CUIDEMOS MEXICO
Energy Efficient Lighting CDM Project
Results of Main Stakeholder Consultation
August 2008
cool nrg International Pty Ltd
Australia Head Office 269 Stewart Street Brunswick East, Victoria 3057 Australia
Phone +61 3 9387 2964 Fax +61 3 9387 0299
cool nrg Mexico SRL de CV
Vosgos #220 int. 102-B, Col. Lomas de Virreyes, Mexico, D.F. C.P. 11000
Phone/Fax: +52 55 2789 7751
www.coolnrg.com
Summary of Main Stakeholder Public Consultation
Title:
Environmental and Social Impacts of replacing incandescent light
bulbs with compact fluorescent light bulbs
Place:
Hotel Marriot Real Puebla, Puebla City
Date/Time:
August 28th, 2008 (11:00 am)
List of Participants:
•
•
COMEX
Tiendas Coppel
Institutions invited that could not attend:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Greenpeace Mexico
CONIECO
DNV
CESPEDES
CECADESU
Unión de Grupos Ambientalistas
Consejo de la Comunicación
Secretaria de Energia (SENER)
Autoridad Nacional Designada (SEMARNAT)
FIDE
Centro Mario Molina
Secretaria de Medio Ambiente del GDF
Greenpeace International
WWF International
MERCI Corps International
REEEP
Gold Standard Foundation
cool nrg International Pty Ltd
Australia Head Office 269 Stewart Street Brunswick East, Victoria 3057 Australia
Phone +61 3 9387 2964 Fax +61 3 9387 0299
cool nrg Mexico SRL de CV
Vosgos #220 int. 102-B, Col. Lomas de Virreyes, Mexico, D.F. C.P. 11000
Phone/Fax: +52 55 2789 7751
www.coolnrg.com
Organización
FIDE
SEMARNAT
GDF
CESPEDES
CECADESU
MARIO MOLINA
DNV
WWF MEXICO
COMEX PUEBLA
COMEX MEXICO
FOMECAR
CONIECO
SMARN Puebla
WWW International
REEEP
Greenpeace International
Merci Corps International
Contacto
Medio
Ing. Javier Ortega
Ing. Miguel Angel Cervantes
Oscar Vazquez
Alejandro Loera
Email & Tel 5254 3044
Email & Tel 54900987
Email
TEL
TEL
EMAIL
Phone
EMAIL
Email and Phone
Email and Phone
Email & Tel 5449-9349
Email
Email & Tel
Email
Email
Email
Email
Rodolfo Lacy
Barbara Lara
Gerardo Vazquez
Miguel Angel Rubio
Teresa Crespo
Benita Von de Groeben
Fecha
27/08/08
27/08/08
27/08/08
27/08/08
27/08/08
27/08/08
27/08/08
27/08/08
27/08/08
27/08/08
26/08/08
26/08/09
28/8/08
28/8/08
28/8/08
28/8/08
28/8/08
Confirmación/Status
Tel y Mail a Virginia Mayen/ No puede asistir
Tel, no puede asistir -Lucrecia Martin
Vía Email: Betty y Oscar
Sin confirmar
Sin confirmar
NO
No
NO
Confirmado
Confirmado
No
No esta en el pais
No
An open invitation to the Public Consultation session was published in the local
newspaper, El Sol de Puebla, on August 25th and 27th (see Appendix).
Agenda during the Public Consultation Session:
1. Welcome and introduction to Cool nrg
2. Power point presentation of the proposed Program of Activities for Mexico and
the specific impacts of the first project replacing 1 million incandescent light
bulbs with compact fluorescent light bulbs (CO2 reduction estimations,
alignment with current national efforts in energy efficiency, social and energy
consumption benefits)
3. Discussion on the environmental, social and health impacts of the proposed
project in accordance with the Gold Standard Manual for CDM Project
Developers
4. Questions and Answers
5. Closing of the Stakeholders Feedback Round and Public Consultation
cool nrg International Pty Ltd
Australia Head Office 269 Stewart Street Brunswick East, Victoria 3057 Australia
Phone +61 3 9387 2964 Fax +61 3 9387 0299
cool nrg Mexico SRL de CV
Vosgos #220 int. 102-B, Col. Lomas de Virreyes, Mexico, D.F. C.P. 11000
Phone/Fax: +52 55 2789 7751
www.coolnrg.com
Results of the Final Stakeholder Consultation and
Stakeholder Feedback round
Those attending the event asked no further questions, and made no additional
comments with regards to the environmental or social impacts of the project.
All stakeholders who participated in the Initial and Main Stakeholder consultation
process have indicated satisfaction with the feedback provided and had no further
questions or queries with regards to the CUIDEMOS Mexico PoA.
During the open feedback round of the project while posted on the UNFCCC website
the following questions where asked to the project developer:
Stakeholder:
What is the sampling methodology used in the project to randomly select the
monitoring households?
Response:
The methodology requires two sample groups:
•
•
A group of households in which metering equipment will be installed in order
to monitor lighting use.
A non-metered group of households involved in periodic spot-checks to
monitor ongoing functionality of the efficient light bulbs distributed during the
project.
Attached is a document summarising the sampling methodology to be used in order
to select households in which metering equipment will be installed. This document
has been submitted as an Annex to the PoA DDs for consideration by the DOE, and
we are happy to share it with you.
Selection of the second sample group of non-metered households will be undertaken
through random selection of households participating in the project. A database of
participating households will be established during the light bulb distribution process.
A representative sample of spot check households will be created through a simple
randomised selection process applied to the project database.
cool nrg International Pty Ltd
Australia Head Office 269 Stewart Street Brunswick East, Victoria 3057 Australia
Phone +61 3 9387 2964 Fax +61 3 9387 0299
cool nrg Mexico SRL de CV
Vosgos #220 int. 102-B, Col. Lomas de Virreyes, Mexico, D.F. C.P. 11000
Phone/Fax: +52 55 2789 7751
www.coolnrg.com
Stakeholder:
What is the current stage of the project and have you contacted the Mexico City
Environment Minister with regards to this project?
Response:
Thank you for your enquiry regarding our PoA "CUIDEMOS Mexico (Campana De
Uso Intelegente De Energia Mexico)".
In response to your question, we are currently still in validation.
We have been in discussion with some of your colleagues within the Ministry of
Environment in Mexico City. In particular Oscar Vazques and Beatriz del Valle have
been our main point of contact. If you would like further information about our
previous meetings and current plans, please feel free to contact either Andres Rivera
(andres@coolrng.com) or Manuel Rosemberg (manuel@coolnrg.com) from our
Mexico City office.
cool nrg International Pty Ltd
Australia Head Office 269 Stewart Street Brunswick East, Victoria 3057 Australia
Phone +61 3 9387 2964 Fax +61 3 9387 0299
cool nrg Mexico SRL de CV
Vosgos #220 int. 102-B, Col. Lomas de Virreyes, Mexico, D.F. C.P. 11000
Phone/Fax: +52 55 2789 7751
www.coolnrg.com
cool nrg International Pty Ltd
Australia Head Office 269 Stewart Street Brunswick East, Victoria 3057 Australia
Phone +61 3 9387 2964 Fax +61 3 9387 0299
cool nrg Mexico SRL de CV
Vosgos #220 int. 102-B, Col. Lomas de Virreyes, Mexico, D.F. C.P. 11000
Phone/Fax: +52 55 2789 7751
www.coolnrg.com
2a consulta pública 2008
2nd public consultation 2008
PUEBLA
introducción
El día 28 de agosto de 2008 se realizó la segunda consulta pública
local del proyecto “Cuidemos México” en la ciudad de Puebla. Siguiendo
las normas Gold Standard y la metodología dictada por las Naciones Unidas se invitó a representantes de ONGs y agencias gubernamentales, y se
contó con la asistencia de miembros de las cadenas Comex y Coppel. Se
presentó el proyecto a los asistentes y se abrió una sesión de preguntas y
respuestas sobre los impactos sociales y ambientales del mismo. El evento
fué todo un éxito y nos fortalece para seguir adelante con las siguientes
fases del programa.
On august 28th, 2008 Cool nrg executed the second public consultation
for the project “Cuidemos México” in the city of Puebla. Following the Gold
Standard norm and the United Nations Methodology we invited different
NGOs, government agencies, and the general public; we were able to discuss the main environmental and social impacts with representatives from
Comex and Coppel. The event was a success and gave us strength to continue bolstering upcoming stages of the project.
andres rivera pesquera/manuel rosemberg s.
cool nrg méxico
2a consulta pública 2008
public consultation 2008
PUEBLA
invitación electrónica
e-vite
sent to both government institutions and ngo´s across méxico
2a consulta pública 2008
public consultation 2008
PUEBLA
anuncio periódicos
newspaper ad
publicada el 25 y 27 de agosto de 2008, periódico El Sol de Puebla
published August 25th and 27th, El Sol de Puebla Newspaper
2a consulta pública 2008
public consultation 2008
PUEBLA