Development Status Report

Transcription

Development Status Report
Development
Status Report
Toowoomba
November 2014
Development Status Report
Toowoomba Regional Council Area
Table of
Contents
Project Locations Map 5
Projects Underway 6
Projects Approved
& Awaiting Commencement
11
Projects Proposed
13
Projects Recently Completed
16
November 2014
TSBE is the ‘go-to’ organisation that links business with
opportunity to achieve sustainable growth and diversity
for the region.
Toowoomba and the wider Surat Basin is a regional centre that is
continuing to experience high growth and increased investment
generated by an active resource sector, growing infrastructure
requirements, seasoned agricultural productivity and many other
successful industries. TSBE remains committed to fostering and
facilitating the sustainable growth and development of our region. As
such, TSBE wholeheartedly supports the local business community
by being an information centre, advocacy agent for key infrastructure
issues and providing vital services to local businesses.
The Development Status Report is updated bi-annually to equip readers
with knowledge including costs, locations and estimated completion
dates for known developments in the Toowoomba region. It is through
providing this complete record that we hope to encourage further
investment, lending confidence and providing businesses with the
relevant information to make sound business decisions.
This document is compiled by TSBE for its members. Significant care
has been taken to confirm the currency and accuracy of the material.
TSBE holds no responsibility for errors or omissions and will ensure
that any changes in project are included in subsequent editions.
Our region is rich
with possibility.
We have thriving
agriculture,
manufacturing
and transport
industries...
2
Development Status Report
November 2014
Executive Summary
The succeeding Development Status Report for the Toowoomba region highlights
the significant levels of investment within the area. The projects listed within this
publication are categorised into four difference phases of development:
•
•
•
•
Projects Underway
Projects Approved and Awaiting Commencement
Projects Proposed
Projects Recently Completed
Due to the nature of the document, some information has been excluded and this
must be acknowledged as a limitation of this report. This information relates to
developments where commercial-in-confidence arrangements still currently exist or
where information still has public availability restrictions in place. These areas are
marked as ‘TBA’. The report also excludes the majority of developments under the $2
million construction cost threshold. These limiting factors must be taken into account
when reading this report.
Conservative findings show approximately $11 billion development spend in the
region. Included in this total is the $300 million spent building the long-anticipated
Brisbane West Wellcamp Airport and Business Park. The airport is now complete,
and commercial flights in and out of the region have commenced. Another large
infrastructure project is Interlink SQ, currently underway with Stage One due for
completion in 2015. In total, projects currently underway totalled more than $3.9 billion
and are expected to contribute significantly to development in the region. Awaiting
commencement is the approved QIC redevelopment of Grand Central and Gardentown
shopping centres, with the construction cost contributing $460 million to total
development spend. Additionally, $1.7 billion will be spent building the Toowoomba
Second Range Crossing, with construction beginning in 2015 and completion set
for 2018. Projects approved and awaiting commencement totalled $2.3 billion. Also
included in the total development spend figures are major proposed projects, including
the Melbourne to Brisbane Inland Rail Project and the new Bunnings, with these
figures totalling $4.1 billion.
The below chart demonstrates the report’s overall findings:
Development Spend Distribution (million)
Proposed - $4,057
22%
Underway - $3,967.3
39%
Projects Approved & Awaiting
Commencement - $2,251.5
39%
TSBE would like to thank the companies that contributed information to this document.
They are formally acknowledged at the end of the report. Any proponent with
information to be included in future editions can contact TSBE on (07) 4639 4600.
The findings of
this report are
conservative but
indicate a total
development spend
for our region
well in excess of
$11 billion
3
D
evelopment Status Report
November 2014
TSBE would like to thank our
key partners and supporters:
Foundation Partner
Major Sponsor
Diamond Members
Platinum Members
TSBE is the go-to
organisation that
links business
with opportunity
to achieve
sustainable
growth and
diversity...
4
Development Status Report
November 2014
Gold Members
Partner Regional Councils
Project Locations Map
5
D
evelopment Status Report
November 2014
Projects Underway– Infrastructure and Services
Project Name
Wellcamp Airport and
Business Park
3
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
Wellcamp
A jet capable
privately owned
airport, available for
commercial freight
and passenger
movements.
Commercial business
park to complement
Wellcamp Airport.
Wagners
$300
November
2014
Queensland
Government
(Royalties for
the Regions
funding)
$50
March 2015
Outer Circulating Road Project
1
Toowoomba
The project involves
construction of a
new four lane road
extending Victoria
St from Russel St
at the Chalk Drive
intersection. Once
completed, the ringroad network will
run along Herries
St, Clifford St,
Russell St, Victoria
St extension, Chalk
Drive and Hume St to
help improve traffic
efficiency in the
inner city. Includes
restoration of West
Creek Railway
Bridge.
National Broadband
Network
1
Toowoomba
Rollout of the NBN in
Toowoomba
Australian
Government
$246
June 2015
1
Throughout
the Darling
Downs and
Lockyer
Valley
Reconstruction
of flood-affected
roads on the Main
Roads network from
devastating natural
disaster events of
2011, 2012 and 2013.
Queensland
Government
(Transport
and Main
Roads), CGI
Consulting
and AECOM
$1,055
June 2015
Freight
Terminals
Trust
Stage 1 - $30
Total
Investment
- $160
Stage 1-2015
Charlton
200 hectare
Intermodal and Bulk
Freight Terminal
development for
Southern Queensland
Toowoomba
Upgrade work for
O’Mara Rd between
the Warrego Hwy and
Toowoomba-Cecil
Plains Rd to handle
increased traffic
associated with the
Charlton-Wellcamp
Enterprise Area
Toowoomba
Regional
Council
$21
June 2015
Transport Network
Reconstruction Program
Interlink SQ
O’Mara Road Upgrade
6
Map
Position
Development Status Report
November 2014
3
1
Completion2025
Projects Underway – Infrastructure and Services
Cont.
Project Name
Toowoomba Substation
Upgrades
CBD Flood Mitigation
Works
Category D Flood
Mitigation works
Map
Position
1
1
1
Proponent
Construction Cost (million)
Estimated
Completion
Date
Location
Description
Toowoomba
Upgrade to the
Toowoomba central
substation as part of
the redevelopment
of Gardentown
and Grand Central
shopping centre,
as well as the
South Toowoomba
substation beside the
City Golf Club.
Toowoomba
Regional
Council
$74
Late 2015
Toowoomba
Upgrade to
stormwater drainage
systems on the
northern end of
Ruthven St crossing
East Creek and
upstream channel
works
Toowoomba
Regional
Council/
Queensland
Government
$4.6
March 2015
Toowoomba
Project includes
multiple detention
basin works and road
crossings.
Toowoomba
Regional
Council
$27
June 2015
Projects Underway – Mining and Energy
Project Name
New Acland Mine
Map
Position
4
Location
Acland
Description
Open-cut coal
mine employing
300 people and
injecting $300 million
into the southeast
Queensland economy
each year
Proponent
New Hope
Group
Construction Cost (million)
$1,700
7
Estimated
Completion
Date
2017
D
evelopment Status Report
November 2014
Projects Underway – Property and Construction
Project Name
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
2
Kleinton and
Meringindan
Rds,
Highfields
Stage 5 includes
49 residential lots
Clive
Berghofer
Group
$2.3
March 2015
1
Shoesmith
Rd and
Gwenda Dr,
Westbrook
Stage 3 and
4 includes 46
residential blocks
Clive
Berghofer
Group
$2
November
2014
1
280
Mackenzie
Street,
Rangeville
144 bed residential
aged care home.
Bupa Aged
Care
$25
Early 2015
1
Glenvale
Rd and
McDougall
St,
Toowoomba
108 residential sites
(over 3 stages) and a
recreational park
Kevin Carlin
$12.5
November
2014
Sanctuary Rise Stage 3
1
Greenwattle
and Barlow
Sts,
Toowoomba
Stage 3 includes 70
residential lots of a
total of 311 lots to be
delivered in 5 stages
Consolidated
Properties
Group
$3
July 2015
Nelson Street Estate Stage 4
1
Nelson and
Kearney Sts,
Toowoomba
Stage 4 includes 65
residential blocks
Clive
Berghofer
Group
$3
November
2014
Vacy St and
Anzac Av,
Toowoomba
Stage 2: The Clifton
on Vacy and the
Clifton on Anzac.
The three Clifton
sites will offer 43
townhouses.
Thirdi
Property
Group
$11.6
November
2014
1
Holberton St
Newtown
12 two bedroom
apartments,
including four
adaptable dwellings
on the ground floors
for tenants needing
wheelchair access
Queensland
Government
(Housing
2020
Strategy)
$2.6
Late 2014
Community Care Unit
1
Spring and
West Sts,
Toowoomba
Residential facility
with 24 beds for
mental health
patients
Queensland
Government
$11.6
Late 2014
Warwick Street
1
Toowoomba
Expansion of
Stonestreet’s
Coaches
Stonestreet’s
Coaches
$3.5
Late 2015
North Highfields Estate
Stage 5
Westbrook Estate Stages
3 and 4
Bupa Aged Care Facility
Parkview Estate Stage 3
The Clifton Toowoomba
Stage 2
Social Housing Complex
8
Map
Position
Development Status Report
November 2014
1
Projects Underway – Property and Construction
cont.
Project Name
Kalimna Park Residential
Estate Stage 12
Rosemount Downs
Retirement Village
New Toowoomba City
Library
CBD Hotel Development
Highfields State High
School
Map
Position
2
1
1
1
2
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
Highfields
12 stage residential
land subdivision with
stage one remaining
with 36 lots
QMAC Group
$3.4
December
2014
Glenvale,
Toowoomba
153 home estate
including country club
bar and restaurant,
tennis courts, bowling
green and pool
Stephen
Thomas
$80
April 2015
Herries and
Victoria Sts,
Toowoomba
6800 square metre
facility spread across
three storeys. Includes
the library, as well as
an immunisation clinic,
local history library,
a bicycle drop-off
centre and undercover
basement parking for
95 cars
Toowoomba
Regional
Council
$24.5
Late 2015
Margaret St,
Toowoomba
An 8-storey,
74-room Quest Serviced
Apartment hotel, that
will incorporate part of
the historical Church of
Christ building
FKG
$14.5
May 2015
Highfields
New high school to
accommodate Grade 7
and 8 at the new school,
with subsequent year
levels added each year
to Grade 12
Queensland
Government
$35
Stage 1
-January
2015
Crampton
Automotive
$10
March 2015
-New Mercedes
showroom
-Refurbishment of
the existing building
for the new Hyundai
showroom
Crampton Automotive
Extension
1
James St,
Hume St and
Phillip St,
Toowoomba
-New workshop and
part department
-Drive-through service
centre
-New used car
operation
-Customer parking area
and service storage
facility
9
D
evelopment Status Report
November 2014
Projects Underway – Property and Construction
cont.
Project Name
Wilsonton Shopping
Center Development
Sorrento Estate
St Andrew's Hospital
Expansion
Map
Position
Construction Cost (million)
Estimated
Completion
Date
Wilsonton
Shopping
Center
$50
November
2016
Development of a 101
block subdivision in
an 8.5 hectare area
between Ruthven and
Kearney Sts.
FKG
$15
July 2015
Toowoomba
Development of
new infrastructure
providing surgical
and mental health
services facilities. Will
encompass 20 bed
mental health unit.
Toowoomba
Regional
Council
$9.2
Early 2015
Toowoomba
Grammar
School
$11
July 2015
Location
Description
1
Wilsonton,
Toowoomba
Construction of a state
of the art, eight cinema
movie theatre, two
new fast food outlets
and a second Kmart
department store. Also
includes a demolition
and modernisation of
KFC restaurant, new
medical centre and
mechanical repair
workshop.
1
Kearney
Spring,
Toowoomba
1
Proponent
Toowoomba Grammar
School Boarding House
1
Toowoomba
Expansion of student
accommodation
facilities with the
construction of two
major buildings
Redevelopment of Grand
Central and Gardentown
Shopping Centres
1
Margaret St,
Toowoomba
Integration of
Grand Central and
Gardentown shopping
centres
QIC
$460
September
2016
1
Hume St,
Toowoomba
300 square metretenanted retail building
in the existing car park
of the Hooper Centre
HC Property
Services
TBA
TBA
Hooper Center Plan
10
Development Status Report
November 2014
Projects Approved and Awaiting Commencement–
Infrastructure and Services
Project Name
Rail Tunnel Upgrades
Toowoomba Second
Range Crossing
Map
Position
1
1
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
Toowoomba
Range
Expand the capacity
of 11 rail tunnels
through the
Toowoomba Range
Queensland
Government
$17
TBA
Toowoomba
A bypass route to the
north of Toowoomba,
approximately 41km
in length, running
from the Warrego
Highway at Helidon in
the east to the Gore
Highway at Athol
Queensland
and Federal
Government
$1,700
2018
Projects Approved and Awaiting Commencement–
Property and Construction
Project Name
Athena Motel and
Apartment
Map
Position
1
Brownesholme Village
Expansion
Eastside Village
Development
Worship Centre
1
1
Construction Cost (million)
Estimated
Completion
Date
Marcus
Goldie
TBA
Early 2015
Stage 1-96 bed aged
care facility
Carinity
$15.5
May 2015
Cohoe and
Herries Sts,
Toowoomba
Proposed fast food
precint development
to include a
McDonalds and KFC
JM Kelly
Group
$9
Subject to
redesign
Boundary
St and
Hursley Rd
Toowoomba
370 seat worship
centre with a floor
area of just under 2000
square metres over
two storeys, as well
as a childcare centre,
a mens shed and a
caretakers residence
Lifeworks
Uniting
Church
$4.5
Stage 1
Late 2015
Location
Description
214
James St
Toowoomba
Construction of a
new 33 room motel
spanning 3,600 square
metres. Will include
single story main
building and a two
storey manager’s
residence
Highfields
Rd,
Highfields
Proponent
11
D
evelopment Status Report
November 2014
Projects Approved and Awaiting Commencement–
Property and Construction CONT.
Project Name
Highfields Sports Park
Crows Nest Retirement
Facility
Charlton Sports Precinct
Makin Mattresses Outlet
12
Development Status Report
November 2014
Map
Position
2
5
3
1
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
Highfields
39.4 hectares of
land providing a high
quality multi sports
facility. This will be
used daily for training
and competition and
for larger sporting
carnivals.
Toowoomba
Regional
Council
$25.5
Crows Nest
98 hectare site to
include 204 one, two
and three bedroom
residential dwellings, a
community centre and
convenience store. To
be built over six stages
B&P
Woodhead
D&K
Hoskings
& MN Vogler
$20
Commencing
December
2014
Charlton
Master plan
completed in February
2014 for approximately
44 hectares of land
acquired to be
developed into major
sporting facilities area
Toowoomba
Regional
Council
TBA
TBA
Corner
Alderley St
and Walter
Drive
Building of a 1000
square metre new
factory outlet at the
entrance of the 7SD
industrial park in
Harristown. This
construction includes
400 square metre
showroom, 400 square
metre assembly area
and 200 square metre
of storage.
Makin
Mattresses
TBA
TBA
Stage 1July 2015
Final Stage
- June 2018
Projects Proposed– Infrastructure and Services
Project Name
Melbourne to Brisbane
Inland Rail Project
Sewerage Network
Enabling Project
Steger Road Upgrade
Map
Position
1
3
3
Construction Cost (million)
Estimated
Completion
Date
Location
Description
Proponent
Toowoomba
A proposed rail link,
to run from the Port
of Melbourne to the
Port of Brisbane and
transverse through
Toowoomba with the
construction of a
tunnel through the
Toowoomba Range
Australian
Government
and private
investors
$3,000
2020
Charlton
Sewerage Network
Enabling Project
at the Toowoomba
Enterprise Hub.
Covering 2000
hectares, this area
will provide much
needed industrial
land for the region.
Toowoomba
Regional
Council and
Industry
$9
December
2015
Charlton
Upgrade of Steger
Road at Toowoomba
Enterprise Hub.
Covering 2000
hectares, this area
will provide much
needed industrial
land for the region.
Toowoomba
Regional
Council and
Industry
$7
June 2016
Projects Proposed – Mining and Energy
Project Name
New Acland Coal Mine
Stage 3 (revised project)
Map
Position
4
Location
Acland
Description
Continuation of
the existing New
Acland open-cut
coal mine, boosting
employment to 435
people at its peak,
and contributing
almost $6.6 billion
over the life of
the mine in direct
operating costs
Proponent
New Hope
Group
Construction Cost (million)
$869
Estimated
Completion
Date
2029
13
D
evelopment Status Report
November 2014
Projects Proposed– Property and Construction
Project Name
Map
Position
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
Highfields
Extension of existing
Mary Mackillop
Primary School to
become a preschool
to Grade 12 campus
Mary
Mackillop
Primary
School
$30
Stage 1 January 2016
1
Ruthven St,
Toowoomba
18,130 sqm site to
include Bunnings
Warehouse and 480
parking spaces. To
be built on former
Foundry site.
Bunnings
$43
2018
Charlton Shopping Centre
3
Warrego
Highway,
Charlton
A shopping centre to
be built over 4,700
square metres, with
a gross floor area of
1,025 square metres
Range
Manufacturing
TBA
TBA
Westbrook Motel
6
Main St,
Westbrook
Motel with 27 units
to be built next door
to existing shopping
centre
TBA
TBA
TBA
Anzac Avenue Super
Centre Shopping Complex
1
Anzac Av,
Toowoomba
Shopping complex
including furniture
and retail outlets
Wagners
$10.5
2016
1
Bridge,
Ruthven,
Russell,
Railway and
Bellevue
Sts,
Toowoomba
This area is
proposed to become
an urban village with
green, residential
and retail spaces
and an indoor
marketplace
Toowoomba
Regional
Council/
Queensland
Government
TBA
TBA
Pure Land
Learning
College
TBA
TBA
Invest and
Grow
TBA
TBA
Mary Mackillop Catholic
High School
Bunnings Warehouse
Toowoomba Rail Yards
Precint Redevelopment
2
Education and Meditation
Facility
4
TBA
State of the art
education and
meditation facility
to include classes
for Prep to Grade
12 students and
a prayer hall. The
school will be
self-sustainable,
using solar panels
to power its library,
dining hall, prayer
room, 12 room staff
dormitory and 120
plus rooms
Residential Unit
Development
1
Cavell and
Bridge Sts,
Toowoomba
14 units including 10,
2 bedroom units and
4, 3 bedroom units
14
Development Status Report
November 2014
Projects Proposed– Property and Construction
Cont.
Project Name
Zimm Corner Upgrades
Redevelopment of Marco Polo Chinese
Restaurant Site
Worker’s Accommodation
Map
Position
1
1
8 and 10
BORAL Asphalt Facility
Eastpointe Apartments
1
Construction Cost (million)
Estimated
Completion
Date
Location
Description
Proponent
Toowoomba
Upgrading the
Zimms Corner
service station
including area for
trucks to drive in,
fill up, turn around
and park. An area
for drivers to eat,
rest and shower will
also be provided. It
is also proposed to
be opening 24 hours
a day.
Zimms Corner
$3
Late 2014
Toowoomba
A fast food
redevelopment of
the abandoned site
at the intersection of
Ruthven and Alderley
Sts. There will be
seven food outlets,
two drive-throughs
(Subway and the
Coffee Club).
Brutnell
Developments
$6.5
August 2014
Beale and
Gayle Sts,
Oakey and
Postman’s
Ridge
300 unit workers
accommodation
village, split between
sites at Oakey and
Postman’s Ridge for
workers building the
Toowoomba Second
Range Crossing.
Qantac
$24
February
2015 &
May 2015
Charlton
The construction of a
manufacturing plant
capable of producing
180 tonnes of
asphalt every hour.
This will be built
on 37.44 hectares
of land within
the Toowoomba
Enterprise Hub.
BORAL
$10
2020
Kitchener
St,
Toowoomba
11 storey, 48 unit
development
FKG
$45
TBA
15
D
evelopment Status Report
November 2014
Projects Recently Completed (last 12 months)
Project Name
Map
Position
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
FKG Office Stage 2
1
275
McDougall
St
Toowoomba
Workshop
FKG
$4
Completed
Toowoomba Turf Club
Track Restoration Project
1
Toowoomba
Reinstatement of a
turf track at Clifford
Park
Toowoomba
Turf Club
$7
Completed
Highfields
Expansion and
upgrade of existing
Woolworths
supermarket,
Woolworths petrol
station, car park
sail and additional
specialty shops
Lauder Pty
Ltd
$7
Completed
Ironbark Ridge
Residential Estate
Westbrook
Three stage 99 lot
residential land
subdivisions with
Stage 3 completing
the final 33 lots.
Ridgewood
Properties
$2.2
Completed
Drayton Shopping Centre
Brisbane St
Drayton
Shopping centre that
includes Woolworths,
bottle shop and
pharmacy
Chris Hughes
$20
Completed
North
Toowoomba
Shopping complex
that includes Coles,
Aldi, a medical
centre, pharmacy,
newsagent and 20
specialty shops
Hallmark
Property
$25
Completed
Private
Investment
$2.5
Completed
Highfields Village
Shopping Centre
Expansion
Northpoint Shopping
Centre
1
1
The Vault on Ruthven
1
Ruthven St
Toowoomba
Adult entertainment
venue within the old
Commonwealth Bank
building. A total of
960 sq metres was
refurbished
Westbrook Stages 1 and 2
6
Westbrook
50 residential blocks,
selling from April
2014
Clive
Berghofer
Group
$2.2
Completed
1
Stenner St
Toowoomba
Refurbishment and
new build within
existing Blue Care
facility
Blue Care
$6.5
Completed
1
Greenwattle
and
Barlow Sts
Toowoomba
68 lots (total 311
lots, in 5 stages)
of residential land
subdivision
Consolidated
Properties
Group
$6
Completed
Blue Care Refurbishment
Sanctuary Rise
Residential Estate Stage 1
16
Development Status Report
November 2014
Projects Recently Completed (last 12 months)
Project Name
Map
Position
Location
Description
Proponent
Construction Cost (million)
Estimated
Completion
Date
Heritage Bank
Refurbishment
1
400
Ruthven St
Toowoomba
Refurbishment
which includes a
complete makeover
of rear courtyard
and Heritage Plaza
arcade, upper tower
repainted and new
tiles on exterior
areas around the
building
Redevelopment of
Chronicle Building
1
Ruthven St
Toowoomba
4000 square metres
of office and retail
with Power Tynan the
major tenant
Argyle
Investments
$4
Completed
189 Hume St,
Toowoomba
Multi level
commercial and
retail development.
Includes apartments
and underground
car park, offices
and a café
Coffee House
Pty Ltd
$8
Completed
Toowoomba
A new stormwater
network will be
installed in Goggs
Street, as part of the
West Creek channel
works. The Project
will provide flood
mitigation for a storm
event up to a nominal
one in 10-year event.
Toowoomba
Regional
Council,
State
Government
and Federal
Government
$4.5
Completed
Department
of Transport
and Main
Roads
$80.5
Completed
Laguna Serviced
Apartments
Goggs Street Flood Mitigation
1
1
Heritage
Bank
$3
Completed
Toowoomba Range
Roadworks
1
Toowoomba
Flood reconstruction
works of new 1.2km
eastbound section
of the Toowoomba
Range. It has made
the range accessible
under extreme
weather conditions
to all 23,000 vehicles
that use the highway
daily.
Empire Theatre Expansion (Armitage Centre)
1
54-56 Neil St,
Toowoomba
350-seat Toowoomba
Regional Arts and
Community Centre
Toowoomba
Regional
Council
$5.5
Completed
2
Kleinton and
Meringindan
Rds,
Highfields
Stage 4 includes 52
residential blocks
Clive
Berghofer
Group
$2.3
Completed
North Highfields Estate
Stage 4
17
D
evelopment Status Report
November 2014
Projects Recently Completed (last 12 months)
CONT.
Project Name
Map
Position
Location
Construction Cost (million)
Estimated
Completion
Date
Consolidated
Properties
Group
$3
Completed
Description
Proponent
Stage 2-74 lots residential
land subdivision
Sanctuary Rise Stage 2
1
Greenwattle
and Barlow
Sts,
Toowoomba
Witmack Industrial
Park Stage 4
3
Witmack
Industrial
Park
Industrial Business Park
Witmack
Industrial Pty
Ltd
$5
Completed
Centenary Heights State High School
1
Ramsay and
South Sts,
Toowoomba
Grade 7 infrastructure/new
12 space teaching block
Department
of Education
$4.5
Completed
51 Wilkinson
St.
Toowoomba
Multi level administration
building, workshop
facilities, recycling
facilities and transport
bays for 45 trucks. The
transport depot will
include 6 workshop bays
and 1,200m2 office building
built by GK Lawson and
Steinmuller Constructions.
JJ Richards
& Sons Pty
Ltd
$12
Completed
JJ Richards & Sons
Toowoomba Depot
18
Development Status Report
November 2014
1
A BIG THANK YOU TO OUR GENEROUS CONTRIBUTORS:
19
D
evelopment Status Report
November 2014