espa architecture

Transcription

espa architecture
ISSN 1614-9572
BACnet Europe
Journal
BACnet – World of Integration
Frankfurt/Main April 6.–11., 2008, Hall 9.1, Stand
08
03/08
BACnet am Flughafen
Airport goes BACnet 9
Interview: Unabhängigkeit
Interview: Independence 13
Herausforderung Energiesparen
Saving Energy as Challenge 20
Kommandopriorisierung
Command Priorization 45
BACnet beflügelt Export
BACnet boosts Export 57
DESIGO TX-I/O
All field devices under firm control.
The innovative and streamlined DESIGO TX-I/O™ product range offers flexibility, user-friendliness and compact design. The DESIGO TX-I/O modules conform to DIN-standards, save space,
are short-circuit-proof and eliminate false wiring. Moreover, they allow concrete cleartext
labeling giving an overview over the connections. Only four types of I/O modules are required
to handle all types of signals. Optional features include manual control, multicolor LEDs and
LCD. The new DESIGO TX-I/O modules are fully compatible with the proven PTM modules, thus
protecting the customers' investments.
www.siemens.com/buildingtechnologies
s
Inhalt – Content
Editorial
Notes
5
Editorial: Steil bergauf zur Integration – Editorial: A Rapid Step towards Integration
6
BACnet – Welt der Integration – The World of Integration
Erfahrungsbericht – Field Report
9
BACnet Europe Journal
13
Hohe Unabhängigkeit von Einzelfabrikaten
BACnet Technology – System Integration with several manufacturers
17
BACnet senkt Kosten an der Universität Bremen
BACnet cuts costs at the University of Bremen
ISSN 1614-9572
The BACnet Europe Journal is the European
magazine for building automation based on
BACnet technology. Experts, practitioners
and professionals show the way in applying
and developing the BACnet standard – from
building automation trends to devices and
application projects; from qualification and
training to testing and certification; from
who’s who in the BACnet community to
useful information on events and publications.
Special attention is given to members and
activities of the BACnet Interest Group
Europe (BIG-EU).
Flughafen Frankfurt plant Gebäudeautomation mit BACnet
Frankfurt Airport goes BACnet for Building Automation
Anwendungen – Solutions
Distribution
This bi-annual and bi-lingual Journal
(English/German) can be ordered free
of charge by partners, members, media
representatives and friends of the BACnet
Europe Interest Group (BIG-EU) - registered
society. Order the BACnet Europe Journal
by E-Mail from info@big-eu.org
20
Deutsche Post: Energiesparen beginnt mit BACnet
German postal service: Saving Energy Starts with BACnet
22
Fit for Future – neue Gebäudeleittechnik an der Universität Stuttgart
Future-proof Building Services Management System at university of Stuttgart
24
Gebäudeautomation XXL auf der Neuen Messe Stuttgart
Neue Messe Stuttgart is Building Automation XXL
26
Effektive Integration hinter historischer Fassade – Effective Integration behind ancient Facade
28
Höchstmaß an Energieeffizienz – Highest Level of Energy Efficiency
30
Landschaftsverband Rheinland – Integration in bestehende GLT
BACnet Integration in Existing System
34
DSM senkt Energiekosten mit BACnet Antrieben – DSM cuts Energy Costs with BACnet Drives
36
Energiesparende Klimatechnik in der Berliner Charité
Energy-saving Air Conditioning Technology at the Charité Hospital Berlin
38
Maximale Funktionalität, totale Integration – Maximum functionality, total integration
41
Fraport testet BACnet Geräte – Wettbewerb auf hohem Niveau
Airport test BACnet Devices – Competition at High Stage
Editor
BACnet Europe Interest Group (BIG-EU),
registered society,
Droste-Hülshoff-Straße 1
44141 Dortmund
Germany
Phone: +49-2 31-56 77 72 69
Fax: +49-2 31-42 78 67 32
E-mail: info@big-eu.org
URL: www.big-eu.org
43
BACnet Test Framework an der FH Dortmund
University of Applied Sciences and Arts Dortmund meets BACnet Test Framework
45
Kommandopriorisierung mit BACnet – Command Priorization with BACnet
Executive Board
Volker Röhl, DeTeImmobilien (President),
Bill Swan, Alerton/Honeywell
(Vicepresident)
Gijs de Koning, Regel Partners B.V.
Roger Braun, Siemens Schweiz AG
(Treasurer)
Online distribution
The BACnet Europe Journal is posted as a
Portable Document Format (PDF)-File to
www.big-eu.org and www.bacnet.de
Produkte – Products
Editorial Office
MarDirect Marketing Direct GbR
Bruno Kloubert
Phone: +49-2 31-42 78 67 31
E-mail: kloubert@mardirect.de
Picture credits
BIG-EU, MarDirect and specified companies
BACnet® is a registered trademark of the
American Society of Heating, Refrigerating
and Air Conditioning Engineers, Inc.
(ASHRAE)
BACnet/IP Building Controller frei programmierbar
Freely programmable BACnet/IP Controller
47
Deltas Fenster in die BACnet Welt – Delta´s Window to the BACnet World
48
Natives BACnet mit der `Wonderware System Platform´
Native BACnet with the Wonderware System Platform
49
Objektorientiertes System für offene Lösungen – Object-oriented System for open Solutions
51
Neue BACnet Automationsstationen – New Automation Stations for BACnet
53
Universal-Gataway Compact: Der Schlüssel zur Integration
The Key to Integration: Universal-Gataway Compact
54
Extrem flexibel und reich an Funktionen – Extremly Flexible and High in Performance
55
BACnet-Watcher funktioniert ohne GLT – Operates without BMS: BACnet-Watcher
BACnet Interest Group Europe
Advertising
MarDirect Marketing Direct GbR
Britta von Helden
Phone: +49-2 31-56 77 72 69
Fax: +49-2 31-42 78 67 32
E-mail: vonhelden@mardirect.de
Copyright
© BIG-EU 2008 – Further editorial use of
articles in the BACnet Europe Journal is
encouraged (!) with reference to the source.
Please send a specimen copy to the editor,
or if published online, send the URL per
mail to kloubert@mardirect.de
46
57
AHR Expo: BACnet beflügelt Export – AHR Expo: BACnet boosts export
58
Normungsausschuss – SSPC 135 Meeting
60
Willkommen in der BIG-EU – Welcome to the BIG-EU
61
Fachbuch „Enregieeffizienz durch Gebäudeautomation“
62
BACnet Kalender – Calendar of BACnet Events
ISSN 1614-9572
BACnet Europe
Journal
BACnet – World of Integration
Frankfurt/Main April 6.-11., 2008, Hall 9.1, Stand B59
08
03/08
Titelbild
Cover picture
Flughafen Frankfurt
Frankfurt Airport
Alle Ausgaben sind als Download im Servicebereich von
www.big-eu.org verfügbar
All issues can be downloaded
from the service area of
www.big-eu.org
BACnet am Flughafen
ˆÀ«œÀÌÊ}œiÃÊ
˜iÌÊÊÊʙ
Interview: Unabhängigkeit
˜ÌiÀۈiÜ\ʘ`i«i˜`i˜ViÊÊÊ£Î
Herausforderung Energiesparen
->ۈ˜}ʘiÀ}ÞÊ>ÃÊ
…>i˜}iÊÊÊÓä
Kommandopriorisierung
œ““>˜`Ê*ÀˆœÀˆâ>̈œ˜ÊÊÊ{x
BACnet beflügelt Export
˜iÌÊLœœÃÌÃÊÝ«œÀÌÊÊÊxÇ
© Fraport AG
BACnet Europe Journal 8 03/08
3
Ideenreichtum für die Welt
von morgen
Damit aus einer Vision Wirklichkeit wird, muss man das Unmögliche behandeln,
als wenn es möglich wäre. Wir von Johnson Controls arbeiten daran, das Leben
lebenswerter zu gestalten und die Orte zu verbessern, an denen die Menschen ihre
Zeit verbringen. Dafür optimieren unsere Spezialisten Prozesse und planen maßgeschneiderte Lösungen für Ihre Industrieanlagen und Gebäudesysteme.
Von Lüftung, Klima und Kälte bis zur Sicherheits-, Steuer- und Regelungstechnik:
wir haben für viele Anwendungen die passende technische Antwort – und die entscheidenden Ideen, damit aus Ihren Visionen Wirklichkeit wird. Für mehr Energieeffizienz, mehr Qualität und mehr Verlässlichkeit in Ihrem Betrieb.
Wann sprechen wir über Ihre Ideen?
JOHNSON CONTROLS SYSTEMS & SERVICE GMBH | TELEFON: 0621 / 468-601 | FAX: 0621 / 468-314 | WWW.JOHNSONCONTROLS.DE
Steil bergauf zur Integration
A Rapid Step towards Integration
Liebe Leser,
BACnet hat sich in kurzer Zeit zum Weltstandard für ein
offenes Kommunikationsprotokoll in der Gebäudeautomation
entwickelt. Dies war auf Grund der vorherrschenden proprietären Systeme nicht unbedingt zu erwarten. Aber nach
der Gründung der BIG-EU vor zehn Jahren ging es zuerst in
Deutschland und anschließend in Europa steil bergauf. Getrieben wurde dies von den zielgerichteten Kräften aus dem
Bereich der Hersteller, Planer und Immobilienbetreiber in der
BIG-EU. Damit wurde die nachhaltige Weiterentwicklung
von BACnet zum Weltstandard massiv unterstützt.
Durch die Reaktion der Hersteller auf einen sich positiv abzeichnenden „BACnet-Markt“ stehen dem Fachplaner heute
(fast) alle Möglichkeiten der Integration gebäudetechnischer
Anlagen, Funktionen und Informationen zur Verfügung. Die
Ziele der Betreiber und Investoren können mit heute verfügbaren Mitteln erreicht, ja teilweise sogar übertroffen werden.
Das setzt aber die richtige fachtechnische Beratung und Planung voraus.
Dear Reader,
BACnet has in a very short period of time developed into
the worldwide standard open communication protocol within
building automation. This was not really to be expected due
to the presence of the dominant proprietary systems. After
the foundation of the BIG-EU ten years ago Germany tookoff and was immediately followed by the rest of Europe. This
rapid climb to success was driven by numerous goal-oriented forces within the BIG-EU from the areas of manufacturing,
planning and real estate. For this reason the sustainable
development of BACnet as a worldwide standard has been
solidly supported.
Today, due to the reaction of manufactures towards a
positively defined BACnet market (nearly) every possible
option for the integration of building technology applications,
functions and information is available to planers. Today, the
goals set by these companies and investors can be reached, if
not even partially surpassed, with the resources readily available. This of course assumes correct specialist consulting and
planning.
Für einen wirtschaftlichen und nutzerorientierten Gebäudeoder Liegenschaftsbetrieb ist es unabdingbar, dass zur richtigen Zeit die richtigen Informationen zur Verfügung stehen.
Damit erhebt sich automatisch die Forderung nach der zentralen Betriebsführung und Integration aller Systeme. Sie ist eine
Vorrausetzung, um z. B. Forderungen zur Energiekostenoptimierung und -abrechnung zu erfüllen (s. Artikel „Neue Messe
Stuttgart“ und „Fraport“).
For profitable and user oriented building & real estate businesses it is essential that the right information is available at
the right time. This automatically raises the need for a central
control system and the integration of all systems. This is a
requirement that, for example, meets both energy and service
cost optimisations (see article “New Stuttgart Fair” and
“Fraport”).
Abgesehen von dem betriebsorientierten Mehrwert durch
BACnet erschließt das offene Kommunikationsprotokoll die
Möglichkeit des freien Wettbewerbs. Dadurch sind der Investitionsschutz gewahrt, der Einsatz innovativer, nutzungsgerechter Technik gesichert und marktgerechte Kosten erzielbar.
Apart from service oriented added value enabled through
BACnet, the open communication protocol unlocks the possibility for open competition. Therefore investments are protected, the application of innovate, technology which is right
for the task is assured and, is obtainable in line with market
costs.
Das Engagement der AMEV Arbeitsgruppe „BACnet in öffentlichen Gebäuden 2007“ und die Weiterentwicklung des Standardleistungsbuchs StLB Bau (070) fördern diesen Prozess.
Assisting this process is the involvement of the AMEV working
group “BACnet in Public Buildings 2007” and the further development of the standard performance book StLB Building
(070).
Mit dem Weltstandard BACnet steht uns ein offenes Kommunikationsprotokoll für die Gebäudeautomation mit starker
Marktdurchdringung zur Verfügung. Ich lade Sie ein, den
Stand der BIG-EU auf der Light+Building zu besuchen und
sich über die neuesten Entwicklungen, Systemintegrationen
und die durchgeführte Zertifizierung zu informieren.
BACnet, a world standard for building automation and an
open communication protocol which has strong market
penetration is now available. I would like to invite you to visit the BIG-EU stand at light+building where it will be able to
inform you about the latest developments, system integration
and how certification operates.
Auf Wiedersehen auf der Light+Building!
See you again
at light+building!
Siegfried Weikmann
Planungsgruppe M+M AG
Mitglied des BIG-EU
Beirates
Member of the BIG-EU
Advisory Board
BACnet Europe Journal 8 03/08
5
BACnet Interest Group Europe
BACnet – Welt der Integration
The World of Integration
BACnet live auf der Light+Building: Die BACnet Interest
Group Europe (BIG-EU) zeigt mit 30 Ausstellern aus
sieben Nationen, wie BACnet in der Praxis funktioniert.
Die ausgestellten Produkte sind miteinander vernetzt.
Der Gemeinschaftsstand ist angelegt wie ein MultiVendor-Projekt, in dem alle Komponenten einheitlich
mit dem BACnet Protokoll kommunizieren.
BACnet live at light+building: the BACnet Interest Group
Europe (BIG-EU), comprising of 30 exhibitors from seven
countries, shows how BACnet functions in practice. The
exhibited products are all networked with each other.
The association’s stand, B59 in Hall 9.1, is a multi-vendor
project in which all components consistently communicate
using the BACnet protocol.
Auf ihrem bisher größten
Messestand präsentiert sich
die BIG-EU mit dem Slogan
„BACnet – Welt der Integration. 10 Jahre Erfolg in Europa“. Vor genau zehn Jahren wurde die BIG-EU von
18 Unternehmen gegründet.
Seitdem hat sich der herstellerneutrale Integration mit
BACnet zum Erfolgsfaktor
in der Gebäudeautomation
entwickelt. Heute zählt die
BIG-EU 80 Mitglieder – und
von Monat zu Monat werden es mehr.
Herstellerneutrale
Zone in der Mitte
Auf der Light+Building ist
die BIG-EU mit 30 Ausstellern aus sieben Nationen
vertreten. Die BACnet Gemeinschaft auf der Messe ist
damit so groß wie nie zuvor.
Zu den Ausstellern zählen:
ABB Automation Products,
Alerton,
Axima,
Delta
Controls, GFR, Honeywell,
I.T.E.N.O.S., INGA, INH
GmbH/HHO-Automation,
Johnson Controls Systems
& Service, Kieback&Peter,
90
80
70
60
50
40
30
20
10
0
1998
1999
2000
2001
2002
2003
2004
2005
2006
Mitgliederentwicklung der BIG-EU 1998-2008.
BIG-EU Membership development 1998-2008.
6
BACnet Europe Journal 8 03/08
2007
2008
Frankfurt/Main April 6.–11.2008 hall 9.1, stand B59
MBS, Neuberger Gebäudeautomation, Novar, Plüth Regelsysteme, Priva, Promotor
Verlag, Regel Partners, SaiaBurgess, Samson, SauterCumulus,
SE-Elektronic,
Siemens SBT, SysMik, TAC,
Trane, WAGO Kontakttechnik, Wonderware und
WSPLab. Neu ist die herstellerneutrale Zone in der
Mitte des Stands. Hier zeigt
die BIG-EU die Vorteile von
BACnet bei der Integration.
Erfahrene Integratoren erklären die übergreifende Kommunikation am Beispiel von
Automations- (BACnet –
Building Controller B-BC)
und Managementstationen
(BACnet Operator Workstations – B-OWS). Aus den
über 48 Diensten, die BACnet bietet, wird die Architektur von BACnet Systemen an
fünf Beispielen gezeigt: Alarme, Zeitpläne, Trends, Datenaustausch und Gerätemanagement.
Neu auf dem Stand sind auch
die weltweit ersten Geräte
mit europäischem BACnet
Zertifikat. Als europäischer
Nachweis
für
geprüfte
BACnet Konformität ergänzt
das Zertifi kat die amerikanische BTL Marke. Die
BIG-EU sieht darin die Basis,
um europäische Anforderungen zur Energieeffi zienz
und zur Zertifi zierung von
Gebäudeautomationssystemen wirksam umzusetzen.
Feierliche Übergabe
Die feierliche Übergabe der
Konformitätsnachweise fi ndet am 7. April um 14.30
Uhr auf der Messe statt.
Die Zertifi kate werden von
WSPCert, der europäischen
BACnet Zertifizierungsstelle
überreicht. Die Genehmigungen zum Führen der BTL
Marke vergibt die BIG-EU.
Von den amerikanischen
BACnet Testing Laboratories (BTL) entwickelt, bleibt
die BTL Marke weiterhin
das internationale Zeichen
für BACnet konforme Produkte.
Alle Produkte mit BTL Marke werden öffentlich gelistet. Die BIG-EU führt ihre
Liste unter www.big-eu.org/
conformance/listeu.php/, die
Liste der amerikanischen
BACnet International (BI)
ist über www.bacnetinternational.org/btl/ erreichbar.
Die Listings sind Marktübersichten zu allen geprüften
Geräten. Sie enthalten detaillierte Informationen über die
eingetragenen Produkte, vom
technischen Datenblatt bis zu
den ausführlichen Konformitätserklärungen (Protocol Implementation Conformance
Statement – PICS).
BACnet hat mit der AMEV
Empfehlung „BACnet in öffentlichen Gebäuden 2007“
und mit der Weiterentwicklung des Standardleistungs-
Willkommen zum BACnet
Gemeinschaftsstand auf
der light+building 2008.
Welcome at the joint
BACnet booth at the
light+building.
buchs (StBL) Bau 070 neue
Impulse erhalten. Über alle laufenden Entwicklungen
und die Mitgliedschaft in
der BIG-EU können sich alle
Besucher am BACnet Stand
B59 in Halle 9.1 informieren.
The BIG-EU is exhibiting
under the banner “BACnet –
the World of Integration - 10
Years of Success in Europe“
and has its biggest exhibition
stand ever. The BIG-EU was
founded by 18 companies
exactly 10 years ago. Since
then manufacturer neutral
integration with BACnet has
developed into a success factor in building automation.
Today the BIG-EU has 80
members and its membership
is steadily growing month by
month.
Exhibitors from
Seven Countries
The BIG-EU is represented
by 30 exhibitors from seven
countries at light+building.
The BACnet community at
the exhibition is therefore
bigger than it ever has been before. The exhibitors include:
ABB Automation Products,
Alerton,
Axima,
Delta
Controls, GFR, Honeywell,
I.T.E.N.O.S., INGA, INH
GmbH/HHO-Automation,
Johnson Controls Systems
& Service, Kieback&Peter,
MBS, Neuberger Gebäude-
automation, Novar, Plüth
Regelsysteme, Priva, Promotor
Verlag, Regel Partners, SaiaBurgess, Samson, SauterCumulus,
SE-Elektronic,
Siemens SBT, SysMik, TAC,
Trane, WAGO Kontakttechnik,
Wonderware,
WSPLab.
The manufacturer neutral
zone in the middle of the
stand is new. Here the BIG-EU
shows how BACnet functions in integration. BACnet
provides a total of 48 services. Experienced integrators explain the overlapping
communication of alarms,
schedules, data exchange,
trends and equipment management by examples such as
the automation workstation
(BACnet-Building Controller
(B-BC)) and the management workstation (BACnet
Operator Workstation (BOWS)).
Also new on the stand is
the first appliance in the
world to carry a European
BACnet certificate. The certificate will be presented on
April 7th at 2.30 p.m. at the
BACnet booth by WSPCert,
the European BACnet cer-
tification centre. The grants
to use the BTL mark will be
presented by the BIG-EU.
Tested BACnet Conformity
The certificate is European
proof of the tested BACnet
conformity and complements
the American BTL mark. The
BIG-EU sees in this the basis
for effectively implementing
the European demands for
energy efficiency and certification of building automation systems.
The BTL mark developed
by the BACnet Testing
Laboratories (BTL) remains
nevertheless the international
uniform symbol for BACnet
conforming products.
All products with the BTL
mark are publicly listed. The
BIG-EU maintains its list on
www.big-eu.org/conformance/listeu.php/, and the
list of the American BACnet
International (BI) can be
reached on www.bacnetinternational.org/btl/. The listings
are a market overview of
all tested equipment. They
contain detailed information about the listed products from technical data
specifications to an extensive conformity declaration
(Protocol
Implementatio
Conformance Statement –
PICS).
BACnet has received a new
impulse from the AMEV
recommendation “BACnet in
Public Buildings 2007” and
the further development of
the standard instruction book
StBL (070). Visitors to the
BACnet stand can gain
information about current
developments and membership of the BIG-EU in
Hall 9.1, Stand B59.
Bruno Kloubert
Head of Marketing
MarDirect
kloubert@mardirect.de
BACnet Europe Journal 8 03/08
7
Wpo!ejftfn!Tuvim!sfhfmo!voe!tufvfso!Tjf!ejf!Xfmu
9Vh^hiYVh;Vho^c^ZgZcYZVc9ZaiV8dcigdahcVi^kZg768cZiœHnhiZbVgX]^iZ`ijgÄH^Z`ŽccZckdc>]gZb
6gWZ^iheaViojcYkdc“WZgVaab^iiZahLZWoj\g^[[Vj[VaaZ>]gZ<ZW~jYZ[jc`i^dcZcoj\gZ^[Zc!h^ZhiZjZgcjcY
“WZglVX]Zc#9^ZhZhKZghegZX]Zc\^ai[“g=Z^ojc\!A“[ijc\!@a^bV!7ZaZjX]ijc\hhiZjZgjc\!Ojig^iih`dcigdaaZ
jcY6cW^cYjc\kdc:B6$7B6#DWH^ZZ^c-%"hiŽX`^\Zh=dX]]Vjh!Z^c`aZ^cZh7“gd\ZW~jYZ!Z^c)%"<ZW~jYZ
8Vbejh!Z^cEgdYj`i^dchjciZgcZ]bZcdYZgZ^c*%%7ZiiZc@gVc`Zc]Vjhh^cY#B^iYZgaZ^X]iojWZY^ZcZcYZc
BVcV\ZbZcihd[ilVgZ7"DLHDG86k^ZljcYDG86lZW]VWZcH^ZY^Z@dcigdaaZ“WZgY^Z>c[dgbVi^dcZc
jcYc^X]iVcYZgh]Zgjb!]ZghiZaaZg"jcY\ZlZg`Z“WZg\gZ^[ZcY#B^i9ZaiV8dcigdah^hi>ciZ\gVi^dcZ^c[VX]#
lll#YZaiVXdcigdah#Xdb
Erfahrungsbericht Field Report
Flughafen Frankfurt plant
Gebäudeautomation mit BACnet
Frankfurt Airport goes BACnet
for Building Automation
Die Fraport AG als Flughafenbetreiber hat früh erkannt, dass die Gebäudeautomation mit
ihren Einrichtungen für einen energieeffizienten, wirtschaftlichen und sicheren Betrieb
der Technischen Gebäudeausrüstung sorgt und eine Voraussetzung für ein umfassendes
Gebäudemanagement ist.
The Fraport AG, the airport operator has detected early that the building automation
with its equipment provides an energy efficient, economic and reliable operation and
management of the technical building equipment and is a prerequisite for a comprehensive building management.
Der Flughafen Frankfurt
Main zählt zu den wichtigsten Weltflughäfen. Der Flughafenbetreiber Fraport AG
beabsichtigt umfassende Sanierungs- und Modernisierungsmaßnahmen mit den
Zielen:
fenen Gebäudeautomationssystems (GA-System) der
Bestand des kompletten Flughafengeländes wie der beiden
Terminals, der Service- und
Verwaltungsgebäude sowie
der Bedarf zukünftiger Bauprojekte betrachtet.
Ertüchtigung des technischen Anlagenbestandes,
Beitrag zum Klimaschutz;
Reduzierung des Energieverbrauches und der CO2
Emissionen,
Neuorganisation und Sanierung der Gebäudeautomation auf Basis eines
neutralen Kommunikationsprotokolls,
Kostenreduzierung durch
Wettbewerb und Produktneutralität,
Einsatz moderner Gebäudemanagementstrategien,
Entscheidung für BACnet
Die Entscheidung für BACnet
als offenes Datenkommunikationsprotokoll im Jahr
2003 war zukunftsweisend
und geschah parallel zur
weltweiten Standardisierung
in der ISO 16484-5.
Entsprechend diesen Zielen
wird der Gebäudeautomation ein hoher Stellenwert
beigemessen. Bereits zwei
Jahre vor dem geplanten
Start der Planungen hat die
Fraport AG ein Expertenteam zusammengestellt, um
die Vorgaben an ein gewünschtes heterogenes System,
also ein System mit unterschiedlichen Herstellern, zu
defi nieren.
Der BACnet Standard als Teil
der Weltnorm für Gebäudeautomation DIN EN ISO
16484 bietet das umfänglichste und leistungsfähigste
Datenkommunikationsprotokoll in der Gebäudeautomation, das ohne Lizenzrechte
und ohne herstellerspezifische
Hardware für jedermann zugänglich ist.
Hierbei wurde zur Realisierung eines wettbewerbsof-
BACnet basiert auf genormten Diensten, Objekten und
Funktionen und wird laufend
im Standardisierungsgremium des SSPC 135 an neue
Anforderungen agepasst und
ergänzt.
Lastenheft
BACnet bietet innerhalb der
Norm durch eine Vielzahl von
optionalen Eigenschaften ge-
wisse Gestaltungsfreiräume
bei den Objekten sowie unterschiedliche Realisierungsmöglichkeiten bei der Umsetzung von Funktionen.
Hinsichtlich der Anforderungen eines Großflughafens an die gewünschte und
erforderliche Interoperabilität zwischen GA-Systemen
unterschiedlicher Hersteller
ist es unumgänglich, neben
der Forderung nach Normkonformität diverse zusätzliche Festlegungen zu treffen.
Die Fraport AG hat mit
Unterstützung der GA Ingenieurgesellschaft mbH ein
umfangreiches
Lastenheft
„Gebäudeautomation“ erstellt. Hier sind neben den
Anforderungen an BACnet
hinsichtlich der zu unterstützenden Dienste in den jeweiligen Interoperabilitätsbereichen (BIBBs) Objekte und
deren Eigenschaften, Meldungsklassen, Alarmprioritäten, Quittierungsoptionen,
Kommunikationsvorgaben
etc. auch Anforderungen an
die konventionellen Bereiche
der Gebäudeautomation festgelegt worden.
Es wurden Vorgaben an
das Benutzeradress-System,
die GA-Funktionen und spezielle übergeordnete Funktionen des Flughafens, die
einzusetzende
Hardware,
Schaltanlagen und Installation, Netzwerke, Systeme für
besondere
Anwendungen,
Bedien- und Managementeinrichtungen, die Raumautomation sowie die Dokumentation definiert. Darüber
hinaus wurden im Lastenheft
„Gebäudeautomation“ alle
gewerkespezifischen Schnittstellen und Liefergrenzen
beschrieben.
GA-Planung mit BACnet
Der Einsatz offener Kommunikationsprotokolle (hier:
BACnet) und die Realisierung
heterogener GA-Systeme stellt
eine Herausforderung an die
planenden Ingenieure im Bereich der Gebäudeautomation dar, bietet aber auch neue
Möglichkeiten. Beispielhaft
sei hier eine Auswahl unterschiedlicher Netzwerkstandards, die Freiheit bei der
Strukturierung der Meldungsklassen, der Alarmierung und der Priorisierung
genannt.
Neben den grundlegenden
Kenntnissen der Gebäudeautomation müssen die planenden Ingenieure über fundierte BACnet Kenntnisse
verfügen, um dessen Vorzüge
wirtschaftlich und funktionell umsetzen und ein
interoperables Gesamtsystem
planen zu können.
BACnet Europe Journal 8 03/08
9
Erfahrungsbericht Field Report
Offene Systeme sind in
der Luftfahrt schon lange
Realität.
In the aerospace open
systems are reality for a
long time.
Ein umfangreiches Studium
der GA-Weltnorm DIN EN
ISO 16484 ist für eine
Planung der Gebäudeautomation mit BACnet unerlässlich, als Einstieg kann der
BIG-EU „Leitfaden zur
Ausschreibung interoperabler
Gebäudeautomation auf Basis
von BACnet“ benutzt werden.
Darüber hinaus muss ein
fundiertes Fachwissen im
Bereich der von BACnet unterstützten Netzwerkstandards
zur gebührenden Berücksichtigung der damit zusammenhängenden wirtschaftlichen,
organisatorischen und technischen Aspekte vorausgesetzt werden.
Wie können nun die erforderlichen BACnet-Spezifikationen und die Umsetzung der
Anforderungen eines Großprojektes sinnvollerweise planerisch erfasst und dargestellt
werden?
Hierzu ist der konsequente
Einsatz der VDI-Richtlinie
3814 Blatt 1 bzw. der DIN
EN ISO 16484-3 ein Muss!
Mit Hilfe der Automationsschemen und der dazu korrespondierenden GA-Funktionslisten muss der planende
Ingenieur alle projektspezifischen Anforderungen an
sämtliche
(Ein-/Ausgabe-,
Verarbeitungs-,Managementund Bedien-) Funktionen mit
Zuordnung der zu verwen-
denden BACnet-Objekttypen
in der Bemerkungsspalte spezifizieren. Der Forderung der
DIN 18386 (VOB/C: ATV
Gebäudeautomation) zur Verwendung von Funktionen als
Abrechnungseinheiten wird
hiermit ebenfalls entsprochen
und es werden einheitliche
kalkulierbare
Dienstleistungspositionen erzeugt.
Umsetzung der geforderten
Funktionalität durch unterschiedliche Auftragnehmer zu
gewährleisten.
Aus Sicht der Integrationsplanung wird empfohlen,
sämtliche Datenpunkte eines
Aggregates sowie alle Datenpunkte mit einer eigenen
Benutzeradresse in einer
separaten Zeile der GA Funktionsliste darzustellen. Erst
damit besteht die Möglichkeit, sämtliche zugehörigen
Funktionen eindeutig zu
beschreiben. Darüber hinaus
müssen zusätzliche, ergänzende bzw. nicht zur Norm
gehörende Funktionen datenpunktbezogen, zeilenweise
in der Bemerkungsspalte und
ggf. auf Beiblättern erläutert
werden.
Zur Erstellung der Leistungsverzeichnisse sollten bei öffentlichen Ausschreibungen
die Leistungspositionen mit
Hilfe des Standardleistungsbuches 070 (zurzeit erfolgt
eine Anpassung auf die
BACnet-Spezifikationen) verwendet werden.
Für die Darstellung komplexer
Steuerungsabläufe
empfiehlt sich die Verwendung von Zustandsgraphen
bzw. Ablaufdiagrammen gemäß der neuen VDI-Richtlinie 3814 Blatt 6. Bei der Fraport AG wurden bereits im
Vorfeld dieser Richtlinie umfangreiche Ablaufdiagramme
erstellt, um eine einheitliche
Auf dieser Basis und mit
einem konsequenten Einsatz
einer Qualitätssicherung in
allen Planungs- und Ausführungsphasen kann der
Umsetzung der durch die
Fraport AG selbst gesetzten
Ziele bei einem der weltweit
größten BACnet-Projekte optimistisch entgegengesehen
werden.
10 BACnet Europe Journal 8 03/08
Bei der Integrationsplanung
ist die demnächst erscheinende VDI-Richtlinie 3814
Blatt 5 – „Hinweise zur Systemintegration“ zu berücksichtigen.
Mit dem Einsatz von qualifi zierten GA-Fachingenieuren
in der Planung und bei Einhaltung dieser Empfehlungen
wird den potentiellen Auftragnehmern eine nachvollziehbare und kalkulierbare
Ausschreibungsunterlage zur
Verfügung gestellt.
Frankfurt Airport (FRA)
is one of the world‘s most
important international airports. The airport operator
Fraport AG intends comprehensive renovation and
modernization activities with
the objectives:
Upgrading of technical
equipment stocks,
Contribution to climate
protection; reduction of
energy consumption and
CO2 emissions,
Reorganization and renovation of the building
automation in view of the
future airport requirements,
Cost reduction by competition and product neutrality,
Use of modern building
management strategies
In accordance with these objectives, a great importance
will be attached to the building automation. Just two
years before the scheduled
start of the planning, Fraport
AG has assembled a team of
experts to define the requirements of a desired heterogeneous system, which is a system
with different manufacturers.
The stock of the complete
airport ground as the two
terminals, the service and
administrative buildings and
the needs of future building
projects were considered, to
realize a competitive building
Erfahrungsbericht Field Report
automation and
systems (BACS).
control
Decision for BACnet
The decision for an open
BACnet data communication
protocol in 2003 was pioneering and happened parallel
to the global standardization
in the ISO 16484-5.
BACnet is based on standardized services, objects and
functions and is constantly
adjusted and supplemented
in the SSPC 135 standardization committee to new
requirements.
The BACnet standard as part
of the global standard for
building automation and
control systems DIN EN ISO
16484 offers the most
extensive and powerful communications protocol for
building automation and
control systems, without the
license rights and without
the need for specific vendor
hardware.
System requirements
Within the standard BACnet
offers by a number of optional
properties some creative
leeway with the objects
and different implementation possibilities for the
implementation of functions.
It is essential, that in addition
to a demand for standard
conformity, several additional
specifications, with regard to
the requirements of a major
airport to the desired and
required interoperability between BAC-Systems from
different manufacturers, are
to be taken.
Fraport AG has created
with the support of the GA
Ingenieurgesellschaft mbH
an extensive requirement of
building automation. Here,
in addition to the requirements of BACnet in terms
of support services in their
respective areas of interoperability (BIBBs), objects and
their properties, notification
classes, alarm priorities,
acknowledge options, communications, etc. also set
requirements on the conventional areas of building automation.
A user-address system, the
BACS functions and the
overall special functions of
the airport, the type of hardware, switchgear and installation, networks, dedicated
special systems, operating
and management devices,
room control and documentation are specified there too.
In addition, the system
requirement contains all
interfaces between all maintenance groups and building
automation and delivery
boundaries.
Building automation
planning with BACnet
The use of open communication protocols (here: BACnet)
and the implementation of
heterogeneous BAC-Systems
represent not only a challenge
to the building automation
planners, but also offer new
possibilities.
A selection of different
network standards, alarm
notifications, priorities and
a structural freedom of
notification classes may serve
here as an example.
Apart from the basic knowledge of building automation,
the planning engineers must
have a competent knowledge
of BACnet to plan its benefits
economically and functionally and implement an interoperable system.
An extensive study of building automation world standard DIN EN ISO 16484 is
essential for planning building
automation with BACnet,
as entry may be used the
BIG-EU “guide to specifying interoperable building
automation and control systems using BACnet”. In addition, a substantial exper-
tise in the field of BACnet
supported network standards for due consideration
of the associated economic,
organizational and technical
aspects will be provided.
How can this necessary
BACnet specifications and
the implementation of the
requirements of a major
project be usefully collected
and displayed?
For this the consistent use of
the VDI guideline 3814 part
1 respectively DIN EN ISO
16484-3 is a must! With the
help of automation schematics
and the corresponding BACS
function lists, the planning
engineer has to specify all
project requirements for all
(I-/O, processing-, management- and operator-) functions with an assignment to
used BACnet object types in
the remarks column.
The demands of DIN
18386 (VOB / C: Building
Automation ATV) for use
of functions as accounting
units, are also satisfied and
there will be uniform predictable service positions.
From the integration planning
is recommended that all data
points of a unit and all data
points with a unique user
address are displayed in a
separate row in the BACS
function list. Only thus it is
possible, to clear all functions
related to describe. Moreover,
additional, complementary
and no-standard functions
based on each data point
should be remarked line by
line in the remarks column,
and possibly explained on
additional sheets.
It is recommended to use
state graphs and flow charts
according to the new VDI
guideline 3814 part 6, for a
planning and presentation
of complex control circuits.
These flow charts have been
already created by Fraport
AG in order to uniform implementation of the required
functionality
contractors.
by
different
The forthcoming new VDI
guideline 3814, part 5 –
“References of systems integration” shall be used for
integration planning.
The German master specification for tender 070 which
is currently revised on the
BACnet specifications shall
be used for establishing of
performance lists for public
tenders procedures.
An assignment of qualified
BACS engineers in a planning
procedure and compliance
with these recommendations
provides potential contractors with an understandable
and predictable tender document.
On this basis and with a
consistent use of quality
assurance in all planning
and implementation phases
of
the
implementation,
Fraport AG may optimisticly
look forward to realization
own targets in one of the major
BACnet projects worldwide.
Bernd Hanke
Head of Airport Facility
Management
Fraport AG
Günter Meyer
Head of Engineering
Planning and Project
Management
Fraport AG
Thomas Kohlhoff
Marius Hartel
Managing Partner
GA Ingenieurgesellschaft
mbH
info@ga-ing.de
www.ga-ing.de
BACnet Europe Journal 8 03/08 11
12 BACnet Europe Journal 8 03/08
Erfahrungsbericht Field Report
Hohe Unabhängigkeit von Einzelfabrikaten
BACnet Technology - System Integration with
several manufacturers
Die Wöhler Holding GmbH & Co. KG hat für ihr Unternehmen, die Wöhler Messgeräte
Kehrgeräte GmbH in Bad Wünnenberg, einen Neubau errichtet – auf 5000 m2 und mit
höchsten Anforderungen an die Energieeffizienz, Sicherheit und Bedienung. Bei der
Systemintegration mit diversen Herstellern zeigt sich BACnet als marktfähiger Kompromiss
aus Funktionalität und Wirtschaftlichkeit.
Wöhler Holding GmbH & Co.KG constructed the new building of Wöhler Messgeräte
Kehrgeräte GmbH - at 5000 square meters footage and according to the highest standards
of energy efficiency, safety, and operating. The BACnet driven system integration of several
building services is a compromise of functionality and economic efficiency.
Die innovativen technischen
Gebäudesysteme
sollten
durchgängig mit BACnet
realisiert werden. Der Planungsauftrag ging an das Ingenieurbüro Ottensmeier in
Paderborn. Dessen Aufgabe
war eine besonders energieeffi ziente Planung der technischen Gebäudeausstattung
(TGA).
Welche Gründe haben zur
Entscheidung für BACnet
geführt? Das fragten wir die
Verantwortlichen: Thomas
Wecker, Produktionsleiter
Wöhler, Franz-Gerd Stuckmann, Geschäftsführer des
BIG-EU Mitglieds SWG
Stuckmann Wirtschaftliche
Gebäudesysteme
GmbH,
Claus-Hermann Ottensmeier, Projektleiter der Ottensmeier Ingenieure und Arend
Brink, Leiter Produktmanagement des Systemanbieters Kampmann GmbH.
BACnet Europe Journal:
Herr Wecker, was veranlasste
Wöhler, das BACnet-Protokoll als Grundlage der MSRRegelungstechnik zu wählen?
Thomas Wecker: Um die
MSR-Technik zu planen, haben wir zunächst ein Grundsatzgespräch mit der Ottensmeier Ingenieurgruppe und
ponenten. Wie konnten Sie
das Projekt realisieren?
Systembeteiligte (v.l.n.r.) Involved partners (from left to
right) Franz-Gerd Stuckmann, SWG · Claus-Hermann
Ottensmeier, OI · Thomas Wecker, Wöhler · Arend Brink,
Kampmann.
der SWG geführt. Einerseits
mussten die gegebenen Systeme im Altbau berücksichtigt
werden. Andererseits hatten
wir komplexe Anforderungen
an die neue Gebäudetechnik.
Wir wollten nicht nur Lüftungs-, Kessel- und Zugangskontrollsysteme integrieren,
sondern auch eine Einzelraumregelung für die Be- und
Entlüftung sowie ein Lichtsteuerungssystem. Dafür war
ein übergeordnetes Protokoll
zu finden, das alle Informationen auf eine Bedienoberflä-
che bringt. Das BACnet
Protokoll erfüllt diese Anforderung.
Den Planern von Ottensmeier
gaben wir den Auftrag, die
einzelnen Komponenten unter einer einheitlichen Regelstruktur zu integrieren.
BACnet Europe Journal:
Herr Ottensmeier, die zentrale Aufschaltung auf ein
übergeordnetes Gebäudeleitsystem stellt besondere Anforderungen and die Kom-
Claus-Hermann Ottensmeier: Wöhler hat sich für eine
investitionssichere Integration entschieden. Das Ziel ist
ein offenes, zukunftsfähiges
Gebäudeleitsystem, das fabrikatsneutral eine Anbindung
von Einzelkomponenten aus
den verschiedenen TGA-Gewerken ermöglichte. Das
Stichwort heißt Interoperabilität. Mit BACnet können die
ausgewählten Systeme gemeinsame Funktionen ausführen und managen. Wichtig
war, dass die direkte
BACnet-Anbindung gegeben
war. Diese konnte durch die
Fa. Kampmann mit dem
Frischluft-Klimagerät und
durch SWG mit der MSRTechnik von Delta Controls
realisiert werden. Auch das
Zugangskontrollsystem und
die Volumenstromregelung
von Delta Controls haben
eine direkte BACnet-Anbindung.
Für weitere Einheiten wie die
Kesselanlage von Viessmann
wurde eine LON-BACnetKopplung realisiert. Ebenso
für das im Gebäude integrierte Bus-System LCN,
und zwar über ein externes
Modul zum BACnet-Bus.
BACnet Europe Journal 8 03/08 13
Erfahrungsbericht Field Report
BACnet Europe Journal:
Herr Stuckmann, welche Kriterien waren für Sie als Systemintegrator bei der Systemauswahl entscheidend?
Franz-Gerd Stuckmann:
Der Anspruch an die Homogenität des Automationssystems war groß. Um sowohl
das Bestandssystem anzubinden als auch die Zutrittskontrolle, Alarmüberwachung
und Beleuchtungssteuerung
sowie Einzelraumregelung zu
integrieren, haben wir uns für
ein System von Delta Controls
entschieden. Das hat zwei
Vorteile: Erstens ist hier ein
einheitliches System von der
BACnet-Operator-Workstation bis zur Feldebene mit
Einbindung der Volumenstromregler und Frequenzumformer über BACnet vorhanden. Zweitens ermöglichte der
innovative modulare Aufbau
die notwendige Installation
durch ortsansässige Unternehmen.
favorisierten Lüftungsgeräte
einzusetzen. Diese sollten
nach dem Prinzip Frischluft-Klima mit indirekter
Verdunstungskühlung funktionieren. Das Automationssystem ist direkt über TCP/IP
eingebunden.
BACnet Europe Journal:
Herr Wecker, mit dem neuen
Gebäude haben Sie Ihre Gebäudeautomation vollständig
integriert. Wurden Ihre Ziele
erfüllt?
Thomas Wecker: Die Entscheidung für BACnet war
sehr wichtig für unser Unternehmen. Nun können wir
von jedem Ort und jedem
Rechner die Anlagen einfach
bedienen und überwachen.
Über die einheitliche Bedienoberfläche überwachen, optimieren und analysieren wir
den Betrieb. Das reduziert
zum Beispiel unseren Energieeinsatz. Außerdem können
wir durch das integrierte Stö-
rungs- und Alarmmanagement jederzeit auf allen
Ebenen eingreifen. Das ist für
uns – zusammen mit der Zutrittskontrolle – ein enormer
Zugewinn an Sicherheit.
BACnet Europe Journal:
Wir danken Ihnen für das
Interview.
Wöhler Holding GmbH &
Co.KG constructed the new
Building of Wöhler Messgeräte Kehrgeräte GmbH according to energy efficiency specifications. The building had
to meet the highest energy efficiency and security standards. BACnet compromise in
functionality and economical
efficiency is very important
for system integration with several manufacturers.
The technical building system
should be implemented via
BACnet Technology. Wöhler
assigned the engineers of Ot-
tensmeier to plan the energy
efficient building. We asked
the project participants, Thomas Wecker, Plant Manager
Wöhler; Franz-Gerd Stuckmann, CEO SWG GmbH
(Member of BIG-EU); ClausHermann Ottensmeier, Project Manager Ottensmeier Ingenieure; Arend Brink, Project
Manager, Kampmann GmbH,
why they decided to connect
the building automation via
BACnet.
BACnet Europe Journal:
Mr. Wecker, why did you
choose BACnet as the basis
for the Building Automation
& Control system?
Thomas Wecker: We arranged an initial meeting with the
engineers of Ottensmeier (OI)
and SWG Stuckmann Wirtschaftliche Gebäudesysteme
GmbH (SWG), to plan the
Building technology. We had
to consider the existing system
in the old building on the one
BACnet Europe Journal:
Herr Brink, was bewog Sie als
Hersteller, Automationssysteme mit BACnet Kommunikation einzusetzen?
Arend Brink: Nach Jahren
der Entwicklung und diversen
Gehversuchen mit verschiedenen Standards bot BACnet
erstmals eine Philosophie, die
auf einem marktfähigen Kompromiss aus Funktionalität
und Wirtschaftlichkeit beruht.
Die hohe Unabhängigkeit
von Einzelfabrikaten ist ein
weiterer wichtiger Grund, sich
für BACnet zu entscheiden.
So war es mit dem Automationssystem EMS 4 der GFR
(Gesellschaft für Regelungstechnik und Energieeinsparung mbH) möglich, die
Integration diverser Hersteller-Systeme an die BACnet Technologie.
Intergration of several manufacturers systems to BACnet technology.
14 BACnet Europe Journal 8 03/08
Erfahrungsbericht Field Report
Projektpartner
Project partner
Bauherr Owner
Wöhler Holding GmbH
& Co. KG
www.woehler.de
Planer TGA
Planning building services
Ottensmeier Ingenieure
www.oi-tga.de
Systemintegrator
System integrator
SWG
Stuckmann Wirtschaftliche Gebäudesysteme
GmbH
www.swg-beckum.de
Neubau der Wöhler Messgeräte Kehrgeräte.
New building of Wöhler Messgeräte Kehrgeräte.
hand and on the other hand
the extensive requirements towards our new building technology. We wanted to have a
technology with the capability to integrate a HVAC unit,
Access Control and a Light
Control system with a single
user interface. The BACnet
protocol met all our requirements. Therefore Ottenmeier
Ingenieure assigned the task
to integrate all demanding
components into one Building
control structure.
BACnet Europe Journal:
Mr. Ottensmeier, how did
you integrate the different
components into the project?
Claus-Hermann
Ottensmeier:
Wöhler requested a futureorientated automation system
with the capacity to connect
manufacturers’ individual
components. BACnet’s interoperability enabled us to
connect the different Systems, like the HVAC Unit
from Kampmann, the Delta
Controls System (SWG), a
volume flow control and
an access control system
directly through the protocol. To connect additional
units, such as the boiler from
Viessmann, we linked them
through LON to BACnet.
BACnet Europe Journal:
Mr. Stuckmann, which criteria were the decisive factors in
determine and selecting the
system?
Franz-Gerd Stuckmann:
Wöhler had high expectations
in building a homogeneous
automation system. The Delta
Controls System enabled us
to integrate the individual
building control units (e.g.
BACnet-Operator-Workstation, Volume flow control) to
their existing system. The innovative structure of the system enables local contractors
to do necessary installations.
BACnet Europe Journal:
Mr. Brink, as a manufacturer,
what was your motivation to
use the BACnet technology?
Arend Brink: After spending
years in developing different
standards, BACnet is finally
offering a philosophy that is
based on functionality and
cost effectiveness. An important reason why we decided
to use BACnet is its ability to
integrate different manufacturer products into one system. As a result we were able
to connect the preferred
HVAC units as well as GFR´s
(Gesellschaft für Regelungstechnik und Energieeinsparung GmbH) automation system EMS 4 directly through
TCP/IP.
MSR/DDC BACnet
AC Unit
Delta Controls
www.deltacontrols.de
Lüftungsgeräte
Airconditioning devices
Kampmann GmbH
www.kampmann.de
BACnet Europe Journal:
Mr. Wecker, did you reach
your goals by implementing
the new building control system?
Kessel
Boiler unit
Viessmann Werke GmbH
& Co KG
www.viessmann.de
Thomas Wecker: The decision pro-BACnet was very important for our company. The
system allows the user to connect and manage it independently from any location. By
using BACnet we were able to
reduce our energy costs, by
controlling, optimizing and
analyzing
our
building
through one interface. Furthermore, we are able to connect directly to our security
and alarm level, in case of
emergency. This ensures our
requirements towards access
control and alarm security.
Frequenzumformer
Frequency converter
Danfoss GmbH
www.danfoss.de
BACnet Europe Journal:
Thank you for your time.
LON-BACnet Kopplung
LON-BACnet Coupling
Loytec electronics GmbH
www.loytec.de
LCN-BACnet Kopplung
LCN-BACnet Coupling
MBS
www.mbs-software.de
Bus-System Elektro
Bus-System for
electric systems
LCN
www.lcn.de
BACnet Europe Journal 8 03/08 15
Your building’s energy costs have a
direct impact
on the environment in your boardroom.
And on the planet.
What’s good for business is good for society. Turn to TAC for intergrated building systems
that cut energy usage. Meet TAC at Light & Building in hall 9.1, booth E50 and learn more.
Copyright © 2008, TAC, a company of Schneider Electric.
Erfahrungsbericht Field Report
BACnet senkt Kosten an der
Universität Bremen
BACnet cuts costs at the University of Bremen
Die Universität Bremen verwendete beim Ausbau ihrer Gebäudeautomation die
Automationsstation Cosmos 4000 Open von Plüth. Über die neutrale BACnet
Schnittstelle kommuniziert sie mit der Gebäudeleittechnik M-Plus von Johnson Controls.
Schon in der Planungsphase konnte Plüth alle vom Betreiber geforderten Funktionen
testen – dank des Simulationsmodells. Damit war der reibungslose Ablauf des Projekts
garantiert.
To upgrade its building automation the University of Bremen used the automation station
Cosmos 4000 Open by Plueth, which communicates with the Johnson Controls central
building control system via a neutral BACnet interface. As early as during the planning
stages a simulation model allowed Plueth to test all the functions required by the
operator, so smooth processing of the project was guaranteed.
Die Universität Bremen ist
das Wissenschaftszentrum im
Nordwesten Deutschlands.
Die Forschungsstätte für
1.950 Wissenschaftlerinnen
und Wissenschaftler bietet
Studienplätze für ca. 22.800
Studierende und weitere
1.250 Arbeitsplätze für
nichtwissenschaftliche Mitarbeiter. Der reibungslose
Betrieb des ständig wachsenden Gebäudebestands kann
nur durch eine entsprechende Infrastruktur mit der
dazugehörigen Gebäudeautomation gewährleistet werden. Dafür ist es notwendig,
dass Anlagen und Anlagenteile 24 Stunden pro Tag an
365 Tagen im Jahr fehlerfrei
funktionieren.
Die BACnet Funktionalität
wird daher vor Beginn der
eigentlichen Baumaßnahme
mittels Netzwerkanalyser
überprüft. Die für die Betreiber wesentlichen Funktionen
werden hierbei mittels Simulationsmodell eingehend untersucht. Alle Funktionen
zwischen der Gebäudeleittechnik M-Plus von Johnson Controls und der Plüth
Cosmos 4000 Open wurden
getestet, die vom Betreiber
geforderten Funktionen realisiert. Der Netzwerkanalyser
macht den Datenverkehr
transparent.
BACnet Funktionalität
vorgeschrieben
Von der Gesellschaft für Bremer Immobilien wurde gemeinsam mit dem Ingenieurbüro m+p aus Braunschweig
ein Konzept für eine neutrale
Managementebene erarbeitet. Durch BACnet wurde
eine wesentliche Verbesserung der Wettbewerbssituation in der Gebäudeautomation geschaffen. Der Erfolg
lässt sich an den gesunkenen
Investitionskosten ablesen.
Für die Neubaumaßnahmen
wurde ein Pfl ichtenheft entwickelt, dass die BACnetFunktionalität ab der Automationsstation vorschreibt.
Neue dezentrale Bedienplätze sollten ebenfalls über
BACnet kommunizieren und
gleichzeitig so konzipiert sein,
dass die Anlagen beim Ausfall der GLT autark sind. Da
die Gebäudeautomation der
Universität über ein eigenes
Ethernet-Netzwerk betrieben
© Universität Bremen
Universität Bremen.
University of Bremen.
wird, ist die Bedienung der
Anlagen mittels Webbrowser
möglich.
Volle Funktionalität und
einheitliche Bedienung
Die vorhandene Siemens
Siclimat X- GLT mit ihren
5.000 Datenpunkten wurde
über eine OPC- Schnittstelle
in das Gesamtsystem eingebunden. Auf diese Weise
lässt sich der gesamte Anlagenbestand über ein einziges
Managementsystem überwachen und bedienen.
Die Vorteile der neuen Systemstruktur mit BACnet liegen auf der Hand:
Einfache Handhabung über
Web-Browser,
Volle Funktionalität und
BACnet Europe Journal 8 03/08 17
Erfahrungsbericht Field Report
Bedienung
via „WEB“
Siemens Siclimat
X-Terminal
einheitliche Bedienung zentral oder dezentral,
Abnahmen vor Ort über
einen transportablen Laptop.
JCI M5 plus mit
Schnittstellen für:
E 0 -S D C -B u s
N 1 -M e ta sys-B u s
B A C n e t-C lien t
O P C -C lien t
In trane t
N etzw erk der
U ni B rem en
G läserne W arte
m it „W E B -B row ser“
GLT-EZ
GLT-EZ
V T 1 00
E0
S iclim a t X S e rve r
V e rsion V 4
N1
Zukünftige
Maßnahmen
Alarmierung
via OPC
S 5_L in k
S5
P rofibus
D ez. B edienplätze
A utom ationsebene
Die neue GLT-Systemstruktur an der
Universität Bremen.
New BMS System
architecture at the
University of Bremen.
E nergiezentrale
S iem ens
O P C -S erver
B eliebiger B edienp latz
m it „W E B -B row ser“
NCM
G-GLT
G-GLT
S5
NMT
IW S /G W S
SMT
TZI, NAE
B A C net/IP
NCM
ZIK, Plüth
B A C net/IP
An zentraler Stelle plant die
Universität Bremen nun eine
gläserne Leitstation. Durch
das moderne Gebäudemanagementsystem und Plüth
Cosmos 4000 Open sind
dafür die besten Voraussetzungen geschaffen.
tion work started. The most
important functions for the
operator are analyzed indepth using a simulation model. All functions between
the Johnson Controls central building control system
M-Plus and the Plueth
Cosmos 4000 Open are
tested and the functions
required by the operator realized. The network analyzer
makes the data communication transparent.
from the automation station.
New decentralized operator
stations should also communicate via BACnet and at
the same time be designed so
that, in the event of a failure
of the building management
system, the other systems
can continue independently.
Since the university building
automation runs via its own
Ethernet network the systems can be operated via a
web browser.
The University of Bremen is
the scientific hub of North
West Germany. The research
facility for 1,950 scientists
has some 22,800 students
and an administrative and
technical staff of 1,250. The
smooth operation of the ever
increasing complex of buildings can only be warranted with the right infrastructure and the corresponding
building automation. This
means that all systems and
system parts have to function
properly 24/7.
BACnet functionality
specified
A joint project between
the Gesellschaft für Bremer
Immobilien (responsible for
properties belonging to the
City of Bremen) and the
Braunschweig engineering
consultants m+p provided
a concept for a neutral management level. BACnet has
been able to establish a major improvement in the competitive building automation
environment and successes
of which can be seen in lower
investment costs.
Full functionality and
standardized operation
An OPC interface integrated
the existing Siemens Siclimat
X- GLT with its 5,000 data
points into the complete
system, allowing the entire
system to be monitored and
operated via a single management system.
Therefore a network analyzer
was used to check BACnet
functionality before construc-
Specifications were drawn-up
for new developments stipulating BACnet functionality
18 BACnet Europe Journal 8 03/08
NAE
The University of Bremen is
now planning a transparent
master control station and,
with the modern building
management system and
Plueth Cosmos 4000 Open,
the best foundations have
been laid for this.
The advantages of the new
system structure with BACnet
are obvious:
Easy handling with a web
browser,
Complete functionality and
standardized centralized or
decentralized operation,
On-site approval possible
via laptop.
Bernd Hoopmann
m+p consulting
Nord GmbH
bernd.hoopmann@
mp-gruppe.de
www.mp-gruppe.de
ABB standard drives for HVAC applications –
fluent in native BACnet plus 16 other languages
Frequenzumrichter für die Gebäudetechnik –
beherrschen fließend BACnet und 16 weitere Sprachen
ABB standard drives for HVAC applications.
5000 BACnet installations worldwide.
8000
HKL-Frequenzumrichter von ABB.
5000 BACnet Installationen weltweit.
8000
Here’s why ABB standard drives for HVAC applications
Das sind die Gründe, warum HKL-Frequenzumrichter von ABB wirklich
really make a difference:
den Unterschied machen:
• Suitable for standard induction motors rated
• Für Standard-Asynchronmotoren mit einer Nennleistung von
from 0,75 to 355 kW (1 to 550 HP)
0,75 bis 355 kW (1 bis 550 HP) geeignet
• Native BACnet embedded as standard
• BACnet standardmäßig integriert
• Direct connection to BACnet MS/TP networks –
• Direkte Ankopplung an BACnet MS/TP-Netzwerke - kein Gateway
no gateway needed
notwendig
• BTL approved B-ASC (Application Specific Controller)
• BTL-Zulassung B-ASC (Application Specific Controller)
Visit us at www.abb.com/drives
Besuchen Sie uns im Internet unter
www.abb.de/motors&drives
E-Mail: motors.drives@de.abb.com
Anwendungen Solutions
Deutsche Post: Energiesparen
beginnt mit BACnet
German postal service: Saving Energy
Starts with BACnet
Energiesparen zählt seit Jahrzehnten zu einem der wichtigsten Mittel zur langfristigen Kostenminimierung – eine
Binsenweisheit, die jedoch auch eine extreme Herausforderung bedeuten kann. Wie groß, das beweist ein Blick in
die Fracht- und Briefzentren bei der Deutsche Post AG.
Saving energy has been among the most important
measures for long term cost minimization. This
commonplace can represent quite a challenge, however.
Its real size can be illustrated by a glance at the freight
and letter centres of the Deutsche Post AG.
Die Deutsche Post Immobilienservice GmbH ist eine
Konzerntochter der Deutsche Post AG und einer der
größten Immobilienbesitzer
Deutschlands. Sie verwaltet
ca. 8.600 Liegenschaften,
und zwar nicht nur Büround Verwaltungsgebäude,
sondern auch zahlreiche
Fracht- und Briefzentren.
Diese Fracht- und Briefzentren stellen enorme Energieverbraucher dar. Stehen
zum Beispiel die Rolltore bei
niedrigen Temperaturen zu
lange offen, so zieht dies
einen massiv erhöhten Energiebedarf zum Erreichen der
voreingestellten Raumtemperatur nach sich.
Zählerstände in Echtzeit
In der Vergangenheit konnte
DPIS Zählerstände der einzelnen Liegenschaften lediglich manuell erfassen und
ausschließlich rückschauende
Analysen anhand der Versorgungsabrechnung vornehmen
– ein umständliches und zudem recht ungenaues Vorgehen.
Ziel war es daher, möglichst
bald ein System zu testen und
einzuführen, welches zeitnah
die Zählerstände der Energiezähler zentral verfügbar
macht und weitere Maßnahmen zur Energieeinsparung
auf effiziente Art unterstützt.
Umgebung gehostet, zugänglich per normalem WebBrowser. Dank BACnet erlaubt activeOperation die
zentrale Überwachung und
Steuerung dezentraler Anlagen verschiedenster Hersteller
mit unterschiedlichsten Applikationen.
DPIS entschied sich für
das Produkt activeOperation
der I.T.E.N.O.S. GmbH,
Bonn, nicht zuletzt weil mit
BACnet die Forderung nach
einer standardisierten Kommunikationsschnittstelle erfüllt war. Voraussetzung bei
DPIS war die Aus- bzw.
Nachrüstung aller Standorte
mit elektronisch lesbaren
Zählern und busfähigen
Temperatursensoren, deren
Daten in Datenkonzentratoren gesammelt werden und
hier zum Transport via
BACnet bereitstehen.
Die Vorteile für DPIS manifestierten sich schon nach
wenigen Monaten Testbetrieb an allen vier Pilotstandorten. So erschöpft sich das
System nicht im bloßen zentralen Erfassen von Zählerständen, sondern erlaubt
darüber hinaus die Einleitung
zeitnaher, gezielter Maßnahmen (per E-Mail, SMS etc.).
Dank des integrierten Reporting- und Analysetools wird
die Analyse von historischem
und aktuellem Datenmaterial – und hiermit das Aufzeigen von Trends und Ausblicken – ermöglicht. Mit Hilfe
ergänzenden Datenmaterials
zu Jahreszeiten, Wetterlagen
und standortspezifischen Faktoren können Energieflüsse
ermittelt werden.
Zentrale Überwachung
dank BACnet
activeOperation ist eine integrierte Portallösung für das
Management von Gebäuden
und Anlagen. Sie wird bei
I.T.E.N.O.S. in hochsicherer
activeOperation in Kombination mit BACnet versetzen
DPIS nun in die Lage, Potenziale sowohl beim Energiesparen als auch beim
Energieeinkauf möglichst optimal auszuschöpfen.
20 BACnet Europe Journal 8 03/08
Deutsche Post Immobilienservice GmbH (DPIS) is a
subsidiary of Deutsche Post
and one of the biggest real
estate owners in Germany.
DPIS manages approximately
8,600 properties, not only
office and administrative
buildings but also freight and
letter centres.
The freight and letter centres
consume lots of energy.
When for instance the rolling
gates stay open too long
at low temperatures, the
consequence is a substantial
increase in energy demand
to reach the preset room temperature again.
Energy counter
readings real-time
In the past, DPIS had to record
the counter readings manually and could only perform
retrospective analyses on the
basis of the utility bills – a
lengthy and quite imprecise
method.
Against this background,
DPIS wanted the test and
introduction of a new system
as soon as possible. This
system was supposed to
make available the counter
readings of the energy
counters real-time and to
support further measures to
save energy in an efficient
Anwendungen Solutions
Wie im Post-Tower Bonn
lässt sich auch in den
Fracht- und Briefzentren
der Deutschen Post AG
Energie sparen.
Like in the Post-Tower
Bonn, the freight and letter centers of the German
Post AG can save energy.
identification of trends and
forecasts. Additional data on
seasons, weather and location
specific factors help define
energy flows.
activeOperation in combination with BACnet enables
DPIS, not only to save energy,
but also to optimise their
energy purchase.
© Deutsche Post World Net
way. DPIS decided for the
product activeOperation of
I.T.E.N.O.S., Bonn, mainly because the offer met the
requirement of a standardized communication interface – BACnet. As a prerequisite, DPIS had to outfit
all locations with electronically readable counters and
bus-compatible temperature
sensors. Their data is collected in data concentrators
and is made available for
transport via BACnet.
Central control
thanks to BACnet
activeOperation is an integrated portal solution for
the management of buildings
and facilities. At I.T.E.N.O.S. it
is hosted in high security surroundings, but accessible via
normal web browser. Thanks
to BACnet, activeOperation
enables the central monitoring and control of decentralized facilities, of different
vendors and with most different applications.
The benefits for DPIS
became clear already after
few month of test operation
in four pilot locations. The
system is not only suitable
for the central recording of
counter readings, but also
for the initiation of prompt
and efficient measures (via
e-mail, SMS or the like).
Thanks to the integrated
reporting and analysis tool,
the analysis of historical
as well as current data is
enabled – and thus the
Wolfgang Heck
Telematik
Leiter Technische Realisierung & Produktmanagement
I.T.E.N.O.S. GmbH
Wolfgang.Heck@itenos.de
www.itenos.de
BACnet Europe Journal 8 03/08 21
Anwendungen Solutions
Fit for Future – neue Gebäudeleittechnik
an der Universität Stuttgart
Future-proof Building Supervisory Management System at the University of Stuttgart
Mit einer modernen BACnet Kommunikation zur Leitebene
und einer komfortablen Bedienoberfläche mit dem MPlus
System hat die Universität Stuttgart ein zukunftsfähiges
System erhalten, das die Bewirtschaftung der Gebäude
sicher und wirtschaftlicher macht.
With state-of-the-art communication between the BACnet
and the control system and a user-friendly operator
interface using the MPlus system, the University of
Stuttgart now has a system that is fit for the future. This
makes the building operation safer and more efficient.
Im Zuge der Ausschreibung
zur Errichtung einer modernen und einheitlichen Gebäudeleittechnik mit Energiemanagement Stufe 2 wurde die
Johnson Controls Systems &
Service GmbH im September
2006 damit beauftragt, die
auf dem fi rmenneutralen Datenübertragungssystem FND
basierende Leitzentrale der
Universität Stuttgart auf die
neueste Technik mittels
BACnet Kommunikation zu
erweitern. Gleichzeitig beauftragte das Universitätsbauamt im Rahmen der
Ausschreibung zusätzliche
Dienstleister mit der Erweiterung und Erneuerung der
MSR-Technik einzelner Universitätsgebäude sowie deren
Anbindung an das zentrale
Gebäudeautomationssystem.
Universitätsbauamt Stuttgart gemeinsam mit den GAPlanern der Fc.ingenieure
das
bestehende
Pfl ichtenheft für FND um den
BACnet Anteil entsprechend
der AMEV Empfehlung
„BACnet 2007“. Damit schufen sie die Voraussetzungen
für die einheitliche Aufschaltung der verschiedenen
neue
MSR-Komponenten
auf die Gebäudeleittechnik.
Zudem wurde im Rahmen
von Konformitätstests mit
allen beteiligten Firmen die
Einhaltung des Pfl ichtenhefts
anhand von Beispielen durchgearbeitet, um ein gemeinsames Verständnis für die
Projektierung der einzelnen
Teilbereiche zu erzielen.
Im Rahmen der Umsetzung
installierte Johnson Controls
dann zunächst die Gebäudeleittechnik mit Metasys®
Web Access (MWA) und
zwei Bedienplätze inklusive
des SQL Datenbankservers.
Das integrierte Softwarepaket des MPlus Systems bestehend aus M-Graphics (Anlagengrafi ken mit Animation),
M-Alarm (Alarm Softwarepaket mit Reports), M-Trend
(Trenddarstellung und Auswertung) sowie dem MPlusExplorer (zum Navigieren im
System) ermöglicht die zentrale und komfortable Steuerung des Systems. Eine moderne SQL Datenbank dient
zur Speicherung der Trenddaten.
Einheitliche Aufschaltung
Um den hohen Anforderungen
der Universität gerecht zu
werden und alle bisher verwendeten Benutzeradressen
bei FND und BACnet zu vereinheitlichen, setzte Johnson
Controls auf ein MPlus Serversystem mit „Name Server“. Vor dem Beginn der
eigentlichen Umsetzung aktualisierte und ergänzte das
Eine innovative Gebäudeleittechnik für die innovative Universität.
An innovative Building Management Supervisory System for the innovative University.
22 BACnet Europe Journal 8 03/08
Anwendungen Solutions
right conditions for consistent switching of the various
BMS components by the building automation system. To
achieve a common understanding for the various projects
involving subsections of the
system, conformity tests
were performed with all of
the companies involved, by
working through examples
to ensure compliance with
the system specifications.
Von FND zu BACnet
Im nächsten Schritt stellten
die Techniker von Johnson
Controls die sechs GAKnoten von der bestehenden FND-Kommunikation
zur Leitzentrale auf die neue
BACnet Kommunikation um.
Hierbei wurden die FND
Datenpunkte in BACnet Objekte umgewandelt sowie das
Zeitschalten in BACnet Objekte Kalender und Schedule
umgesetzt. Das Ereignisschalten und die zyklischen
Programme der jeweiligen
GA-Knoten wurden beibehalten.
Danach
schalteten
die
Johnson Controls Experten
die BACnet GA-Knoten und
BACnet Controller in den
einzelnen Teilbereichen auf
das neue GLT MPlus System
auf und passten die 16-stellige FND Adressen über Regeln an die neue 26-stellige
Adress-Syntax an. Abschießend wurden die bestehenden Anlagengrafi ken konvertiert und dynamisiert.
In the call for tenders for
the installation of a state-ofthe-art integrated building
services and Stage 2 energy
management system, Johnson
Controls Systems & Service
GmbH in September 2006
was awarded a contract to
bring the University of
Stuttgart’s control centre,
which was based on the vendor neutral FND communication protocol, up to date with
the latest BACnet communications technology. As part
of the same call for tenders,
the University Construction
Board awarded contracts to
other vendors for the extension and modernisation of
the BMS technology in individual buildings, as well as for
connecting these buildings to
the central building services
management system.
Consistent switching
To meet the University’s high
exacting expectations and
standardise all existing FND
and BACnet user addresses,
Johnson Controls designed
an MPlus server system including a name server. Prior
to the actual implementation, the Stuttgart University
Construction office partnered
with the building automation
planners at Fc.ingenieure to
update and expand the
existing system specifications for FND, to include
BACnet in accordance with
the “BACnet 2007” recommendations published by
AMEV. This created the
Johnson Controls then began the implementation by
installing the building services management system
with Metasys® Web Access
(MWA) and two operator
control stations including an
SQL database server. The
MPlus System is comprised of an integrated software package consisting of
M-Graphics (animated system
graphics), M-Alarm (alarm
software
with
reports),
M-Trend (trend display and
evaluation), and the MPlusExplorer (for system navigation), allowing for convenient, centralized control of
the system. The trend data
is saved in a state-of-the-art
SQL database.
From FND to BACnet
In the next step, the Johnson
Controls engineers switched
the six building automation
nodes over from the existing communication system between the FND and
the control centre to the
new BACnet communication system. This involved
converting the FND data
points into BACnet objects
as well as implementing the
time switching as BACnet
Calendar and Schedule objects. The event switching and
the cycling programs of the
various building automation
nodes remained unchanged.
The specialists from Johnson
Controls then switched the
BACnet building automation nodes and the BACnet
Controller in the various portions of the system over to the
new MPlus BSM system and
converted the 16-figure FND
addresses to the new 26-figure
address syntax according to a
rule system. Finally, they
converted the existing system
graphics and made them dynamic.
Projektbeteiligte
Project Participants
Universitätsbauamt
Stuttgart und Hohenheim
Universität Stuttgart
Dezernat Technik und
Bauten
Fc.ingenieure GmbH,
Ettlingen
Datentechnik Fries,
Dachau
H&K, Theres
JohnsonControls Systems
& Service GmbH, Stuttgart
Kieback&Peter, Stuttgart
Messner Gebäudetechnik,
Stuttgart
Siemens Building
Technologies, Stuttgart
Ewald Stadelmeier
Ewald.stadelmeier@jci.com
Johnson Controls Systems
& Service GmbH
www.johnsoncontrols.com
BACnet Europe Journal 8 03/08 23
Anwendungen Solutions
Gebäudeautomation XXL
auf der Neuen Messe Stuttgart
Neue Messe Stuttgart is
Building Automation XXL
Mit dem Bau der Neuen Messe Stuttgart waren 1000 Firmen mit insgesamt 10.000 Arbeitern beschäftigt. Sie richteten die bislang größte Baustelle Deutschlands ein. Zur
Ausführung der Gebäudeautomation mit ihrem System
ProGrafNT/PMC wurde Neuberger beauftragt.
About 1,000 companies and 10,000 construction workers
were involved in building the Neue Messe Stuttgart
– Germany’s largest construction site so far. Neuberger
received the order to execute the building automation
using their ProGrafNT/PMC system.
Für die Neue Messe Stuttgart
entstanden auf einem 83 ha
großen Grundstück sieben
Standard-Messehallen, eine
Hochhalle und ein Kongresszentrum, so dass nun
100.000 m² Ausstellungsfläche genutzt werden können.
Für Neuberger war eine Herausforderung bei diesem 10
Mio. Euro Auftrag die Bewältigung des engen Zeitplans, denn die gesamte Bauzeit bis zur Teileröffnung
betrug nur 33 Monate. Eine
wichtige Anforderung an die
Gebäudeautomation bestand
in der Umsetzung des im
Messebau dieser Größenordnung neuartigen Schichtlüftungsprinzips, um besonders
energiesparend und komfortabel ein angenehmes Raumklima zu schaffen. Der laufenden Projektausführung
kam die gute Zusammenarbeit mit der Planungsgruppe
M+M AG zugute.
40.000
Informationspunkte
Zum Leistungsumfang gehörten 400 Schaltschrankfelder, 166 Automationsstationen und insgesamt 40.000
Informationspunkte, darunter 2000 Temperaturfühler.
Diese sind nicht nur in den
120 Lüftungsanlagen, den
Heizungs- und Kälteanlagen,
sondern auch in den Büros
und Hallen installiert. Über
1000 km Kabel verbinden
Motoren, Sensoren und Aktoren mit den Schaltschränken. Um ein solch ausgedehntes Gebäudeautomationsnetz
mit vielen Teilnehmern und
Informationspunkten fristgerecht und rationell aufbauen
und fehlerfrei übergeben zu
können, setzte man auf das
leistungsfähige BACnet/IPProtokoll.
Jede Halle und die Verbindungsgebäude erhielten einen
eigenen Gebäudeleitrechner
zur Kommunikation mit den
Automationsstationen und
den Raumreglern. Mit dem
zentralen Management-Leitrechner im Serverraum der
Hochhalle behält der für den
Betrieb Verantwortliche ständig den Überblick über die
gesamte Liegenschaft.
Das weit verzweigte Netz verbindet durchgängig Management-, Leit- und Feldebene.
Dabei ist eine ManagementGLT den elf Leitrechnern und
sechs Bedienstationen in den
Hallen übergeordnet. Für
eine hohe Verfügbarkeit gibt
es für die Management-GLT
einen Backup-Server. Beide
sind mit Ethernet gekoppelt
und bilden ein redundantes
Parallelsystem mit gegenseitiger Überwachung und zyklischer Datensicherung. Es
steht so immer ein Reserveserver mit allen aktuellen Daten bereit.
Monteure bei der Schaltschrank-Inbetriebnahme.
Technicians on commissioning of control cabinet.
24 BACnet Europe Journal 8 03/08
Die Leitrechner kommunizieren mit 166 im gesamten Messegelände verteilten
PMC -Automationsstatio nen und einer Siemens PX in
der Heizungsanlage über das
BACnet/IP-Protokoll. Die mit
LON vernetzte Beleuchtung
und Beschattung (ca. 5000
Informationspunkte) ist via
LON-OPC-Server angebunden, eine Siemens S7-Automationsstation für den Entlastungstunnel via OPC.
Neu entwickelter
Verbrauchskostenmanager
Um den Betreiber bei den
umfangreichen und ständig
wechselnden Verbrauchskostenverteilungen zu entlasten,
wurde auf der Managementebene ein von Neuberger neu
entwickelter Verbrauchskostenmanager eingesetzt. Er
erhält von den Leitrechnern
laufend alle Energieverbräuche der Heizungs-, LüftungsKlima- und Sanitäranlagen,
die mit Hilfe von fast 2000
M-Bus-Zählern erfasst werden.
Da neben den Verbräuchen
auch alle Messwerte und
Schaltzustände der großen
Anlage im Langzeitarchiv
geführt werden, entsteht im
Laufe der Zeit eine wertvolle
strukturierte Datenbasis, die
man jederzeit in vorgefertigten Archivcharts visualisieren
und zur Überprüfung und
weiteren energetischen Optimierung verwenden kann.
Im seit Herbst 2007 laufenden regulären Messebetrieb hat sich das innovative
Sicht über die Neue Messe
Stuttgart.
Panoramic View at south
Germany´s biggest
exhibition hall Stuttgart.
Klimatisierungs- und Automationskonzept bereits zur
Zufriedenheit des Betreibers,
der Aussteller und Messebesucher in der Praxis bewährt.
On an area of 83 hectares 7
standard exhibition halls, the
Grand Hall (South Germany’s
biggest exhibition hall) as
well as a Congress Center
have been built. Thus, an exhibition space of 100,000 m²
is available.
With an order volume of
10 Mill. Euro this was the
biggest order Neuberger ever
obtained and the challenge
was to fulfill all requirements
within a very tight operating
schedule as the total construction period lasted only
33 months. An important
requirement to the building
automation was the realization of an innovative layer
ventilation system in order to
create an agreable air condition in an energy-saving and
comfortable way. The good
Project realization also came
due to the good Teamwork
with the Planungsgruppe
M+M AG.
40,000 information points
The scope of supply includes
400 control cabinet fields,
166 automation stations and
a total of 40,000 information
points, among them there are
2,000 temperature sensors.
These sensors are not only
installed in the 120 ventilation plants and the heating
and cooling plants but also
in the offices and halls. More
© Projektgesellschaft Neue Messe GmbH
than 1,000 km of cable were
used to connect motors, sensors and actuators with the
control cabinets.
mutual monitoring and cyclic
data backup. So a backup
server with all actual data is
always available.
In order to be able to
establish such a comprehensive building automation
system with many stations
and data points efficiently
and in due time and to fulfill
all requirements, the highperformance BACnet/IP Protocol was used.
The host computers communicate with 166 PMC
automation stations which
are distributed on the entire
trade fair ground and a
Siemens PX in the heating
plant via the BACnet/IP
Protocol. The LON internetworked lighting and
shadowing (approx. 5,000
information points) is connected via LOC-OPC-Server
and a Siemens S7 automation
station for the discharge tunnel via OPC.
Every hall as well as the link
buildings are equipped with
their own host computer
for communication with the
automation stations and the
room controllers. Via the
central management host
computer in the server room
of the Grand Hall the responsible person is able to supervise the entire property all
the time.
The widely branched network
is continuously connecting
the management level, process
control level and field
level. Here a supervisory
Management Server monitors the 11 host computers
and the 6 operator’s panels
in the halls. To ensure a reliable availability of the
Management Server, a backup
server is provided.
Both are connected via
Ethernet and form a redundant parallel system with
the large plant are recorded
in the long-time archive and
so, in the course of the time,
a valuable and structured
database will be generated,
which can be visualized in
archive charts at any time
and can be used for analysis
and further energy optimisation.
Regular trade fair operations
at Neue Messe Stuttgart
began in autumn 2007 and
since then the innovative
air-conditioning and automation concept is working to
the complete satisfaction of
user, exhibitors and visitors.
New operating
cost manager
In order to facilitate the
extensive and ever-changing
operating cost distribution
to the user, an operating
cost manager, developed by
Neuberger, was used on the
management level.
This operating cost manager
continuously receives all
energy consumption values
of the heating, ventilation,
air conditioning plants and
sanitary facilities from the
host computers. These values
are measured by means of
nearly 2,000 M-Bus counters.
Additionally to the consumption values all measured
values and switching states of
Bernd Deutschmann
Technical writer
Neuberger Gebäudeautomation GmbH & Co. KG
info@neuberger.net
www.neuberger.net
BACnet Europe Journal 8 03/08 25
Anwendungen Solutions
Effektive Integration hinter
historischer Fassade
Effective Integration behind
ancient Facade
Das Haus 104/110 Boulevard Haussmann mit sieben
Geschossen, zwei Tiefgaragengeschossen und 12.000
Quadratmetern Bürofläche wurde jetzt vollständig
saniert und restauriert. Bei der technischen Ausstattung
setze man auf BACnet und die Gebäudeleittechnik von
Kieback&Peter.
The building 104/110 Boulevard Haussmann with its
seven stories, a two-level underground parking lot and
12,000 m² office space has just recently been completely
re-developed and renovated. For the technical facilities
modern BACnet technology and Kieback&Peter were
called for.
Der Boulevard Haussmann
in Paris gehört zu den großen
Boulevards, die im 19. Jahrhundert unter der Herrschaft
Napoleon III. von Baron
Haussmann angelegt wurden. Bis heute prägen sie das
Bild von Paris. Hier liegen
die berühmten Kaufhäuser
Galeries Lafayette und Le
Printemps. Außerdem haben
viele Banken und Versicherungen hier ihren Sitz. Die
kompletten Umbauarbeiten
hat die Firma Bouygues
übernommen.
Natives BACnet
Die historische Fassade des
Gebäudes wurde original im
Architekturstil renoviert, den
Baron Haussmann prägte.
Bei der technischen Ausstattung setze man auf moderne Technologie. Dazu gehört
moderne Gebäudeautomation: Kieback&Peter hat das
Gebäude mit einer modernen Gebäudeleittechnik auf
Basis des BACnet Protokolls ausgestattet. Das Automationssystem DDC4000
von Kieback&Peter steuert
und regelt die Heizungsund Klimaanlagen sowie die
Stromversorgung. Es verfügt
über natives BACnet und
kommuniziert über Ethernet
(TCP/IP, BACnet).
Die zwölf Luftreinigungsund Klimaanlagen und weitere Anlagen zur Wärmeund Kälteversorgung sind in
das Automationssystem integriert. Das Automationssystem DDC4000 sorgt für
sicheren und effi zienten Anlagenbetrieb. Die Automationsstation DDC4200 verfügt
über einen Touchscreen mit
großer Bedienoberfläche. Mit
gut verständlichen Klartexten und Anlagenbildern ist
die Bedienung einfach und
komfortabel. Darüber hinaus können technische Störungen schnell identifi ziert
werden und auch Auswertungen über Trendkurven
vorgenommen werden.
Auch Stromversorgung, Beleuchtung und Notstromaggregat sind integriert. Automationsstationen DDC4200
steuern und regeln die Niedrigspannungsversorgung.
Das Stromaggregat ist über
eine
Schnittstelle
Jbus/
BACnet angeschlossen. Es
verfügt über seine eigene
26 BACnet Europe Journal 8 03/08
speicherprogrammierbare
Steuerung, die für die Sicherheit zuständig ist. Die Stromzähler sind ebenfalls über
Jbus/BACnet Schnittstellen
mit dem System vernetzt.
Energieeffizienz
Für die Raumautomation
wird das auf LON basierende Raumautomationssystem
technolon mit Raumregler
der Produktlinie RCN eingesetzt. Die RCN Regler sind
eu.bac zertifi ziert. Die eu.bac
Zertifi zierung garantiert hohe Regelgenauigkeit und Energieeffi zienz. Um die Raumautomation nahtlos mit dem
IP-Netz zu verbinden, wurde
eine LON/IP Architektur gewählt. Sie nutzt damit dasselbe Kommunikationsmedium wie BACnet/IP. Diese
Architektur zeigt, dass LON
und BACnet jeweils ihre
eigene Rolle spielen und harmonisch über dasselbe Netz
arbeiten können. Die Mitarbeiter können mit Funkfernbedienungen die Regler
bedienen und die Raumkonditionen nach ihren Bedürfnissen einstellen. Die technolon Raumautomation steuert
Temperatur und Sonnen-
schutz in den Büroräumen
genau nach Bedarf. Damit
spart sie viel Energie.
Auf der Managementebene
wurde die Kieback&Peter
Gebäudeleittechnik Neutrino-GLT installiert. In der
Neutrino-GLT sind sowohl
LON als auch BACnet integriert. Nicht weniger als
6.000 Datenpunkte werden
über die GLT verwalten, davon 500 BACnet Objekte.
In der GLT-Leitzentrale sind
gleichzeitig ein Client und
Server aktiv. Dem Server
steht eine leistungsfähige
GLT-Datenbank sowie der
direkte kommunikative Zugriff auf alle Informationen
der betriebstechnischen Anlage BTA zur Verfügung.
Der Client hingegen ist für
die Darstellung und Abarbeitung der GLT-Bedienoberfläche verantwortlich.
The Boulevard Haussmann
in Paris is one of the great
boulevards constructed in
the 19th century under
Napoleon III by Baron
Haussmann. Even today these
Anwendungen Solutions
Moderne Gebäudeautomation hinter historischer
Fassade am Boulevard Haussmann in Paris.
Modern building automation behind an historical
facade of Boulevard Haussmann in Paris.
DDC4200 automation station
has a touch screen with a large
user interface. With plain
text and installation graphics
that are easy to understand
operation is quite straightforward. Any technical faults
can be identified promptly
and evaluations carried out
via trend curves.
The power supply, lighting
and emergency power supply
are also integrated. The
DDC4200 automation stations control and regulate
low-voltage power supply.
The power supply is connected via a Jbus/BACnet interface and has its own API
responsible for security. The
electricity meters are also
networked with the system
via Jbus/BACnet interfaces.
boulevards still very much
shape the city. Here you can
find the famous department
stores Galleries Lafayette and
Le Printemps. Many banks
and insurance companies
have their headquarters in
this area. All structural alteration works were carried
out by the construction company Bouygues.
Nativ BACnet
The historical facade of the
building was restored in
original Haussmann style,
however for the technical
facilities modern technology
was called for. This includes
modern building automation:
Kieback&Peter installed a
central building control system
based on the BACnet protocol. The Kieback&Peter
DDC4000 automation system controls and regulates
the heating and air-conditioning systems together
with the power supply. The
DDC4000 automation system
is native BACnet and communicates via Ethernet (TCP/
IP, BACnet).
The 12 air-conditioning systems and other installations
such as district heating and
cooling are integrated in
the automation system The
DDC4000 automation system
provides for secure and efficient system operation. The
Energy efficiency
The chosen room automation
solution is the LON-based
technolon system with room
controllers from the RCN
product range. The RCN
controllers are eu.bac certified. The eu.bac certification
guarantees high control accuracy and energy efficiency.
LON/IP architecture ensures
that the room automation
is easily connected to the
IP-network, using the same
communication medium as
BACnet/IP. This architecture
shows that LON and BACnet
both have their respective
parts to play, but can work
harmoniously via the same
network. With a remote control the room occupants can
set the controllers and thus
adjust the room conditions
to suit their requirements via
radio frequency. technolon
room automation regulates
the temperature and antiglare protection as necessary,
this way saving a lot of
energy.
The Neutrino-GLT central
building control system was
installed at management
level. Both LON and BACnet
are
integrated
in
the
Neutrino-GLT. No less than
6,000 data points are governed via the GLT, 500 of
which are BACnet objects.
In the GLT primary control
unit both Client and Server
are active at the same time.
The Server can access a highperformance GLT database
and also has direct, communicative access to all information of the operational
systems BTA. The Client on
the other hand is responsible
for the presentation and
execution of the GLT user
interface.
Lucien River
General Manager
Kieback&Peter France
river@kieback-peter.fr
www.keback-peter.de
BACnet Europe Journal 8 03/08 27
Anwendungen Solutions
Höchstmaß an Energieeffizienz
Highest Level of Energy Efficiency
Das Klinikum Bremerhaven/Reinkenheide ist ein
Musterbeispiel für Energieeffizienz im Krankenhaus. Dank
der umfassenden Erneuerung aller gebäudetechnischen
Anlagen konnte der Energieverbrauch um über 25 Prozent
reduziert werden.
The Clinical Center of Bremerhaven/Reinkenheide
is a model for energy efficiency in hospitals. The
comprehensive upgrading of all building services
installations enabled energy consumption to be reduced
by more than 25%.
Im Rahmen eines Energiespar-Contracting
Projektes in Zusammenarbeit
mit Siemens spart das Klinikum jährlich 519.000 Euro
an Energiekosten und entlastet die Umwelt um 3.200
Tonnen CO2 pro Jahr. Um
die Nachhaltigkeit und damit auch die Wirtschaftlichkeit zu sichern, wurde der
Vertrag für eine Laufzeit von
12 Jahren geschlossen.
Im Jahr 1976 eröffnet war
das Klinikum Bremerhaven
im Stadtteil Reinkenheide mit
seinen 680 Betten das mo-
dernste seiner Art im Land
Bremen. Bis heute konnte es
seine Spitzenstellung als Therapie- und Diagnosezentrum
kontinuierlich ausbauen. Im
Gegensatz dazu haben die
gebäudetechnischen Anlagen über die Betriebsjahre
ihre Leistungsfähigkeit und
Effi zienz insbesondere im
Hinblick auf den Energieverbrauch eingebüsst. Im Jahr
2004 mussten rund zwei
Millionen Euro für Primärenergie aufgewendet werden.
Es bestand dringender Handlungsbedarf für eine umfassende Sanierung und Modernisierung.
Mit einer von der Klimaschutzagentur „Bremer Energie-Konsens“ erstellten Ausschreibung im Frühjahr 2006
wurde das Vergabeverfahren
für das Energiespar-Contracting Projekt europaweit
gestartet. Die Agentur steuerte den Vergabeprozess und
stand auch während der Realisierungsphase dem Bauherrn beratend zur Seite.
Die Siemens Division Building
Technologies überzeugte mit
einem Angebot, das eine Reduktion des Jahresenergieverbrauchs um 25 Prozent
garantierte und gewann den
Auftrag. Die baulichen Maßnahmen sowie die Modernisierungs- und Optimierungsmaßnahmen der technischen
Anlagen begannen im April
2006 und dauerten rund 12
Monate, da nahezu alle notwendigen Baumaßnahmen im
laufenden Betrieb durchgeführt werden mussten.
120 Einzelmaßnahmen
Die umgesetzten rund 120
Maßnahmen betrafen alle
gebäudebetriebstechnischen
Einrichtungen, wie die Heizungsinfrastruktur, Kälteerzeugung, Erneuerung der
G roß k üche n spü l m a s ch i nen, medizinische Druckluftversorgung, Niederspannungshauptversorgung und
Dampfsterilisatoren. Die über
70 raumlufttechnischen Anlagen wurden komplett entkernt und mit der BACnet
Automation DESIGO PX auf
Contracting Partner Klinikum Bremerhaven.
28 BACnet Europe Journal 8 03/08
den neuesten Stand der Technik gebracht. Automatisierung und Energiemanagement kommunizieren mit
BACnet/IP und stellen ein
Höchstmaß an Energieeffi zienz sicher.
Die Energieeinsparungen sind
beachtlich, wie Jürgen Breuer, Technischer Leiter des Klinikums an einigen Beispielen
aufzeigt. So konnte der Energiebedarf für Ferndampf zur
Klimatisierung, zum Kochen
und zur Sterilisation um
rund 6 200 MWh oder um
72 Prozent verringert werden, was dem thermischen
Energieverbrauch von rund
350 Einfamilienhäusern entspricht. Die Klimaanlagen,
die nicht zum Operationsbereicht oder zur Intensivpflege
gehören, beginnen jetzt erst
bei einer Außentemperatur
von 2°C zu heizen. Bevor
jedoch die Temperatur unter diesen Grenzwert sinkt,
kann über ein hocheffi zientes
Wärmerückgewinnungssystem der Abluft soviel Energie entzogen werden, daß
kein zusätzlicher Heizbetrieb
notwendig ist, so Breuer. Ein
weiteres großes Einsparpotenzial betrifft die bedarfsgerechte Wärmeversorgung des
Gebäudes. Durch den Einsatz von hocheffi zienten Umwälzpumpen werden rund 50
MWh Strom pro Jahr eingespart. Durch die Erneuerung
der Heizkreisregelung werden die Raumtemperaturen
innerhalb der Nachtstun-
Anwendungen Solutions
den, beziehungsweise außerhalb der Nutzungszeiten in
bestimmten Gebäudebereichen abgesenkt. Die Energieeinsparung für die Raumheizung liegt bei rund 5 000
MWh oder 50 Prozent, das
ist in etwa soviel wie 280
Einfamilienhäuser verbrauchen.
Das Wichtigste für die Patienten im Krankenhaus
sind und bleiben kompetente
Ärzte und moderne Medizintechnik. Doch das medizinische System und die rasche Genesung der Patienten
funktioniert nur mit guter
haustechnischer Infrastruktur. Hier hat das Klinikum
Bremerhaven/Reinkenheide
einen Meilenstein hinsichtlich Anlagenqualität, nachaltiger Kosteneinsparung und
Energieoptimierung gesetzt.
In the context of an Energy
Management
Contracting
project in association with
Siemens the Clinical Center
is achieving savings of
519,000 euros in energy costs
and reducing CO2 emissions
by 3,200 tonnes annually.
This contract was concluded
for a period of twelve years
in order to ensure sustainability and thus economic
efficiency.
The 680-bed Clinical Center
opened in Bremerhaven/
Reinkenheide in 1976 was the
most modern of its kind in the
state of Bremen. It has continued to extend its leading
position as a therapy and
diagnostic center right up
to the present day. By contrast, the productivity and
efficiency of its building
services installations have
declined over the years,
especially as regards energy
consumption. Primary energy
costs amounted to some
two million euros in 2004.
There was an urgent need for
extensive refurbishment and
upgrading.
The bidding process for the
Energy Management Contracting project was launched
throughout Europe in the
spring of 2006 with an invitation to tender drawn up
by the “Bremen Energy Consensus” climate protection
agency. The agency controlled the bidding process and
also advised the owner of
the premises during the implementation phase.
Siemens’ Building Technologies Division submitted a
convincing bid guaranteeing
a 25% reduction in annual
energy consumption, and
won the contract. The structural works and the upgrading and optimization of the
technical installations started in April 2006 and lasted
about twelve months, since
almost all the necessary
structural work had to be
performed while the premises
continued to function normally.
120 separate steps
Some 120 steps were taken, affecting all the building
services installations, such as
heating infrastructure, cooling equipment, replacing the
canteen dishwashers, medical
compressed-air supply, main
low-voltage supply and steam
sterilizers. More than 70
conditioned-air systems were
completely disassembled and
rebuilt to the latest state of
the art with the BACnet
based building automation
systems DESIGO PX. Building automation and energy
management operate based
on BACnet/IP and assure the
highest level of energy efficiency.
Remarkable energy savings
have been achieved, as Jürgen
Breuer, Technical Manager
of the Clinical Center, explains using several examples. For instance, the power
required in terms of steam
supplies for air conditioning,
cooking and sterilization has
been reduced by some 6 200
MWh or 72%, equivalent to
the thermal energy consumption of about 350 singlefamily houses. The air conditioning systems outside of the
operating or intensive care
sectors now only start heating at outdoor temperatures
of 2°C. However, before
the temperature falls below
this threshold, so much
energy can be extracted from
the exhaust air via a highly
efficient heat recovery system that additional heating
generation is unnecessary,
Jürgen Breuer adds. Loaddemand heat supply to the
building represents a further
major source of potential
savings. The use of highly
efficient circulating pumps
enables some 50 MWh
of electricity to be saved
annually. The upgrading of
the heating circuit control
system enables room temperatures in certain parts of the
building to be reduced during the night, i.e. outside
their hours of use. The energy
savings on room heating
amount to some 5 000 MWh
or 50%, which corresponds
approximately to the consumption of 280 single-family
houses.
The most important considerations for patients in the hospital are, as ever, competent
Infrastruktur für Ärzte
und Patienten.
Infrastructure for doctors
and patients.
doctors and up-to-date medical technology. However,
the medical system and the
rapid recovery of patients
depend on good building
services infrastructure. This
is where the Bremerhaven/
Reinkenheide Clinical Center has achieved a milestone in
terms of installation quality,
sustained cost economies
and energy optimization.
Michael Hartmann-Skörup
Head of SBT DE BAU
Energy & Environmental
Solution
Siemens Building Technologies GmbH & Co. oHG
michael.hartmannskoerup@siemens.com
www.siemens.com/
buildingtechnologies
BACnet Europe Journal 8 03/08 29
Anwendungen Solutions
Landschaftsverband Rheinland –
Integration in bestehende GLT
Rhineland Regional Council:
BACnet Integration in Existing System
Der Landschaftsverband Rheinland setzt bei seiner GLT
auf ein offenes System und vollständige Integration. Die
in seinen neugebauten Förderschulen in Linnich und
Oberhausen eingesetzten DDC-Controller miles® -AS29
der Messner Gebäudetechnik werden via BACnet in die
bestehende GLT eingebunden.
The Rhineland Regional Council is focusing its
building control tech-nology on an open system and
full integration. The DDC controller miles®-AS29 from
the Messner Gebäudetechnik GmbH company, which
is being used in its newly built special education schools
in Linnich and Oberhausen, will be integrated into the
existing building control technology via BACnet.
Der
Landschaftsverband
Rheinland (LVR) ist ein
Zusammenschluss von 14
kreisfreien Städten und 13
Kreisen. Mit seinen 40 Förderschulen, zwei Krankenschulen, zehn Krankenhäusern, sechs Museen und
seinem Heilpädagogischem
Netzwerk sowie als größter Leistungsträger für Menschen mit Behinderungen in
Deutschland erfüllt der LVR
Aufgaben in der Behinderten- und Jugendhilfe, in der
Psychiatrie und der Kultur,
die rheinlandweit wahrgenommen werden.
Seit Jahren ansteigende Schülerzahlen an den Rheinischen
Förderschulen des LVR machten Neubauten in Linnich
und Oberhausen erforderlich.
Schwerpunkt dieser Förderschulen ist die Betreuung von
körperbehinderten Kindern.
Neben den Klassen-, Fachund Therapieräumen sowie
die Verwaltungsräumen und
die Schülerbibliothek wurden
auch Turnhallen und Lehrschwimmbecken mit den zugehörigen Sanitärräumen errichtet.
Offene GLT in Köln
Bisher sind ca. zehn Liegenschaften des LVR in das Gebäudemanagementsystem der
Hauptverwaltung in Köln integriert. Dabei sind sechs
verschiedene Regelfabrikate
über BACnet, LON oder
OPC aufgeschaltet.
Ziel ist es, alle Liegenschaften
in das Managementsystem
aufzunehmen. Die Zentrale
arbeitet nach dem Prinzip
der verteilten Server und
kann somit praktisch unbegrenzte Datenmengen verarbeiten. Neben der Monitoring-Funktion übernimmt
sie die Alarmüberwachung,
die Trendaufzeichnung und
dient als Webserver. Von allen angeschlossenen Liegen-
30 BACnet Europe Journal 8 03/08
schaften können deren Webseiten abgerufen werden und
je nach Zugangsberechtigung
des Users ist die Systembedienung möglich.
Messner-miles®
integriert sich via BACnet
In den Förderschulen in
Oberhausen und Linnich sind
BACnet-Controller miles® AS29 der Messner Gebäudetechnik eingesetzt. Sie
arbeiten für jede Schule als
autarkes System. Im Wesentlichen übernehmen sie
die Heizungs-, Lüftungsund Klimaregelung. Hinzu
kommt der Datenaustausch
mit der Badewassertechnik
der Schwimmbäder, der über
MODBus realisiert ist. Hierbei werden Messgrößen wie
der Chlorgehalt, der Redox-
Wert, PH-Wert usw. an die
miles® -AS29 und von dort
an die GLT übertragen.
In der FS Oberhausen sind
zusätzlich die LON-Regler
der Fußboden-Heizungsverteilung über die miles® -LONKopplung eingebunden. Die
miles® -Stationen verwalten
130 Regelkreise und geben
die Stellgrößen für die Ventile vor.
Wichtige Meldungen und
Messwertänderungen werden
über DSL-Router als BACnetObjekte an die GLT nach
Köln übertragen. Da für den
Datentransfer das COVPrinzip gilt, garantieren
die schnellen DSL-Standleitungen kurze Übertragungszeiten wie in einem lokalen
Förderschule des LVR in Oberhausen.
The Rhineland Regional Council special education school
in Oberhausen.
Anwendungen Solutions
Netzwerk. An der Leitzentrale wandelt ein BACnet-OPCServer die Informationen in
das benötigte OPC-Format
um.
Umgekehrt ist die vollständige Bedienung der miles® Controller über die Zentrale
möglich. Zunutze macht
man sich diese Möglichkeit
insbesondere, um von den
Anlagenbildern aus Sollwerte zu ändern bzw. Ferienpläne über das Schedule-Objekt einzutragen.
The Rhineland Regional
Council is an affiliation of
14 urban authorities and 13
districts. With its 40 special
education
schools,
two
schools for the sick, ten
hospitals, six museums and
its orthopedagogy network as
well being Germany’s largest
service provider for disabled
people,
the
Rhineland
Regional Council provides
disabled, youth, psychiatry
and cultural services throughout the Rhineland.
The steadily rising number
of pupils attending the
Rhineland Regional Council’s
special education schools
over recent years had necessitated the construction of
new buildings in Linnich
and Oberhausen. These special education schools focus
on the care of physically
disabled children.
Gymnasiums and swimming
pools for swimming lessons
as well as the related sanitary facilities were also built
in addition to classrooms,
specialty rooms and therapy
rooms, administrative space
and the school library.
Open building control
technology in Cologne
Up to now approximately ten
of the Rhineland Regional
Council’s properties have
been integrated into the
building management system
of the head administrative
office in Cologne. Six different makes of controllers are
connected there via BACnet,
LON or OPC.
The goal is to include all
properties in the management
system. The control center
works on the principle of
distributed servers which
allows it to process almost
BACnetOPCServer
unlimited amounts of data.
In addition to the monitoring function, it also
handles alarm monitoring,
trend recording and is used
as web server. Websites can
be called up from all connected properties and system
operator control is possible if
the user has the appropriate
access rights.
Messner-miles® integrated
via BACnet
The
special
education
schools in Oberhausen and
Linnich are equipped with
BACnetcontroller
miles®AS29 from the Messner
Gebäudetechnik
GmbH
company. These function
as independent systems for
each school. Essentially,
they handle the control of
heating, ventilation and airconditioning. Also included
is the data exchange with the
swimming pool water technology which is implemented
via MODBus. Variables such
as chlorine content, redox
value, PH value, etc. are
transmitted to the miles®AS29 and from there to the
building control technology
system.
The special education school
in Oberhausen also has the
LON controllers for floor
heating distribution linked
via the miles®-LON coupling.
The miles® stations manage
130 control loops and specify the control variables for
the valves.
Crucial messages and changes
in measured values are
transmitted via DSL routers
as BACnet objects to the
Cologne building control
technology system. Since
data transfer uses the COV
principle, the high-speed
DSL dedicated lines guarantee short transmission times
similar to a local network. At
the control center a BACnetOPC server converts the information into the required
OPC format.
Vice versa, the miles® controller can be fully managed
at the control center. This
is particularly useful when
reference values have to be
changed using system screens
or vacation plans have to be
entered in the schedule object.
GLT Köln / BMS in Cologne
BACnet/IP
DSL-Router
Server
Webserver
Rufdienste /
Workstation
Paging services
SQL-Server
FS Oberhausen
BACnet/IP
DSL-Router
miles®-AS29
LON-Regler für Fußbodenheizungsverteilung
LON controllers for floor heating distibution
BACnet/IP
FS Linnich
DSL-Router
MODBus-Kopplung zur
Badewassertechnik
MODBus coupling to
swimming pool water
technology
miles®-AS29
MODBus-Kopplung zur Badewassertechnik
MODBus coupling to swimming pool water
technology
Volker Barufke
Marketing Messner
Gebäudetechnik
volker.barufke@messner.de
www.messner.de
BACnet Europe Journal 8 03/08 31
A TOUCH of EXCELlence in B
Wenn Gebäudemanagement wirklich leicht sein soll.
Excel Touch 1:1
168 x 126 mm
Excel Touch
Pure operating efficiency, with application specific,
rapid-access lists for data points, time programs,
and parameters - bus-wide. Ideal for new construction
and existing buildings.
Visualizes applications of Excel Web
and Excel 800/500/100/50.
Excel Web
Freely programmable HVAC controller with:
BACnet/IP, LONWORKS®, Linux, Email/SMS
alarming, web access, and many more.
uilding Management.
Excel Touch
Pure Bedieneffizienz, mit anlagenspezifischen
Schnellzugriffslisten für Datenpunkte, Zeitprogramme und Parameter, busweit. Ideal für
Neuanlagen und Nachrüstung.
Excel Web
Frei programmierbare DDC mit den modernsten
Zutaten: BACnet/IP, LONWORKS®, Linux, Email/SMS
Alarmierung, Webzugang und vielem mehr.
Visualisiert Applikationen von Excel Web
und Excel 800/500/100/50.
More information:
phone +44 (0) 870 600 1659
+49 (0) 69 8064 281
hbs.info@honeywell.com
Anwendungen Solutions
DSM senkt Energiekosten mit
BACnet Antrieben
DSM cuts Energy Costs with
BACnet Drives
DSM, ein niederländisches Unternehmen für Life Science
und Materialforschung, spart seit der Installation von
drehzahlgeregelten Antrieben in den beiden Laborgebäuden auf dem Research Campus des Werks Chemelot in
Geleen (NL) jährlich etwa 25.000 Euro an Energiekosten.
Some 25,000 Euros of energy are being saved each year
by DSM, a Dutch life sciences and material sciences firm,
following the installation of variable speed drives within
two laboratory buildings, located on the Research Campus
at the Chemelot site in Geleen, the Netherlands.
Das Projekt wurde von dem
niederländischen Systemintegrator Regel Partners durchgeführt. Auf Anraten des
Elektro- und Mechaniklieferanten Burgers Ergon entschied sich DSM bei der
HLK-Anlage für Standard
Drive-Frequenzumrichter
von ABB, um auch das
BACnet Kommunikationsprotokoll nutzen zu können.
BACnet stellt die serielle
Verbindung zur neuen Gebäudeleittechnik (GLT) her.
Hierdurch wird ein Fernzugriff auf den Frequenzumrichter über das Internet
ermöglicht, sodass Sollwertänderungen komfortabel über
einen PC vorgenommen werden können. Durch das System entfällt nicht nur die
Überprüfung der Sollwerte
vor Ort, es erlaubt dem
Benutzer auch sofort auf
Änderungen zu reagieren.
Da das BACnet-Protokoll
speziell für die Gebäudetechnik entwickelt wurde, bietet es auch Standard-Tools
für die Geräteintegration.
BACnet bedeutet nicht nur
eine einfache Installation,
sondern liefert auch mehr
Daten und gibt DSM die
Möglichkeit einer besseren
Kontrolle, Überwachung und
Einstellung der Antriebe von
einem einzigen Bedienplatz
aus. Es werden umfangreichere Informationen über
die Leistung der einzelnen
Antriebe geliefert, und die
Funktion der Gesamtanlage
kann überwacht werden.
für HLK-Anwendungen sind
auch von BTL (BACnet Testing Laboratories) zugelassen.
Bei dem ursprünglichen Belüftungssystem in Geleen
wurden Leitschaufeln am
Einlass verwendet, die den
Luftstrom mechanisch um
80 bis 85% begrenzt haben,
während die Elektromotoren
im Dauerbetrieb mit voller
Drehzahl liefen. Bei 24 Motoren mit einer Gesamtleistung von mehr als 400 kW
ergab dies eine erhebliche
Energieverschwendung. Der
Austausch der Leitschaufeln
am Einlass durch eine Drehzahlregelung der Lüftermotoren am Ein- und Auslass
führte zu einer Energieeinsparung von mindestens 10%.
Alle Motoren wurden ausgetauscht und durch neue
Motoren mit jeweils eigenem
ABB Standard Drive (IP54)
für HLK-Anwendungen ersetzt. Die Montage erfolgte
entweder an der Wand oder
auf Montageplatten in der
Nähe der Motoren. Alle 24
Frequenzumrichter können
eine eigene, eindeutige Bezeichnung erhalten und so
leichter in das GLT-System
integriert werden. Jeder Frequenzumrichter besitzt entsprechend der Schaltung
oder der jeweiligen Aufgabe
eine Klartextbezeichnung.
Der Wartungstechniker kann
dadurch den Frequenzumrichter, seine Funktion und
seinen Standort sofort identifi zieren.
So kann das Wartungsunternehmen die gesamte Anlage,
einschließlich der Antriebe
fernüberwachen und spart
dadurch Zeit und Geld bei
der Reaktion auf Anlagenstörungen.
Seit 2004 bietet ABB Antriebe für HLK-Awendungen
mit voll integrierter oder
„nativer“ BACnet Kompatibilität an. Deshalb benötigt der ABB Standard Drive
für HLK-Anwendungen keine Anpassung mittels zusätzlicher Buskoppler. Frequenzumrichter von ABB
ABB Frequenzumrichter IP54 im Werk Chemelot von DSM.
Wall-mounted ABB drives IP54 at the Chemelot site of DSM.
34 BACnet Europe Journal 8 03/08
Anwendungen Solutions
Electro Drive, der Partner
von ABB für HLK-Antriebe
in den Niederlanden, lieferte die Frequenzumrichter.
Die Inbetriebnahme erfolgte
mit Hilfe der in die Geräte
integrierten InbetriebnahmeAssistenten und dem Assistenten für serielle Kommunikation.
Bei der Inbetriebnahme erspart BACnet den Leittechnikspezialisten den Aufwand,
Gateways für die Kommunikation mit den Geräten zu
installieren. Durch BACnet
können die Frequenzumrichter schon beim Anschluss die
erforderlichen Einstellungen
laden. Mit Hilfe der BACnet
Schnittstelle können die Inbetriebnahme und Abstimmung von einem zentralen
Ort aus erfolgen, wodurch
sich die erforderliche Inbetriebnahmedauer deutlich
verkürzt. Außerdem können
Parametersätze mittels Steuertafel bequem zwischen den
Frequenzumrichtern kopiert
werden. Der Benutzer braucht
nur die BACnet Gerätenummer zu ändern.
Heute werden die Betriebsstunden, alle Motormesswerte, die Verbrauchszähler
und der Status der physischen
E/A der Frequenzumrichter
überwacht und die Daten
erfasst, indem die Frequenzumrichter einzeln im
GLT-System abgefragt werden. Nur die Motordrehzahl
wird im GLT-System grafisch
angezeigt. Die Steuerung der
Frequenzumrichter erfolgt
durch fest verdrahtete E/A.
Künftig plant Burgers Ergon
jedoch, die Antriebe über die
serielle Kommunikationsverbindung anzusteuern. Hierdurch werden die Verkabelungskosten weiter gesenkt
und Verkabelungsfehler in
der Anlage vermieden.
Under the guidance of Dutch
system integrator, Regel
Partners and upon the advice
of the electrical and mechanical contractor, Burgers Ergon,
DSM opted for ABB standard
drives for HVAC in order
to harness the inbuilt
BACnet communication protocol. BACnet provides the
serial link to the new BMS,
thereby giving remote access
to the drive over the Internet,
making any change to
setpoints possible from the
comfort of a PC. Apart from
avoiding the need to physically check setting values,
this facility enables the user
to react instantly to any
change.
As the BACnet protocol is
specially developed for building services, it offers standard
tools for integration of
devices. BACnet provides
DSM with ease of installation
as well as offering more data,
better control and ease of
monitoring and adjusting the
drives from a single point.
It gives more information
about how each drive is
performing and helps to
monitor the performance
of the overall building installation.
This enables the responsible
maintenance company to
monitor the entire system
including drives, remotely,
thereby saving time and
money in responding to any
system fault.
ABB has been offering drives
for HVAC applications with
a fully incorporated, or
“native”, BACnet capability
since 2004. Thus the ABB
standard drive for HVAC
did not need to be adapted
using addon software gateways. ABB standard drives
for HVAC are also approved
to BTL (BACnet Testing
Laboratories).
The original HVAC air
handling system at Geleen
used inlet guide vanes, which
mechanically restricted air
flow to between 80 to 85%
while the electric motors
would run continuously, at
full speed. With 24 motors,
totalling over 400kW, this
amounted to high energy
wastage. Replacing the inlet
guide vanes with variable
speed control of the supply
and return fan motors,
reduced the energy consumption by at least 10%.
Each motor was replaced
and the new motors fitted
with their own IP54 rated
ABB standard drive for
HVAC, either wall-mounted
or on a mounting rack close to
the motors. All 24 drives can
be named uniquely to ensure
better integration to the
BMS system. Each drive is
identified in clear text, in
accordance with electrical
schematics or depending on
the drive’s task. This enables
the maintenance engineer
to immediately identify the
drive, its function and its
location
need once they are connected.
The BACnet interface enables
drive commissioning and/or
tuning from a central location,
thereby considerably shortening the required commissioning time. Furthermore, when
one parameter set is identified,
it can be easily copied to
other drives using the drive’s
control panel. Only the
BACnet device number needs
to be changed by the user.
Today, the running hours, all
motor measurements, energy
counters and status of
physical I/O from the drives
are monitored and the data
collected by checking each
drive individually in the BMS.
Only the motor speed is
displayed graphically within
the BMS. The drives controls
are based on hardwired I/O,
but in future installations,
Burgers Ergon, plans to also
control the drives over the
serial communication link.
This will further reduce
cabling costs and avoid any
misconnection during installation.
The drives were delivered
and commissioned by Electro
Drive, the HVAC drives
partner for ABB in the Netherlands. The commissioning
of the drives was carried out
using the onboard wizards
known as the start-up assistant and serial communication assistant.
During
commissioning,
BACnet saves the control
specialists from having to
spend time inputting gateways to talk to the equipment.
BACnet enables the drives to
download the settings they
Marcel Zevenbergen
Sales Engineer
Motors and Drives
ABB B.V. Netherlands
marcel.zevenbergen@
nl.abb.com
www.abb.com/
motors&drives
BACnet Europe Journal 8 03/08 35
Anwendungen Solutions
Energiesparende Klimatechnik
in der Berliner Charité
Energy-saving Air Conditioning
Technology at the Charité Hospital Berlin
Der Paul-Ehrlich-Hörsaal der Charité – Universitätsmedizin Berlin – wurde mit einem energiesparenden Klimagerät
von Hansa ausgestattet. Es enthält modernste Steuerungstechnik von Saia-Burgess Controls mit spezieller Speichertechnologie und BACnet-Anbindung.
The Paul Ehrlich auditorium at the Charité hospital
– university hospital in Berlin – has been equipped with
an energy-saving air conditioning system which comprises
the latest control technology from Saia-Burgess Controls
along with dedicated memory technology and BACnet
connection.
Gegründet 1710, zählt die
Charité zu den ältesten und
traditionsreichsten Krankenanstalten in Deutschland. Sie
ist heute zugleich eine der
größten Universitätskliniken
Europas. Getreu ihrer Mission „Forschen, Lehren, Heilen, Helfen“ widmen sich
rund 14.000 Mitarbeiter
der Krankenversorgung, der
Wissenschaft und der Ausbildung des ärztlichen Nachwuchses.
In den Hörsaal des Instituts
für Mikrobiologie wurde im
Jahr 2006 eine neue Klimaanlage eingebaut. Deren
Controller von Saia-Burgess
Controls wurde via BACnet
problemlos mit der bestehenden zentralen Gebäude-Leitwarte der Charité verbunden, die aus dem Hause TAC
stammt. Entwickelt und umgesetzt wurde das Steuerungskonzept von Hansa, einem
führenden Unternehmen der
Klima-Branche mit mehr als
30 Jahren Erfahrung im Bereich Klimaanlagen und Lüftung.
Energiesparende
Klimageräte
Klimaanlagen werden gerne
mit Energieverschwendung
gleichgesetzt. Das Gegenteil
beweist die Firma Hansa, die
Durch die Steuerung dokumentiert:
85% Energieeinsparung.
Documented by the control: 85% energy savings.
36 BACnet Europe Journal 8 03/08
sich auf eine besonders effiziente Klimatechnik für Gebäude spezialisiert hat. Gerade in Zeiten des wirtschaftlichen Drucks hat dies auch
die Charité überzeugt, ihren
Paul-Ehrlich-Hörsaal
mit
Hansa-Klimatechnik auszustatten.
Die Raumluft wird in
dem kompakten Klimagerät
(Serie HKG-KOV-ER-071-S)
gefi ltert, be-/entfeuchtet und
bei Bedarf gekühlt bzw.
geheizt. Bei bestehenden
Raumverhältnissen zeigen
sich die Kompaktgeräte gegenüber den üblichen Normalausführungen im Vorteil.
Innovative
Steuerungstechnik
Aus Sicherheitsgründen erlaubte die Charité den
einfach zu realisierenden
Fernzugriff auf die mit WebTechnologie ausgestattete
Steuerung nicht. Stattdessen
erbrachte die Steuerung
selbst den Beleg der Energieeinsparung mit Hilfe des
integrierten Saia File Systems.
Hierbei werden in csv-Dateien die jeweiligen Energieverbräuche und Temperaturen
in Kombination mit den Leistungsdaten der Ventilatoren
und Pumpen aufgezeichnet.
Bei jeder Wartung wird das
File System ausgelesen und
bei Hansa dokumentiert.
Die Daten liefern eindeutige
Informationen und belegen
die im hohen Qualitätsanspruch begründeten Versprechungen Hansas. Im
Vergleich zu Umluftkühlsystemen (auch Splitsysteme)
benötigt die Klimaanlage von
Hansa im realen Langzeiteinsatz überzeugende 85 Prozent weniger elektrische
Energie.
Datenaustausch via
BACnet
Eine wesentliche Vorgabe
war die Einbindung der Klimaanlage in die bereits auf
dem Gelände der Charité installierte Gebäude-Leittechnik. Die einzelnen Gebäude
werden über eine Leitstation
von TAC bedient und überwacht. Mit BACnet besteht
eine Schnittstelle, mit der die
Klimaanlage nahtlos in die
bestehende Leittechnik eingebunden werden konnte, denn
die eingesetzte Steuerung
von Saia-Burgess Controls
hat die BACnet-Funktionalität nach dem BACnet Standard 135-2004 integriert.
Anwendungen Solutions
Der Paul-Ehrlich-Hörsaal
liegt im Campus Charité
Mitte.
The Paul-Ehrlich auditorium is situated in the
hospital campus Charité
Mitte.
as the control system used,
from Saia-Burgess Controls,
has the BACnet functionality
(BACnet Standard 135-2004)
built in.
Die Saia-Burgess Steuerung
ist als BACnet Broadcast Management Device (BBMD)
konfiguriert und kommuniziert mit einer weiteren
BBMD im BACnet-Netzwerk
der Charité. Es werden 56
BACnet-Objekte zur GLT
übertragen. Der Zeitschaltkatalog wurde umgesetzt
durch die Anlage eines
BACnet-Objekts in der GLT.
Über die BACnet-Anbindung
sind also nicht nur ein
einfacher Datenaustausch
zwischen Klimagerät und
GLT möglich, sondern auch
komplexere Aufgabenstellungen wie Alarmierung und
Trendaufzeichnungen.
Founded in 1710, the Charité
is one of Germany’s oldest
and most tradition-rich
healthcare institutions. Today, it is also one of Europe’s
biggest university hospitals.
True to the motto, “Research,
Teaching, Healing, Helping”,
around 14,000 employees
apply themselves to healthcare, science and the training
of the next generation of
doctors.
A new air conditioning system
was fitted in the auditorium of the institute for
microbiology in 2006. The
controller of this system, from
Saia-Burgess Controls, was
effortlessly connected via
BACnet with the existing
central building management
system at the Charité, which
was built by the company
TAC. The control concept
was developed and implemented by Hansa, a leading
company in the air conditioning industry with more
than 30 years of experience
in the field of air conditioning
systems and ventilation.
Energy-saving air
conditioning systems
Air conditioning systems are
commonly associated with
wasted energy. The opposite
is proven by Hansa, which
specialises in particularly
efficient air conditioning technology for buildings. Precisely in these times of economic
pressure, this factor has
convinced the Charité to
equip its Paul Ehrlich auditorium with Hansa climate
technology.
In this compact air conditioning system (series HKGKOV-ER-071-S), ambient air
is filtered, de/humidified and
where required, cooled or
heated. Requiring no adjustment to existing room
dimensions, the compact
systems present an advantage
compared with conventional
standard models.
Innovative control
technology
With safety considerations
in mind, the Charité did not
permit the easily realisable
remove access to the webtechnology equipped controls.
Instead, the control itself
provides evidence of energy
savings with the aid of the
integrated Saia File System.
In this process, the relevant
energy consumption levels
and temperatures, combined
with output data of the
valves and pumps, is listed
in csv fi les. The fi le system is
read out and documented at
Hansa during every maintenance operation.
The data deliver unambiguous information and realise
Hansa’s promises based
on a high claim to quality.
During actual longterm use,
the air conditioning system
from Hansa requires a
convincing 85% percent less
electrical energy compared
to circulating air cooling
systems (including split
systems).
Data exchange via BACnet
One significant stipulation
was the integration of the air
conditioning with the building
control technology already
installed on the Charité site.
The individual buildings are
operated and monitored by
a control station from TAC.
BACnet creates an interface
with which the air conditioning system could be
integrated seamlessly with the
existing control technology,
The Saia-Burgess control
system is configured as a
BACnet Broadcast Management Device (BBMD) and
communicates with an additional BBMD in the BACnet
network of the Charité. 56
BACnet objects are transmitted to the building control
system. The timeswitch catalogue was implemented via
the installation of a BACnet
object in the building control
system. Therefore, via the
BACnet connection not only
is an uncomplicated data
exchange between air conditioning system and building
control system possible, but
also more complex tasks
such as an alarm system and
trend recording.
Oliver Greune
Product Manager
Systemintegrator Business
Infrastructure Automation
Europe
Saia-Burgess Controls AG
oliver.greune@saia.
burgess.com
www.start-controls.com
BACnet Europe Journal 8 03/08 37
Anwendungen Solutions
Maximale Funktionalität, totale Integration
Maximum functionality, total integration
Auf einer Gesamtfläche von 225.000 m² vereint Polens kürzlich fertig gestellter Złote
Tarasy Komplex im Herzen Warschaus Geschäfts-, Büro- und Entertainmentgebäude.
Eine Multikinokette, diverse Shoppingarkaden, Gastronomieeinrichtungen sowie eine
Freizeitanlage nehmen 65.000 m² der Fläche ein, weitere 65.000 m² stehen für Büroflächen zur Verfügung. Darüber hinaus erweitert eine Tiefgarage mit 1.700 Parkplätzen
den Infrastrukturbereich für die Besucher.
Covering a total surface area of 225,000 m2, Poland’s recently completed Złote Tarasy
complex in the heart of Warsaw comprises commercial, office and entertainment
buildings. A Multikino cinema, restaurants, entertainment centers and shops occupy
65,000 m2 of the space and a further 65 000 m2 is used for offices. An underground
accommodates up to 1700 cars.
Das Glanzstück von Złote
Tarasy ist ein helles, luftiges
Atrium – eine mehrstufige
Terrasse unter einem Wellglasdach, auf der Besucher
verweilen und den Sonnenschein genießen können, sogar in den Wintermonaten.
Das moderne Geschäfts- und
Freizeitzentrum gilt als das
größte Multifunktionsprojekt, das je in Polen realisiert wurde. Aufgrund seiner
Größe, der Vielzahl unterschiedlicher Funktionen und
dem Anspruch, Gebäudeau-
tomation und Sicherheitstechnik nahtlos miteinander zu
vereinen, wurde ein System
gesucht, das hohe Verfügbarkeit und maximale Integrationsfähigkeit miteinander verbindet.
Die eingesetzte Andover
Continuum Produktfamilie
ermöglicht die gesamte Funktionalität der Liegenschaft,
aufgeteilt in zwei unabhängig von einander agierende
Systeme, die den „Tower
Office“ und den Freizeitkomplex mit 18 Workstati-
ons überwachen. Insgesamt
20.000 Datenpunkte integriert die Cyberstation als
eingesetzte Leitebene mit folgenden Funktionsbereichen:
Lüftung und Klimatisierung (über 40 Fan Coils,
350 Abluftventilatoren sowie Pumpen und weitere
Geräte in Unterstationen),
Beleuchtung (Steuerung
und Kontrolle von mehr
als 1.000 Lichtkreisen),
Zutrittskontrolle (mit rund
250 Eingängen),
Vollständige Integration
des Integral Videoüberwachungssystems von TAC
mit mehr als 420 Kameras
in die Cyberstation Leitebene,
Komplette Anbindung und
Überwachung des Brandmeldesystems mit über
4.500 Datenpunkten über
speziell entwickelte X-Driver in die Continuum Leitzentrale,
Überwachung der Kältetechnik durch die Anbindung des Trane-Systems
via BACnet/IP,
Anbindung des Energiemanagementsystems zur
Stromverteilung
über
Schneider Electric Modicon Controller (TSX PREMIUM),
Anbindung von 35 Thyssen
Rolltreppen und 45 Kone
Aufzügen via ODBC,
Integration von drei voneinander
unabhängigen
Monitoring- und Abrechnungssystemen für anfallende Verbräuche (Wasser,
Heizung, Klima, Strom)
über eine Ankopplung an
den M-Bus.
Der kürzlich fertiggestellte
Komplex in Polens Hauptstadt gehört gegenwärtig zu
den hochkarätigsten Investitionen in Mittel- und Osteuropa.
Złote Tarasy vereint Business und Unterhaltung.
Złote Tarasy comprise business an entertainment.
38 BACnet Europe Journal 8 03/08
Via BACnet/IP wird die
Kältetechnik im Złote Tarasy Komplex in Warschau
überwacht.
Using BACnet/IP the BMS
in Złote Tarasy in Warsaw
enables to monitor the
refrigeration system.
The jewel in Złote Tarasy’s
crown is a light, airy indoor
courtyard - a multi-level terrace covered with a corrugated glass roof where visitors
can, stroll, sit and enjoy the
sunshine, even in the winter
months.
This modern business and
entertainment centre represents the largest multi-functional project seen in Poland
to date. Due to its size, the
variety of different functions
it houses and the claim to
seamlessly combine building automation and security,
the Złote Tarasy complex required a system which could
guarantee highest availability and maximum integration
capability.
The chosen Andover Continuum product family allows the facility’s complete
functionality, segmented into two independently acting
systems, which monitor and
control the “Tower Office”
and the entertainment complex with 18 workstations in
total. Both systems integrate
over 20,000 points from all
the buildings’ sub-systems.
The integrated system consists of:
Ventilation and air conditioning (approximately 40
air handlers and over 350
exhaust fans, pumps and
devices in heat and cold
distribution substations),
Lighting control (control
and monitoring over 1000
lighting circuits),
Access control (approximately 250 entrances),
Total integration of TACs
Integral video surveillance
system including more
than 420 cameras into
the Cyberstation Building
Management System,
Fire alarms: By using a
specially developed X-
Atrium.
Courtyard.
driver in the Building
Management System, it is
possible to monitor 4,500
fi re points,
Refrigeration: Using the
BACnet/IP data communication protocol the Building Management System
enables the user to monitor
the refrigeration system.
This is in turn controlled
by the Trane instrumentation & control system,
An electricity management
system lets operators read
and visualize data captured
from the building’s power
distribution wiring system,
managed by SchneiderModicon controllers of
TSX PREMIUM series,
Transport: ODBC interfaces were used to input
data from 35 Thyssen escalators and 45 Kone lifts to
the Building Management
System,
Connection of three independently working monitoring and settlement
systems for utilities con-
sumption (water, heating,
cooling, electricity) via
M-BusMonitoring
and
settlement system for
utilities consumption.
The recently completed building complex in Poland’s capital city joins the category of
the highest class investments
in the Central and Eastern
Europe.
Marek Olszewski
HVAC Team Leader
TAC Sp. z o.o.
Warsaw Branch
marek.olszewski@tac.com
www.tac.com
BACnet Europe Journal 8 03/08 39
®
Saia BACnet Building Controller
Others call it native,
we call it innovative.
eb
W
el
an
-P
P
eX
"
/
ma
fi
b
u
n
s
E
O
ce
a
n
D
I
O
L
+
A
L
N
W
o
rk
M
s
P
-B
u
s
M
o
d
s
N
u
K
b
X
/
E
IB
n
e
t
Saia-Burgess Controls AG
Bahnhofstrasse 18 | CH-3280 Murten | Schweiz
T +41 26 672 71 11 | F +41 26 672 74 99
www.start-controls.com | pcd@saia-burgess.com
r
lle
ro
nt
Co
n
g
io
in
at
c
ld
ct
t
tifi
ui
s
je
en No
ct
® B
ob
je
llm e
et
g er em ob
u
l
o
lin s p yst ic D)
Cn ) nr Va
u
r
C
BA -B nt E of rve ed trie le s am s (F
e
n
(B Eve ng /Se Sch en h fi dy ice
/ 0
+ Cha ent ar o 5 flas ove dev
+ Cli lend p t on em ign
u
r e
Ca th ng d or
+ wi ndi an th f
e e i
Tr at w
+ Cre D
M
+ BB
ro
er
P
lay
tion
3
CD
Aut
o
a ®P
Sai
7
Inte
rn
Tel et / In
eco tra
m
net
Anwendungen Solutions
Fraport testet BACnet Geräte –
Wettbewerb auf hohem Niveau
Airport tests BACnet Devices –
Competition at High Stage
Die Fraport AG ließ mit Unterstützung durch die GA Ingenieurgesellschaft mbH und das
Ingenieurbüro Pregizer ein eigenes BACnet Testlabor einrichten. Grundlage der Tests sind
die individuellen Anforderungen, die der Flughafen an seine Liegenschaften stellt. Die
BACnet Konformität wird mit dem BACnet Test Framework getestet, das von MBS
entwickelt wurde.
Fraport AG, the operating company of Frankfurt Airport, established an own BACnet test
laboratory. Supporter were the GA Consulting Engineers and the Consulting Engineer
Pregizer. The tests are basing on the individual requirements against the real estate of the
airport. The BACnet conformance is tested with the BACnet Test Framework, designed
by MBS.
Als im Jahr 2002 im Zuge
geplanter Ausbauten am Flughafen Frankfurt Main die
Situation der Gebäudeautomation betrachtet wurde,
stellte sich folgende Ausgangssituation dar:
zwei unterschiedliche, getrennte Systeme eines einzelnen Herstellers,
proprietäres Datenkommunikationsprotokoll,
weit über 200.000 Datenpunkte,
kein Wettbewerb in der Gebäudeautomation möglich.
Als eines der primären Ziele
für zukünftige Projekte am
Flughafen wurde die Schaffung von Wettbewerb im Bereich der Gebäudeautomation
auf Basis eines neutralen,
offenen Datenkommunikationsprotokolls festgelegt.
Um dieses Ziel zu erreichen,
wurde nach intensiven Recherchen und Diskussionen in
verschiedenen Bereichen der
Fraport AG BACnet als geeignetes Datenkommunikationsprotokoll ausgewählt.
Da BACnet eine gewisse
Wahlfreiheit in der Umsetzung innerhalb des Protokolls durch die einzelnen
Hersteller zulässt, ist auch
bei bestehender BACnet
Konformität eine volle Interoperabilität verschiedener
Hersteller im Funktionsverbund nicht automatisch gegeben.
BACnet für Großflughafen
Eine Untersuchung bei der
Fraport AG ergab, dass die
besonderen Anforderungen
eines Großflughafens an die
Gebäudeautomation innerhalb der normativen Vorgaben der GA-Weltnorm mit
dem BACnet Datenkommunikationsprotokoll realisiert werden könnten. Diese
Anforderungen wurden in
einem umfangreichen GALastenheft zusammengestellt
und ausführlich beschrieben.
Zum Zeitpunkt der Entscheidungsfi ndung gab es weltweit keine Möglichkeit, die
geforderten BACnet-Funktionalitäten mit einem vertretbaren und reproduzierbaren
Aufwand zu prüfen und zu
dokumentieren. Lediglich
manuelle Tests mit großem
Zeit- und Kostenaufwand
und mit eingeschränktem
Funktionsumfang standen
zur Verfügung.
Die Fraport AG entschied
sich darauf hin für einen
innovativen und zukunftsweisenden Weg und ließ
mit externer Unterstützung
durch die GA Ingenieurgesellschaft mbH und das
Ingenieurbüro Pregizer ein
eigenes BACnet Testlabor
einrichten, in dem mit einem
innovativen Testverfahren
die BACnet Konformität und
die speziellen liegenschaftsspezifischen Anforderungen
gemäß dem GA Lastenheft
mit vertretbarem Aufwand
getestet werden sollten.
Mit der praktischen Durchführung der Prüfungen im
Testlabor wurde die MBS
GmbH, Krefeld beauftragt.
Das war die Geburtsstunde
des „BACnet Test Framework“, einer Software, die
für diesen Zweck von MBS
entwickelt wurde.
Ziel der Testsoftware sollte
die Ermöglichung einer
automatisierten Prüfung der
Konformität zum BACnetProtokoll sein – inklusive aller optionalen Eigenschaften
von Geräten verschiedener
Hersteller für Gebäudeautomationssysteme, die das
BACnet-Protokoll verwenden.
Zusätzlich wurden Möglichkeiten zur Durchführung
von Interoperabilitäts- und
Performance-Prüfungen realisiert.
Mit einem zunächst begrenzten, aber langfristig erweiterbaren Kreis von Bietern
wurden Geheimhaltungsund Kooperationsvereinbarungen geschlossen mit dem
Ziel, die Projektanforderungen gemäß dem GA-Lastenheft in ihren Produkten
umzusetzen. Zur Prüfung
wurden von den Herstellern
Testeinheiten bereitgestellt.
Erweiterter
Funktionsumfang
Diese Testeinheiten wurden
im Testlabor mit dem BACnet
Test Framework auf Einhaltung der Konformität, in gemeinsamen Testrunden mit
allen Herstellern auf Interoperabilität untereinander sowie
auf Performance im FraportNetzwerk untersucht.
Das BACnet Test Framework
wird mittlerweile ebenfalls
für die Zertifi zierungsprüfungen im europäischen Testlabor WSPLab in Stuttgart
eingesetzt.
BACnet Europe Journal 8 03/08 41
Anwendungen Solutions
Durch die automatisierten
Testverfahren ist es nun in
bisher nicht erreichbarer
Vollständigkeit und Schnelligkeit möglich, die Eigenschaften von BACnet Geräten
zu erkennen und zu analysieren. Dies hat schon jetzt auch
außerhalb des Frankfurter
Flughafens zur Beschleunigung der BACnet-Umsetzung und Weiterentwicklung beigetragen. Dadurch
werden in vermehrtem Maße BACnet Geräte zur Verfügung stehen, welche mit
erweitertem Funktionsumfang bereits getestet und zertifi ziert sind.
Jede größere Liegenschaft
kann auf dieser Basis künftig liegenschaftsspezifi sche
BACnet-Anforderungen auswählen und diese mit vertretbarem Aufwand normkonform überprüfen lassen.
Dadurch wird erstmals
„echter“ Wettbewerb mit
BACnet auf einem hohen
Standard ermöglicht.
In 2002 during scheduled
expansions at the Airport
Frankfurt/Main, the situation in building automation
was as follows:
two different and separated
systems of one single
manufacturer
proprietary communication
protocol
more than 200.000 datapoints
no business competition in
building automation possible
As the primary intention for
future building automation
projects at the airport, establishment of business competition based on a neutral,
manufacturer-independent
and open data-communication protocol was specified.
To succeed, BACnet was
chosen as the appropriate
data communication protocol
after intensive research and
internal discussions at different departments of Fraport
AG.
Due to the fact, that BACnet
allows the freedom to choose
certain functionality from
the standard by manufacturers, a full interoperability of
all functions between devices
from different manufacturers
cannot be expected by
nature.
BACnet for major airports
A research by Fraport AG
showed, that the special
requirements of major airports in terms of building
automation will be fulfilled
using the world-wide norm
BACnet. Those requirements
were documented in an
extensive functional specification for the building automation in future projects.
But, at the time of this
decision, it was not possible
to test and document the
specified
and
required
BACnet functionality with
appropriate and reproducible
effort. Only manual tests
with limited functionality
range were available causing
huge effort for manual testing.
Fraport AG decided for an
innovative and trend-setting
approach and established an
own test laboratory with
external support by GA
Consulting Engineers and
Consulting Engineer Pregizer.
The test laboratory was
intended to establish innovative test methods to test the
BACnet conformance and
facility-specific requirements
to building automation
components with acceptable
effort. The order to perform
42 BACnet Europe Journal 8 03/08
the practice tests in this
test-laboratory was given to
MBS, Krefeld. For this
purpose, MBS developed the
software “BACnet Test
Framework”.
Objective of this test software
was enabling automated
conformance testing of
BACnet components including all optional properties of
devices from different manufacturers.
Additionally methods for
testing the interoperability
and performance of devices
were developed.
With a limited, but in future
extendable number of manufacturers non-disclosure and
cooperation-contracts were
signed to achieve the project
requirements specified in the
functional specifications.
For the testing purpose, the
manufacturers provided test
equipment to the laboratory.
Enhanced
scope of operation
This test equipment was
tested on conformance to
BACnet using the BACnet
Test Framework. In workshops with all manufacturers, the interoperability of
the provided devices was
tested as well as the performance within the Fraport
network.
Meanwhile, the BACnet
Test Framework is used as
the official test-tool of the
European test laboratory
WSPLab,
Stuttgart
as
reported in earlier issues of
this journal.
Due to the automated test
methods, testing the properties and conformance of
BACnet devices can now be
performed in integrity and
rapidness, which was not
possible up to now.
Additionally,
this
fact
already lead to speeding-up
BACnet realizations and development of BACnet devices
outside the scope of Fraport
and Airport Frankfurt/Main.
In the future more and
more tested and certified
BACnet
implementations
with enhanced functionality
will be available on the
market.
On this basis, each larger facility may test their specific
requirements on BACnet in
the future with acceptable
effort according to the norm.
For the fi rst time, this allows
“real and fair” business
competition with BACnet at
high stage.
Bernd Hanke
Head of Airport Facility
Management
Fraport AG
Günter Meyer
Head of Engineering
Planning and Project
Management
Fraport AG
Thomas Kohlhoff
Managing Partner
GA Ingenieurgesellschaft
mbH
Marius Hartel
Managing Partner
GA Ingenieurgesellschaft
mbH
Volker Pregizer
Owner Consulting
Ingenieurbüro Pregizer
Frank Schubert
MBS GmbH
frank.schubert@
mbs-software.de
www.mbs-software.de
Anwendungen Solutions
BACnet Test Framework an der
FH Dortmund
University of Applied Sciences and Arts
Dortmund meets BACnet Test Framework
An der Fachhochschule Dortmund wird eine Gruppe von Studierenden im Rahmen
einer Projektarbeit umfangreiche Recherchen und Arbeiten zur Software BACnet Test
Framework (BTF) durchführen.
At the University of Applied Sciences and Arts Dortmund a group of students will
perform extensive researches and workings on the software BACnet Test Framework
(BTF) within a semester work.
Die Software BACnet Test
Framework wurde als europäisches Testtool ausgewählt
und ist seit der ersten automatisierten Testrunde für
BACnet-Geräte im europäischen Testlabor WSPLab,
Stuttgart im Einsatz.
Im Januar wurde die Installation der Software im Labor
für Prozessoren und Bussysteme des Fachbereichs Informations- und Elektrotechnik
der Fachhochschule Dortmund vorgenommen. Im
Rahmen eines kurzen Workshops wurden die Studenten
gründlich in die praktische
Arbeit mit der Software
eingeführt. Hierzu war Frank
Schubert von der Herstel-
lerfi rma MBS GmbH aus
Krefeld anwesend und erarbeitete mit den an diesem
Projekt beteiligten Studierenden die grundlegenden Vorbereitungen zur Arbeit mit
der Software, angefangen
bei der Installation, über die
Einrichtung der Testumgebung für ein BACnet-Gerät
bis hin zu ersten Testläufen.
Im Rahmen der Projektarbeit
sollen praktische Erfahrungen mit der automatisierten Prüfung von BACnetGeräten gesammelt werden.
Mit Hilfe der integrierten
Programmierschnittstelle des
BACnet Test Framework lassen sich jedoch auch Ideen
wie ein Electronic Protocol Conformance Statement
(EPICS-) Generator realisieren.
Die Projektarbeit wird einen
Umfang von zwei Semestern haben. Darüber hinaus
sind weitere Projekt- oder
Diplomarbeiten geplant.
Das BTF an der FH Dortmund. V. l. n. r.: Frank Schubert
(MBS), Prof. Peter Fischer (FH Dortmund), Stephani
Damaica, Dominik Obermeyer, Zhihao Liu (Studenten).
The BTF at the University of Applied Sciences and Arts
Dortmund. From left to right: Frank Schubert (MBS),
Prof. Peter Fischer (University), Stephani Damaica,
Dominik Obermeyer, Zhihao Liu (students).
The software BACnet Test
Framework was chosen as
the European test-tool and
is currently used in the first
automated testround for
BACnet devices at the
European
test-laboratory
WSPLab in Stuttgart.
On January, 8th the software
was installed in the laboratory for processors and bus
systems of the department
for information technology
and electrotechnique at
the University of Applied
Sciences and Arts, Dortmund.
During the installation a
workshop was made for
the basic introduction to
the practical work with the
software. For this Frank
Schubert from the manufacturer company of the
software MBS, Krefeld and
the group of students (see
picture below) took the first
practical steps in using the
software to test BACnet
devices.
Within this semester work
experiences in automated
testing may be researched.
Using the programming
interface of the software
additionally ideas like an
EPICS-Generator (EPICS=
EPICS=Electronic Protocol
Conformance Statement) can
also be realized.
The semester work will
have a length of approx. 2
semesters, further semesterworks or Diploma thesis are
intended.
Prof. Peter Fischer
Faculty of Communications
Engineering
University of Applied
Sciences and Arts
Dortmund
fischer@fh-dortmund.de
BACnet Europe Journal 8 03/08 43
Systemintegration mit diversen Herstellern
BACnet
● ist die zukunftsweisende Lösung für intelligente Gebäudesysteme
● bietet das einheitliche, herstellerübergreifende Management aller Systemebenen
● wirkt kostensenkend durch Synergieeffekte
Mit BACnet dem Markt einen Schritt voraus.
SWG
Stuckmann Wirtschaftliche Gebäudesysteme GmbH
Schinkelstraße 78 Telefon 0 25 21/8 27-0
www.swg-beckum.de
59227 Ahlen
Telefax 0 25 21/8 27-2 49 info@swg-beckum.de
networking|together©
ICS – InlineControlServer
Modular 32-Bit Control Station
BACnet/IP, LONMARK TP/FT-10; opt. IP-852, DALI
Webserver, Alarm, Trendlog, Scheduling, E-Mailing
Embedded Visualization / LNS Plugins
More details at light+building and at Niagara Summit
SysMik at booth 9.1 E10 and 9.1 B59
Frankfurt am Main / 06. - 11. April 2008
May 4 - 6; Saddlebrook Resort - Tampa
sysmik©2008
8
sysmik.com
Anwendungen Solutions
Kommandopriorisierung mit BACnet
Command Priorization with BACnet
In vielen Anwendungen der Gebäudeautomation spielt die Priorisierung von
Kommandos eine wichtige Rolle. Beispielsweise ist es bei Wartungsarbeiten
lebenswichtig, dass andere Prozesse wie Zeitschaltprogramme unterdrückt werden,
solange in der Anlage gearbeitet wird.
In many applications in building automation command priorization is important.
For example for service access it is important to suppress processes like schedule
programs while working.
Für die so genannten kommandierbaren Objekte (also
analoge, binäre und mehrstufige Ausgangs- und Werteobjekte) beschreibt der
BACnet-Standard, wie die
Priorisierung erfolgt. Die
Priorisierung wird mit zwei
Eigenschaften im Objekt
selbst gespeichert.
Hierfür gibt es zunächst den
Automatikwert (Eigenschaft
Relinquish-Default), der immer dann greift, wenn kein
anderer höher priorisierter
Wert geschrieben wurde.
Neben dem Automatikwert
sieht der BACnet-Standard
16 Prioritätsstufen (1=höchste, 16=niedrigste Priorität)
vor, die unterschiedlichen
Prozessen aber auch unterschiedlichen Benutzern zugeteilt werden können (Eigenschaft Priority Array).
Soll ein Wert geschrieben
werden, so wird gleichzeitig
immer die Prioritätsstufe mit
angegeben (Vorgabewert ist
Stufe 16). Der jeweils höchste priorisierte Wert greift
dann auch in die Anlage
durch (d.h. wird z.B. auf den
Ausgang geschrieben).
Wird ein Wert auf einer niedrigeren Priorität geschrieben, so greift dieser nicht in
die Anlage durch, solange
noch ein höher priorisierter
Wert vorhanden ist. Um den
Wert wieder zurück zu nehmen, wird programmtechnisch die Konstante NULL
auf die jeweilige Priorität geschrieben, was dazu führt,
dass der vorherige Wert gelöscht und die nächst niedrigere Priorität durchgreift.
Eine Besonderheit stellt die
Prioritätsstufe 6 dar, diese
ist für minimale Einschaltund Ausschaltzeiten reserviert und darf in keinem Fall
von außen beschrieben werden. BACnet schreibt für bestimmte Prioritätsstufen die
Bedeutung vor (z.B. 1= Manual Life-Safety, 8= Manual
Operator), andere Prioritätsstufen sind im Projekt frei
defi nierbar.
Wichtig ist, dass nicht mehr
benötigte Prioritäten (z.B.
nach einem Serviceeinsatz)
auch wieder gelöscht werden, da niedriger priorisierte Bediener ansonsten keine
Chance haben, Werte zu verändern.
Wird im Projekt keine Kommandopriorisierung benötigt,
so können alle Prozesse die
gleiche Priorität verwenden (z.B. 8 = Manual Operator), was dazu führt, dass
immer der letzte Zugriff „gewinnt“.
For the so-called commandable objects (analog, binary
and multi-state output and
value objects) the BACnet
standard clearly describes
the mechanisms of priorization. The priorization is
stored within the object using
two properties.
The automatic value (property Relinquish Default) is
used, when no other (higher)
value was written to the object. Beyond the automatic
value BACnet allows 16 levels for priorization (1=highest, 16=lowest), which can be
assigned to certain processes
or user levels (property
Priority Array).
external processes. The meaning of certain priority levels
is defi ned in the BACnetstandard (e.g. 1= Manual
Life-Safety, 8= Manual Operator), others can freely be
defined in projects (Available).
It is quite important to release
values which are no longer
required (e.g. after a service
access) to allow lower priorized users the access to the
objects again.
If priorization of any kind is
not required in a project, all
processes may have the same
priority (e.g. 8 = Manual
Operator), which results in
“last wins”.
If a value is written to the
object, the priority is given
in
the
write-command
(Default-Priority is 16). Only
the highest value within the
priority array is written to
the output. If a value with
a lower priority is written,
it will not be written to the
output as long as a higher
priorized value exists.
To erase a value from the priority array, the NULL constant is written to the object
at the designated priority
level, which leads to the next
lower value to become active.
The priority 6 is reserved for
minimum on- and off-times
and shall never be written by
Frank Schubert ppa.
Sales Manager
MBS GmbH
frank.schubert@
mbs-software.de
www.mbs-software.de
BACnet Europe Journal 8 03/08 45
Produkte Products
BACnet/IP Building Controller
frei programmierbar
Freely programmable BACnet/IP
Controller
Im Frühjahr wird das in der Industrie- und Gebäudeautomation erfolgreiche WAGO-I/O-SYSTEM 750 um den
BACnet/IP-Controller 750-830 erweitert.
This spring, the 750-830 BACnet/IP Controller will join the
WAGO-I/O-SYSTEM 750, which has been very successful
in the industrial and building automation sectors.
Der WAGO BACnet/IP-Controller 750-830 repräsentiert
das Geräteprofil des BACnetBuilding-Controllers (B-BC).
Konzipiert als frei programmierbares Gerät, kann er
eine Vielzahl verschiedener
Gebäudeautomations-, Steuerungs- und Regelungsaufgaben übernehmen. Der
Controller bietet sowohl
Client-, als auch Serverfunktionalität.
Controller geladen werden. Zur Unterstützung der
Anwender stehen Bibliotheken, zum Beispiel für
HLK-Anwendungen mit integrierten Visualisierungselementen, zur Verfügung.
Dafür ist im Controller ein
interner WEB-Server vorhanden, auf dem HTMLSeiten für die webbasierten
Anwendungen hinterlegt werden können.
Bei der Anwendung als
BACnet Native Server erkennt
der Controller automatisch
alle angesteckten digitalen
und analogen E/A-Baugruppen und erstellt daraus
BACnet-Objekte.
Danach können mit dem
kostenlosen WAGO Tool
„WAGO BACnet Configurator“ die BACnet-Objekte aus
dem Controller ausgelesen
und gegebenenfalls modifiziert werden. Auch BACnetGeräte anderer Hersteller
kann man mit diesem Tool
einbinden. Als Schnittstelle
zu KNX TP1-Netzwerken
kann eine WAGO KNX/EIB/
TP1-Klemme an den BACnetController gesteckt werden.
Mit der WAGO IEC-Programmiersoftware (WAGOI/O-PRO CAA) können
darüber hinaus eigene Applikationen erstellt, BACnetObjekte erzeugt und in den
BACnet/IP-Controller 750-830.
The WAGO 750-830 BACnet/
IP Controller represents the
device profile for the BACnet
building controller (B-BC).
Designed as a freely programmable device, this controller can perform a variety
of building automation, control and regulating tasks,
offering both client and server
functions.
When used as a BACnet
native server, the controller
automatically detects all digital and analog I/O modules
connected to the system and
generates the corresponding
BACnet objects.
Using WAGO IEC programming software (WAGO-I/OPRO CAA), it is also possible
to create dedicated applica-
tions and generate BACnet
objects that can be loaded
into the controller. Libraries
(e.g., for HVAC applications
with integrated visualization
elements) are available to
support users. Furthermore,
the controller features an
internal server on which
HTML pages can be placed
for use in Web-based applications.
Using the „WAGO BACnet
Configurator“ tool, BACnet
objects can be read out from
the controller and modified
if necessary. BACnet devices
from other manufacturers
may also be integrated with
this tool. A WAGO KNX/
EIB/TP1 module may be
connected to the BACnet
controller to interface with
KNX TP1 networks.
WAGO Kontakttechnik
GmbH & Co. KG
info@wago.com
www.wago.com
46 BACnet Europe Journal 8 03/08
Produkte Products
Deltas Fenster in die BACnet Welt
Delta’s Window to the BACnet World
Das Delta HMI (Human Maschine Interface) ist ein 7 Zoll
Farb-Touchscreen und wird für die Visualisierung eines
BACnet Gebäudeautomationssystems eingesetzt.
The Delta HMI is a 7 inch colour touchscreen HMI (Human
Machine Interface) used for interfacing with BACnet
building automation systems.
Das Delta HMI nutzt
BACnet über Ethernet, um
mit den DDC Controllern
zu kommunizieren. Mit frei
gestaltbaren 3D-Grafiken lassen sich kundenspezifische
und anwenderfreundliche
Applikationen erstellen.
Applikation
Das Delta HMI ermöglicht
Bedienern, HLK- und Gebäudeautomationssysteme
wie zum Beispiel Lüftungsanlagen, Kessel, Kälteanlagen,
Beleuchtungssteuerung, Zutrittskontrolle und Sicherheitsgewerke mittels Echtzeit-Grafi k zu überwachen
und zu verwalten. Das HMI
kann auf der Wand oder im
Schaltschrank montiert wer-
den und ermöglicht es, Zeitpläne, Alarme und Trendlogs
von Lüftungs-, Heizungsund Kühlanlagen und andere
mechanische Einrichtungen
zu überwachen und zu
verändern.
Das Delta HMI kann als
Schnittstelle verwendet werden, um sehr einfach die
Raumbelegung, den Temperatursollwert zu ändern und
einen Lageplan zu visualisieren.
Eigenschaften
7 Zoll Farbtouchscreen,
attraktives, modernes Design,
Kundenspezifi sche Grafi ken können direkt mit
Deltas Illustrator erstellt
werden,
Überwachen und Steuern
von BACnet Objekten
sowie Eingängen, Ausgängen und Variablen,
Modifizieren von BACnet
Objekten wie Zeitpläne und
Kalender,
Alarme anzeigen und
bestätigen,
Sollwerte ändern, Ein- und
Ausgänge überwachen,
Multiuser Kennwörter für
restriktive Zugriffsteuerung,
einstellbare Zeitspanne für
Hintergrundbeleuchtung,
unterstützt BACnet über
Ethernet-Kommunikation,
Firmware kann über das
Netzwerk geladen werden,
Gestaltet
für
Schaltschrank- und Wandmontage, für Neubau- und
Sanierung.
The Delta HMI uses BACnet
over Ethernet to communicate with controllers on a
local area network. User
created, 3D animated graphics allow the HMI to be completely customized for your
specific application.
Application
The Delta HMI allows occupants to monitor and manage
a building’s systems, such as
air handlers, boilers, chillers,
lighting, access and security.
Systems and floor layouts can
be monitored and adjusted,
including temperature setpoints, schedules, calendars
HMI Touchscreen Bediendisplay.
HMI Touchscreen operator interface.
and alarms. The Delta HMI is
suitable for panel mounting in
mechanical rooms, and also
has a design quality that
makes it appealing for use
as a small building interface,
mounted in public spaces,
such as a reception area.
Features
7 inch colour Touchscreen
interface,
Attractive, modern design
to install in any location,
Create custom 3D graphics
using Delta Control’s
Illustrator drawing tool,
Monitor and command
BACnet objects such as
Inputs, Outputs and Variables,
Modify BACnet objects
such as schedules and
calendars,
Display and acknowledge
alarms,
Change system setpoints,
Multiple users and passwords
for
restricting
access,
Adjustable backlighting
timeout,
Supports BACnet over
Ethernet communications
Designed for mounting in
Panel, wall, new and retrofit locations,
Firmware can be fl ash
loaded over the network.
Delta Controls Germany Ltd.
dlukanic@deltacontrols.de
www.deltacontrols.de
BACnet Europe Journal 8 03/08 47
Produkte Products
Natives BACnet mit der
'Wonderware System Platform'
Native BACnet with the
Wonderware System Platform
Die 'Wonderware System Platform' ist eine flexible, skalierbare, objektorientierte
Softwareplattform, die die Anforderungen des Managements von Liegenschaften
aller Größen oder geografischen Verteilung erfüllt.
The Wonderware System Platform is a flexible, scalable and object-orientated Software
platform suited to fulfill all facility management requirements, regardless of size or
geographical distribution.
Mit der 'Wonderware System
Platform' können nun die
Vorteile der Objektorientierung des BACnet voll
genutzt werden. Das von der
Fa. Munich Software für die
System Platform angebotene
MSP BACnet Integration
Package (kurz MSP BACnet)
ermöglicht die automatische
Konfiguration eines BACnetProjektes in der System Platform. Dieses Paket besteht
aus den folgenden Komponenten:
BACnet Application Generator – automatische/interaktive Applikationserstellung,
DASBACnet Server – nativer BACnet Datenserver.
Zur Konfiguration werden
alle
Teilnehmer
eines
BACnet-Netzwerkes eingelesen und wahlweise die in den
Devices verwendeten Objekte
oder die Devices selbst mit
ihren Properties automatisch
in der 'System Platform' als
Objekt angelegt. Veränderungen an der BACnet-Konfiguration können später
jederzeit neu synchroniert
werden. Für den Systemintegrator
bietet
MSP
BACnet:
Integration der Konfiguration,
Integration der Datenerfassung,
Objektabbildung im Modell,
Eingebaute Diagnose.
Mit der 'System Platform' ist
somit eine volle und herstellerneutrale Durchgängkeit
zwischen der Automationsund Managementebene gewährleistet. Dies ermöglicht
sowohl den Systemintegratoren wie auch Nutzern enorme Vorteile:
Remotefunktionalität für
Entwicklung, Administration und Wartung,
Strukturierter Ansatz durch
Objektvorlagen und Vererbung,
Sicheres Änderungsmanagement durch integrierte
Datenbank und Versionsverwaltung,
Standardisierungsmöglichkeiten,
Geringe Erstellungs- und
Wartungskosten,
Investitionssicherheit,
Flexible Erweiterbarkeit.
The Wonderware System
Platform makes full use of
all advantages that are part
of the object-oriented structure of BACnet. The MSP
BACnet Integration Package
(MSP BACnet) developed by
“Munich Software“ for the
System Platform facilitates
the automatic configuration of a BACnet application
project within the System
Platform. This package consists of the following components:
BACnet Application Generator – automatic/interactive application development
DASBACnet Server –
native BACnet Data server
The application generator
scans all BACnet devices
on the bus and generates
the corresponding objects in
the System Platform as well
as the attributes, properties
and IO configuration associated with it. Future changes of the BACnet devices
and topology can easily be
synchronized and updated.
The MSP BACnet offers system integrators:
Integrated configuration
Integrated data collection
Model-based object representation
Built-in diagnostics
The Wonderware System
Platform is an open and independent platform that supports complete communication between the automation
and management level. This
encompasses various valuable benefits for system integrators as well as users:
Remote functionality for
development, administration and maintenance
Logical and structured approach based on objecttemplates and derivation
Integrated database and
administration of version
history for secure change
management
Standardization
Low development and
maintenance costs
Protection of investment
Scalability
BACnet Integration mit der 'Wonderware System Platform'.
BACnet integration with Wonderware System Platform.
48 BACnet Europe Journal 8 03/08
Wonderware GmbH
gero.kura@
wonderware.com
www. wonderware.com
Produkte Products
Objektorentiertes System für offene
Lösungen
Object-oriented System for Open Solutions
Das Automationssystem DDC4000 von Kieback&Peter ist
mit nativem BACnet offen für unabhängige, gewerkeübergreifende Lösungen.
With native BACnet on board the Kieback&Peter
DDC4000 automation system is open to independent,
cross-functional solutions.
Die gesamte Kommunikation
zwischen den Systemkomponenten basiert auf BACnet.
BACnet unterstützt auch den
Datentransfer zwischen dem
DDC4000-System und der
Gebäudeleittechnik Neutrino-GLT.
Objektorientierte
Systeme
Die Software verschafft dem
DDC4000-System zusätzliche Flexibilität. Parametrierbare Objekte erfüllen
vielfältige, beliebig kombinierbare Steuerungs- und Regelungsaufgaben. Die Aufgaben können online aktiviert
und mit Kennwerten versehen werden. Die Software
steuert auch Modems an und
unterstützt den Versand von
Fax und E-Mails.
Einfache Bedienung
Über einen farbigen Touchscreen hat der Nutzer „hautnahen“ Kontakt zu seinen
Anlagen. Er sieht sofort, was
läuft – über gut verständliche Bedienmenüs, skalierbare
Anlagenbilder und Trendanzeigen. Er kann alles einfach
per Fingertipp bedienen – unterstützt durch Informationsgrafi ken, die mit einem
Blick erfasst werden können.
Trendkurven schaffen Transparenz und erleichtern die
Optimierung.
TCP/IP, Webservices
Die Kommunikation erfolgt
über TCP/IP. Vorhandene Infrastrukturen in Gebäuden
und Liegenschaften können
genutzt werden.
Webservices werden über den
Internet Explorer einfach in
das System integriert. So
können die Automationsstationen fernbedient werden.
Störmeldungen werden per
E-Mail versendet.
The entire communication
between the system components is based on BACnet,
which also supports the
data transfer between the
DDC4000 system and the
Neutrino-GLT central building control system.
Object-oriented Systems
The software gives the
DDC4000 system additional
flexibility. Parameter-driven
objects can carry out any
combination of various control tasks. The tasks can be
activated online and tagged
with variables. The software
also drives modems and
supports fax and e-mail
communication.
Easy to operate
With a colored touch screen
the user has direct contact to
Automationsstation DDC4200 mit Touchscreen.
Automation Station DDC4200 with touchscreen.
the system and can immediately see what is working
– via easily understandable
menus, scalable installation
graphs and trend displays.
All operations are literally at
his fingertips – supported by
information visuals, which
can be captured at a glance.
Trend curves provide for
transparency and facilitate
optimization.
Web services are easily
integrated into the system
via Internet Explorer. This
way the automation stations
can be remotely controlled
and fault reports sent by
e-mail.
TCP/IP, Web Services
The DDC4000 automation
stations communicate via
TCP/IP. Existing infrastructures in the buildings can also
be used.
Kieback&Peter
GmbH & Co. KG
info@kieback-peter.com
www.kieback-peter.de
BACnet Europe Journal 8 03/08 49
For freedom of choice,
flexibility and independence:
choose Priva.
Anders Norén
Managing Director
Priva Building Intelligence Ltd.
Priva, a leading national and international
specialist in building management systems.
As a facilities manager, building manager or building owner, you are well aware of the importance
of a future-proof, energy efficient and cost effective building management system. Flexible
modular applications and guaranteed independence thanks to a network of reliable and expert
installers, and total freedom of choice when
integrating and interfacing with third-party applications. Whether your goal is to reduce carbon
emissions and costs or increase comfort and user
convenience, Priva’s intelligent technology allows
you to optimise all aspects of your building management system without outside assistance. Are
you looking for a building management system
that provides freedom of choice, flexibility and
independence? If so, Priva is the best choice.
The art of having control
Priva Building Intelligence | Postbus 18 | 2678 ZG De Lier | T +31 (0)174-522 600 | F +31 (0)174-522 700 | sales.building@priva.nl | www.ikkiesvoorpriva.nl
room automation
X-RUS – a new generation of room automation
schön
klein
kompatibel
smart
small
compatible
Modernes Design
modern design
Einfache Montage
easy to install
Optimale Energieeffizienz
ideal energy efficiency
Reduzierte Brandlasten
reduced thermal load
Flexibles System:
wenige Gerätetypen, für alle
Raumautomationsaufgaben
Flexible system:
only few components to meet
all challenges of room automation
Individuelles Wohlfühlklima
We’ll regulate that for you.
Controller X-RUS1.0
SE-Elektronic GmbH
Eythstr. 16 · D-73037 Göppingen
just feel comfortable
Tel. +49 (0) 7161/ 95 84 - 0
Fax +49 (0) 7161/ 95 84 - 45
Internet:
www.se-elektronic.de
BACnet MS/TP inside – open to communicate
Produkte Products
Neue BACnet Automationsstationen
New Automation Stations for BACnet
SAUTER stellt auf der Light+Building die neue Systemfamilie EY-modulo vor: Automationsstationen für Gebäude- und Raumautomation - komplett, modular, basierend auf
BACnet/IP mit integrierter Web Technologie.
At the Light+Building exhibition, SAUTER presents its new EY-modulo family of systems:
automation stations for building and room automation - complete, modular and based
on BACnet/IP with integrated web technology.
Die BACnet Automationsstation modu525 und der BACnet Raumautomationsregler
ecos 502 sind aus der Familie EY-modulo 5 mit nativem
BACnet/IP.
Die modu525 ist eine modulare Automationsstation, zugeschnitten auf die heutigen
und zukünftigen Anforderungen der Gebäudeautomation und der primären Energieaufbereitung (HLK). Mit
dem Raumautomationsregler ecos502 dringt BACnet/
IP erstmals in die Raumautomation vor. Die konsequente
Verwendung von IP-Technologie erlaubt den reibungslosen Datenaustausch der
Raumautomation mit der
Primäranlage. Der Building
Controller basiert auf einer
modularen Struktur, so dass
die Bedürfnisse einer Anlage flexibel mit I/O Modulen
angepasst werden können.
Ein ausgeklügeltes, großzügiges Beschriftungskonzept
erlaubt den sicheren Anlagebetrieb vor Ort. Mit Kommunikationsmodulen moduCom kann die modu525 für
die Integration von FeldbusSystemen wie Modbus/RTU,
M-Bus usw. in BACnet/IP
eingesetzt werden.
Die Automationsstation modu525 wurde beim akkreditierten BACnet Testlabor
(WSPLab) für den BACnet
Konformitätstest eingereicht.
Zusätzlich
zur
nativen
BACnet Funktionalität verfügt die modu525 über einen
integrierten Web Server, der
die vollständige Visualisie-
The building controller has
a modular structure, so that
the requirements of an installation can be met flexibly
using I/O modules. A clever
and generous method of
inscription facilitates operation on site. With moduCom
communication modules, the
modu525 can be used to integrate field-bus systems such
as Modbus/RTU, M-Bus etc.
in BACnet/IP.
Automationsstation modu525 und Raumautomationsregler ecos 502 (EY-modulo 5 Familie).
Automation station modu525 and ecos 502 room
automation controller (EY-modulo 5 Family).
rung, Bedienung, Analyse
und Alarmierung der Objekte mit einem Standard-Internet-Browser erlaubt. Die
Visualisierung und Bedienung erfolgt hierbei über
speziell für PC oder mobile
Clients optimierte Web-Seiten. Innovativ wurde für die
strukturierte Darstellung der
Anlagen das „Structured
View“ Objekt aus dem
Addendum d des BAC-netStandards 135-2004 verwendet. Mit diesem integrierten
moduWeb erhalten Sie somit
jederzeit Zugriff auf die
Anlage - vom Schaltschrank
oder per Fernzugriff, über
das lokale Netzwerk oder
das Internet.
At the Light+Building Fair
Frankfurt, SAUTER will be
unveiling its EY-modulo system: the modu525 BACnet
automation station and the
ecos502 BACnet room automation controller from the
EY-modulo 5 family with
native BACnet/IP.
The modu525 is a modular
automation station, tailored
to the present and future demands of building automation and of primary energy
processing (HVAC). With
the ecos502 room automation controller, BACnet/IP is
advancing into room automation systems for the first
time. The resolute use of IP
technology enables data from
the room automation system
to be exchanged readily with
the primary installation.
The modu525 automation
station was submitted to
WSPLab, an accredited
BACnet testing laboratory
for the BACnet conformity
test.
In addition to the native
BACnet functionality, the
modu525 has an integrated
Web-Server that provides
full visualisation, operation,
analysis and alerting using
a standard internet browser.
Visualisation and operation
are performed on web pages
designed specially for PC or
mobile clients. As an example of innovative thinking,
the ‚structured view‘ object
(from the addendum d to the
BACnet standard 135-2004)
is used to portray the structure of the installations. This
integrated moduWeb provides access to the plant at all
times – either from the motor
control centre or by remote
access via the local network
or the internet.
Fr. Sauter AG
info@ch.sauter-bc.com
www.sauter-controls.com
BACnet Europe Journal 8 03/08 51
Produkte Products
Universal-Gateway Compact:
Der Schlüssel zur Integration
The Key to Integration:
Universal-Gateway Compact
Die MBS GmbH aus Krefeld stellt zur Messe
light+building 2008 die neue Produktlinie
„Universal-Gateway Compact“ vor.
At the fair light+building 2008 MBS,
Krefeld introduces the new product-line
„Universal-Gateway Compact“.
Mit der neuen Produktlinie
„Universal-Gateway Compact“ wird das Portfolio
der bekannten und bewährten
MBS
Universal-Gateways
nach unten abgerundet.
Die Geräte sind mit USB-,
Ethernet- sowie 2xRS232
und 1xRS485-Schnittstellen
ausgestattet. Zur Überwachung sind ein interner
Temperatursensor sowie ein
Schaltausgang mit 1250W
Anschlussleistung vorhanden.
Das Gerät wird im Schaltschrank auf DIN-Hutschienen montiert. Der Spannungsanschluss ist als variabler
AC/DC-Anschlussausgeführt
und erlaubt den Anschluss
an eine Vielzahl möglicher
Spannungsquellen.
Als Kommunikationsprotokolle steht eine Vielzahl
offener und frei verfügbarer,
aber auch hersteller-spezifischer Protokolle zur Verfügung.
Als Besonderheit stehen
BACnet-seitig erstmals vier
der sechs möglichen Medien
zur Verfügung:
BACnet Ethernet
(ISO8802-3)
BACnet/IP nach Annex-J
(inkl. BBMD und FDFunktionalität)
BACnet/PTP über Modem
BACnet/MSTP über RS485
Als weitere offene Protokolle
stehen unter anderem Modbus (seriell und TCP/IP), EIB/
KNX, IEC 60870, ESPA
4.4.4, OPC-Data Access und
viele mehr zur Verfügung.
Die Konfiguration erfolgt
mit Hilfe der enthaltenen
kostenfreien Transfersoftware oder alternativ über den
integrierten Webserver.
Umfangreiche Diagnosefunktionen erlauben die Untersuchung der Kommunikation
auf den angeschlossenen
Schnittstellen.
Mit dem Universal-Gateway
Compact steht eine insbesondere für kleine Applikationen geeignete Lösung
für die Integration verschiedener Kommunikationsaufgaben zur Verfügung. Die
Geräte sind ab Jahresmitte
2008 verfügbar.
Der Universal-Gateway
Compact
Universal-Gateway
compact
The new product-line „Universal-Gateway Compact“
completes the portfolio of
well-known and approved
Universal-Gateways.
The devices provide USB-,
Ethernet- as well as 2xRS232
and 1xRS485-interfaces. For
external observation, an
additional temperature-sensor and a relay switching
output with 1250W connecting load are integrated.
They are mounted to the
cabinet using the integrated
DIN rail mounting. The
connection voltage offers
a wide range of variable
AC/DC power supply.
The supported communication protocols cover
proprietary protocols as well
as open and freely available
protocols.
BBMD and FD-functionality)
BACnet/PTP over Modem
BACnet/MSTP over RS485
Further protocols are e.g.
Modbus (serial and TCP/IP),
EIB/KNX, IEC 60870, ESPA
4.4.4, OPC-Data Access and
many more.
For configuration purposes,
the free-of-charge transfersoftware or the internal
web-server may be used.
Extensive diagnosis-functions
allow detailed diagnosis on
the connected interfaces.
The
„Universal-Gateway
Compact“ products provide a
qualified solution, especially
for smaller integrations of
communication tasks.
The product will be available
midyear 2008.
As a special feature, 4 of the
6 available BACnet layers are
supported:
BACnet Ethernet
(ISO8802-3)
BACnet/IP Annex-J (incl.
MBS GmbH
frank.schubert@
mbs-software.de
www.mbs-software.de
BACnet Europe Journal 8 03/08 53
Produkte Products
Extrem flexibel und reich an Funktionen
Extremely Flexible and High in Performance
Das LVIS-ME200 Touch Display ist eine grafische Bedieneinheit mit Automationsfunktionen und Fernzugriff für
BACnet/IP oder BACnet MS/TP Netzwerke. Sie bietet eine
extrem flexible Benutzerschnittstelle mit beispielloser
Palette an Funktionen.
The LVIS-ME200 touch display is a graphical user
interface with automation functions and remote
access. The display for for BACnet/IP or BACnet
MS/TP networks is an extremely flexible graphical
user interface with an unprecedented range of
functions.
Bis zu 500 BACnet Server
Objekte (Binary, Analog
oder Multi-State) plus Scheduling, Alarming und Trending Objekte werden vom
LVIS-ME200 Touch Display
unterstützt. Ebenso ClientFunktionen wie WriteProperty, ReadProperty und
COV Subscription. Kenndaten: 5,7”, 320x240 Pixels,
256 Farben/VGA.
Die mitgelieferte Software
gewährleistet eine unkomplizierte Konfiguration des
Geräts. Vordefi nierte Funktionen vereinfachen das Erstellen von leicht zu bedienenden
Menüs und grafischen Seiten,
welche mit kundenspezifischen Bildern (JPG, BMP,
TIF, animierte GIF, etc.)
angepasst werden können.
Dynamische Informationen
werden
als
numerische
Werte, wechselnde Symbole,
Balkendiagramme oder Text
dargestellt.
LVIS-ME200
unterstützt
Automationsfunktionen wie
Scheduling, Alarming und
Trending. Als lokaler AlarmServer kann es Datenpunkte
überwachen. Als AlarmClient greift LVIS-ME200
auf Alarm Server Objekte
entfernter Geräten zu, um die
Alarmzustände am Display
darzustellen. Scheduling beinhaltet lokale Zeitschaltfunktionen und die Möglichkeit, lokale wie auch entfernte
Scheduling Objekte über das
Display zu konfigurieren.
Die Trendfunktion beinhaltet die grafische Darstellung
und das Protokollieren von
Informationen, welche via
FTP Download zur Verfügung stehen.
Touch Display LVIS-ME200 mit Automationsfunktionen.
Touch Display LVIS-ME200 with automation functions.
54 BACnet Europe Journal 8 03/08
Mathematische
Berechnungen und Funktionen sowie logischen Operatoren
(Boolesche Algebra) werden
unterstützt. Aktionsobjekte
stehen zur Verfügung, um
ereignisbedingt
verschiedenste Aktionen auszulösen. Eine ereignisgesteuerte Email-Benachrichtigung
informiert unmittelbar über
den Systemstatus.
LVIS-ME200 bietet Fernzugriff über TCP/IP. Der
Display-Inhalt kann mittels
VNC Protokoll (Virtual Network Computing) auf einem
PC, PDA oder Smart Phone
dargestellt werden. VNC ist
plattformunabhängig und es
gibt eine Vielzahl von VNC
Clients für unterschiedliche
Betriebssysteme.
The LVIS-ME200 supports
up to 500 BACnet server
objects (binary, analog, or
multi-state) plus scheduling,
alarming
and
trending
objects as well as client functions like WriteProperty,
ReadProperty and COV
Subscription. Characteristics:
5,7”, 320x240 pixels, 256
colors/VGA.
The Configuration Software
supplied with the unit guarantees a straight-forward
configuration.
Predefined
functions simplify creating
easy-to-use menu layouts
and graphical pages using
customized images (JPG,
BMP, TIF, animated GIF,
etc.). Dynamic information is shown in the form of
numeric values, changing
icons, bar graphs or text.
LVIS-ME200 offers basic
automation functions such
as alarming, scheduling, and
trending. As a local AlarmServer it can supervise data
points. As an alarm client,
LVIS-ME200 is accessing
alarm server objects on
remote devices to display
the conditions on its display.
Scheduling includes a local
scheduling service as well as
the possibility to configure
several local and remote
schedulers through display
elements.
The
trending
capability includes trend
graphs and data logs. Logged
information is available via
FTP download.
Mathematical operations as
well as Boolean expressions are supported. Action
objects are available to trigger various actions on special
occasions. An event-driven
email notification promptly
informs about the system status.
LVIS-ME200 provides remote access via TCP/IP.
The content of the display
can be displayed on a PC,
PDA, or smart phone using
the VNC (Virtual Network
Computing) protocol. VNC
is platform-independent and
VNC viewers are available
for many operating systems.
LOYTEC electronics GmbH
sales@loytec.com
www.loytec.com
Produkte Products
BACnet-Watcher funktioniert ohne GLT
Operates without BMS: BACnet-Watcher
Der BACnet-Watcher ist ein universelles Tool für einfaches
Bedienen, Beobachten und Protokollieren von BACnetObjekten ohne GLT-System-Einsatz und Konfigurationsarbeiten.
BACnet-Watcher is a universal tool for easy using,
monitoring and logging of BACnet objects without
BMS system applications and configuration.
Das System stellt die gesammelten Daten von allen
BACnet-Devices im lokalen
IP-Netzwerk über einen HTML-Webserver den Netzwerk-Clients zur Verfügung.
Daher ist es betriebssystemneutral und mit handelsüblichen Webbrowsern
bedienbar. Eine optimaleDarstellung wird zum Beispiel mit Firefox, Iceweasel,
Opera und Safari erreicht.
Eine übersichtliche und einfache Wertedarstellung/-Änderung komplexer Properties, beispielsweise Calendar,
Schedule usw. ist über einfache Eingabemasken direkt
in den Objektlisten möglich. Anlagenzustände können mittels farblicher Hervorhebung der Devices und
Objekte mit Status „OffNormal“ zur schnellen Störerkennung unterschieden werden.
Funktionalität
und Eigenschaften
Nach dem Start erfolgt automatisch ein Netzwerkscan
mit Abfrage aller Devices
und Ihren Objekten inklusive aller zur Diagnose wichtigen Eigenschaften. Über
Objekt- COV-Wer teände rungen oder zyklisches Polling ausgewählter Devices
wird das Prozessabbild permanent aktualisiert. Auf
weiteren Bedienebenen/Seiten folgen die hierarchische
Darstellung aller Devices,
Objekte und Eigenschaften
sowie eine Propertyliste je
Objekt.
Anlagenbezogenes Bedienen
und Beobachten erfolgt über
speicherbare Favoritenlisten.
Das sind frei zusammenstellbare Objektlisten über alle
Devices. Über die Bedienung
von Menüs erfolgen die Speicherung sowie das Auslesen
von Trendlog-Daten mit Darstellung als Textliste oder als
graphisch aufbereitete Trendkurven.
BACnet-Watcher.
Ein BACnet-Watcher mit
angeschlossenem BACnetController ist zum Testen
erreichbar unter: www.bacnet-watcher.com,
Login:
Username: bacnet, Password: watcher
Auf www.bacnet-watcher.com gibt es den
BACnet-Watcher zum Testen.
The BACnet Watcher for testing at
www.bacnet-watcher.com
The system makes the
collected data of all BACnetdevices in the local IP network via a HTML-Webserver
for the network clients available. Consequently it is operating system neutral and user
friendly with the customary
WEB browser. Excellent display is provided by Firefox,
Iceweasel, Opera or Safari.
Funktions and features
After booting, BACnetWatcher automatically starts
its diagnosis with a network
scan of all important features
on all devices and their objects. Via “COV (change of
value)” or “periodic polling
of selected devices” the process image will be updated permanently.
On further user levels/pages
a hierachical display of all
devices, objects and features
as well as a property list per
object follows. A clear and
easy value representation/
change of complex properties, e.g. Calendar-, Schedule
etc. is via easy input masks
possible directly in the object list. For a plant status
or quick error detection the
devices and objects with
an OffNormal status are
highlighted in colour. Plant
related using and
monitoring will be carried out
via a storable favorite lists.
These are free composable
objectlists over all devices.
Via using menus readout and
storing of trendlog-data will
be carried out and displayed
as a textlist or graphical
presentation (trend curves).
A BACnet-Watcher with connected BACnet-Controller
is reachable for testing via:
hwww.bacnet-watcher.com,
Login: Username: bacnet,
Password: watcher
INH-GmbH /
HHO_Automation
nhartleb@inh-hho.de
www.hho-automation.de
BACnet Europe Journal 8 03/08 55
neuberger.
weishaupt gruppe
Neuberger Gebäudeautomation
GmbH & Co.KG
Oberer Kaiserweg 6
D-91541 Rothenburg o.d.Tauber
Telefon 09861/402-0
Telefax 09861/402-333
E-Mail: info@neuberger.net
Internet: www.neuberger.net
Gebäudeautomation.
Offen in allen Ebenen
Automatisch. Effizient.
Neue Messe Stuttgart
Bedarfsorientierte Gebäudeautomation
Wollen Sie Unabhängigkeit,
Flexibilität und größtmögliche
Freiheit? Dann entscheiden Sie
sich für Priva.
Wolfgang Mielke
Geschäftsführer
Priva Building Intelligence GmbH
Priva, national und international der
Spezialist für Gebäudemanagementsysteme.
Als Facility Manager, Gebäudeverwalter oder Gebäudeeigentümer wissen Sie, wie wichtig ein zukunftsorientiertes und (Energie-)kosteneffizientes
Gebäudemanagementsystem ist. Der flexible und
modulare Aufbau unserer Systeme eröffnet Ihnen
Unabhängigkeit in der Bearbeitung, völlige Freiheit
bei der Integration von Drittsystemen und Verwendung der Feldgeräte. Ein Netzwerk von zuverlässigen, qualifizierten Installationspartnern garantiert
zusätzliche Betriebssicherheit. Mit den intelligenten
Technologien von Priva alle haben Sie alle Optionen für die optimale Funktionalität Ihres Gebäu-
demanagementsystems selbst in der Hand. Die
Kostenentwicklung haben Sie im Griff und durch
die Steigerung von Komfort und die Benutzerfreundlichkeit, wächst die Zufriedenheit der Nutzer.
Suchen Sie ein Gebäudemanagementsystem, das
Ihnen alle Freiheiten, Flexibilität und Unabhängigkeit garantiert? Dann ist Priva die optimale Wahl.
The art of having control
Priva Building Intelligence | Postbus 18 | 2678 ZG De Lier | T +31 (0)174-522 600 | F +31 (0)174-522 700 | sales.building@priva.nl | www.ikkiesvoorpriva.nl
BACnet Interest Group Europe
AHR Expo: BACnet beflügelt Export
AHR Expo: BACnet boosts export
Mitglieder der BIG-EU präsentierten Ihre Produkte auf
der AHR-Expo 2008 in New York. Die traditionsreiche
Messe für Heizung, Lüftung, Klimatisierung und Kühlung
entwickelt sich zunehmend zum globalen Marktplatz.
Members of BIG-EU presented their products at the AHR
Expo 2008 in New York. The long-established trade fair
for heating, ventilation, air-conditioning and refrigeration
is rapidly becoming a global marketplace.
Es war die größte AHR Expo
seit ihrer Gründung vor 72
Jahren. Vom 22.-24. Januar
trafen sich in New York
60.000 Fachbesucher und
Aussteller aus 132 Ländern.
Auch die Mitglieder der
BIG-EU nutzen den amerikanischen Marktplatz zunehmend für ihren Export. Die
Teilnahme war erstmals zentral durch MarDirect organisiert worden. So war ein
vollständiges Servicepaket zu
günstigen Konditionen möglich, messetypische Besonderheiten konnten frühzeitig berücksichtigt werden.
Kieback&Peter präsentierte
in New York die Gebäudeleittechnik Neutrino GLT,
das Gebäudeautomationssystem DDC4000, aber auch
den BusModulRegler BMR
sowie Ventile und Stellantriebe. Plüth stellte vier native
BACnet Controller für unterschiedliche
Projektgrößen
und die native BACnet GLT
COSMOweb vor. Eine hohe
Besucherdichte ermöglichte
zahlreiche Kontakte in die
USA, aber auch in andere
Länder und Kontinente. Die
ersten Vertriebserfolge wurden schon während der Messe gemeldet.
Traditionell wird die AHR
Expo in Verbindung mit den
ASHRAE Winter Meetings
veranstaltet. Das bot der
BACnet Community wieder
die Chance, den weltweiten
BACnet Erfolg in gemeinsamen Treffen weiter zu entwickeln. Die Vertreter der
BIG-EU sitzen im Normungsgremium SSPC 135. In ihrem
Liaison Meeting beschlossen
die BIG-EU und die amerikanische BACnet International
weitere gemeinsame Schritte.
Außerdem nahmen die Vertreter der BIG-EU geschlossen
an der Mitgliederversammlung der BACnet international
teil.
Die nächste AHR Expo findet in Chicago statt, vom
26.-28. Januar 2009. Die
ASHRAE Winter Meetings
beginnen bereits am 24. Januar.
It was the largest ever AHR
Expo since its beginnings 72
years ago. From January 22
– 24, New York City was the
rendezvous for 60,000 trade
visitors and exhibitors from
132 countries. The BIG-EU
members are also increasingly using this American marketplace to promote their
exports. For the first time
participation was organized
centrally by MarDirect. This
way an allround service
package was possible at
favorable conditions and the
Die bisher größte AHR Expo fand im Januar
in New York statt.
The largest ever AHR Expo took place in
New York City in January.
expo special features could be
taken into consideration in
good time.
The exhibits that were presented by Kieback&Peter
included the Neutrino GLT
Building management system,
the Building Automation
System DDC4000, but also
the Bus Module Controller
BMR, control valves and
servodrives. Plueth presented four native BACnet
Controllers for projects of
various scales and the native
BACnet GLT COSMOweb.
The record-breaking visitor
attendance not only paved
the way for numerous contacts in the USA, but also in
other countries and continents. First sales success reports were made before the
show was over.
Tradition has it that the AHR
Expo is always held in con-
junction with the ASHRAE
Winter Meetings. This again
gave the BACnet community
the opportunity of advancing
the world-wide success of
BACnet during these get-togethers. BIG-EU is represented
in the BACnet Committee
SSPC 135. Further concerted
measures were resolved
during the liaison meeting between BIG-EU and American
BACnet International. The
BIG-EU representatives also
attended
the
Annual
General Meeting of BACnet
International.
The next AHR Expo will
take place in Chicago, from
January 26 – 28, 2009, with
the ASHRAE Winter Meetings
beginning on January 24.
Bruno Kloubert
Head of Marketing
MarDirect
kloubert@mardirect.de
BACnet Europe Journal 8 03/08 57
SAMSON
Normungsausschuss
SSPC 135 Meeting
In New York traf sich unter der Leitung von Bill Swan das
BACnet Standing Standard Project Committee (SSPC 135)
zum ASHRAE Winter Meeting.
The SSPC 135 Meeting during the AHRAE Winter Meeting
in New York was conducted by its chairman Bill Swan.
Der BACnet Ausschuss empfahl die öffentliche Revision
von zehn Ergänzungen des
BACnet Standards. Von
großem Interesse war die Ergänzung q, die darauf zielt,
den BACnet Standart über
drahtlose ZigBee Netzwerke
zu tunneln.
In verschiedenen Arbeitsgruppen verfolgte der BACnet
Ausschuss die Zulassung von
neun weiteren Ergänzungen.
Addendum j ist eine solche
Ergänzung, die die physikalische Zutrittskontrolle unterstützt. Ein weiteres Addendum, das für die öffentliche
Revision vorbereitet wurde,
ist Addendum i. Es unterstützt Beleuchtungsanwendungen.
BACnet on board
Das frei konfigurierbare Automationssystem TROVIS 6600 wächst mit den
Anforderungen: Ob Kleinanlage, mittlere
Gebäudegröße oder verteilte Liegenschaft,
es ist für alle Fälle gerüstet.
Mit einem breiten Spektrum
weiterer Anwendungen setzt
der BACnet Ausschuss seine
Arbeit fort. Darunter fällt die
Integration von Gebäuden
und Energieversorgung, die
Erarbeitung von Standardgeräteprofilen für die Gebäudeautomation, die Steuerung
der Videoüberwachung und
die Betriebsüberwachung für
Aufzüge.
The BACnet committee
recommended public review
for 10 addenda to the
BACnet standard including
Addendum q, to tunnel
BACnet over ZigBee wireless
networks.
In other developments, the
BACnet committee worked
towards approval of nine
additional addenda during
the meeting. One such
addendum is Addendum j,
support for physical access
control. Another addendum
being prepared for public review is Addendum i, support
for lighting applications.
The BACnet committee is
continuing to work on a
broad range of other items
such as integrating buildings and the energy utilities,
developing standard profiles
for various building automation devices, CCTV control,
and elevator monitoring.
Ob als Stand-Alone-Gerät oder im Verbund mit Partnersystemen über BACnet/IP
– TROVIS 6600 entspricht dem aktuellen
Stand der Technik: SAMSON hat BACnet
durchgehend integriert und das Profil
BACnet Building Controller (B-BC) und
darüber hinausgehende Funktionen
implementiert.
A01075DE
Der im System integrierte Web-Server
ermöglicht den vollgrafischen Zugriff auf
alle Anlagendaten, von jedem Ort zu jeder
Zeit. Hohe Funktionalität wird durch Ferneinwahl, Datalogging und Alarmmanagement erreicht.
SAMSON AG · MESS- UND REGELTECHNIK
Weismüllerstraße 3 · 60314 Frankfurt am Main
Telefon: 069 4009-0 · Telefax: 069 4009-1507
E-Mail: samson@samson.de
Internet: http://www.samson.de
Das BACnet Komitee ist international besetzt.
The SSPC 135 is internationally represented.
Werden Sie Mitglied der BIG-EU
Become a Member of the BIG-EU
Europäischer Interessenverband für offene Gebäudeautomation mit BACnet®
European interest group for open building automation systems with BACnet®
Acht Gründe für
Ihre Mitgliedschaft:
Eight reasons for
becoming a member:
1. Netzwerk
1. Network
Nutzen Sie die BACnet Kontakte zu Betreibern und Investoren, Planern
und Herstellern, Systemhäusern, Anlagenerrichtern und Systemintegratoren in Europa! Nehmen Sie Verbindung zu den BACnet Interest Groups
in Nordamerika, Australien, Asien und im Mittleren Osten auf! Tauschen
Sie persönliche Erfahrungen aus in Arbeitsgruppen, Mitgliederversammlungen, bei Ausstellungen und in unseren Mail-Communities.
2. Podium für Produkte und Projekte
Take advantage of the BACnet network of European contacts to get
in touch with operators and investors, planners and suppliers, system
vendors, plant engineers and system integrators! Get connected with the
BACnet Interest Groups in North America, Australia, Asia and the Middle
East! Exchange experiences with others in working groups and general
meetings, at exhibitions and in our mail communities.
2. A podium for products and projects
Mit unserem BACnet Europe Journal und unserem Internetauftritt
www.big-eu.org bieten wir Plattformen für BACnet Botschaften aus
Ihrem Unternehmen zur Entwicklung des BACnet Standards. Informieren
Sie über Ihr Unternehmen und Ihre BACnet Produkte und stellen Sie
Ihre Referenzprojekte vor. Neue Mitglieder präsentieren sich mit einem
Kurzprofil.
3. Referenz gegenüber dem Kunden
With our BACnet Europe Journal and our Internet presence at www.bigeu.org, we offer platforms for spreading the latest BACnet news from
your company for the development of the BACnet Standard. Tell others
about your company and your BACnet products and present your
reference projects. New members introduce themselves with a short
company profile.
3. A reference for your clients
Weisen Sie sich mit einer Mitgliedschaft in der BIG-EU als kompetenter
BACnet Partner Ihren Kunden gegenüber aus!
4. Informationen aus erster Hand
As a BIG-EU member, you will present yourself to your clients as a qualified
BACnet partner.
4. First hand information
Sichern Sie sich einen Wissensvorsprung bei der Entwicklung von BACnet Produkten. Die BIG-EU steht im Austausch mit dem Standing Standard Project Committee SSPC 135 der ASHRAE und informiert ihre Mitglieder über Innovationen zum BACnet Standard.
5. Mitgestaltung der BACnet ISO-Norm
Make sure that you are the first to know about the latest BACnet
developments when designing your products. The BIG-EU is in close contact
with the Standing Standard Project Committee SSPC 135 of ASHRAE and
informs its members about innovations to the BACnet Standard.
5. Develop the BACnet ISO Standard
Wir begleiten die Normenentwicklung und kommunizieren die Anforderungen unserer Mitglieder an den BACnet Standard. Mitglieder sind
eingeladen, in den Marketing- und Technik-Arbeitsgruppen mitzuwirken
und Ihre Erfahrungen einzubringen.
6. Beteiligung an BACnet Veranstaltungen
We participate in the development of the BACnet ISO Standard and
make sure that the requests of our members are heard. Members are
invited to participate in the Working Groups Marketing and Technique
and to share their experiences.
6. Participation in BACnet events
Beteiligen Sie sich an unseren Gemeinschaftsständen, zum Beispiel
auf der light+building in Frankfurt/M, und an unseren BACnet Fachtagungen.
7. Trainingsangebote
Take part in our community stands, e.g. at the light+building in Frankfurt,
and in our `BACnet days´.
7. Training
Nehmen Sie unsere Trainingsangebote wahr und gestalten Sie diese
aktiv mit.
8. Zentrale Geschäftsstelle
Take advantage of our BACnet training and take an active role in its
development.
8. Head Office
Unsere Geschäftsstelle steht Ihnen jederzeit mit Informationen über die
BIG-EU und unsere Leistungen zur Verfügung.
If you require any further information about the BIG-EU and its services,
please do not hesitate to contact our Head Office.
Ja, ich interessiere mich für die Leistungen der BIG-EU. Bitte senden Sie mir detaillierte Informationen über eine Mitgliedschaft zu.
I am interested in the BIG-EU’s services. Please send me further information about becoming a member.
Name .......................................................................................
Land/Country ...........................................................................
Firma/Company ........................................................................
E-Mail .......................................................................................
Straße Nr./Street No ..................................................................
Tel. ...........................................................................................
PLZ Ort/City/town sort/post code .............................................
..................................................................................................
Datum, Unterschrift/Date, signature
Seite kopieren und faxen an / Please copy this page and fax it to:
+49-2 31-42 78 67 32
BACnet Interest Group Europe
Willkommen in der BIG-EU
Welcome to the BIG-EU
INH-GmbH /
HHO_Automation
Tel. +41-61-725-11-22
www.hho-automation.de
Die Ingenieurgesellschaft INH
GmbH / HHO_Automation
entwickelt seit 1990 Hardwareund Software für Komponenten der Gebäudeautomatisierung und Fernwirktechnik.
Komponenten zum GLT/
DDC-System PROSYS wurde
seit 1994 entwickelt, mit zugehörigen Software-Produkte
werden grundsätzlich eigenentwickelt und gepflegt. Seit
1994 gehören zum Lieferprogramm Entwicklungs-und
Lieferleistungen für die strukturierte Systemintegration verschiedener DDC/SPS-Systeme
und Bussysteme.
Im Jahr 2007 wurde die
Entwicklung verschiedener
BACnet-Produkte aufgenommen. Die INH-GmbH erbringt
Produktlieferleistungen und
Dienstleistungen zur Ausführung von HLKSE-Projekten
im Bereich Gebäudeautomatisierung, Fernwirktechnik, Versorgungstechnik, Betriebsüberwachung. Seit 2007 ist die
INH-GmbH Solution Provider der WAGO-Kontakttechnik GmbH & Co.KG.
In 1990 the engineer association/company INH GmbH /
HHO _Automation is founded.
Since then it presents a high
performenced
processing
company in the hard- and
software for components
in building automation and
telecontrol engineering. In the
year 1994 started the processing of the components for the
BMS/DDC system PROSYS,
that are self-developed and
maintained. The product range
contains processing- and setup
for the structured system
integration of different/miscellaneous DDC/SPS systems
and bus systems. In 2007
the company started with
developing of various BACnet
products. INH-GmbH performs strongly in product
delivery, engineering services
to execute HVAC projects
in the area/field of building
automation, telecontrol engineering, supply engineering/
building services engineering
and plantcontrolling. INH
GmbH is solution provider
of the WAGO-Kontakttechnik
GmbH & Co.KG.
Aquametro AG
Tel. +41-61-725-11-22
www.aquametro.com
Aquametro AG produziert
und vertreibt weltweit Durchfluss- und Energiemessgeräte
für Energieversorger, für
die Haustechnik und für
Anwendungen in der Prozessindustrie. Seit 1928 steht
Aquametro für Zählertradition - durch Generationen
von Qualitätsprodukten und
die Bereitstellung angewandter Lösungen. Das Bewusstsein für die Vielfalt
der Bedürfnisse, die wir weltweit antreffen, prägt unser
Verhalten. Kurze Ablesezeit,
Reduktion der Installationsund Integrationskosten sowie quantitative und qualitative Auswertungen stehen
dabei im Vordergrund.
Aquametro produces and markets throughout the world
flow meters and energy meters
for supply industries, building
management and applications
in the process industries. From
1928 onwards, Aquametro
has been synonymous with
metering technology - through
the many generations of quality products and practical solutions we have provided. We
60 BACnet Europe Journal 8 03/08
are continually aware of the
variety of specific requirements needed throughout the
world - whether technological, economical, ecological or
cultural – and this determines
the way we act. The priorities
are the need for quick readout times; low installation
and integration costs and
high-quality data processing.
Fritz-Haber-Institut der
Max-Planck-GesellschaftTel: +49-30-8413-30
www.fhi-berlin.mpg.de
Das Fritz-Haber-Institut der
Max-Planck-Gesellschaft, gegründet 1911 als Kaiser-Wilhelm-Institut für Physikalische
Chemie und Elektrochemie, ist
eine weltweit bekannte Stätte der Forschung im Bereich
der physikalischen Chemie
allgemein, und der Untersuchung von physikalisch-chemischen Vorgängen an Oberflächen und Grenzflächen im
Besonderen. Mit seiner Eingliederung in die Max-PlanckGesellschaft 1953 wurde es
nach seinem ersten Direktor
benannt. Das Institut verfügt
über die Abteilungen Anorganische Chemie, Chemische
Physik, Molekülphysik, Physikalische Chemie und Theorie.
The
Fritz-Haber-Institute,
founded as „Kaiser-WilhelmInstitut für Physikalische
Chemie und Elektrochemie“
in 1911 is a world-renowned
institution for research in
physical chemistry in general,
and the investigation of physical/chemical processes at
surfaces and interfaces in
particular. Integrated into the
Max-Planck-Society in 1953,
it was named in honour of
its fi rst director. The institute
incorporates the five depart-
ments, Inorganic Chemistry,
Chemical Physics, Molecular
Physics, Physical Chemistry,
and Theory.
Salzburg Research
Forschungsgesellschaft mbH
Tel. +43-662-2288-200
www. salzburgresearch.at
Salzburg Research ist die Forschungsgesellschaft des Landes
Salzburg und betreibt angewandte Forschung im Bereich
der Informations- und Kommunikations-Technologien.
Die Forschungsabteilung ANC
beschäftigt sich mit zuverlässigen, performanten und robusten Netzwerktechnologien.
Dazu zählen das Modellieren
und das Messen der Übertragungsqualitäten im Internet
(„Quality-of-Service“) ebenso wie die Entwicklung von
Kommunikationsinfrastrukturen für verteilte Embedded
Systems.Salzburg Research
leistet Beiträge zur Standardisierung der Kommunikationstechnologien, u.a. in der Gebäudeautomatisierung und im
Bereich der Sicherheits-IT.
Salzburg Research is the
research company of the State
of Salzburg and conducts
applied research in the areas
of information and communication technologies. The
research departments ANC
focuses on reliable, performing and robust network technologies. Thereby the modelling and monitoring of the
data transmission qualities
(“quality-of-service”) is as
well part of our work as the
development of communication infrastructures for distributed embedded systems.
Salzburg Research contributes to the standardization of
communication technologies,
e.g. in the building automation and in the area of secure
IT.
Fachbuch „Energieeffizienz
durch Gebäudeautomation“
Die Energieeffi zienz von Gebäuden ist „das“ zentrale
Thema im gesamten Umfeld
des Bauens. Unter dem Leitbegriff der Gesamtenergieeffi zienz gilt es dabei, die einzelnen Phasen im Prozess
der Gebäudeerstellung, Planung, Errichtung, Betreibung, Wartung und Pflege,
Renovierung und Abbruch,
gemeinsam zu betrachten.
Ausgangspunkt für die europäischen Normen und deutschen Gesetze zum Energiesparen im Gebäudesektor
ist die „Richtlinie 2002/91/
EG des europäischen Parlaments und des Rates vom 16.
Dezember 2002 über die Gesamtenergieeffi zienz von Gebäuden“. Daraus entstand
die zum 1. Oktober 2007 in
Kraft getretene Novelle der
deutschen Energieeinsparverordung.
Das vorliegende Buch gibt
Hinweise und Anregungen,
die Gesetze, Verwaltungsvorschriften und Normen,
aber auch die Angaben der
Systemhersteller effi zient umzusetzen. Anhand der Vorstellung ausgeführter Praxisbeispiele erfährt der Leser,
inwieweit durch den Einsatz
von Gebäudeautomation als
„Leitgewerk“ die Energieeffi zienz gesteigert und die Betriebskosten gesenkt werden
können. Ein einführendes
und vertiefendes Fachbuch
für Bauingenieure, Architekten, Planer, Errichter,
Systemintegratoren, die verschiedenen Vertreter der
einzelnen Gewerke, Investoren, Betreiber und Benutzer.
Der Herausgeber Peter Fischer ist Professor für Informations- und Kommunikationstechnik am Fachbereich
Informations- und Elektrotechnik der Fachhochschule
Dortmund.
Peter Fischer (Hrsg.),
Energie- und Kosteneffizienz
durch gezielte
Gebäudeautomation
ISBN 978-3-922420-16-3
Promotor Verlag
1. Aufl. 2008 42,00 Euro
Innovation by
integration
Does your organisation enjoy the advantages of BACnet?
Interoperable system integration; a one-time investment that
provides supplier independence; no licensing costs and freedom to
choose hardware technology. Remote access utilizing BACnet over
Ethernet makes systems operation from any location a reality. The
result: low-cost investment + optimal ease-of-use = an innovative
building management system.
System Integrators with Content
Regel Partners B.V.
Hogebrinkerweg 8
3871 KN Hoevelaken
P.O. Box 86
3870 CB Hoevelaken
T. +31 (0)33 254 48 48
F. +31 (0)33 254 48 44
info@regelpartners.nl
www.regelpartners.nl
Regel Partners does it right!
BACnet Europe Journal 8 03/08 61
4-
#ONTROLISJUSTATOUCHAWAY
BACnet Kalender
Calendar of BACnet Events
!LARMING
3CHEDULING
4RENDING
.OTIFICATION
Datum
Date
Ort
Location
Veranstaltung Event
Kontakt
Information
06.11.04.2008
Frankfurt, D
l+b 2008
BIG-EU Office, info@big-eu.org
23.24.04.2008
Mannheim, D
BACnet/VDI
Training: Gebäudeautomation mit BACnet
Frank Schubert, MBS GmbH,
Krefeld, D, frank.schubert mbssoftware.de // Hans R. Kranz,
HAK-Ingenieurberatung Haustechnik Automation Kranz,
Forst, D, hans.kranz vdi.de
03.06.2008
London, GB
BACnet Forum
London
BIG-EU Office, info@big-eu.org
05.06.2008
Berlin, D
BIG-EU EB / AB
Meeting
Prof. Peter Fischer, Fachhochschule Dortmund, D, fischer fhdortmund.de
05.06.2008
Berlin, D
BIG-EU General
Meeting
Prof. Peter Fischer, Fachhochschule Dortmund, D, fi scher fhdortmund.de
06.06.2008
Berlin, D
BIG-EU WG-M
Meeting
Christian Müller, Honeywell
GmbH, Offenbach, D, christian.
mueller honeywell.com
06.06.2008
Berlin, D
BIG-EU WG-T
Meeting
René Quirighetti, Siemens Building Technologies Ltd., Zug, CH,
rene.quirighetti siemens.com
18.19.08.2008
Frankfurt, D
BACnet/VDI
Training: Gebäudeautomation mit BACnet
Frank Schubert, MBS GmbH,
Krefeld, D, frank.schubert mbssoftware.de // Hans R. Kranz,
HAK-Ingenieurberatung Haustechnik Automation Kranz,
Forst, D, hans.kranz vdi.de
September
2008
Vienna, A
BACnet Forum
Wien
BACnet Forum Wien
September
2008
Vienna, A
BIG-EU EB / AB
Meeting
Prof. Peter Fischer, Fachhochschule Dortmund, D, fi scher fhdortmund.de
September
2008
Vienna, A
BIG-EU WG-M
Meeting
Christian Müller, Honeywell
GmbH, Offenbach, D, christian.
mueller honeywell.com
September
2008
Vienna, A
BIG-EU WG-T
Meeting
René Quirighetti, Siemens Building Technologies Ltd., Zug, CH,
rene.quirighetti siemens.com
07.10.10.2008
Essen, D
BACnet booth
Security Essen
BIG-EU Office, info@big-eu.org
Octrober
2008
Milano, I
BACnet Forum
Milano
BIG-EU Office, Dortmund, D,
info@big-eu.org
23.27.11.2008
Dubai, UAE
BACnet booth
The Big 5 Show
Dubai 2008
Bruno Kloubert, MarDirect
GbR, Dortmund, D., kloubert@
mardirect.de
27.28.11.2008
Düsseldorf, D
BACnet/VDI
Training: Gebäudeautomation mit BACnet
Frank Schubert, MBS GmbH,
Krefeld, D, frank.schubert mbssoftware.de // Hans R. Kranz,
HAK-Ingenieurberatung Haustechnik Automation Kranz,
Forst, D, hans.kranz vdi.de
Nov 08
Paris, F
BACnet Forum
Paris
Association BACnet France,
Paris, mercurio@mardirect.de
27.-28.11.08
Düsseldorf, D
BACnet/VDI
Training: Gebäudeautomation mit BACnet
Frank Schubert, MBS GmbH,
frank.schubert mbs-software.
de // Hans R. Kranz, HAK-Ingenieurberatung, Forst, D
hans.kranz@vdi.de
01.12.2008
Krefeld, D
BIG-EU EB / AB
Meeting
Prof. Peter Fischer, Fachhochschule Dortmund, D, fi scher fhdortmund.de
02.12.2008
Krefeld, D
BIG-EU WG-M
Meeting
Christian Müller, Honeywell
GmbH, Offenbach, D, christian.
Mueller honeywell.com
02.12.2008
Krefeld, D
BIG-EU WG-T
Meeting
René Quirighetti, Siemens Building Technologies Ltd., Zug,
CH, rene.quirighetti siemens.
com
2EMOTE!CCESS
YFX
#ALCULATION
,6)3#ONTROL
AND$ISPLAY0ANEL
4HEPANELSOLUTIONFOR"!#NET¸NETWORKSAND
,ON-ARK¸SYSTEMSWITHEMBEDDEDAUTOMATION
FUNCTIONSREMOTEACCESSANDEMAILNOTIFICATION
,/94%#ELECTRONICS'MB("LUMENGASSE7IEN!USTRIA
INFO LOYTECCOMs4ELs&AX
,6)3ISATRADEMARKOF,/94%#ELECTRONICS'MB(,ON-ARKANDTHE,ON-ARK,OGOAREMANAGEDGRANTEDANDUSEDBY,ON-ARK
)NTERNATIONALUNDERALICENSEGRANTEDBY%CHELON#ORPORATION"!#NETISAREGISTEREDTRADEMARKOFTHE!MERICAN3OCIETYOF(EATING
2EFRIGERATINGAND!IR#ONDITIONING%NGINEERS)NC!3(2!%
NETWORKSUNDERCONTROL
4-
Whenever limitless building automation
is under discussion, talk turns to BACnet.
And if it has to be modular,
extensible and energy efficient
as well, talk turns to SAUTER.
SAUTER EY-modulo 5: with BACnet IP.
Energy efficient, open and economical – module for module for module. The
modular, native BACnet stations of the SAUTER EY-modulo 5 series are the intelligent solution in every respect for any needs relating to building management.
With its optimal function modules, integrated web connection and comfortable
intelligent unitary control, SAUTER sets new standards. Because it is freely
programmable, SAUTER EY-modulo 5 provides perfect system integration and
smooth operation. Find out more about its versatility: www.sauter-controls.com
Systems
Components
Services
Facility Management
Foto © Hans Neleman/zefa/Corbis
… wir sehen uns.
Light+Building 2008
Stand 9.1, E40
… see you there.
Gut aufgestellt
Well positioned …
and optimally set. Even in tough situations Kieback&Peter’s
DDC4000 automation system doesn’t work up a sweat.
The operation of the DDC4200 automation station via
touch screen is simple, clear and secure. This allows you
to dedicate your time to what really matters.
… und bestens eingestellt.
Mit dem Automationssystem DDC4000
von Kieback&Peter kommen Sie selbst
in brenzligen Situationen nicht ins
Schwitzen.
Die Bedienung der Automationsstation DDC4200 über Touchscreen
ist einfach, transparent und sicher.
So haben Sie Zeit, sich den wirklich
wichtigen Dingen
zu widmen.
Journal 8 GmbH
03/08& Co. KG, 12347 Berlin, Germany, Tel.: +49 30 600 95-0, E-Mail: info@kieback-peter.de
64 BACnet Europe Kieback&Peter
www.kieback-peter.de