Tramdepot Beverwaard (NL)
Transcription
Tramdepot Beverwaard (NL)
Tramdepot Beverwaard (NL) Kick Off TramStore21, Thursday, October 23rd, Brussels Project TramStore21 Interreg IVB NWE W.F. (Wilko) Mol M.A. sr. consultant innovation, dep. Strategy and Innovation Outline 1. The company RET 2. A sustainable company 3. Current depot 4. Location Tramdepot Beverwaard 5. Lay-out Tramdepot site 6. Artist Impressions 7. Planning 8. Organization 9. Specific environmental/sustainable measures 10. Objectives Sustainable Tramdepot project 11. Indication of investment and Energy reductions 12. Opportunities for RET within TramStore21 13. To summarize 1 The company RET Founded in 1878 Since 2007: independent governmental organ (N.V.) Regional Authority of Rotterdam is legal owner (“inhouse operator”) 600.000 passengers per day, 2.500 employees Annual turnover € 430 million Regional rail-/metronetwork, 8 tramlines, 36 buslines, 14 night buslines Since 1 May 2008: Fast Ferry Hoek van Holland 150 metros, 125 trams, 220 busses and 1 fast ferry 6 stabling and maintenance areas: 2 metro, 2 tram and 2 bus A sustainable company No hype but clear focus RET aims to be the most sustainable public transport company in the world! An anthology: - Agreement on sustainable transport with Rotterdam Climate Initiative (Dec.’07) - 100% renewable traction power tram/metro - 100% regenerative braking tram/metro - Pilot super cab (tram) - Busses 100% Euro5/EEV - Pilot with hybrid busses - Eco-friendly driving training - Etc., etc. 2 Current depot Current depot outdated More space and modern maintenance equipments needed A new location for 95 new trams! Perfect opportunity for building a tramdepot of the 21st century Location: South-east Rotterdam Transfer location: P+R, direct access to motorway (direct access to city centre, football stadion and events, (i.e. Ahoy) > 19.700 m2 available site > 5.650 m2 maintenance equipment hall + wash site trams + RET offices > 12.400 m2 stabling area City centre Location Beverwaard Football stadion Feyenoord Ahoy events hall Existing tramline 3 Lay-out Tramdepot site Site tramdepot secured by fences, surveillance cameras and a glass wall at the eastside. Water ditch Westside Northtside Wash site trams Maintenance hall (5.650 m2) Southside Water pond Entrance to tramstore site RET offices (400 m2) RET parking place 12.400 m2 groundfloor: stabling area (95 trams) + Public parking place (P&R) at roof Sound barrier Exit tramdepot Eastside Entrance to P&R Entrance tramdepot Artist Impression: northside view 4 Artist Impression: southside view Planning Tendering Building Permit Environmental Permit Ground works Start building (piles) Building works ready Tram Depot ready Start operation : 10 May 2008 : 1 November 2008 (expected) : 1 November 2008 (expected) : July – December 2008 : 1 December 2008 (prov. permits) : March/April 2010 : May 2010 : September 2010 5 Organization Specific environmental/sustainable measures Grey water cycles Solar energy Wind turbines Park & Ride roof Foundation tramdepot: recycled granulate Energy piles under maintenance hall Illumination (interior and exterior) 6 Objectives Sustainable Tramdepot project 1. Improving quality of environment Location depot & P+R to promote PT to city centre and main events ! Profit : reduction of CO2-emission 2. Improving sustainability in building construction Sustainable materials, concrete floors ! Profit : 23.000 m2 with recycled granulate 3. Managing natural resources Solar energy Wind turbines ! Profit : clean energy, no pollution or waste, no overcapacity, compensation, etc. 4. Lowcost use of energy Energy piles Grey water for tramwashing and sanitary use in offices Illumination (movement detection and daylight depending) ! Profit : energy reduction and promote efficient use of energy Indication of investment and energy reductions Total investment (depot, P+R, crossings, tramstop): € 40.000.000 Total building costs tramdepot: € 22.000.000 1. Parking roof double use of groundspace/yr 2. Energy piles 90.000 m3 saving of gas/yr 3. Illumination 300.000 kWh/yr 4. Grey water tram washing 1.300 m3 saving of water/yr 4. Grey water cycle toilets 1.300 m3 saving of water/yr 5. Environmentally friendly materials PM 6. Solar boilers 60% saving of gas use/yr 7. Wind turbines 1.000.000 kWh/yr 7 Opportunities for RET within TramStore21 Sharing knowledge with partners and others Benchmarking with partners (financially and technical) Encourage to manage natural resources in other new (RET-)buildings Building a sustainable tramdepot, with low energy use and reduction of maintenance costs Imagebuilding: “be good and show it” To summarize Project TramStore21 helps to Encourage the sustainability and management of natural resources in conformity with local policy Innovate in sustainable and eco-friendly techniques Build a sustainable tramdepot in the Beverwaard, an excellent location for a tramdepot in combination with P+R and an existing tramline Implement the technical innovative but realistic solutions Overcome the additional costs of the specific investments Create a common base for sharing knowledge and experiences 8 Contact details RET N.V. W.F. (Wilko) Mol M.A. PO Box 112 3000 AC Rotterdam +31 10 447 5332 +31 6 145 155 08 wfmol@ret.nl www.ret.nl 9
Similar documents
RET - Clean Fleets
• 2 updates (including modified software, a new type of generator engine and new axles, but same battery pack!) for improvement • RET Operation (especially drivers) satisfied with the
More information