mike Cooper
1st Subsurface Oilfield Management Limited
Maximise Economic Recovery of Hydrocarbons
Outer Moray Firth Area Plan Area
Best economic outcome for UKCS.
Licensees, DECC/OGA & HM Treasury cooperate.
ICOP principles apply.
OGA/OGUK compile sensitive data.
NNS, CNS & SNS Area Plans underway.
The ever-steepening curve
The Evolving Production History of
the OMF Area
Outer Moray Firth Basin 1976-1980
Piper Hub
Tartan Hub
Claymore Hub
1stSOM
Outer Moray Firth Basin 1980-1990
IVRRH
Buchan
Hannay
1stSOM
Outer Moray Firth Basin 1993
Scott Hub
1stSOM
Outer Moray Firth Basin 1999-2002
Captain
Blake
Ross
1stSOM
Outer Moray Firth Basin 2002-2014
Buzzard
Why secondary humps?:
Stratigraphic traps:
Scapa, Blake, Buzzard
1stSOM
Future:
Golden Eagle hub, PDL & exploration
OMF Annual Oil Production by Hub
Strat trap & fault
seal,
Palaeozoic around
flanks
Many fields are mature and demonstrate low but steady decline
Modern fields demonstrate higher decline rates. (Note cumulative effect)
Emphasises the importance of major finds (Exploration!!)
Input Model database arranged in hubs, LOF production-to-date, needs forecast
1stSOM
Annual Oil Production
Is there another hump to
come?: PDL, Golden Eagle
& future exploration.
OMF has produced 400,000 - 450,000 BOPD over majority of last 40 years
1stSOM
Average: 4 wells per year
Average: <2 wells per year
4 E&A wells per year to <2 E&A wells per year in Q14 & Q15
How many deep exploration wells or testing new plays?
OMF Area Field Size Distribution
Lowlander
Dolphin
Developed,
Producing or
Abandoned
Perth
INFRASTRUCTURE – Western Outer Moray Firth - 2015
Captain1997
Scott
Dolphin
T
T
T
THamish
Rob Roy
Ivanhoe
Blake 2001
Ross
T
Cromarty
Goldeneye
(CCS)
T
Atlantic
T
T
Golden Eagle
Hannay
2014
Ettrick
2009
Buzzard
T
Buchan
Blackbird
2007
T
Fixed Platforms
FPSO (FPV)
Subsea Tieback
( 1 - 8 years old)
( 5 -18 years old)
(T ceased production)
Only major pipelines shown.
No differentiation on service
(oil/gas/both)
1stSOM
INFRASTRUCTURE – Western Outer Moray Firth - 2025
Blake 2001
Goldeneye
(CCS)
Golden Eagle
2014
T
Peregrine
Buzzard
2007
T
Fixed Platforms
FPSO (FPV)
Subsea Tieback
( 1 - 8 years old)
( 5 -18 years old)
(T ceased production)
Woodmac 1stSOM
Jan 15 projections
1stSOM
INFRASTRUCTURE – Eastern Outer Moray Firth - 2015
T
Athena
2011
Piper
Claymore
1976/1992
1977
Scapa
BRAE-FORTIES (FPS)
Lowlander
Saltire
T
Iona
T
Highlander
T
T
Duart
T
Chanter
Tartan
1981
Petronella
1993
DonanTLochranza
Dumbarton
Scott
1993
MacCulloch
T
T
1997
Galley
T
T
Hamish
TRob Roy
T
Fixed Platforms
FPSO (FPV)
Subsea Tieback
T
T
Rochelle
TBurghley
Balmoral
T
Brenda
1986
T
Blair
Ivanhoe
T
Blenheim
T
Nicol
Dolphin
T
Toni
1997
Perth
Goldeneye (CCS)
Tiffany
T
Renee
T
Beauly
T
Rubie
(22 - 37 years old)
( 3 - 28 years old)
(ceased production)
T
Alba
Only major pipelines shown.
No differentiation on service
(oil/gas/both)
Britannia
1998
1stSOM
INFRASTRUCTURE – Eastern Outer Moray Firth - 2025
BRAE-FORTIES (FPS)
Lowlander
T
Claymore
1977
Scapa
Perth
Dolphin
Alba
T
Fixed Platforms
FPSO (FPV)
Subsea Tieback
T
(22 - 37 years old)
( 3 - 28 years old)
(ceased production)
Britannia
1998
Woodmac 1stSOM
Jan 15 projections
1stSOM
Stratigraphy
Seal
R
R
S
Source
& Seal
R
1stSOM
Azinor
Penny
Kl
Fynn
Ranger
Claymore
Piper
Lowlander
Tartan
North
Tartan
South
Ju
Perth
Scapa
Key
Oilfield
Key
PDL
Scott
Spaniards
West
Dolphin
Exploration
Prospect/Lead
Telford
Ivanhoe
Base Cretaceous Unconformity Structure Map
Rob Roy
STOIIP
STOIIP
(mmbbls)
Perth
Dolphin
498
39
Lowlander
120
TOTAL
657
The largest remaining undeveloped
conventional STOIIP in the UK?
PDL Factsheet
All three fields are sour in nature
2015 Status
Perth
Dolphin
Lowlander
H2S ppm
6,500
4,600
12,000
CO2
41%
31%
16%
Perth
Dolphin
Lowlander
Wells
• FPSO at Perth
Producers
5
1
2
• 12 well 1st phase
Injectors
2
1
1
Distance
from hub
(km)
2
8
16
Parkmead
Faroe
Atlantic
52.03% (Op)
34.62%
13.35%
-
100% (Op)
-
• Equalisation ongoing
• Appraise phase complete
Perth
Dolphin
Lowlander
H2S OCCURENCES
PDL – FPSO
 FPSO hub for PDL tie-backs
 New build ‘ship-shaped’ vessel.

20yr design life
 ‘Lease’ contract
 Designed for sour fluid
 Add third party ‘sweet’ oil
This?
Conclusions
BRAE-FORTIES (FPS)
T
Claymore
Scapa
Alba
Britannia
1998
1stSOM
Or this?
Conclusions
T
T
Lowlander
T
Claymore
T Saltire
Scapa
Redevelopment
T
Exploration
Discovery
T
Piper
Redevelopment
Tartan
Redevelopment
T
Perth
Scott
Redevelopment
Enablers:
BRAE-FORTIES (FPS)
Fynn Discovery
1) PDL Hub 80+ mmbbls with
sour service
2) Commodity price recovery
Dolphin
3) Exploration
1)
2)
3)
4)
T
IVRRH
Redevelopment
Missed pay
Stratigraphic plays
Palaeozoic plays
Fractured basement
T
Renee/Rubie
Redevelopment
4) Fiscal incentives
Alba
Britannia
1998
1stSOM
Acknowledgements
I would like to thank Parkmead Group, Faroe Petroleum & Atlantic
Petroleum for permission to publish this paper.
The following personnel have made significant contributions to the
understanding of the area.
Dave Soutter, David Southwood, Nick Allan, Jon Ashdown, Phil
Ware & Gordon Smith for the Subsurface Input
Tim Coxe, Scott Binnie, Chris Hopper & Adrian Jones for the
Facilities Input
Colin Percival, Alan Walker, John Wood & Wayne Kirk for project
Management and JV Support