spec sheet - Oslo Data Center Location
Transcription
spec sheet - Oslo Data Center Location
Oslo Data Center Location DMS 60o12.1’N 10o14.3’E Follummoveien, Hønefoss, Norway www.oslodclo.com Oslo Data Center Location at Hønefoss, Norway – A part of the Oslo region. Oslo Data Center Location Hønefoss, Norway DMS 60o12.1’N 10o14.3’E Hydropower 17 MW SITE POWER LINES E16 / HIGHWAY SUBSTATION HYDROPOWER Hydropower CONNECTIVITY 6 MW COOLING WATER 25 km Substation 300 kV OO 132 kV Hydropower 28 MW Cooling water 1 000 l / sec 3x Substations 132 kV OO 22 kV C IT Y 60 k 420 kV OO 132 kV LO OS Substation 0 km L 7 OS 1 km / 0.621 miles m Oslo – 60 km Hønefoss – 3 km The location O SITE CHARACTERISTICS. SITE ACCESS AND DISTANCES. O Up to 100 ha of flat land on stable and well drained compact gravel soil. O Direct access from national highway E16 along 2-lane paved local road, 0 – 2 km. O Zoned for industrial use. O Oslo International Airport is 70 km / 60 minutes away. O The site is largely greenfield with some internal roads and infrastructure. O New and extended zoning in progress to be completed within 2017 in order to include new areas. O Municipality offers fixed time plans for detailed zoning and building permit approval. O Oslo city is 60 km / 60 minutes away (1 million inhabitants including suburbs). O The town of Hønefoss is 3 km away (19 000 inhabitants). O Drammen harbour is 65 km / 60 minutes away. POWER SUPPLY. COOLING. O Idle capacity of more than 100 MW is available at 22 kV adjacent to site. O Up to 1 000 l / sec of filtered river water available for cooling. O Additional dedicated 132 kV/200+MW substation can be constructed on site. O Excess heat dump to district heating grid may be possible. O 3 independent 132 kV substations 1 km away, supplied from two High Voltage TSO substations, 420 kV and 300 kV. O Cool Nordic climate. O Additionally, 3 hydropower stations in river Begna adjacent to site with an accumulated power of 50 MW. O Redundant dark fibre available adjacent to site. CONNECTIVITY. O Can be offered from several providers. Space Power O O O FOLLUMMOEN O POWER SUPPLY The land covers a total area of 130 Ha. Excluding the necessary space for public roads, green belts, buffer zones and the existing rail road and 300 kV power lines, it is expected that the buildable flat area should be in the order of 60 Ha on the upper level (155 ± 5 m.a.s.), and 18 Ha on two separate lower levels (approx. 125 m.a.s.). Oslo Data Center Location is located at a strong node and interconnection point of the national (TSO/420 kV), regional (DSO/132 kV, and local (22 kV) power grids. This can be supplemented with approximately 50 MW of local hydro power generation in adjacent river Begna. The development is directed by the municipality, providing a generic industrial zoning plan which is taking into account the specific needs of a typical hyper scale datacenter. O GEOTECHNICAL STATUS The area consists of stable and dry gravel to a depth of roughly 15–50 metres above solid bedrock. Geotechnical analysis shows that the site is suitable for industrial development. Buildings with a ground pressure up to 200 – 300 kPa can be constructed practically anywhere in the area. O ENVIRONMENTAL IMPACT ANALYSIS Onsite visits and public records show no environmental issues in conflict with the purpose of building large scale data centres. The soil is well suited for surface water management and drainage, even following extensive hard surface construction. No cultural heritage or archeological sites are recorded in the area. O ZONING PLAN The borders of the zoning plan are according to the map on page 2. The further process will progress according to the following milestones in the zoning plan preparation are expected: Formal startup mid October 2016 Municipal Council Municipal Council Municipal Council First political evaluation January 2017 Final approval June – Sept 2017 The local utility, Ringeriks-Kraft Nett AS, has permits and ability to deliver up to 100 MW at the site within 12 months from order / investment decision. O TECHNICAL PROPOSAL FOR 100 MW A 2,6 km 22 kV cable can be constructed from the Follum substation utilizing an idle 80 MVA transformer and adjacent 80 + 60 MVA transformers to 100 MW capacity. Power redundancy solutions can be provided as indicated in the map to the right. 10 MW is already available at site to be provided during construction. O EXTENSIONS UP TO 300 MW The power supply can be extended with an additional 200 MW by constructing a dedicated 132 / 22 kV substation at the site. Such extensions will be established by the regional grid operator (DSO / 132 kV) Glitre Energi Nett AS in collaboration with the national TSO Statnett SF (300 – 420 kV). 132 kV 80 MVA 132 / 22 / 5 kV 60 MVA 132 / 22 kV 22 kV 80 MVA 132 / 22 / 5 kV New switchgear New underground cables 80 MW Overhead line / underground cables 20 MW Hydroelectric 28 MW Customer 100 MW Hydroelectric 17 MW Hydroelectric 6 MW Connectivity O O DARK FIBRE MAP Several dark fibre and wavelength carriers are present at the Oslo Data Center Location site or immediately adjacent to the site. Easy Fibre is one of the companies present with dark fibre capacity. illustration / map: easyfibre.se Ringerike O NATIONAL BUSINESS ENVIRONMENT O THE MUNICIPALITY OF RINGERIKE adm. centre The town of Hønefoss (19 000 inhabitants) total area 1 970 km2 total population 43 000 country Norway county Buskerud Part of Oslo Business Region O Norway is fully integrated in the EU single market by the European Economic Area agreement. National law is based on EU directives. O Norway is a safe and business friendly country. According to the publication ”Ease of doing business 2014” from the IFC and World Bank, Norway ranks 7th among the 189 countries listed. O The parliament holds a broad majority across the party spectrum in support of the datacenter industry. O The energy tax for datacentres is 0,0048 NOK / kWh, about 0,5 € / MWh, the same as other strategic industries. PUBLIC INFRASTRUCTURE O Ringerike has large areas that are zoned for industry and a significant local renewable energy generation O Proximity to both Oslo City (60 km) and OSL, Oslo International Airport at Gardermoen (70 km), ensures efficient access to workforce and supplies O High quality hospital (9 km), police station (6 km) and fire department with industrial capacity (8 km) all located in the vicinity of Oslo Data Center Location. Ringerike EDUCATION, SCIENCE AND RESEARCH is a district in Norway, O Norway has a vital and growing IT industry O The University of Oslo is the largest and most diverse university in Norway O The university campus in Hønefoss (University College of Southeast consisting of the municipalities Hole, Jevnaker and Ringerike Norway) provides education and research locally O Several secondary and vocational schools provide a highly competent and dynamic workforce. LOCAL GOVERNMENT "In Ringerike we focus on facilitating for development and growth. The district's mayors welcome new establishments to one of Norway’s most expansive business regions. Basing your business in Ringerike will give your company and employees great opportunities for further growth and development." ringerike kommune mayor | Kjell B. Hansen corporate partners THE NORDIC REGION SWEDEN FINLAND NORWAY Oslo International Airport RUSSIA Oslo ESTONIA U.K. NORTH SEA LAT VIA DEN. BALTIC SEA LITHUANIA BELARUS TECHNICAL / COMMERCIAL ISSUES: BUSINESS / HOSPITALITY: LOCAL GOVERNMENT: Dr. Rolf Jarle Aaberg Mr. Jørgen Moe Jr. Mrs. Gunn Edvardsen (+47) 930 33 907 (+47) 934 07 021 jm@oslodclo.com gunn.edvardsen@ ceo follum eiendom as (+47) 977 08 138 rja@oslodclo.com Postal address ceo ringerike utvikling as/ director regional development director general of strategic development ringerike.kommune.no Oslo Data Center Location C/O University College of Southeast Norway, PO BOX 164 Sentrum, N-3502 Hønefoss Mr. Pelle Gangeskar Visiting address Postal address Visiting address Visiting address www.oslodclo.com Follumveien 100, N-3515 Hønefoss chief business development (+47) 911 13 636 pg@oslodclo.com Oslo Data Center Location C/O University College of Southeast Norway, PO BOX 164 Sentrum, N-3502 Hønefoss Bredalsveien 14, N-3502 Hønefoss Postal address Ringerike Kommune, PO BOX 123 Sentrum, N-3502 Hønefoss Town Hall, Osloveien 1, N-3502 Hønefoss Space Power Connectivity o o o