Ancona,29-30/10/09
Transcription
Ancona,29-30/10/09
“Arianna, il filo…bus e soluzioni innovative” A Ancona, 29 30/10/09 29-30/10/09 Filobus a Salisburgo (Austria) Arnulf Schuchmann Direttore della Ferrovia Locale di Salisburgo 1 Transport history in Salzburg 1886 1887 1892 1940 1887 1909 1907/9 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 2 "Salzburger Sa bu ge Lokalbahn" o a ba today oday Biggest rail operator in the country side "Salzburg" commuter/regional railway - "Salzburger Lokalbahn" (1.000 V, DC) cargo- and passenger transport in the ÖBB and other networks 3 funiculars trolley bus in Salzburg - "Stadtbus" Stadtbus ships on the Wolfgangsee - "Wolfgangssee Schiffahrt" cog railway to the Schafberg - "Schafbergbahn" narrow-gauge regional i l railway il - "Pinzgauer "Pi L Lokalbahn" k lb h " commuter/regional railway - "Berchtesgadener Land Bahn" from 12/2009 44 mio. p passenger g in 2008 580 employees “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Trolley bus comes to Salzburg 1939: Decision to build a trolley bus network 1940: Opening p g of the first trolley y bus line Siegmundsplatz - Maxglan Trolley meets tram, 1940 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Opening of line D from main station to Alpensiedlung 1949 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Heavy traffic at Staatsbrücke 50's “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 First articulated trolleys on Salzburg's streets 1961 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Re-routing of line 77 to the new airport building 1994 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Extension of line 1 to Trade Fair Center 2001 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 New line Taxham - Europark (shopping centre) 2003 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 2009 - big steps for system's development New line 10 Sam to country hospital Extension to Design outlet centre “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Extension of line 3 - first PPP Network extension in 2009 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Trolley bus in Salzburg today “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 The trolley bus lines “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Salzburg g trolley y bus facts 186 km length of total lines 9 trolley bus lines 90 km overhead network p ) 106 electric and 104 mechanic switches ((excl. depot) 44 crossings TB/TB, 5 crossings TB/railway 17 substations in the last 10 years 12 km new lines and 13 km rebuild 86 trolley buses in total 280 drivers, 57 workers in the workshop and overhead services 37,5 37 5 mio mio. passengers in 2008 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Vehicle costs per kilometer (€) Type of cost Standard St d d articulated trolleybus 20 years Auxiliary y engine articulated trolleybus 20 years y Articulated motorbus 13 years Fixed costs (vehicle costs) 0.82 0.88 0.74 Capital costs (annuity) 0.74 0.80 0.66 Insurance 0 08 0.08 0 08 0.08 0 08 0.08 Variable costs 0.59 0.59 0.83 Energy 0.16 0.16 0.43 Maintenance M i t iincl. l iinternal t l services 0.43 0.43 0.40 Infrastructure 0.23 0.23 0.01 Total incl incl. infrastructure 1 64 1.64 1 70 1.70 1 58 1.58 Total excluding rectifiers and overhead conductor lines 1.41 1.47 1.57 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Extrapolation p of energy gy p prices shows the advantages of the trolley bus Cent/kWh resp. l Trend 70 The development of energy prices is crucial for the right decision on PT systems 60 diesel fuel 50 160 40 30 IIn ten t years the th already existing difference would y increase by additional 60% 100 20 10 0 1991 Trend electric power 1993 1995 1997 1999 2001 2003 2005 2007 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 2009 2011 2013 2015 Year The investment-obstacle investment for the infrastructure is cheaper than for a tram system but much higher than for a diesel bus system A trolleybus system is 10 times faster to install A trolleybus system is 80% cheaper to build Trolleybuses have only 50% of the operational costs of a tram system Trolleybus power infrastructure has a life of 50 - 60 years and is lighter than for trams Advantage for Salzburg: city region have subsidized most of the initial investment of the recently new built infrastructure in recognition of the benefits of the trolleybus for the city “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Clear decision pro trolley bus Higher investment costs (approx (approx. 50%) could be justified by a dense and compact network and a high use of the fixed installations as well as of the trolley buses in particular Operational costs are much lower than for diesel/gas b operations bus ti (0 (0,4 4 tto 0 0,6 6 €/km, €/k 10% off total t t l costs) t ) lower energy and maintenance costs for vehicles Revenues are 15% higher since passengers react with a "rail-bonus" (experienced in cases, where the diesel bus line was electrified) “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Clear decision pro trolley bus About 60.000 tons of CO2 are saved annually Harmful noise effects are avoided In combination with the own power production of Salzburg AG by water generators the overall emissions are zero By optimizing the network and the internal procedures of procurement a further cost saving potential of 5-10% can be realized “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Meanwhile sustainabilityy is common for local politicians Prices of real estate along trolley bus routes have been increased much more than on diesel routes or areas without ith t PT Local employers and shop centres ask for trolley bus services in order to offer their customers an easy access by connecting their facilities to the existing et o PT network Financing of infrastructure is done by communities “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Future of trolley bus in Salzburg The new generation: Th ti 23 trolley buses three 'pilot' p vehicles in advance low floor articulated CEGELEC IGBT IGBT-AC AC electronics power 250 KW low speed length 18 m auxiliary diesel engine 3 air condition boxes delivered in 2011/2012 “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 Filobus a Salisburgo ((Austria)) Grazie per la cortese attenzione Arnulf Schuchmann arnulf.schuchmann@salzburg-ag.at lf h h @ l b t “Arianna, il filo…bus e soluzioni innovative” Ancona,29-30/10/09 23