Development Status Report
Transcription
Development Status Report
Development Status Report Toowoomba November 2014 Development Status Report Toowoomba Regional Council Area Table of Contents Project Locations Map 5 Projects Underway 6 Projects Approved & Awaiting Commencement 11 Projects Proposed 13 Projects Recently Completed 16 November 2014 TSBE is the ‘go-to’ organisation that links business with opportunity to achieve sustainable growth and diversity for the region. Toowoomba and the wider Surat Basin is a regional centre that is continuing to experience high growth and increased investment generated by an active resource sector, growing infrastructure requirements, seasoned agricultural productivity and many other successful industries. TSBE remains committed to fostering and facilitating the sustainable growth and development of our region. As such, TSBE wholeheartedly supports the local business community by being an information centre, advocacy agent for key infrastructure issues and providing vital services to local businesses. The Development Status Report is updated bi-annually to equip readers with knowledge including costs, locations and estimated completion dates for known developments in the Toowoomba region. It is through providing this complete record that we hope to encourage further investment, lending confidence and providing businesses with the relevant information to make sound business decisions. This document is compiled by TSBE for its members. Significant care has been taken to confirm the currency and accuracy of the material. TSBE holds no responsibility for errors or omissions and will ensure that any changes in project are included in subsequent editions. Our region is rich with possibility. We have thriving agriculture, manufacturing and transport industries... 2 Development Status Report November 2014 Executive Summary The succeeding Development Status Report for the Toowoomba region highlights the significant levels of investment within the area. The projects listed within this publication are categorised into four difference phases of development: • • • • Projects Underway Projects Approved and Awaiting Commencement Projects Proposed Projects Recently Completed Due to the nature of the document, some information has been excluded and this must be acknowledged as a limitation of this report. This information relates to developments where commercial-in-confidence arrangements still currently exist or where information still has public availability restrictions in place. These areas are marked as ‘TBA’. The report also excludes the majority of developments under the $2 million construction cost threshold. These limiting factors must be taken into account when reading this report. Conservative findings show approximately $11 billion development spend in the region. Included in this total is the $300 million spent building the long-anticipated Brisbane West Wellcamp Airport and Business Park. The airport is now complete, and commercial flights in and out of the region have commenced. Another large infrastructure project is Interlink SQ, currently underway with Stage One due for completion in 2015. In total, projects currently underway totalled more than $3.9 billion and are expected to contribute significantly to development in the region. Awaiting commencement is the approved QIC redevelopment of Grand Central and Gardentown shopping centres, with the construction cost contributing $460 million to total development spend. Additionally, $1.7 billion will be spent building the Toowoomba Second Range Crossing, with construction beginning in 2015 and completion set for 2018. Projects approved and awaiting commencement totalled $2.3 billion. Also included in the total development spend figures are major proposed projects, including the Melbourne to Brisbane Inland Rail Project and the new Bunnings, with these figures totalling $4.1 billion. The below chart demonstrates the report’s overall findings: Development Spend Distribution (million) Proposed - $4,057 22% Underway - $3,967.3 39% Projects Approved & Awaiting Commencement - $2,251.5 39% TSBE would like to thank the companies that contributed information to this document. They are formally acknowledged at the end of the report. Any proponent with information to be included in future editions can contact TSBE on (07) 4639 4600. The findings of this report are conservative but indicate a total development spend for our region well in excess of $11 billion 3 D evelopment Status Report November 2014 TSBE would like to thank our key partners and supporters: Foundation Partner Major Sponsor Diamond Members Platinum Members TSBE is the go-to organisation that links business with opportunity to achieve sustainable growth and diversity... 4 Development Status Report November 2014 Gold Members Partner Regional Councils Project Locations Map 5 D evelopment Status Report November 2014 Projects Underway– Infrastructure and Services Project Name Wellcamp Airport and Business Park 3 Location Description Proponent Construction Cost (million) Estimated Completion Date Wellcamp A jet capable privately owned airport, available for commercial freight and passenger movements. Commercial business park to complement Wellcamp Airport. Wagners $300 November 2014 Queensland Government (Royalties for the Regions funding) $50 March 2015 Outer Circulating Road Project 1 Toowoomba The project involves construction of a new four lane road extending Victoria St from Russel St at the Chalk Drive intersection. Once completed, the ringroad network will run along Herries St, Clifford St, Russell St, Victoria St extension, Chalk Drive and Hume St to help improve traffic efficiency in the inner city. Includes restoration of West Creek Railway Bridge. National Broadband Network 1 Toowoomba Rollout of the NBN in Toowoomba Australian Government $246 June 2015 1 Throughout the Darling Downs and Lockyer Valley Reconstruction of flood-affected roads on the Main Roads network from devastating natural disaster events of 2011, 2012 and 2013. Queensland Government (Transport and Main Roads), CGI Consulting and AECOM $1,055 June 2015 Freight Terminals Trust Stage 1 - $30 Total Investment - $160 Stage 1-2015 Charlton 200 hectare Intermodal and Bulk Freight Terminal development for Southern Queensland Toowoomba Upgrade work for O’Mara Rd between the Warrego Hwy and Toowoomba-Cecil Plains Rd to handle increased traffic associated with the Charlton-Wellcamp Enterprise Area Toowoomba Regional Council $21 June 2015 Transport Network Reconstruction Program Interlink SQ O’Mara Road Upgrade 6 Map Position Development Status Report November 2014 3 1 Completion2025 Projects Underway – Infrastructure and Services Cont. Project Name Toowoomba Substation Upgrades CBD Flood Mitigation Works Category D Flood Mitigation works Map Position 1 1 1 Proponent Construction Cost (million) Estimated Completion Date Location Description Toowoomba Upgrade to the Toowoomba central substation as part of the redevelopment of Gardentown and Grand Central shopping centre, as well as the South Toowoomba substation beside the City Golf Club. Toowoomba Regional Council $74 Late 2015 Toowoomba Upgrade to stormwater drainage systems on the northern end of Ruthven St crossing East Creek and upstream channel works Toowoomba Regional Council/ Queensland Government $4.6 March 2015 Toowoomba Project includes multiple detention basin works and road crossings. Toowoomba Regional Council $27 June 2015 Projects Underway – Mining and Energy Project Name New Acland Mine Map Position 4 Location Acland Description Open-cut coal mine employing 300 people and injecting $300 million into the southeast Queensland economy each year Proponent New Hope Group Construction Cost (million) $1,700 7 Estimated Completion Date 2017 D evelopment Status Report November 2014 Projects Underway – Property and Construction Project Name Location Description Proponent Construction Cost (million) Estimated Completion Date 2 Kleinton and Meringindan Rds, Highfields Stage 5 includes 49 residential lots Clive Berghofer Group $2.3 March 2015 1 Shoesmith Rd and Gwenda Dr, Westbrook Stage 3 and 4 includes 46 residential blocks Clive Berghofer Group $2 November 2014 1 280 Mackenzie Street, Rangeville 144 bed residential aged care home. Bupa Aged Care $25 Early 2015 1 Glenvale Rd and McDougall St, Toowoomba 108 residential sites (over 3 stages) and a recreational park Kevin Carlin $12.5 November 2014 Sanctuary Rise Stage 3 1 Greenwattle and Barlow Sts, Toowoomba Stage 3 includes 70 residential lots of a total of 311 lots to be delivered in 5 stages Consolidated Properties Group $3 July 2015 Nelson Street Estate Stage 4 1 Nelson and Kearney Sts, Toowoomba Stage 4 includes 65 residential blocks Clive Berghofer Group $3 November 2014 Vacy St and Anzac Av, Toowoomba Stage 2: The Clifton on Vacy and the Clifton on Anzac. The three Clifton sites will offer 43 townhouses. Thirdi Property Group $11.6 November 2014 1 Holberton St Newtown 12 two bedroom apartments, including four adaptable dwellings on the ground floors for tenants needing wheelchair access Queensland Government (Housing 2020 Strategy) $2.6 Late 2014 Community Care Unit 1 Spring and West Sts, Toowoomba Residential facility with 24 beds for mental health patients Queensland Government $11.6 Late 2014 Warwick Street 1 Toowoomba Expansion of Stonestreet’s Coaches Stonestreet’s Coaches $3.5 Late 2015 North Highfields Estate Stage 5 Westbrook Estate Stages 3 and 4 Bupa Aged Care Facility Parkview Estate Stage 3 The Clifton Toowoomba Stage 2 Social Housing Complex 8 Map Position Development Status Report November 2014 1 Projects Underway – Property and Construction cont. Project Name Kalimna Park Residential Estate Stage 12 Rosemount Downs Retirement Village New Toowoomba City Library CBD Hotel Development Highfields State High School Map Position 2 1 1 1 2 Location Description Proponent Construction Cost (million) Estimated Completion Date Highfields 12 stage residential land subdivision with stage one remaining with 36 lots QMAC Group $3.4 December 2014 Glenvale, Toowoomba 153 home estate including country club bar and restaurant, tennis courts, bowling green and pool Stephen Thomas $80 April 2015 Herries and Victoria Sts, Toowoomba 6800 square metre facility spread across three storeys. Includes the library, as well as an immunisation clinic, local history library, a bicycle drop-off centre and undercover basement parking for 95 cars Toowoomba Regional Council $24.5 Late 2015 Margaret St, Toowoomba An 8-storey, 74-room Quest Serviced Apartment hotel, that will incorporate part of the historical Church of Christ building FKG $14.5 May 2015 Highfields New high school to accommodate Grade 7 and 8 at the new school, with subsequent year levels added each year to Grade 12 Queensland Government $35 Stage 1 -January 2015 Crampton Automotive $10 March 2015 -New Mercedes showroom -Refurbishment of the existing building for the new Hyundai showroom Crampton Automotive Extension 1 James St, Hume St and Phillip St, Toowoomba -New workshop and part department -Drive-through service centre -New used car operation -Customer parking area and service storage facility 9 D evelopment Status Report November 2014 Projects Underway – Property and Construction cont. Project Name Wilsonton Shopping Center Development Sorrento Estate St Andrew's Hospital Expansion Map Position Construction Cost (million) Estimated Completion Date Wilsonton Shopping Center $50 November 2016 Development of a 101 block subdivision in an 8.5 hectare area between Ruthven and Kearney Sts. FKG $15 July 2015 Toowoomba Development of new infrastructure providing surgical and mental health services facilities. Will encompass 20 bed mental health unit. Toowoomba Regional Council $9.2 Early 2015 Toowoomba Grammar School $11 July 2015 Location Description 1 Wilsonton, Toowoomba Construction of a state of the art, eight cinema movie theatre, two new fast food outlets and a second Kmart department store. Also includes a demolition and modernisation of KFC restaurant, new medical centre and mechanical repair workshop. 1 Kearney Spring, Toowoomba 1 Proponent Toowoomba Grammar School Boarding House 1 Toowoomba Expansion of student accommodation facilities with the construction of two major buildings Redevelopment of Grand Central and Gardentown Shopping Centres 1 Margaret St, Toowoomba Integration of Grand Central and Gardentown shopping centres QIC $460 September 2016 1 Hume St, Toowoomba 300 square metretenanted retail building in the existing car park of the Hooper Centre HC Property Services TBA TBA Hooper Center Plan 10 Development Status Report November 2014 Projects Approved and Awaiting Commencement– Infrastructure and Services Project Name Rail Tunnel Upgrades Toowoomba Second Range Crossing Map Position 1 1 Location Description Proponent Construction Cost (million) Estimated Completion Date Toowoomba Range Expand the capacity of 11 rail tunnels through the Toowoomba Range Queensland Government $17 TBA Toowoomba A bypass route to the north of Toowoomba, approximately 41km in length, running from the Warrego Highway at Helidon in the east to the Gore Highway at Athol Queensland and Federal Government $1,700 2018 Projects Approved and Awaiting Commencement– Property and Construction Project Name Athena Motel and Apartment Map Position 1 Brownesholme Village Expansion Eastside Village Development Worship Centre 1 1 Construction Cost (million) Estimated Completion Date Marcus Goldie TBA Early 2015 Stage 1-96 bed aged care facility Carinity $15.5 May 2015 Cohoe and Herries Sts, Toowoomba Proposed fast food precint development to include a McDonalds and KFC JM Kelly Group $9 Subject to redesign Boundary St and Hursley Rd Toowoomba 370 seat worship centre with a floor area of just under 2000 square metres over two storeys, as well as a childcare centre, a mens shed and a caretakers residence Lifeworks Uniting Church $4.5 Stage 1 Late 2015 Location Description 214 James St Toowoomba Construction of a new 33 room motel spanning 3,600 square metres. Will include single story main building and a two storey manager’s residence Highfields Rd, Highfields Proponent 11 D evelopment Status Report November 2014 Projects Approved and Awaiting Commencement– Property and Construction CONT. Project Name Highfields Sports Park Crows Nest Retirement Facility Charlton Sports Precinct Makin Mattresses Outlet 12 Development Status Report November 2014 Map Position 2 5 3 1 Location Description Proponent Construction Cost (million) Estimated Completion Date Highfields 39.4 hectares of land providing a high quality multi sports facility. This will be used daily for training and competition and for larger sporting carnivals. Toowoomba Regional Council $25.5 Crows Nest 98 hectare site to include 204 one, two and three bedroom residential dwellings, a community centre and convenience store. To be built over six stages B&P Woodhead D&K Hoskings & MN Vogler $20 Commencing December 2014 Charlton Master plan completed in February 2014 for approximately 44 hectares of land acquired to be developed into major sporting facilities area Toowoomba Regional Council TBA TBA Corner Alderley St and Walter Drive Building of a 1000 square metre new factory outlet at the entrance of the 7SD industrial park in Harristown. This construction includes 400 square metre showroom, 400 square metre assembly area and 200 square metre of storage. Makin Mattresses TBA TBA Stage 1July 2015 Final Stage - June 2018 Projects Proposed– Infrastructure and Services Project Name Melbourne to Brisbane Inland Rail Project Sewerage Network Enabling Project Steger Road Upgrade Map Position 1 3 3 Construction Cost (million) Estimated Completion Date Location Description Proponent Toowoomba A proposed rail link, to run from the Port of Melbourne to the Port of Brisbane and transverse through Toowoomba with the construction of a tunnel through the Toowoomba Range Australian Government and private investors $3,000 2020 Charlton Sewerage Network Enabling Project at the Toowoomba Enterprise Hub. Covering 2000 hectares, this area will provide much needed industrial land for the region. Toowoomba Regional Council and Industry $9 December 2015 Charlton Upgrade of Steger Road at Toowoomba Enterprise Hub. Covering 2000 hectares, this area will provide much needed industrial land for the region. Toowoomba Regional Council and Industry $7 June 2016 Projects Proposed – Mining and Energy Project Name New Acland Coal Mine Stage 3 (revised project) Map Position 4 Location Acland Description Continuation of the existing New Acland open-cut coal mine, boosting employment to 435 people at its peak, and contributing almost $6.6 billion over the life of the mine in direct operating costs Proponent New Hope Group Construction Cost (million) $869 Estimated Completion Date 2029 13 D evelopment Status Report November 2014 Projects Proposed– Property and Construction Project Name Map Position Location Description Proponent Construction Cost (million) Estimated Completion Date Highfields Extension of existing Mary Mackillop Primary School to become a preschool to Grade 12 campus Mary Mackillop Primary School $30 Stage 1 January 2016 1 Ruthven St, Toowoomba 18,130 sqm site to include Bunnings Warehouse and 480 parking spaces. To be built on former Foundry site. Bunnings $43 2018 Charlton Shopping Centre 3 Warrego Highway, Charlton A shopping centre to be built over 4,700 square metres, with a gross floor area of 1,025 square metres Range Manufacturing TBA TBA Westbrook Motel 6 Main St, Westbrook Motel with 27 units to be built next door to existing shopping centre TBA TBA TBA Anzac Avenue Super Centre Shopping Complex 1 Anzac Av, Toowoomba Shopping complex including furniture and retail outlets Wagners $10.5 2016 1 Bridge, Ruthven, Russell, Railway and Bellevue Sts, Toowoomba This area is proposed to become an urban village with green, residential and retail spaces and an indoor marketplace Toowoomba Regional Council/ Queensland Government TBA TBA Pure Land Learning College TBA TBA Invest and Grow TBA TBA Mary Mackillop Catholic High School Bunnings Warehouse Toowoomba Rail Yards Precint Redevelopment 2 Education and Meditation Facility 4 TBA State of the art education and meditation facility to include classes for Prep to Grade 12 students and a prayer hall. The school will be self-sustainable, using solar panels to power its library, dining hall, prayer room, 12 room staff dormitory and 120 plus rooms Residential Unit Development 1 Cavell and Bridge Sts, Toowoomba 14 units including 10, 2 bedroom units and 4, 3 bedroom units 14 Development Status Report November 2014 Projects Proposed– Property and Construction Cont. Project Name Zimm Corner Upgrades Redevelopment of Marco Polo Chinese Restaurant Site Worker’s Accommodation Map Position 1 1 8 and 10 BORAL Asphalt Facility Eastpointe Apartments 1 Construction Cost (million) Estimated Completion Date Location Description Proponent Toowoomba Upgrading the Zimms Corner service station including area for trucks to drive in, fill up, turn around and park. An area for drivers to eat, rest and shower will also be provided. It is also proposed to be opening 24 hours a day. Zimms Corner $3 Late 2014 Toowoomba A fast food redevelopment of the abandoned site at the intersection of Ruthven and Alderley Sts. There will be seven food outlets, two drive-throughs (Subway and the Coffee Club). Brutnell Developments $6.5 August 2014 Beale and Gayle Sts, Oakey and Postman’s Ridge 300 unit workers accommodation village, split between sites at Oakey and Postman’s Ridge for workers building the Toowoomba Second Range Crossing. Qantac $24 February 2015 & May 2015 Charlton The construction of a manufacturing plant capable of producing 180 tonnes of asphalt every hour. This will be built on 37.44 hectares of land within the Toowoomba Enterprise Hub. BORAL $10 2020 Kitchener St, Toowoomba 11 storey, 48 unit development FKG $45 TBA 15 D evelopment Status Report November 2014 Projects Recently Completed (last 12 months) Project Name Map Position Location Description Proponent Construction Cost (million) Estimated Completion Date FKG Office Stage 2 1 275 McDougall St Toowoomba Workshop FKG $4 Completed Toowoomba Turf Club Track Restoration Project 1 Toowoomba Reinstatement of a turf track at Clifford Park Toowoomba Turf Club $7 Completed Highfields Expansion and upgrade of existing Woolworths supermarket, Woolworths petrol station, car park sail and additional specialty shops Lauder Pty Ltd $7 Completed Ironbark Ridge Residential Estate Westbrook Three stage 99 lot residential land subdivisions with Stage 3 completing the final 33 lots. Ridgewood Properties $2.2 Completed Drayton Shopping Centre Brisbane St Drayton Shopping centre that includes Woolworths, bottle shop and pharmacy Chris Hughes $20 Completed North Toowoomba Shopping complex that includes Coles, Aldi, a medical centre, pharmacy, newsagent and 20 specialty shops Hallmark Property $25 Completed Private Investment $2.5 Completed Highfields Village Shopping Centre Expansion Northpoint Shopping Centre 1 1 The Vault on Ruthven 1 Ruthven St Toowoomba Adult entertainment venue within the old Commonwealth Bank building. A total of 960 sq metres was refurbished Westbrook Stages 1 and 2 6 Westbrook 50 residential blocks, selling from April 2014 Clive Berghofer Group $2.2 Completed 1 Stenner St Toowoomba Refurbishment and new build within existing Blue Care facility Blue Care $6.5 Completed 1 Greenwattle and Barlow Sts Toowoomba 68 lots (total 311 lots, in 5 stages) of residential land subdivision Consolidated Properties Group $6 Completed Blue Care Refurbishment Sanctuary Rise Residential Estate Stage 1 16 Development Status Report November 2014 Projects Recently Completed (last 12 months) Project Name Map Position Location Description Proponent Construction Cost (million) Estimated Completion Date Heritage Bank Refurbishment 1 400 Ruthven St Toowoomba Refurbishment which includes a complete makeover of rear courtyard and Heritage Plaza arcade, upper tower repainted and new tiles on exterior areas around the building Redevelopment of Chronicle Building 1 Ruthven St Toowoomba 4000 square metres of office and retail with Power Tynan the major tenant Argyle Investments $4 Completed 189 Hume St, Toowoomba Multi level commercial and retail development. Includes apartments and underground car park, offices and a café Coffee House Pty Ltd $8 Completed Toowoomba A new stormwater network will be installed in Goggs Street, as part of the West Creek channel works. The Project will provide flood mitigation for a storm event up to a nominal one in 10-year event. Toowoomba Regional Council, State Government and Federal Government $4.5 Completed Department of Transport and Main Roads $80.5 Completed Laguna Serviced Apartments Goggs Street Flood Mitigation 1 1 Heritage Bank $3 Completed Toowoomba Range Roadworks 1 Toowoomba Flood reconstruction works of new 1.2km eastbound section of the Toowoomba Range. It has made the range accessible under extreme weather conditions to all 23,000 vehicles that use the highway daily. Empire Theatre Expansion (Armitage Centre) 1 54-56 Neil St, Toowoomba 350-seat Toowoomba Regional Arts and Community Centre Toowoomba Regional Council $5.5 Completed 2 Kleinton and Meringindan Rds, Highfields Stage 4 includes 52 residential blocks Clive Berghofer Group $2.3 Completed North Highfields Estate Stage 4 17 D evelopment Status Report November 2014 Projects Recently Completed (last 12 months) CONT. Project Name Map Position Location Construction Cost (million) Estimated Completion Date Consolidated Properties Group $3 Completed Description Proponent Stage 2-74 lots residential land subdivision Sanctuary Rise Stage 2 1 Greenwattle and Barlow Sts, Toowoomba Witmack Industrial Park Stage 4 3 Witmack Industrial Park Industrial Business Park Witmack Industrial Pty Ltd $5 Completed Centenary Heights State High School 1 Ramsay and South Sts, Toowoomba Grade 7 infrastructure/new 12 space teaching block Department of Education $4.5 Completed 51 Wilkinson St. Toowoomba Multi level administration building, workshop facilities, recycling facilities and transport bays for 45 trucks. The transport depot will include 6 workshop bays and 1,200m2 office building built by GK Lawson and Steinmuller Constructions. JJ Richards & Sons Pty Ltd $12 Completed JJ Richards & Sons Toowoomba Depot 18 Development Status Report November 2014 1 A BIG THANK YOU TO OUR GENEROUS CONTRIBUTORS: 19 D evelopment Status Report November 2014 Toowoomba and Surat Basin Enterprise Postal Address PO Box 658, Toowoomba QLD 4350 P 07 4639 4600 F 07 4639 3416 E info@tsbe.com.au W www.tsbe.com.au