South Boston Bypass Road (SBBR)
Transcription
South Boston Bypass Road (SBBR)
South Boston Bypass Road (SBBR) and High Occupancy Vehicle (HOV) Lanes Pilot Program Elements of the Pilot Program 24 ho ur s Unrestricted access to the Ted Williams Tunnel eastbound HOV system during all time periods. Unrestricted access allowed between Richards Street/Cypher Street and West Service Road during all time periods in both directions. A South Boston Waterfront Sustainable Transportation Study (SBW STS) Recommendation 6: 10 00 :0 AM 0 AM to Westbound (outbound) restrictions remain at all times. Unrestricted access allowed between I-93 Frontage Road to Richards Street/ Cypher Street; one-way eastbound (inbound) during the morning peak period only (6:00 AM to 10:00 AM). 0 300 600 Feet South Boston Bypass Road (SBBR) I-90 Eastbound HOV Ramp from Kneeland Street HOV Ramp from I-93 Frontage Road On-ramp from I-93 Northbound HOV Lane I-90 Eastbound HOV Lane from I-93 Northbound Key Intersections Background Project Overview Points of Contact The South Boston Waterfront (SBW) Sustainable Transportation Plan (STP) considered several transportation improvements to alleviate congestion in the South Boston neighborhood and to provide additional access to the waterfront. One proposed enhancement was modification of current access restrictions along the South Boston Bypass Road (SBBR). The SBBR is currently limited to commercial traffic only from the I-93 Frontage Road system to West Service Road in recognition of maritime industrial businesses that depend on dedicated truck routes to support their operations, which are key to the distribution of goods and services throughout New England. The SBBR/HOV Pilot Program consists of: If you have questions at any time, the following resources are available: In addition to the temporary SBBR access restriction modifications, the Pilot Program will also include access modifications to portions of the current High Occupancy Vehicle (HOV) system. The proposed HOV modifications are an attempt to enhance access to the South Boston Waterfront area only during the Pilot Program. Temporarily lifting the restrictions along a portion of the HOV system, currently underutilized, will provide an alternate route for traffic destined for Logan Airport to avoid unintended consequences associated with trips not originating or destined for South Boston using the SBBR to access the airport. SBBR between Cypher Street/Richards Street and West Service Road unrestricted access during all time periods in both directions SBBR between I-93 Frontage Road and Cypher Street/Richards Street eastbound (inbound) unrestricted access during the morning peak period (6:00 to 10:00 AM) [Note: westbound (outbound) direction remains restricted during all time periods] Massachusetts State Police will be strictly enforcing restrictions on the SBBR. Failure to comply may result in a moving violation and a fine of $50 per infraction. HOV Ramps open to general traffic during all time periods »»I-93 Northbound to I-90 Eastbound »»I-93 Northbound to South Station »»I-93 Frontage Road to I-90 Eastbound »»Kneeland Street/Lincoln Street to I-90 Eastbound Project email address: SBBR.Pilot@dot.state.ma.us Call Center phone number: 857-368-3500 SBW STS website: www.abettercity.org/landdev/southboston.html If information is needed in another language, please contact the Highway Division Call Center at (857) 368-3500 or SBBR.Pilot@dot.state.ma.us. Caso necessite de informações em outro idioma, favor entrar em contato com the Highway Division Call Center pelo fone (857) 368-3500 ou SBBR.Pilot@dot.state.ma.us. Si necesita información en otro idioma, por favor contactar a the Highway Division Call Center al (857) 368-3500 o SBBR.Pilot@dot.state.ma.us. 如果需要使用其它语言了解信息,请联系蕾切尔.汉默曼, (857) 368-3500 或 SBBR.Pilot@dot.state.ma.us. 如果需要使用其它語言了解信息,請聯系瑞秋.漢默曼, (857) 368-3500 或 SBBR.Pilot@dot.state.ma.us. »»Kneeland Street/Lincoln Street to I-93 Southbound An analysis will follow after the Pilot Program to determine what, if any, further actions may be taken. Project Schedule 2015/16 TRAFFIC MONITORING CHECKPOINT END DATE Late September/Early October 2015 Friday, February 19, 2016 START DATE TRAFFIC MONITORING CHECKPOINT POST PILOT PROGRAM EVALUATION Monday, August 17, 2015 Early December 2015 March 2016