Perth Dolphin Lowlander
Transcription
Perth Dolphin Lowlander
Commercialising stranded oilfields in the Outer Moray Firth The Perth Dolphin Lowlander Development DEVEX 2015 AECC Thursday, 21 May 2015 12:20-12:45hrs Mike Cooper 1st Subsurface Oilfield Management Limited Maximise Economic Recovery of Hydrocarbons Outer Moray Firth Area Plan Area Best economic outcome for UKCS. Licensees, DECC/OGA & HM Treasury cooperate. ICOP principles apply. OGA/OGUK compile sensitive data. NNS, CNS & SNS Area Plans underway. The ever-steepening curve The Evolving Production History of the OMF Area Outer Moray Firth Basin 1976-1980 Piper Hub Tartan Hub Claymore Hub 1stSOM Outer Moray Firth Basin 1980-1990 IVRRH Buchan Hannay 1stSOM Outer Moray Firth Basin 1993 Scott Hub 1stSOM Outer Moray Firth Basin 1999-2002 Captain Blake Ross 1stSOM Outer Moray Firth Basin 2002-2014 Buzzard Why secondary humps?: Stratigraphic traps: Scapa, Blake, Buzzard 1stSOM Future: Golden Eagle hub, PDL & exploration OMF Annual Oil Production by Hub Strat trap & fault seal, Palaeozoic around flanks Many fields are mature and demonstrate low but steady decline Modern fields demonstrate higher decline rates. (Note cumulative effect) Emphasises the importance of major finds (Exploration!!) Input Model database arranged in hubs, LOF production-to-date, needs forecast 1stSOM Annual Oil Production Is there another hump to come?: PDL, Golden Eagle & future exploration. OMF has produced 400,000 - 450,000 BOPD over majority of last 40 years 1stSOM Average: 4 wells per year Average: <2 wells per year 4 E&A wells per year to <2 E&A wells per year in Q14 & Q15 How many deep exploration wells or testing new plays? OMF Area Field Size Distribution Lowlander Dolphin Developed, Producing or Abandoned Perth INFRASTRUCTURE – Western Outer Moray Firth - 2015 Captain1997 Scott Dolphin T T T THamish Rob Roy Ivanhoe Blake 2001 Ross T Cromarty Goldeneye (CCS) T Atlantic T T Golden Eagle Hannay 2014 Ettrick 2009 Buzzard T Buchan Blackbird 2007 T Fixed Platforms FPSO (FPV) Subsea Tieback ( 1 - 8 years old) ( 5 -18 years old) (T ceased production) Only major pipelines shown. No differentiation on service (oil/gas/both) 1stSOM INFRASTRUCTURE – Western Outer Moray Firth - 2025 Blake 2001 Goldeneye (CCS) Golden Eagle 2014 T Peregrine Buzzard 2007 T Fixed Platforms FPSO (FPV) Subsea Tieback ( 1 - 8 years old) ( 5 -18 years old) (T ceased production) Woodmac 1stSOM Jan 15 projections 1stSOM INFRASTRUCTURE – Eastern Outer Moray Firth - 2015 T Athena 2011 Piper Claymore 1976/1992 1977 Scapa BRAE-FORTIES (FPS) Lowlander Saltire T Iona T Highlander T T Duart T Chanter Tartan 1981 Petronella 1993 DonanTLochranza Dumbarton Scott 1993 MacCulloch T T 1997 Galley T T Hamish TRob Roy T Fixed Platforms FPSO (FPV) Subsea Tieback T T Rochelle TBurghley Balmoral T Brenda 1986 T Blair Ivanhoe T Blenheim T Nicol Dolphin T Toni 1997 Perth Goldeneye (CCS) Tiffany T Renee T Beauly T Rubie (22 - 37 years old) ( 3 - 28 years old) (ceased production) T Alba Only major pipelines shown. No differentiation on service (oil/gas/both) Britannia 1998 1stSOM INFRASTRUCTURE – Eastern Outer Moray Firth - 2025 BRAE-FORTIES (FPS) Lowlander T Claymore 1977 Scapa Perth Dolphin Alba T Fixed Platforms FPSO (FPV) Subsea Tieback T (22 - 37 years old) ( 3 - 28 years old) (ceased production) Britannia 1998 Woodmac 1stSOM Jan 15 projections 1stSOM Stratigraphy Seal R R S Source & Seal R 1stSOM Azinor Penny Kl Fynn Ranger Claymore Piper Lowlander Tartan North Tartan South Ju Perth Scapa Key Oilfield Key PDL Scott Spaniards West Dolphin Exploration Prospect/Lead Telford Ivanhoe Base Cretaceous Unconformity Structure Map Rob Roy STOIIP STOIIP (mmbbls) Perth Dolphin 498 39 Lowlander 120 TOTAL 657 The largest remaining undeveloped conventional STOIIP in the UK? PDL Factsheet All three fields are sour in nature 2015 Status Perth Dolphin Lowlander H2S ppm 6,500 4,600 12,000 CO2 41% 31% 16% Perth Dolphin Lowlander Wells • FPSO at Perth Producers 5 1 2 • 12 well 1st phase Injectors 2 1 1 Distance from hub (km) 2 8 16 Parkmead Faroe Atlantic 52.03% (Op) 34.62% 13.35% - 100% (Op) - • Equalisation ongoing • Appraise phase complete Perth Dolphin Lowlander H2S OCCURENCES PDL – FPSO FPSO hub for PDL tie-backs New build ‘ship-shaped’ vessel. 20yr design life ‘Lease’ contract Designed for sour fluid Add third party ‘sweet’ oil This? Conclusions BRAE-FORTIES (FPS) T Claymore Scapa Alba Britannia 1998 1stSOM Or this? Conclusions T T Lowlander T Claymore T Saltire Scapa Redevelopment T Exploration Discovery T Piper Redevelopment Tartan Redevelopment T Perth Scott Redevelopment Enablers: BRAE-FORTIES (FPS) Fynn Discovery 1) PDL Hub 80+ mmbbls with sour service 2) Commodity price recovery Dolphin 3) Exploration 1) 2) 3) 4) T IVRRH Redevelopment Missed pay Stratigraphic plays Palaeozoic plays Fractured basement T Renee/Rubie Redevelopment 4) Fiscal incentives Alba Britannia 1998 1stSOM Acknowledgements I would like to thank Parkmead Group, Faroe Petroleum & Atlantic Petroleum for permission to publish this paper. The following personnel have made significant contributions to the understanding of the area. Dave Soutter, David Southwood, Nick Allan, Jon Ashdown, Phil Ware & Gordon Smith for the Subsurface Input Tim Coxe, Scott Binnie, Chris Hopper & Adrian Jones for the Facilities Input Colin Percival, Alan Walker, John Wood & Wayne Kirk for project Management and JV Support 1 s t S u b su rf a ce O ilf ie ld Ma n a ge m ent L im it e d Te l: 0 7 7 1 8 3 8 5 3 25 in f o @1 st som. co m