tram power upgrade project
Transcription
tram power upgrade project
Impact on land The project will ensure the site is securely fenced off for the entire construction period. Most works will be restricted to the substation site, however for a small period underground connection work will be carried out and works will be required outside the site. Advance notification will be provided to the community for any additional impacts. The project team will make every effort to minimise the impact on the land. ALBERT RD & FERRARS ST SOUTH MELBOURNE TRAM POWER UPGRADE PROJECT A tree management plan will be in place during construction to minimise the impact on surrounding vegetation. Any impact to the land outside the site area will be remedied once works are complete. Traffic Residents can expect construction vehicles moving through the local area. At times temporary lane closures and footpath closures will be required. Traffic controllers will be present to help minimise disruption to motorists and pedestrians. Please look for warning signage and follow the direction of traffic controllers. Please note the footpath and underpass next to the site will remain open. Advance notification will be provided if a closure is required. As a follow up from the letter delivered to properties on Monday 4 January 2016, Public Transport Victoria (PTV) would like to notify you about the commencement of construction works. PTV and Yarra Trams are building a new tram power substation on the corner of Albert Rd & Ferrars St, South Melbourne. These power upgrade works are part of the Victorian Government’s $800 million investment in new trams and modern infrastructure to help cater for the future demand of Melbourne’s tram network. Minimising disruptions During this time residents can expect to hear construction related noise. Our workers will be mindful of keeping noise to a minimum and respecting the needs of the local community. TIMING PTV and Yarra Trams are committed to keeping the local community informed of construction activity and progress. We thank you for your patience and understanding during this important upgrade work. Early work has commenced on site and will be completed over a seven month period. The majority of work will be carried out during the day. LOCATION Corner of Albert Road & Ferrars Street, South Melbourne IMPACT ON MOTORISTS AND PEDESTRIANS Information in other languages: 9321 5440 9321 5454 9321 5441 9321 5446 9321 5442 9321 5447 9321 5452 9321 5453 If you have a hearing or speech impairment, contact us through the National Relay Service: 9321 5443 9321 5448 > TTY users phone 133 677, then ask for 1800 800 007 9321 5444 9321 5449 9321 5445 All other languages 9321 5450 For more information visit ptv.vic.gov.au/trampowerupgrade call 1800 800 007 or email ptvprojects@ptv.vic.gov.au PTVH0429/16. Authorised by Public Transport Victoria, 750 Collins Street, Docklands Partial lane closures and footpath closures or detours may, at times, be required. The construction zone will be securely fenced off. 86 96 RELIABLE SERVICE FOR 180 MILLION 180 MILLION What will the substation look like? To cater for future demand of Melbourne’s tram network the Victorian Government has invested over $800 million 57 in new RELIABLE trams and modern infrastructure to revitalise the THE SERVICE FOR network. BIGGEST The substation will have an average footprint of 16m x 5m. 55 A tram network for the future 86 TRAM DEPOT TRAM PASSENGERS TRAMS this one has been strategically placed to provide power to nearby routes 96 and 12. 30 Tram power upgrades 48 109 STATE-OF-THE-ART 11 FACILITY 12 RELIABLE 86 96 SERVICE FOR 70 180 MILLION CUSTOMERS 35 NEXT GENERATION > Are critical to boosting the capacityTRAMS of the tram 35 11 patronage growth network to accommodate future 48 in Melbourne 0 > Are necessary to support the introduction of the 7 YEARLY 48 75 THE BIGGEST TRAM DEPOT REDEVELOPMENT IN MELBOURNE’S HISTORY > Installation of prefabricated substation (approximately March/April 2016) > Internal fit out and power connection works > Testing and commissioning > Architectural treatment, landscaping and site clean-up NEW & UPGRADED INFRASTRUCTURE > Will ensure a smooth ride for passengers, 1 a reliable service and consistent journey times. 1 MONTH TRANSFORMING THE HISTORIC PRESTON WORKSHOPS INTO A 2 MONTHS 2 DAYS 1 MONTH 2 MONTHS 1 MONTHS Site preparation Earth works Substation building Electrical works Testing and comissioning Finishing work Removal of vegetation Preparation of foundations Delivery of prefabricated building Electrical connections to building Testing internal equipment Architectural treatment and site clean-up STATE-OF-THE-ART FACILITY INCREASED RELIABILITY70 75 12 96 109 next generation E-Class trams of the building TRANSFORMING THE HISTORIC PRESTON WORKSHOPS INTO A 55 YEARLY Yarra Trams and PTV will provide advance notification of activities likely to cause disruption during construction. 35 TION TRAM DEPOT REDEVELOPMENT IN MELBOURNE’S HISTORY HOME OF MELBOURNE’S 12 IN MELBOURNE’S HISTORY 59 180 MILLION CUSTOMERS > Pouring of concrete base > Construction of new cable pits at the front The scope of works includes: Work will be predominately carried out weekly from HISTORIC Monday to Friday, 7am – 5pm. It is expected the build of the PRESTON WORKSHOPS 109substation new will TRANSFORMING INTO A be completed over a 7 month period; 12 work STATE-OF-THE-ART however the level of on-site 10will 9 vary during this time FACILITY with some periods of low activity. – the landowner, and City of Port Phillip Council who manage the site area, to ensure visual amenity is a key consideration in the architectural façade of the structure. THE BIGGEST 30 works will begin on site in February 2016 including preparation of foundations for the structure and the construction of conduits. 57 RELIABLE SERVICE FOR E’S 86 180 MILLION TRAM DEPOT REDEVELOPMENT Yarra Trams are working closely with VicTrack 5 and YEARLY 3PTV NEXT GENERATION These substations are common across the network and What is planned EarlyPASSENGERS work commenced on site in January 2016. Earth 19 As partYEARLY of these upgrades, PTV in partnership with Yarra REDEVELOPMENT PASSENGERS INHOME MELBOURNE’S OF Trams TRAM is building a new tram power substation on the HISTORY MELBOURNE’S corner of Albert Road & Ferrars Street, South Melbourne. Timing YEARLY TRAM Site set-up INCREASED CAPACITY 78 180 MILLION The substation will be housed within a fully enclosed HISTORIC containerised building that will include architectural PRESTON WORKSHOPS featuresTRANSFORMING to minimise visual INTO A impact and to help the structureSTATE-OF-THE-ART blend in with the surrounding environment. FACILITY RELIABLE An architect was engaged to work closely with key THE SERVICE FOR stakeholders in finalising the design treatment. BIGGEST IN MELBOURNE’S HISTORY RELIABLE SERVICE FOR 11 1, 3, 3a, 5 , 16, 64, 6 6, 8 7, 72 YEARLY TRAM PASSENGERS REDEVELOPMENT 70 Construction of conduits 7 MONTHS 55 9 Please note that these timeframes are approximate and may change. 10 12 96 8 1 9 10 16 ,5,6, 3,3a 7, 72 64, 6 1 8 12 New substation 78 TION THE BIGGEST TRAM DEPOT IN MELBOURNE’S HISTORY 72 96 12 E’S REDEVELOPMENT Artist impression subject to change. 6 12 Timeframes are indicative only and subject to change.