granby zoo - Rousseau

Transcription

granby zoo - Rousseau
Rousseau
Gautrin
Engineering
to service
GRANBY ZOO
outlining in order to create, design
and implement an ecological
system with respect to each
and every individual species.
Making sure that their specific
environment is appropriate
and this in conjuncture with an
exceptional visual effect: fantastic
conception and 3D modulation.
SOUTH PACIFIC PAVILLION / BLUE ROOM
HIPPOPOTAMUS POOLS’
• Revise drawings and sketches
• Supervise the structural construction
in their modernization
• Meet with all of the different responsible
interveners from the city of Granby,
Granby Zoo and Servi System
In order to analyze, conceive and determine
all necessary parameters to implement the
maintenance of an ozone treated ecological
system in conjuncture with all physical
characteristics and chemical composition
of the water specific water treatment and
particularities for each and every species had
to be maintained. Special consideration also
had to be given as a global look-around as
well as look-out; this, only surpassed by an
exceptional conception of 3D modulation.
Project realizations
Controls
Drawing
• Conception of process elements
• Architecture control
• Overall outlay in 3D
• Carry out plan
• Operational description
• Detailed plans of LSS systems
• Field management
• Selection of control component
• Coordination of different
• Automate
Electric
• Network
• Electrical equipment list
• Interface operator
• Calculation of electrical requirements
• Programming
• Preliminary electrical engineering
- Automate
• Electrical concept
- Interface operator
- Board design
- Wiring listings
Coordination of interveners
- Reconnection diagrams
• Mechanic
• RH Aquarium LSS system electrical
interveners
• Pre-purchase
• Construction follow-up
• Start up
Calculations
• Hydraulic
• Structure
• Transmitters
• Equipment dimensioning
• One
• Electric
• Control
concept
Project management
• RG production engineering schedule
• Preliminary component purchase list
• Plumbing needs calculation
• Work schedule update
• Quote for prefabricated LSS system
• Specification layout of LSS system
construction
• Making of the LSS system starting procedure
manual
• Quote validation for prefabrication
• Calculation of the cost related figure
for the fabrication of LSS system
per different mode
• Purchase of the LSS system
• Uptake of the labor and work schedule
Mechanic
• Heating ducks measurements
• Selection of missing equipment
• Conception validation
• Calculation of pressure, flow, diameter,
piping, water pump, ozone, venturi...
• Follow-up of the LSS systems conception
• Automation support
www.rousseau-gautrin.com