300 east first avenue easley, sc 29640 site development plans for
Transcription
300 east first avenue easley, sc 29640 site development plans for
SITE DEVELOPMENT PLANS FOR EASLEY FIRST BAPTIST CHURCH 300 EAST FIRST AVENUE EASLEY, SC 29640 SAFETY NOTICE TO CONTRACTOR: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. ANY CONSTRUCTION OBSERVATION BY THE ENGINEER OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON OR NEAR THE CONSTRUCTION SITE. WARRANTY/DISCLAIMER: THE DESIGNS REPRESENTED IN THESE PLANS ARE IN ACCORDANCE WITH ESTABLISHED PRACTICES OF CIVIL ENGINEERING FOR THE DESIGN FUNCTIONS AND USES INTENDED BY THE OWNER AT THIS TIME. HOWEVER, NEITHER THE ENGINEER NOR ITS PERSONNEL CAN OR DO WARRANT THESE DESIGNS OR PLANS AS CONSTRUCTED EXCEPT IN THE SPECIFIC CASES WHERE THE ENGINEER INSPECTS AND CONTROLS THE PHYSICAL CONSTRUCTION ON A CONTEMPORARY BASIS AT THE SITE. GENERAL NOTES: 1. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD CONDITIONS WHEN POSSIBLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY DIGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS WELL IN ADVANCE OF TRENCHING. IF THE CLEARANCES ARE LESS THAN SPECIFIED ON THE PLANS OR 12", WHICHEVER IS LESS, CONTACT COMMERCIAL SITE SOLUTIONS, INC. (864-855-5200) AND OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION. AGENCY AND UTILITY CONTACTS PLANNING/ZONING/STORMWATER: PLANNING AND DEVELOPMENT CITY OF EASLEY 205 N 1ST STREET EASLEY, SC 29640 CONTACT: TOMMY HOLCOMBE PH: 864-855-7908 GAS: FORT HILL NATURAL GAS 311 SOUTH PENDLETON STREET EASLEY, SC 29640 CONTACT: BOBBY BAGWELL PH: 864-423-5634 TELEPHONE: AT&T CONSTRUCTION & ENGINEERING 218 COLLEGE ST, 2nd FLOOR GREENVILLE, SC 29601 CONTACT: SAMUEL GRIFFITH PH: 864-298-4907 ELECTRIC: EASLEY COMBINED UTILITIES 110 PEACHTREE STREET EASLEY, SC 29641 CONTACT: BOBBY TINSLEY PH: 864-859-4013 DRAWING LIST COVER SHEET EXISTING CONDITIONS PLAN SITE PLAN SITE DETAILS GRADING PLAN STORMWATER DETAILS UTILITY PLAN UTILITY DETAILS DEMOLITION AND EROSION CONTROL PHASE 1 PLAN EROSION CONTROL PHASE 2 PLAN EROSION CONTROL PHASE 3 PLAN EROSION CONTROL DETAILS REVISIONS/SUBMITTALS: 2/28/14 - PRICING SET ISSUED FOR BID 2. THE CONTRACTOR SHALL INCLUDE IN HIS CONTRACT PRICE THE REMOVAL AND DISPOSAL OF ANY EXCESS TOPSOIL HE DETERMINES IS NOT REQUIRED TO PERFORM THE FINAL GRADING AND LANDSCAPING OPERATION. 3. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL REQUIRED/NECESSARY SHEETING, SHORING, AND SPECIAL EXCAVATION MEASURES REQUIRED ON THE PROJECT TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THE DRAWINGS. OWNER AND COMMERCIAL SITE SOLUTIONS, INC. ACCEPT NO RESPONSIBILITY FOR THE DESIGN TO INSTALL SAID ITEMS. 4. CALL THE UTILITY LOCATOR SERVICE 72 HOURS IN ADVANCE OF DIGGING AT 811. 5. ALL WORK SHALL CONFORM TO THE CITY OF EASLEY STANDARDS AND SPECIFICATIONS. 6. ALL CURB/HANDICAP RAMP DESIGNS SHALL CONFORM TO ADA STANDARDS OR THE REGULATIONS OF THE CITY OF EASLEY, WHICHEVER IS MORE RESTRICTIVE. 7. PRE-CAST DRAINAGE AND SANITARY SEWER STRUCTURES HAVE BEEN SPECIFIED ON THE PLANS. OWNER AND COMMERCIAL SITE SOLUTIONS, INC., HOWEVER, ASSUME NO RESPONSIBILITY FOR THESE STRUCTURES AS FIELD CONDITIONS DURING CONSTRUCTION OFTEN DICTATE MINOR ELEVATION ADJUSTMENTS. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY AND EXPENSE FOR MODIFYING THESE STRUCTURES TO ACCOMMODATE THESE FIELD ADJUSTMENTS. 8. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE DAILY RECORD KEEPING OF THE AS-BUILT CONDITION OF ALL OF THE UNDERGROUND UTILITIES, CONSTRUCTION STAKEOUT ASSOCIATED WITH THE PROJECT, PREPARATION OF THE NECESSARY/REQUIRED AS-BUILT WATER AND SEWER PLANS TO BE SUBMITTED TO EASLEY COMBINED UTILITIES AND/OR SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL, AND ALL OTHER INFORMATION REQUIRED IN CONNECTION WITH OBTAINING PERMITS TO OPERATE AND RELEASE OF BONDS. ARCHITECT: LS3P ASSOCIATES LTD. 110 WEST NORTH STREET, SUITE 300 GREENVILLE, SC 29601 PH: 864-235-0405 CONTACT: JONATHAN EDENS 9. ALL WATER LINE AND SEWER LINE INSTALLATION SHALL CONFORM TO THE STANDARDS AND DETAILS OF EASLEY COMBINED UTILITIES AND/OR SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL CONSTRUCTION PERMIT. 10. A COPY OF THE NOTICE OF INTENT AND THE STORM WATER POLLUTION PREVENTION PLAN MUST BE KEPT ON THE WORK SITE AND SHOWN UPON REQUEST. 11. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ALL MATERIAL AND LABOR ASSOCIATED WITH THE TESTING OF THE WATER AND SEWER LINES REQUIRED BY EASLEY COMBINED UTILITIES AND/OR SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL. ENGINEER: 12. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DE-WATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PLANS. 13. THE CONTRACTOR SHALL INCLUDE IN THE PRICE ALL COSTS ASSOCIATED WITH PROVIDING A PROFESSIONAL ENGINEER ON SITE DURING THE CONSTRUCTION OF THE STORM WATER MANAGEMENT FACILITIES, WATER AND SEWER SYSTEMS, ETC., AS REQUIRED FOR AS-BUILT CERTIFICATION. 14. SEDIMENT CONTROL MEASURES MUST BE INSPECTED AND MAINTAINED REGULARLY TO INSURE THAT THE INTENDED PURPOSES ARE ACCOMPLISHED. Commercial Site Solutions, Inc. 402 EAST 1ST AVENUE EASLEY, SC 29640 864-855-5200 21764 STATE ROUTE 54 LUTZ, FL 33549 813-885-2032 15. ALL DRAINAGE STRUCTURES MUST MEET SCDOT AND THE CITY OF EASLEY STANDARD SPECIFICATIONS. 16. ALL SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED THE SITE WORK SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL WITHIN RIGHT OF WAY. THIS IS TO BE DONE IN ACCORDANCE WITH M.U.T.C.D. AND SCDOT STANDARDS. 17. CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM PREVIOUS AND CURRENT DEMOLITION OPERATIONS. DISPOSAL WILL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND/OR FEDERAL REGULATIONS GOVERNING SUCH OPERATIONS. 18. THE GENERAL CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR AND SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. PREPARED FOR: CCL ASSOCIATES 2502 MACY DRIVE ROSWELL, GA 30076 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS SHEET C-0.0 C-1.0 C-2.0 C-2.1 C-3.0 C-3.1 C-4.0 C-4.1 C-5.0 C-5.1 C-5.2 C-5.3 - C5.4 PROPOSED DESCRIPTION REVISIONS EXISTING CONCRETE CURB & GUTTER ISSUED STANDARD DUTY ASPHALT COMMENT LEGEND PRELIMINARY EXISTING PARKING SPACES NOT FOR CONSTRUCTION SITE NOTES A. ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. B. UNLESS OTHERWISE SHOWN, CALLED OUT OR SPECIFIED HEREON ALL CURB AND GUTTER ADJACENT TO ASPHALT PAVING SHALL BE INSTALLED PER SITE DETAILS. EXISTING PARALLEL PARKING SPACES C. CONTRACTOR SHALL BEGIN CONSTRUCTION OF ANY LIGHT POLE BASES FOR RELOCATED LIGHT FIXTURES AND RELOCATION OF ELECTRICAL SYSTEM AS SOON AS DEMOLITION BEGINS. CONTRACTOR SHALL BE AWARE THAT INTERRUPTION OF POWER TO ANY LIGHT POLES OR SIGNS SHALL NOT EXCEED 24 HOURS. alk Ex. Concrete Sidew D. IF DEMOLITION OR CONSTRUCTION ON SITE WILL INTERFERE WITH THE ADJACENT PROPERTY OWNER'S TRAFFIC FLOW, THE CONTRACTOR SHALL COORDINATE WITH THE ADJACENT PROPERTY OWNER, TO MINIMIZE THE IMPACT ON TRAFFIC FLOW. TEMPORARY RE-ROUTING OF TRAFFIC IS TO BE ACCOMPLISHED BY USING DOT APPROVED TRAFFIC BARRICADES, BARRELS, AND/OR CONES. TEMPORARY SIGNAGE AND FLAGMEN MAY BE ALSO NECESSARY. 18.4' R10.0' H. ALL HANDICAP SPACES ARE TO RECEIVE A HANDICAP SYMBOL PAINTED ON THE ASPHALT. RAMP DOWN 8.6' ' LANDSCAPE 8.0 ' ' 9.0 P. TY 5.0 HCAP ACCESSIBLE SPACES W/ SIGN (TYP) 6.0' ALK 5' SIDE W R2.0' R10.0' PROJECT: DEMOLITION, RENOVATIONS, NEW EDUCATION STRUCTURE AND ASSOCIATED SITE IMPROVEMENTS DISTURBED AREA: 1.47 ACRES CHANGE IN IMPERVIOUS SURFACE: 0.06 ACRE REDUCTION *SEE ARCHITECTURAL PLANS FOR BUILDING AND DEMOLITION INFORMATION. 9.0' R4.0' CURBED RAMP W/ TRUNCATED DOMES WARNING SURFACE (TYP) R20.0' R10.0' MR. CHRISTIAN PITTS CCL ASSOCIATES 2502 MACY DRIVE ROSWELL, GA 30076 PHONE: 678-352-0595 R20.0' 4 R20.0' 4" WIDE SOLID WHITE PAINTED STRIPE 25.0' "DO NOT ENTER" SIGN CURBED RAMP W/ TRUNCATED DOMES WARNING SURFACE (TYP) 18" CURB & GUTTER 13.0' 21.0' STOP SIGN 28.0' K 22.0' MAINTAIN MINIMUM 25' DRIVE WIDTH 5' SIDEWALK 300 East 1st Avenue, Easley, SC 29640 PROJECT CONTACT: 4' TALL CHAINLINK FENCE (GATE LOCATIONS TO BE DETERMINED) ' PLAYGROUND AREA SITE DATA SITE ADDRESS: R20.0' 5.0 5' SIDEWAL R4.0' R20.0' END CURB & GUTTER AT BLDG WALL ' 18.0' 22.0' 18.0' 22.0' R4.0' STOP SIGN EXISTING EDGE OF ASPHALT 5.0 18.0' R4.0' R4.0' M. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO ANY EXISTING ITEM DURING CONSTRUCTION SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. REPAIRS SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS. THE CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISTING DAMAGE AND NOTIFY CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START. GROUND FINISHED FLOOR ELEV: 1061.18 ' AREA ' 9.0 18.0' 5.9' HCAP ACCESSIBLE SPACES W/ "VAN HANDICAP" 6 SIGN 18" CURB & GUTTER 18.0' LINE INDICATES NEW ASPHALT PAVEMENT LIMITS (TO BE ADJUSTED BASED UPON ACTUAL FIELD CONDITIONS) "YIELD TO PED." SIGN 124.7' 4' CURB OPENING 5.0' 8.0 LANDSCAPE 15 HCAP ACCESSIBLE SPACES W/ "VAN HANDICAP" SIGN L. THE GENERAL CONTRACTOR IS TO COORDINATE WITH THE APPROPRIATE UTILITY COMPANIES PRIOR TO CONSTRUCTION, ADJUSTMENT, OR RELOCATION OF EXISTING UTILITIES AS DESIGNATED ON THE PLANS. NEW EDUCATIONAL BUILDING (3-FLOORS) ' 17 CURBED ISLAND 8.0 AREA 12 ' 5.0 R2.0' STRIPED ISLAND 9.0' R10.0' R3.0' 18.0' R10.0' 17 STRIPED ISLAND 18.0' MAINTAIN MINIMUM 25' DRIVE WIDTH 15 R20.0' R4.0' R10.0' R3.0' EXISTING EDGE OF ASPHALT R TEMPORARY BENCHMARK: (North Bolt Fire Hydrant): North Bolt Elevation: 1064.56' Know what's 0 20 SCALE: 1" = 20' 40 60 300 EAST FIRST AVENUE EASLEY, SC 29640 R20.0' K. THE EARTHWORK FOR ALL BUILDING FOUNDATIONS AND SLABS SHALL BE IN ACCORDANCE WITH ARCHITECTURAL BUILDING PLANS AND SPECIFICATIONS. 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS 33.0' R4.0' J. STOP SIGNS SHALL MEET THE CRITERIA OF THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION AND MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 4.4' NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH 6.0' 38.8' RAMP UP I. UNLESS OTHERWISE NOTED, ALL ON-SITE CURB SHALL BE INTEGRAL CURB AS SHOWN ON THE DETAIL SHEET. EASLEY FIRST BAPTIST CHURCH LE / SPEED TAB CROSSWALK 10.0' ' 8.0 CURBED RAMP AREA LANDSCAPE 12.5' 6.0' R20.0' 10.0' HCAP ACCESSIBLE SPACES WITH "VAN HANDICAP" SIGN G. ALL DIMENSIONS, UNLESS OTHERWISE NOTED, ARE TO FACE OF CURB, FACE OF BUILDING (BLOCK), OR CENTERLINE OF PARKING BAY. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF ALL ENTRY/EXIT PORCHES AND PRECISE BUILDING DIMENSIONS. R20.0' 8.5' 9.0' CURBED RAMP 24.0' R2.0' F. THE LOCATION OF THE CONSTRUCTION FENCE ON THE DRAWINGS IS FOR GRAPHICAL REPRESENTATION ONLY. THE CONTRACTOR IS TO ENSURE THAT THE CONSTRUCTION FENCE ENCOMPASSES THE ENTIRE WORK AREA. 18.4' 8.0' STAIRS WITH HANDRAILS (SEE DETAIL) LANSCAPE A SITE PLAN AREA LANDSCAPE 18.0' REA SAWCUT OR TOOLED JOINTS (TYP). MATCH PATTERN SHOWN 9.3' PREPARED FOR: 23.3' 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com E. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH AND FOUR INCHES OF TOPSOIL APPLIED. IF ADEQUATE TOPSOIL IS NOT AVAILABLE ON SITE, THE CONTRACTOR SHALL PROVIDE TOPSOIL, APPROVED BY THE OWNER, AS NEEDED. THE AREA SHALL THEN BE SEEDED/SODDED, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE PROJECT SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 18.3' TIE NEW SIDEWALK AREA TO EXISTING AND MATCH GRADE WITH SMOOTH TRANSITION Date: 02-27-14 Drawn: RSM Checked: GDH C-2.0 COMMENT ISSUED REVISIONS PRELIMINARY NOT FOR CONSTRUCTION 12" EXISTING ASPHALT 7'-0" TO BOTTOM OF LOWEST REQUIRED SIGN N.T.S. 1060.30 1060.81 PLAN VIEW RAMP TO BE ASPAHLT, TYP. OF 2 CROSSWALK TO BE CONCRETE 1'-6" 300 EAST FIRST AVENUE EASLEY, SC 29640 K CROSSWAL 1061.50 1060.80 RAMP SITE DETAILS 1061.50 1060.95 SECTION A RAMP 4" MIN. 1061.00 2'-0" 1060.45 NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH TRAFFIC FLOW ARROW PREPARED FOR: 30"x30" SIGN WITH REFLECTIVE RED REFLECTORIZED BACKGROUND AND WHITE REFLECTORIZED LEGEND AND BORDER CONFORMING TO SCDOT SPECIFICATIONS 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS EASLEY FIRST BAPTIST CHURCH 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com 3" CLEAR SECTION A SPEED TABLE DETAIL N.T.S Date: 02-27-14 Drawn: RSM Checked: GDH C-2.1 RIM ELEV EX. EXISTING INLET +/-1058.31 1 MANHOLE +/-1060.35 1A AREA INLET 1060.25 2 MANHOLE 1061.90 3 GRATE INLET 1059.48 3A AREA INLET 1060.10 4 GRATE INLET 1060.25 4A AREA INLET 1059.50 4B AREA INLET 1059.50 WV WV EXISTING PROPOSED DESCRIPTION CONTOUR LINE SPOT ELEVATION 93.00 STORM DRAIN INLET STORM DRAIN MANHOLE STORM DRAIN PIPE DIRECTIONAL DRAINAGE ARROW STORMDRAIN SCHEDULE STRUCTURES SIZE LENGTH TYPE SLOPE IE UP IE DOWN 1 TO EX. 24" 59' HDPE 0.82% 1053.73 1053.24 2 TO 1 24 56' HDPE 0.82% 1054.29 1053.83 3 TO 2 24" 94' HDPE 0.82% 1055.16 1054.39 4 TO 3 18" 90' HDPE 0.82% 1056.0 1055.26 1A TO 1 10" 17' HDPE 2.00% 1057.0 1056.66 3A TO 3 10" 44' HDPE 2.00% 1057.0 1056.12 4A TO 4 10" 33' HDPE 2.00% 1057.0 1056.24 4B TO 4 10" 36' HDPE 2.00% 1057.0 1056.28 ISSUED TYPE REVISIONS STRUCTURE COMMENT LEGEND STORMDRAIN STRUCTURE TABLE NOTE: HDPE PIPE SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M-294 AND AASHTO MP7, TYPE S & D. CONNECTIONS SHALL USE A RUBBER GASKET WHICH CONFORMS TO ASTM F-477. INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM RECOMMENDED PRACTICE D-2321 AND AASHTO SECTION 30. HDPE PIPE SHALL NOT REPLACE ANY SECTION OF CLASS IV RCP. PRELIMINARY NOT FOR CONSTRUCTION NOTE: STORMWATER REQUIREMENTS ARE MET DUE TO 0% INCREASE IN IMPERVIOUS AREA. NOTE: ALL ELEVATIONS ARE SHOWN TO BOTTOM OF CURB UNLESS OTHERWISE CALLED OUT Finish Floor Elev: 1065.97' OHP OHP 1061.50 1062.65 1061.50 1065.33 1060.30 1060.81 1062.89 1065.35 1060.51 1062 60 10 4' CURB OPENING FLUSH H.P. 1065.75 1060.29 3A 3 1059.92 1059.48 4' CURB OPENING 1060.29 1060.51 1059.92 OHP OHP OHP OHP P OH OH OH EX. GRADE (±1050.50) P OH OH FLUSH 1060.23 O 1062 1061 FLUSH 28 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 1060.80 1063 62 P 21. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING, AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF ALL WORK INDICATED ON THESE DRAWINGS. THE OWNER AND THE DESIGN ENGINEER ACCEPT NO RESPONSIBILITY FOR THE DESIGNS TO INSTALL SAID ITEMS. P OH P EX. GRADE (±1060.35) OH 1061.60 1061.50 1061.85 1061.75 10 1061.35 1061.25 22. PRECAST DRAINAGE STRUCTURES HAVE BEEN SPECIFIED ON THE PLANS. THE OWNER AND THE ENGINEER, HOWEVER, ASSUME NO RESPONSIBILITY FOR THESE STRUCTURES, AS FIELD CONDITIONS OFTEN DICTATE MINOR ELEVATION ADJUSTMENTS. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY AND EXPENSE FOR MODIFYING THE PRECAST STRUCTURES TO ACCOMMODATE FIELD REVISIONS. 1061.75 1061.70 23. ALL GRADING OPERATIONS, EXCAVATIONS, FILL, COMPACTION TESTING AND BACKFILL SHALL BE COMPLETED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND OBSERVED AND TESTED BY A QUALIFIED GEOTECHNICAL ENGINEER. THE GEOTECHNICAL ENGINEER SHALL BE DESIGNATED BY AND PAID FOR BY THE OWNER. P 1063.55 OH P HP MIN 12 LF 6" HDPE O@ 2.0% TO ROOF DRAIN 1 FLUSH FLUSH 1062.50 OH OH FLUSH 1061 64 10 1A 1061 2 1062.80 EX. GRADE (±1060.0) 1060.25 1060.72 1062.76 20. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD LOCATIONS WHEN POSSIBLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY DIGGING TEST PITS BY HAND AT ALL CROSSINGS WELL IN ADVANCE OF TRENCHING. IF CLEARANCES ARE LESS THAN SPECIFIED ON THE PLAN OR TWELVE INCHES (12"), WHICHEVER IS LESS, CONTACT THE DESIGN ENGINEER AND THE OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION. HP 1060.50 14. TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY BY SURVEY COMPANY, INC., IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE MADE, AT HIS EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW. 19. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR THE EXACT NUMBER, SIZE AND LOCATION OF ANY ROOF DRAINS. HP O 1060.46 1060.50 P OH 1060.60 13. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 18. CATCH BASINS, MANHOLES, FRAMES, GRATES, SHALL MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD DETAILS FOR CONSTRUCTION AND THE EASLEY REQUIREMENTS . P OH EX. GRADE (±1059.50) 1061.18 10. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 17. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT. P OH 1060.51 9. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 16. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. P EXISTING GRATE TO REMAIN 8. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 15. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STAKED SOD TO ALL SLOPES 3H:1V OR STEEPER. CONTRACTOR SHALL GRASS DISTURBED AREAS IN ACCORDANCE WITH STATE SPECIFICATIONS UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. IF ADEQUATE TOPSOIL IS NOT AVAILABLE ON SITE THE CONTRACTOR SHALL PROVIDE TOPSOIL, APPROVED BY THE OWNER, AS NEEDED. P GROUND FINISHED FLOOR ELEV: 1061.18 1061.18 106 5 1063.80 P OH 1060.29 1063.50 1063.95 1063.42 P OH P 1060 1064.20 P OH EX1 1061 1061.85 P OH EX. GRADE (±1060.32) 7. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1.0 FOOT INTERVALS. 12. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. P NEW EDUCATIONAL BUILDING (3-FLOORS) 6. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1.0 FOOT. 11. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. OH 17 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 1060.10 1065.80 1063 49 LF (TOTAL) 6" HDPE @ MIN 2.0% TO ROOF DRAIN 1060.80 1060.15 1062.50 1065.50 1060.80 1060.80 1063 1062.75 OH P 1065.16 OHP 1061.18 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com OHP 1060.95 OH P 1062.25 5. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED, AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS 1061.00 4A 1060 OHP 1060.62 1060.45 4. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED: TYPE 1: RCP, CLASS III PER ASTM C-76, WITH FLEXIBLE PLASTIC BITUMEN GASKETS AT JOINTS, UNLESS OTHERWISE NOTED OHP 4 1064 FLUSH 1065.00 4 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 60.51 23 LF 8" HDPE COLLECTOR PIPE @ MIN 2.0% 60.60 14 LF 8" HDPE COLLECTOR PIPE @ MIN 2.0% 1060.25 P 1064.40 1064.50 60.60 2 10 61 1064.60 1060.56 1060.50 1062.43 1063.40 Finish Floor Elev: 1049.16' Finish Floor Elev: 1061.18' 1061.18 19 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 10 6 SH FLU 1064.70 1064.90 32 LF 8" HDPE COLLECTOR PIPE @ MIN 2.0% 60.51 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. OHP 1063.15 1063.09 1064.30 1064.70 60.51 1061 1065.65 1060 OH TC: 1064.50 BC: 1064.00 60.51 1060.51 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. EASLEY FIRST BAPTIST CHURCH OHP OHP alk Ex. Concrete Sidew 1065.85 4B 1064.14 1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES SERVING THE STRUCTURE. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. 20 LF (TOTAL) 6" HDPE @ MIN 2.0% TO ROOF DRAIN Finish Floor Elev: 1065.85' 1065.85 1065.85 TRANSITION FROM ASPHALT FLUSH WITH SIDEWALK TO ASPHALT 6" BELOW TOP OF SIDEWALK SITE GRADING NOTES Finish Floor Elev: 1065.89' PREPARED FOR: Finish Floor Elev: 1065.85' GRADING PLAN CONTRACTOR SHALL COMPLY COMPLETELY WITH THE LATEST STANDARDS OF OSHA DIRECTIVES OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR SHALL USE SUPPORT SYSTEMS, SLOPING, BENCHING AND OTHER MEANS OF PROTECTION. THIS IS TO INCLUDE, BUT NOT LIMITED FOR ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH PERFORMANCE CRITERIA AS REQUIRED BY OSHA. PLEASE CONTACT THE CITY OF EASLEY'S STOMRWATER MANAGEMENT DEPARTMENT AT LEAST 3 DAYS PRIOR TO INITIATION OF LAND DISTRUBING ACTIVITY THE CITY OF EASLEY STORMWATER MANAGEMENT DEPARTMENT 205 N. 1ST ST EALSEY, SC 29640 PH: 864-855-7940 EMAIL: tjones@easley-sc.org FAX: 864-307-0008 27. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL COSTS INCURRED FOR INSPECTION AND TESTING OF SOILS DUE TO FAILURE TO COMPLY WITH THE MINIMUM REQUIREMENTS OF THE SOILS REPORT. 28. ALL GRADING OPERATIONS SHALL BE STAKED BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR APPROVED BY THE OWNER. 29. UPON COMPLETION OF THE GRADING, THE SOILS ENGINEER SHALL PROVIDE OWNER WITH A LETTER INDICATING THAT THE SITE AND BUILDING PAD WERE PREPARED IN DIRECT CONFORMANCE WITH THE RECOMMENDATIONS AND CONCLUSIONS IN THE SOILS REPORT. O HP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OH OH P P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P 26. COMPACTION TESTS SHALL BE DONE FOR EACH TWO FEET OF FILL, BUT NOT LESS THAN ONE TEST FOR EVERY 500 CUBIC YARDS, OR MORE FREQUENTLY IF REQUIRED BY THE GEOTECHNICAL ENGINEER. 300 EAST FIRST AVENUE EASLEY, SC 29640 OH 25. COMPACTION SHALL BE DONE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND ON-SITE GEOTECHNICAL ENGINEERS RECOMMENDATIONS. OH P 1063.05 24. NO FILL SHALL BE PLACED PRIOR TO APPROVAL OF THE SUBGRADE BY THE GEOTECHNICAL ENGINEER. P CONNECT TO STORMDRAIN INV (6"): 1055.35 INV (24"); 1054.60 NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH OH P 1061.85 TEMPORARY BENCHMARK: (North Bolt Fire Hydrant): North Bolt Elevation: 1064.56' R Know what's 0 20 SCALE: 1" = 20' 40 60 Date: 02-27-14 Drawn: RSM Checked: GDH C-3.0 COMBINATION INLET N.T.S. 300 EAST FIRST AVENUE EASLEY, SC 29640 NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH STORMWATER DETAILS 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS EASLEY FIRST BAPTIST CHURCH 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com SECTION "A"-"A" PREPARED FOR: ISSUED PLAN PRELIMINARY NOT FOR CONSTRUCTION ELEVATION CORNER BAR CORNER BAR Date: 02-27-14 Drawn: RSM Checked: GDH C-3.1 COMMENT REVISIONS ADJOINING LANDOWNERS. EXISTING DESCRIPTION REVISIONS UE WV WV PROPOSED 18" CONCRETE CURB & GUTTER STORM DRAIN INLET UE ISSUED COMMENT LEGEND SANITARY SEWER LINE SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT WATER LINE PRELIMINARY UE GAS LINE OVERHEAD POWER LINE NOT FOR CONSTRUCTION UNDERGROUND ELECTRIC AND TELEPHONE LINE NEW TRANSFORMER PAD LOCATION. UE UE UTILITY NOTES: 1. ALL SEWER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE STATE OF SOUTH CAROLINA AND EASLEY COMBINED UTILITIES. OHP 4. SEWER CLEANOUTS SHALL BE IN ACCORDANCE WITH THE CITY OF EASLEY AND SCHEC DETAILS AND SPECIFICATIONS. P OH P OH NEW EDUCATIONAL BUILDING (3-FLOORS) P OH P 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com 8. ALL SITEWORK SHALL MEET OR EXCEED THE CITY OF EASLEY STANDARDS AND THE SITEWORK SPECIFICATIONS. 9. CONTRACTOR TO PROVIDE ALL TRENCHING, BACKFILLING, & INSTALL ALL ELECTRICAL CONDUITS TO UTILITY COMPANY SPECIFICATIONS. 10. LOCATION OF SITE UTILITIES SHALL BE VERIFIED BY GENERAL CONTRACTOR & THE PROPER UTILITY COMPANY PROVIDING SERVICE. 11. GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR ALL TAP AND TIE ON FEES REQUIRED, AS WELL AS COST OF UNDERGROUND SERVICE CONNECTIONS TO THE BUILDING. 12. DIMENSIONS SHOWN ARE TO CENTERLINE OF PIPE OR FITTING. 13. ALL TRENCHING, PIPE LAYING, AND BACKFILLING SHALL BE IN ACCORDANCE WITH FEDERAL OSHA REGULATIONS. 14. GENERAL CONTRACTOR SHALL HAVE APPROVAL OF ALL GOVERNING AGENCIES HAVING JURISDICTION OVER THIS SYSTEM PRIOR TO INSTALLATION. P OH P OH 4" SDR 35 SANITARY SEWER SERVICE @ 2.0% SLOPE (MIN.) P OH 4" SS CONNECT 6" AND 4" WASTE LINES WITH WYE FITTING CO 4" SS CO P UE P P OH P CONNECT TO AND REUTILIZE OH EXISTING SANITARY SEWER P OH SERVICE EXISTING MANHOLE (RIM OH 2 12" DOMESTIC WATER SERVICE ENTRY (SEE PLUMBING PLANS FOR DETAIL) OH P OH UE APPROX 1047) INV. IN (MIN.) = 1043.00 INV. OUT (EX.) = UNKNOWN P 6" S S OH OH OH P OH GAS: FORT HILL NATURAL GAS 311 SOUTH PENDLETON STREET EASLEY, SC 29640 CONTACT: BOBBY BAGWELL PH: 864-423-5634 OH P P P NEW TRANSFORMER PAD LOCATION. TO BE SERVICED UNDERGROUND FROM NEAREST POWER POLE. OH P OH P 6" SDR 35 SANITARY SEWER SERVICE @ 2.0% SLOPE (MIN.) ELECTRIC: EASLEY COMBINED UTILITIES 110 PEACHTREE STREET EASLEY, SC 29641 CONTACT: BOBBY TINSLEY PH: 864-859-4013 TELEPHONE: AT&T CONSTRUCTION & ENGINEERING 218 COLLEGE ST, 2nd FLOOR GREENVILLE, SC 29601 CONTACT: SAMUEL GRIFFITH PH: 864-298-4907 P P OH OH P 6" W 6" FIRE SERVICE ENTRY. FDC TO BE LOCATED ON BLDG WALL (SEE FIRE PROTECTION PLANS FOR DETAIL). PLANNING/ZONING/STORMWATER: PLANNING AND DEVELOPMENT CITY OF EASLEY 205 N 1ST STREET EASLEY, SC 29640 CONTACT: TOMMY HOLCOMBE PH: 864-855-7908 OH UE CO UE 6" W 2 1/2" W 6" SS 6" SS AGENCY AND UTILITY CONTACTS PREPARED FOR: CO SEWER EXIT INV. OUT = 1057.68 CO 7. A MINIMUM OF 10 FEET HORIZONTAL SEPARATION MUST BE MAINTAINED BETWEEN WATER AND SEWER LINES. THE VERTICAL SEPARATION IS TO BE A MINIMUM OF 18". OH GROUND FINISHED FLOOR ELEV: 4" 1061.18 SANITARY 6" SANITARY SEWER EXIT INV. OUT = 1057.68 6. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND/OR FINAL CONNECTION OF SERVICES. 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS OHP EXACT LOCATION OF EXISTING DOMESTIC WATER ENTRY UNKNOWN. CONTRACTOR TO LOCATE BEFORE CONSTRUCTION. 5. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD LOCATIONS WHEN POSSIBLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION BY DIGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS WELL IN ADVANCE OF TRENCHING. IF CLEARANCES ARE LESS THAN SPECIFIED ON THE PLAN OR 12", WHICHEVER IS LESS, CONTACT THE DESIGN ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. EASLEY FIRST BAPTIST CHURCH OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP alk Ex. Concrete Sidew 3. ALL SEWER LINES SHALL BE POLYVINYL CHLORIDE (PVC) SDR 35 PER ASTM D-3034. OHP 2. ALL PIPE, FITTINGS, PACKING, JOINTING MATERIALS, VALVES, AND FIRE HYDRANTS SHALL CONFORM TO SECTION C OF THE AWWA STANDARDS. ALL ASSOCIATED HARDWARE SHALL HAVE A MINIMUM WORKING PRESSURE OF CLASS 250. OH P OH P OH P OH OH P O HP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP P OH OH P OHP OHP OHP OHP P OHP OHP OHP 6" DOUBLE DETECTOR CHECK VALVE ASSEMBLY IN VAULT WITH FDC LOCATED AT VAULT. MUST BE COORDINATED WITH EASLEY COMBINED UTILITIES AND FIRE MARSHAL OHP OHP OHP OHP OHP OHP OHP OH APPROXIMATE LOCATION OF EXISTING WATER METER & SERVICE OH P 2 OH P W 2" 1/ 6" C900 PVC FIRE SERVICE WATER LINE SERVICE LINE ENTRY AND EXIT POINTS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL REFER PLANS BY ARCHITECT AND MECHANICAL ENGINEER FOR EXACT LOCATIONS AND DEPTHS EXTEND 6" WATER SERVICE TO BUILDING FROM EXISTING VALVE LOCATION APPROXIMATE LOCATION OF EXISTING 6" WATER MAIN 300 EAST FIRST AVENUE EASLEY, SC 29640 UTILITY PLAN P OH P OH P W 2" 1/ 2 W 6" 2.5" METER AND DDCV ASSEMBLY LOCATION FOR NEW 2.5" DOMESTIC SERVICE NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH P OH P OH REROUTE EXISTING WATER SERVICE TO GYM AREA AROUND NEW CONSTRUCTION. MATCH EXISTING WATER SERVICE SIZE. 2 1 6" /2" W W CONNECT TO EXISTING DOMESTIC WATER SERVICE AND REROUTE SERVICE AROUND NEW CONSTRUCTION OH P OH P 45° BEND TEMPORARY BENCHMARK: (North Bolt Fire Hydrant): North Bolt Elevation: 1064.56' R Know what's 0 20 SCALE: 1" = 20' 40 60 Date: 02-27-14 Drawn: RSM Checked: GDH C-4.0 300 EAST FIRST AVENUE EASLEY, SC 29640 NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH UTILITY DETAILS 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS EASLEY FIRST BAPTIST CHURCH 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com N.T.S. PREPARED FOR: SANITARY SEWER CLEAN-OUT PRELIMINARY NOT FOR CONSTRUCTION Date: 02-27-14 Drawn: RSM Checked: GDH C-4.1 ISSUED COMMENT REVISIONS ISSUED NOTE: THE CONTRACTOR SHALL PROVIDE THE CONSULTING ENGINEER WITH A MINIMUM OF 72 HOURS ADVANCE NOTICE TO THE START OF CONSTRUCTION ACTIVITY. ACTIVITY IS DEFINED, BUT NOT NECESSARILY LIMITED TO INSTALLATION OF STONE CONSTRUCTION DRIVE, SILT FENCE, CLEARING AND GRUBBING, STRIPPING TOPSOIL, GRADING, AND INSTALLATION OF ANY UTILITY OR ROAD WORK. SITE INSPECTIONS BY THE CEC AS REQUIRED CAN THEN BE ARRANGED. NOTE: I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 EG. SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000. NOTE: THE CONTRACTOR SHALL PROVIDE A PLACE IS TO BE PROVIDED FOR CONCRETE TRUCKS TO WASHOUT. THE WASHOUT SHALL BE BURIED ONSITE UNTIL CONSTRUCTION IS COMPLETE. ONCE CONSTRUCTION IS COMPLETE, THE WASHOUT WASTE IS TO BE HAULED OFF TO A LANDFILL. SEE EROSION DETAILS FOR WASHOUT DETAIL. PRELIMINARY GENERAL EROSION NOTES: STANDARD EROSION NOTES OHP Ex. Wood Fence LIMITS OF DISTURBANCE (+/- 1.47 ACRES) OHP OHP SF Finish Floor Elev: 1061.18' Covered Walkway OHP EXISTING AWNING TO BE REMOVED OHP Finish Floor Elev: 1066.94' OHP EXISTING DROP INLET AND STORMDRAIN TO BE REMOVED SF EXISTING SIDEWALK TO BE REMOVED, TYP. Finish Floor Elev: 1049.16' Ex. Wood Fence alk EXISTING WOOD FENCE TO BE REMOVED P OH EXISTING AWNING TO BE REMOVED P OH P OH EXISTING CHAINLINK FENCE TO BE REMOVED SF P OH EXISTING SIDEWALK TO BE REMOVED, TYP. P OH INSTALL SILT SAVER TYPE INLET PROTECTION OVER EXISTING STORM DRAIN INLET. SF Ex. Chain Link Fence Finish Floor Elev: 1066.82' P OH EXISTING AWNING TO BE REMOVED IP P OH P OH P OH HP SF EXISTING BUILDING TO BE REMOVED P OH SF Ex. Concrete Sidew SF LIMITS OF DISTURBANCE (+/- 1.47 ACRES) Covered Walkway SF Finish Floor Elev: 1066.72' OHP OHP way Covered Walk O SF P OH way Covered Walk 6. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DISPOSED OF IN A MANNER THAT PREVENTS CONTACT BETWEEN THESE MATERIALS AND STORM WATER THAT IS DISCHARGED FROM THE SITE. 7. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 8. DUST ON THE SITE SHALL BE CONTROLLED BY SPRAYING WATER ON DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 9. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. 10. ALL EROSION CONTROL MEASURES PRESENTED ON THIS PLAN SHALL BE INITIATED AS SOON AS PRACTICABLE. 11. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED FOR AT LEAST 14 DAYS, SHALL BE TEMPORARILY SEEDED. AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS OR AS REQUIRED BY THE PERMIT. 12. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED. THESE AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN. 13. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR MUD, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE. 14. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 15. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT IN ANY POND/TRAP AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OFTHE SITE. 16. ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE FIELD-LOCATED AND NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. 17. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. 18. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES ETC.) TO PREVENT EROSION. 19. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. 20. IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, SILT FENCES SHALL BE USED TO HELP CONTAIN THE SEDIMENT. P dewalk Ex. Concrete Si 5. GENERAL CONTRACTOR SHALL DENOTE ON PLAN ANY TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. OH P SF OH P OH SF P OH EXISTING CHAINLINK FENCE TO BE REMOVED SF P P OH P OH 1. CONTRACTOR TO SCHEDULE ON-SITE PRE-CON MEETING WITH CITY OF CITY OF EASLEY A MINIMUM OF 72 HOURS PRIOR TO THE START OF LAND DISTURBING ACTIVITIES. 2. COORDINATE WITH CHURCH ON DEMOLITION AND CONSTRUCTION SCHEDULE. 3. INSTALL INLET PROTECTION WHERE ILLUSTRATED (EXISTING STRUCTURES). 4. INSTALL SILT FENCE WHERE ILLUSTRATED. 4. BEGIN DEMOLITION OF EXISTING BUILDING, STRUCTURES, PAVEMENT, AND SIDEWALK. 21. SEDIMENT BASINS ARE ATTRACTIVE TO CHILDREN AND CAN BE VERY DANGEROUS. IN ALL CASES, LOCAL ORDINANCES AND REGULATIONS REGARDING HEALTH AND SAFETY MUST BE ADHERED TO. 22. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 80% OF THE COVER FOR UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED. SF LEGEND OH OH P BUILDING DEMOLITION AREA SF SILT FENCE, TYP. BUILDING DEMOLITION AREA OH P SF SF OH P SILT FENCE, TYP. SF SF BUILDING DEMOLITION AREA P SF OH P OH P OH P SF OH P OH P SF EXISTING PAVEMENT TO BE REMOVED OH SEQUENCE OF CONSTRUCTION - PHASE 1: IP OH OH P OH P OH P OH P TIMING OF PAVEMENT REMOVAL DEPENDENT UPON CHURCH USE SCHEDULE DURING CONSTRUCTION OH P PAVEMENT TO BE REMOVED TO ALLOW WATER SERVICE INSTALLATION (DURING PHASE 3) P OH P OH P TEMPORARY CONSTRUCTION ENTRANCE (LOCATION MAY BE ADJUSTED) 300 EAST FIRST AVENUE EASLEY, SC 29640 SILT FENCE, TYP. 4. CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH SF EXISTING DROP INLET AND STORMDRAIN TO BE REMOVED Sidewalk Ex. Concrete OHP OHP Ex. Chain Link Fence OHP SF Finish Floor Elev: 1065.85' OHP EXISTING WOOD FENCE TO BE REMOVED 3. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. DEMOLITION / E&S CONTROL PHASE 1 PLAN alk Ex. Concrete Sidew Ex. Power Transformer OHP Finish Floor Elev: 1065.89' 2. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE EROSION CONTROL PLAN. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com Finish Floor Elev: 1065.97' NOT FOR CONSTRUCTION 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS COORDINATE WITH EASLEY COMBINED UTILITIES FOR REPLACEMENT LOCATION OF POWER TRANSFORMER. ONCE NEW SERVICE ESTABLISHED, REMOVE EXISTING TRANSFORMER PAD. WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. - WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. - WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BM HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300 ET SEQ. AND SCR100000. 8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE; 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: - WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;ı - WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; - FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND - SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. 1. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH EROSION CONTROL SHALL OBTAIN A COPY OF THE EROSION CONTROL PLAN AND THE STATE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. EASLEY FIRST BAPTIST CHURCH 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED PREPARED FOR: NOTE: THE CONTRACTOR SHALL PROVIDE A PORTABLE TOILET IN AN AREA THAT IS AT LEAST 50' FROM ANY WATERS OF THE STATE OR STORM DRAIN SYSTEM. Finish Floor Elev: 1065.85' COMMENT REVISIONS NOTE: DISPOSAL OF SEDIMENT. SEDIMENT REMOVED FROM SILT FENCE, INLET PROTECTION, SEDIMENT PONDS AND TRAPS, ETC. DURING THE COURSE OF CONSTRUCTION, SHALL BE PLACED ON THE TOPSOIL STOCKPILE AND RESPREAD AT THE END OF THE PROJECT. SEDIMENT REMOVED FROM THESE ITEMS AFTER THE SITE HAS BEEN SEEDED, SHALL BE HAULED OF SITE AND DISPOSED OF AT AN APPROVED, LISCENCED SPOIL AREA THAT IS IN FULL COMPLIANCE WITH THE NPDES REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY APPROVALS NECESSARY TO ALLOW FOR THE DISPOSAL OF THIS MATERIAL IF HAULED OFF-SITE. OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OH OHP P OH P R Know what's 0 20 SCALE: 1" = 20' 40 60 Date: 02-27-14 Drawn: RSM Checked: GDH C-5.0 RIM ELEV EX. EXISTING INLET +/-1058.31 1 MANHOLE +/-1060.35 1A AREA INLET 1060.25 2 MANHOLE 1061.90 3 GRATE INLET 1059.48 3A AREA INLET 1060.10 4 GRATE INLET 1060.25 4A AREA INLET 1059.50 4B AREA INLET 1059.50 WV WV EXISTING PROPOSED DESCRIPTION CONTOUR LINE SPOT ELEVATION 93.00 STORM DRAIN INLET STORM DRAIN MANHOLE STORM DRAIN PIPE DIRECTIONAL DRAINAGE ARROW STORMDRAIN SCHEDULE STRUCTURES SIZE LENGTH TYPE SLOPE IE UP IE DOWN 1 TO EX. 24" 59' HDPE 0.82% 1053.73 1053.24 2 TO 1 24 56' HDPE 0.82% 1054.29 1053.83 3 TO 2 24" 94' HDPE 0.82% 1055.16 1054.39 4 TO 3 18" 90' HDPE 0.82% 1056.0 1055.26 1A TO 1 10" 17' HDPE 2.00% 1057.0 1056.66 3A TO 3 10" 44' HDPE 2.00% 1057.0 1056.12 4A TO 4 10" 33' HDPE 2.00% 1057.0 1056.24 4B TO 4 10" 36' HDPE 2.00% 1057.0 1056.28 ISSUED TYPE REVISIONS STRUCTURE COMMENT LEGEND STORMDRAIN STRUCTURE TABLE NOTE: HDPE PIPE SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M-294 AND AASHTO MP7, TYPE S & D. CONNECTIONS SHALL USE A RUBBER GASKET WHICH CONFORMS TO ASTM F-477. INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM RECOMMENDED PRACTICE D-2321 AND AASHTO SECTION 30. HDPE PIPE SHALL NOT REPLACE ANY SECTION OF CLASS IV RCP. PRELIMINARY NOT FOR CONSTRUCTION NOTE: STORMWATER REQUIREMENTS ARE MET DUE TO 0% INCREASE IN IMPERVIOUS AREA. NOTE: ALL ELEVATIONS ARE SHOWN TO BOTTOM OF CURB UNLESS OTHERWISE CALLED OUT Finish Floor Elev: 1065.97' OHP OHP 1061.50 1062.65 1061.50 1065.33 1060.30 1060.81 1062.89 1065.35 1060.51 1062 60 10 4' CURB OPENING FLUSH H.P. 1065.75 1060.29 3A 3 1059.92 1059.48 4' CURB OPENING 1060.29 1060.51 1059.92 OHP OHP OHP OHP P OH OH OH EX. GRADE (±1050.50) P OH OH FLUSH 1060.23 O 1062 1061 FLUSH 28 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 1060.80 1063 62 P 21. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING, AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF ALL WORK INDICATED ON THESE DRAWINGS. THE OWNER AND THE DESIGN ENGINEER ACCEPT NO RESPONSIBILITY FOR THE DESIGNS TO INSTALL SAID ITEMS. P OH P EX. GRADE (±1060.35) OH 1061.60 1061.50 1061.85 1061.75 10 1061.35 1061.25 22. PRECAST DRAINAGE STRUCTURES HAVE BEEN SPECIFIED ON THE PLANS. THE OWNER AND THE ENGINEER, HOWEVER, ASSUME NO RESPONSIBILITY FOR THESE STRUCTURES, AS FIELD CONDITIONS OFTEN DICTATE MINOR ELEVATION ADJUSTMENTS. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY AND EXPENSE FOR MODIFYING THE PRECAST STRUCTURES TO ACCOMMODATE FIELD REVISIONS. 1061.75 1061.70 23. ALL GRADING OPERATIONS, EXCAVATIONS, FILL, COMPACTION TESTING AND BACKFILL SHALL BE COMPLETED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND OBSERVED AND TESTED BY A QUALIFIED GEOTECHNICAL ENGINEER. THE GEOTECHNICAL ENGINEER SHALL BE DESIGNATED BY AND PAID FOR BY THE OWNER. P 1063.55 OH P HP MIN 12 LF 6" HDPE O@ 2.0% TO ROOF DRAIN 1 FLUSH FLUSH 1062.50 OH OH FLUSH 1061 64 10 1A 1061 2 1062.80 EX. GRADE (±1060.0) 1060.25 1060.72 1062.76 20. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD LOCATIONS WHEN POSSIBLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY DIGGING TEST PITS BY HAND AT ALL CROSSINGS WELL IN ADVANCE OF TRENCHING. IF CLEARANCES ARE LESS THAN SPECIFIED ON THE PLAN OR TWELVE INCHES (12"), WHICHEVER IS LESS, CONTACT THE DESIGN ENGINEER AND THE OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION. HP 1060.50 14. TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY BY SURVEY COMPANY, INC., IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE MADE, AT HIS EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW. 19. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR THE EXACT NUMBER, SIZE AND LOCATION OF ANY ROOF DRAINS. HP O 1060.46 1060.50 P OH 1060.60 13. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 18. CATCH BASINS, MANHOLES, FRAMES, GRATES, SHALL MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD DETAILS FOR CONSTRUCTION AND THE EASLEY REQUIREMENTS . P OH EX. GRADE (±1059.50) 1061.18 10. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 17. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT. P OH 1060.51 9. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 16. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. P EXISTING GRATE TO REMAIN 8. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 15. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STAKED SOD TO ALL SLOPES 3H:1V OR STEEPER. CONTRACTOR SHALL GRASS DISTURBED AREAS IN ACCORDANCE WITH STATE SPECIFICATIONS UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. IF ADEQUATE TOPSOIL IS NOT AVAILABLE ON SITE THE CONTRACTOR SHALL PROVIDE TOPSOIL, APPROVED BY THE OWNER, AS NEEDED. P GROUND FINISHED FLOOR ELEV: 1061.18 1061.18 106 5 1063.80 P OH 1060.29 1063.50 1063.95 1063.42 P OH P 1060 1064.20 P OH EX1 1061 1061.85 P OH EX. GRADE (±1060.32) 7. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1.0 FOOT INTERVALS. 12. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. P NEW EDUCATIONAL BUILDING (3-FLOORS) 6. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1.0 FOOT. 11. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. OH 17 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 1060.10 1065.80 1063 49 LF (TOTAL) 6" HDPE @ MIN 2.0% TO ROOF DRAIN 1060.80 1060.15 1062.50 1065.50 1060.80 1060.80 1063 1062.75 OH P 1065.16 OHP 1061.18 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com OHP 1060.95 OH P 1062.25 5. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED, AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS 1061.00 4A 1060 OHP 1060.62 1060.45 4. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED: TYPE 1: RCP, CLASS III PER ASTM C-76, WITH FLEXIBLE PLASTIC BITUMEN GASKETS AT JOINTS, UNLESS OTHERWISE NOTED OHP 4 1064 FLUSH 1065.00 4 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 60.51 23 LF 8" HDPE COLLECTOR PIPE @ MIN 2.0% 60.60 14 LF 8" HDPE COLLECTOR PIPE @ MIN 2.0% 1060.25 P 1064.40 1064.50 60.60 2 10 61 1064.60 1060.56 1060.50 1062.43 1063.40 Finish Floor Elev: 1049.16' Finish Floor Elev: 1061.18' 1061.18 19 LF 6" HDPE @ MIN 2.0% TO ROOF DRAIN 10 6 SH FLU 1064.70 1064.90 32 LF 8" HDPE COLLECTOR PIPE @ MIN 2.0% 60.51 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. OHP 1063.15 1063.09 1064.30 1064.70 60.51 1061 1065.65 1060 OH TC: 1064.50 BC: 1064.00 60.51 1060.51 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. EASLEY FIRST BAPTIST CHURCH OHP OHP alk Ex. Concrete Sidew 1065.85 4B 1064.14 1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES SERVING THE STRUCTURE. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. 20 LF (TOTAL) 6" HDPE @ MIN 2.0% TO ROOF DRAIN Finish Floor Elev: 1065.85' 1065.85 1065.85 TRANSITION FROM ASPHALT FLUSH WITH SIDEWALK TO ASPHALT 6" BELOW TOP OF SIDEWALK SITE GRADING NOTES Finish Floor Elev: 1065.89' PREPARED FOR: Finish Floor Elev: 1065.85' GRADING PLAN CONTRACTOR SHALL COMPLY COMPLETELY WITH THE LATEST STANDARDS OF OSHA DIRECTIVES OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR SHALL USE SUPPORT SYSTEMS, SLOPING, BENCHING AND OTHER MEANS OF PROTECTION. THIS IS TO INCLUDE, BUT NOT LIMITED FOR ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH PERFORMANCE CRITERIA AS REQUIRED BY OSHA. PLEASE CONTACT THE CITY OF EASLEY'S STOMRWATER MANAGEMENT DEPARTMENT AT LEAST 3 DAYS PRIOR TO INITIATION OF LAND DISTRUBING ACTIVITY THE CITY OF EASLEY STORMWATER MANAGEMENT DEPARTMENT 205 N. 1ST ST EALSEY, SC 29640 PH: 864-855-7940 EMAIL: tjones@easley-sc.org FAX: 864-307-0008 27. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL COSTS INCURRED FOR INSPECTION AND TESTING OF SOILS DUE TO FAILURE TO COMPLY WITH THE MINIMUM REQUIREMENTS OF THE SOILS REPORT. 28. ALL GRADING OPERATIONS SHALL BE STAKED BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR APPROVED BY THE OWNER. 29. UPON COMPLETION OF THE GRADING, THE SOILS ENGINEER SHALL PROVIDE OWNER WITH A LETTER INDICATING THAT THE SITE AND BUILDING PAD WERE PREPARED IN DIRECT CONFORMANCE WITH THE RECOMMENDATIONS AND CONCLUSIONS IN THE SOILS REPORT. O HP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OH OH P P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P 26. COMPACTION TESTS SHALL BE DONE FOR EACH TWO FEET OF FILL, BUT NOT LESS THAN ONE TEST FOR EVERY 500 CUBIC YARDS, OR MORE FREQUENTLY IF REQUIRED BY THE GEOTECHNICAL ENGINEER. 300 EAST FIRST AVENUE EASLEY, SC 29640 OH 25. COMPACTION SHALL BE DONE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT AND ON-SITE GEOTECHNICAL ENGINEERS RECOMMENDATIONS. OH P 1063.05 24. NO FILL SHALL BE PLACED PRIOR TO APPROVAL OF THE SUBGRADE BY THE GEOTECHNICAL ENGINEER. P CONNECT TO STORMDRAIN INV (6"): 1055.35 INV (24"); 1054.60 NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH OH P 1061.85 TEMPORARY BENCHMARK: (North Bolt Fire Hydrant): North Bolt Elevation: 1064.56' R Know what's 0 20 SCALE: 1" = 20' 40 60 Date: 02-27-14 Drawn: RSM Checked: GDH C-5.0 ISSUED NOTE: THE CONTRACTOR SHALL PROVIDE THE CONSULTING ENGINEER WITH A MINIMUM OF 72 HOURS ADVANCE NOTICE TO THE START OF CONSTRUCTION ACTIVITY. ACTIVITY IS DEFINED, BUT NOT NECESSARILY LIMITED TO INSTALLATION OF STONE CONSTRUCTION DRIVE, SILT FENCE, CLEARING AND GRUBBING, STRIPPING TOPSOIL, GRADING, AND INSTALLATION OF ANY UTILITY OR ROAD WORK. SITE INSPECTIONS BY THE CEC AS REQUIRED CAN THEN BE ARRANGED. NOTE: I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 EG. SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000. NOTE: THE CONTRACTOR SHALL PROVIDE A PLACE IS TO BE PROVIDED FOR CONCRETE TRUCKS TO WASHOUT. THE WASHOUT SHALL BE BURIED ONSITE UNTIL CONSTRUCTION IS COMPLETE. ONCE CONSTRUCTION IS COMPLETE, THE WASHOUT WASTE IS TO BE HAULED OFF TO A LANDFILL. SEE EROSION DETAILS FOR WASHOUT DETAIL. PRELIMINARY GENERAL EROSION NOTES: STANDARD EROSION NOTES OHP 10 61 OHP OHP OHP OHP 60 10 OHP P OH P SF 1062 OH P OH P OH P OH SF 1065 1061 IP LIMITS OF DISTURBANCE (+/- 1.47 ACRES) P OH P OH P OH SF SF IP P OH P OH SF SF 1063 1061 HP IP O P OH 1060 6. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DISPOSED OF IN A MANNER THAT PREVENTS CONTACT BETWEEN THESE MATERIALS AND STORM WATER THAT IS DISCHARGED FROM THE SITE. SF OH P OH SF P SF P IP OH P OH SEQUENCE OF CONSTRUCTION- PHASE 2: 1. MAINTAIN SILT FENCE AND INLET PROTECTION WHERE PREVIOUSLY INSTALLED. 2. BEGIN GRADING ACTIVITIES SO THAT THE BUILDING PAD IS ESTABLISHED IN PHASE 2. INSTALL STORMDRAIN AS GRADING ACTIVITIES ALLOW AND INSTALL INLET PROTECTION AS NECESSARY. 8. DUST ON THE SITE SHALL BE CONTROLLED BY SPRAYING WATER ON DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 9. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. 10. ALL EROSION CONTROL MEASURES PRESENTED ON THIS PLAN SHALL BE INITIATED AS SOON AS PRACTICABLE. 11. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED FOR AT LEAST 14 DAYS, SHALL BE TEMPORARILY SEEDED. AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS OR AS REQUIRED BY THE PERMIT. 12. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED. THESE AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN. 13. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR MUD, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE. 14. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 15. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT IN ANY POND/TRAP AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OFTHE SITE. 16. ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE FIELD-LOCATED AND NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. 17. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. 18. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES ETC.) TO PREVENT EROSION. 19. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. 21. SEDIMENT BASINS ARE ATTRACTIVE TO CHILDREN AND CAN BE VERY DANGEROUS. IN ALL CASES, LOCAL ORDINANCES AND REGULATIONS REGARDING HEALTH AND SAFETY MUST BE ADHERED TO. 22. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 80% OF THE COVER FOR UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED. SF LEGEND SF OH SF P OH SF SILT FENCE, TYP. STORM DRAIN INLET STORM DRAIN MANHOLE OH P SILT FENCE, TYP. OH P SF IP P SF OH P OH P OH P OH P 1061 SF OH 1062 SF P P OH SF 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com 7. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. P 60 OH 1064 5. GENERAL CONTRACTOR SHALL DENOTE ON PLAN ANY TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 20. IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, SILT FENCES SHALL BE USED TO HELP CONTAIN THE SEDIMENT. P OH 10 4. CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. OH P OH P OH P OH P OH P OH P OH P STORM DRAIN PIPE 300 EAST FIRST AVENUE EASLEY, SC 29640 SF PROPOSED BUILDING PAD 3. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH SF 1064 IP 2. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE EROSION CONTROL PLAN. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. EROSION & SEDIMENT CONTROL PHASE 2 PLAN SF IP NOT FOR CONSTRUCTION 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS 2 OHP 6 10 OHP 63 10 OHP SF 1061 OHP SF OHP OHP OHP alk Ex. Concrete Sidew LIMITS OF DISTURBANCE (+/- 1.47 ACRES) IP WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. - WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. - WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BM HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300 ET SEQ. AND SCR100000. 8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE; 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: - WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;ı - WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; - FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND - SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. 1. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH EROSION CONTROL SHALL OBTAIN A COPY OF THE EROSION CONTROL PLAN AND THE STATE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. EASLEY FIRST BAPTIST CHURCH 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED PREPARED FOR: NOTE: THE CONTRACTOR SHALL PROVIDE A PORTABLE TOILET IN AN AREA THAT IS AT LEAST 50' FROM ANY WATERS OF THE STATE OR STORM DRAIN SYSTEM. SILT FENCE, TYP. COMMENT REVISIONS NOTE: DISPOSAL OF SEDIMENT. SEDIMENT REMOVED FROM SILT FENCE, INLET PROTECTION, SEDIMENT PONDS AND TRAPS, ETC. DURING THE COURSE OF CONSTRUCTION, SHALL BE PLACED ON THE TOPSOIL STOCKPILE AND RESPREAD AT THE END OF THE PROJECT. SEDIMENT REMOVED FROM THESE ITEMS AFTER THE SITE HAS BEEN SEEDED, SHALL BE HAULED OF SITE AND DISPOSED OF AT AN APPROVED, LISCENCED SPOIL AREA THAT IS IN FULL COMPLIANCE WITH THE NPDES REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY APPROVALS NECESSARY TO ALLOW FOR THE DISPOSAL OF THIS MATERIAL IF HAULED OFF-SITE. OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OH OHP OHP P OH P OH P R Know what's 0 20 SCALE: 1" = 20' 40 60 Date: 02-27-14 Drawn: RSM Checked: GDH C-5.1 ISSUED NOTE: THE CONTRACTOR SHALL PROVIDE THE CONSULTING ENGINEER WITH A MINIMUM OF 72 HOURS ADVANCE NOTICE TO THE START OF CONSTRUCTION ACTIVITY. ACTIVITY IS DEFINED, BUT NOT NECESSARILY LIMITED TO INSTALLATION OF STONE CONSTRUCTION DRIVE, SILT FENCE, CLEARING AND GRUBBING, STRIPPING TOPSOIL, GRADING, AND INSTALLATION OF ANY UTILITY OR ROAD WORK. SITE INSPECTIONS BY THE CEC AS REQUIRED CAN THEN BE ARRANGED. NOTE: I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 EG. SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000. NOTE: THE CONTRACTOR SHALL PROVIDE A PLACE IS TO BE PROVIDED FOR CONCRETE TRUCKS TO WASHOUT. THE WASHOUT SHALL BE BURIED ONSITE UNTIL CONSTRUCTION IS COMPLETE. ONCE CONSTRUCTION IS COMPLETE, THE WASHOUT WASTE IS TO BE HAULED OFF TO A LANDFILL. SEE EROSION DETAILS FOR WASHOUT DETAIL. PRELIMINARY GENERAL EROSION NOTES: STANDARD EROSION NOTES OHP 10 6 10 1 62 OHP SF IP OHP 1060 OHP 1063 OHP OHP SF 1064 IP OHP SF P OH P NEW EDUCATIONAL BUILDING (3-FLOORS) P OH P OH P OH P GROUND FINISHED FLOOR ELEV: 1061.18 SF IP P OH SF IP LIMITS OF DISTURBANCE (+/- 1.47 ACRES) OH OH P OH SF SF 1062 60 10 P OH P OH SF SF 1063 1061 HP IP O P OH 1060 2. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE EROSION CONTROL PLAN. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. 3. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. 4. CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. 5. GENERAL CONTRACTOR SHALL DENOTE ON PLAN ANY TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 6. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DISPOSED OF IN A MANNER THAT PREVENTS CONTACT BETWEEN THESE MATERIALS AND STORM WATER THAT IS DISCHARGED FROM THE SITE. 8. DUST ON THE SITE SHALL BE CONTROLLED BY SPRAYING WATER ON DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 9. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. 10. ALL EROSION CONTROL MEASURES PRESENTED ON THIS PLAN SHALL BE INITIATED AS SOON AS PRACTICABLE. 11. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED FOR AT LEAST 14 DAYS, SHALL BE TEMPORARILY SEEDED. AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS OR AS REQUIRED BY THE PERMIT. 12. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED. THESE AREAS SHALL BE SEEDED NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN. 13. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR MUD, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE. 14. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 15. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT IN ANY POND/TRAP AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OFTHE SITE. 16. ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE FIELD-LOCATED AND NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. 17. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. 18. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES ETC.) TO PREVENT EROSION. 19. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. P P OH SF IP P OH 1061 LEGEND SF OH P P OH SF SILT FENCE, TYP. STORM DRAIN INLET STORM DRAIN MANHOLE STORM DRAIN PIPE SF OH P OH P OH P SF OH P OH P SF OH P SILT FENCE, TYP. OH P SF OH SF SF IP P SF OH P OH P OH 22. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 80% OF THE COVER FOR UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED. SF OH P P 10 62 1063 64 10 SF OH P SF 1061 OH 1. MAINTAIN SILT FENCE AND INLET PROTECTION WHERE PREVIOUSLY INSTALLED AND INSTALL ADDITIONAL SILT FENCE AS ILLUSTRATED. 2. BEGIN CONSTRUCTION OF BUILDING AS PAD GRADE IS ACHIEVED. INSTALL UTILITIES AS GRADING ACTIVITIES ALLOW. 3. COMPLETE GRADING ACTIVITIES. PAVE AND INSTALL CURB AND GUTTER WHERE ILLUSTRATED. AS PAVEMENT TIES IN TO EXISTING PAVEMENT, SILT FENCE THAT WAS PLACED AT EDGE OF SAWCUT LINE CAN BE REMOVED. 4. INSTALL ANY NECESSARY PLANTS, LANDSCAPING, AND PERMANENT VEGETATION. 5. ONCE SITE IS STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES (80% STABILIZATION IS REQUIRED PRIOR TO PROJECT BEING CLOSED OUT AND CERTIFICATE OF OCCUPANCY BEING GRANTED AND AN NOT NEEDS TO BE SUBMITTED TO COE). 21. SEDIMENT BASINS ARE ATTRACTIVE TO CHILDREN AND CAN BE VERY DANGEROUS. IN ALL CASES, LOCAL ORDINANCES AND REGULATIONS REGARDING HEALTH AND SAFETY MUST BE ADHERED TO. OH P OH P OH P SILT FENCE TO BE UTILIZED WHEN WATER SERVICE LINE IS CONSTRUCTED SF P R OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OH OHP SF OH OHP OHP 300 EAST FIRST AVENUE EASLEY, SC 29640 1062 SF 1061 SEQUENCE OF CONSTRUCTION - PHASE 3: NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH P OH EROSION & SEDIMENT CONTROL PHASE 3 PLAN SF OH P OHP 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com 7. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 20. IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, SILT FENCES SHALL BE USED TO HELP CONTAIN THE SEDIMENT. P OH 106 5 OHP NOT FOR CONSTRUCTION 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS 1061 LIMITS OF DISTURBANCE (+/- 1.47 ACRES) IP OHP SF OHP OHP SF OHP OHP OHP alk Ex. Concrete Sidew 1060 WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. - WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. - WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BM HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300 ET SEQ. AND SCR100000. 8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE; 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: - WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;ı - WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; - FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND - SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. 1. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH EROSION CONTROL SHALL OBTAIN A COPY OF THE EROSION CONTROL PLAN AND THE STATE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. EASLEY FIRST BAPTIST CHURCH 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED PREPARED FOR: NOTE: THE CONTRACTOR SHALL PROVIDE A PORTABLE TOILET IN AN AREA THAT IS AT LEAST 50' FROM ANY WATERS OF THE STATE OR STORM DRAIN SYSTEM. SILT FENCE, TYP. COMMENT REVISIONS NOTE: DISPOSAL OF SEDIMENT. SEDIMENT REMOVED FROM SILT FENCE, INLET PROTECTION, SEDIMENT PONDS AND TRAPS, ETC. DURING THE COURSE OF CONSTRUCTION, SHALL BE PLACED ON THE TOPSOIL STOCKPILE AND RESPREAD AT THE END OF THE PROJECT. SEDIMENT REMOVED FROM THESE ITEMS AFTER THE SITE HAS BEEN SEEDED, SHALL BE HAULED OF SITE AND DISPOSED OF AT AN APPROVED, LISCENCED SPOIL AREA THAT IS IN FULL COMPLIANCE WITH THE NPDES REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY APPROVALS NECESSARY TO ALLOW FOR THE DISPOSAL OF THIS MATERIAL IF HAULED OFF-SITE. Know what's 0 20 SCALE: 1" = 20' 40 60 Date: 02-27-14 Drawn: RSM Checked: GDH C-5.2 STANDARD EROSION NOTES 1' MIN 2' MAX DROP INLET WITH GRATE BLOCK AND GRAVEL DROP INLET PROTECTION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. AS SHOWN IN DETAIL ONE BLOCK IS PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. THE BOTTOM ROW OF BLOCKS ARE PLACED AGAINST THE EDGE OF THE STORM DRAIN FOR LATER SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, LATERAL SUPPORT MAY BE GIVEN TO SUBSEQUENT ROWS BY PLACING 2" X 4" WOOD STUDS THROUGH BLOCK OPENINGS. HARD WARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS SHALL BE FITTED OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. CLEAN GRAVEL SHOULD BE PLACED 2 INCHES BELOW THE TOP OF THE BLOCKS ON A 2:1 SLOPE OR FLATTER AND SMOOTHED TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. FLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL INSPECTION AND MAINTENANCE: INSPECT, CLEAN, AND PROPERLY MAINTAIN INLET PROTECTION EVERY CALENDAR WEEK AND AFTER EVERY STORM UNTIL THE PROPERTY IS STABILIZED AND ALL TEMPORARY EROSION CONTROL DEVICES ARE REMOVED. REMOVE ANY SILT THAT HAS COLLECTED AROUND INLET PROTECTION. BLOCK AND GRAVEL DROP INLET PROTECTION COMMENT PREPARED FOR: STABILIZED CONSTRUCTION ENTRANCE INSPECTION AND MAINTENANCE: INSPECT, CLEAN, AND PROPERLY MAINTAIN INLET PROTECTION EVERY CALENDAR WEEK AND AFTER EVERY STORM UNTIL THE PROPERTY IS STABILIZED AND ALL TEMPORARY EROSION CONTROL DEVICES ARE REMOVED. REMOVE ANY SILT THAT HAS COLLECTED AROUND INLET PROTECTION. 2 4 5 1 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIAMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF THE BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH THE APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON TEH PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIAMTE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. 300 EAST FIRST AVENUE EASLEY, SC 29640 FINE WIRE MESH 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com TEMPORARY SEDIMENT POOL NOT FOR CONSTRUCTION 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS SILT FENCE INSTALLATION PRELIMINARY NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH CLEAN DRAIN ROCK. 2:1 GRAVEL SLOPE EASLEY FIRST BAPTIST CHURCH FABRIC ATTACHMENT DETAIL ISSUED CONCRETE BLOCK EROSION CONTROL DETAILS FINE WIRE MESH WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. - WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. - WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BM HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300 ET SEQ. AND SCR100000. 8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE; 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: - WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;ı - WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; - FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND - SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. REVISIONS 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAT BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. Date: 02-27-14 Drawn: RSM Checked: GDH C-5.3 300 EAST FIRST AVENUE EASLEY, SC 29640 NEW FACILITIES FOR EASLEY FIRST BAPTIST CHURCH EROSION CONTROL DETAILS 300 EAST 1ST AVENUE EASLEY, SC 29640 PH: 678-352-0595 CONTACT: CHRISTIAN PITTS EASLEY FIRST BAPTIST CHURCH PREPARED FOR: 402 East First Avenue Easley, South Carolina 29640 (864) 855-5200 www.css-eng.com PRELIMINARY NOT FOR CONSTRUCTION Date: 02-27-14 Drawn: RSM Checked: GDH C-5.4 ISSUED COMMENT REVISIONS