brochure

Transcription

brochure
Industrial,
logistics
and storage facilities
Experience in the industry
Industrial construction holds an important position
in a wide range of services offered by Skanska.
For many years, we have successfully executed
production plants, logistics centers and warehouse
facilities all over the country. Our great contracting
capacity, years of experience and highly qualified staff
enable the execution of the most complex projects, also
at operating facilities without disrupting their operation.
Successful executions of construction works at
operating production plants make us an expert in this
field. If a client is not able to suspend the operations
of an extended plant, we do our best to ensure the
construction works do not disrupt the production
process of the plant. It requires high flexibility and
precise planning of the entire execution, from materials
delivery to the execution of all scopes of work.
The execution of modern logistics and warehouse
centers is an important part of industrial construction.
We can be proud of our great experience in this field
also. We constructed one of the largest furniture and
home appliances distribution warehouses in Central
and Eastern Europe - JYSK in Radomsko. We have also
built distribution centers for our key client, Lidl Polska,
distribution centers for Jeronimo Martins Polska and
the largest, in the history for UPS, handling center
for Central and Eastern Europe.
We execute construction investments for the
production needs of the largest global companies
in the automotive, pharmaceutical, furniture, food,
home appliances and metal industries. Investments
worth mentioning include, among others: Electrolux
dishwasher factories in Żarów, Siewierz and Świdnica,
Toyota factories in Jelcz Laskowice and Wałbrzych,
Bosch and Siemens factories in Łódź as well as
executions for Łabędy Steelworks in Gliwice,
“Balcerzak i Spółka” and Unilever Polska S.A.
During works on industry investments for our clients,
we employ not only Polish engineers, but also engineers
from our sister company - Skanska Czech Republic as a result of which, we gain more access to specialist
knowledge and equipment. The outcome has been
the establishment of a joint team having competence
related to concrete pavements used in the construction
of concrete surfaces in parking lots and warehouses
in logistics centers built, e.g. for Jeronimo Martins
Polska. Together we also executed an extension
and reconstruction of a container terminal within
the premises of the Northern Port in Gdańsk as well as
an extension of a container terminal for the largest
rail freight carrier in the country, PKP CARGO
in Poznań Franowo.
Legend
Green construction
Certificates
Modern technology
the application of renewable
energy sources and materials
safe for humans
obtaining LEED and BREEAM
certificates
the application of technology
such as BIM, 3D, laser scan,
drone, etc.
Design & Build Project
*CCI
Super-deadline
a combination of design works
with construction, under
a single contract
Skanska social campaign
“Safety near a construction site”,
trips to construction sites
a project completed ahead
of the contractual deadline
*Corporate Community Involvement
2
Lidl Distribution Center
in Bydgoszcz
Within a mere nine months, we constructed an immense Distribution
Center in Bydgoszcz, with a hall surface area of 45,000 sqm.
On the initiative of the investor (Lidl), the facility was awarded with
LEED certificate at gold level (LEED Gold) and it has numerous green
solutions to boast of. These include: the recovery of heat from the
cooling installation, connected to the floor heating system in the hall;
the application of natural agents - ammonia - in the cooling system;
LED light fittings with a DALI intelligent control system enabling
considerable savings in electricity consumption; a rainwater recovery
system for toilet flushing and the watering of plants.
Lidl Distribution Center in Bydgoszcz is our first
warehouse project to undergo the LEED
multi-criteria building assessment.
2015, Kujawsko-Pomorskie Voivodeship
Client: Lidl Polska Sp. z o.o.
Usable area: 45,000 sqm
Cubic capacity: 586,359 m³
Handling center and a branch
of UPS in Stryków
We were the contractor of the largest handling center in Central
and Eastern Europe in the history of UPS. During execution of the
investment, we used equipment with a 3D control system, working
with a spatial model. With the use of the equipment, we executed
earthworks and structure layers under the roadway, parking lots
and the hall. Within a mere six months, we executed the project
and constructed both the facility and its external infrastructure.
The works were conducted in the winter season. The center has been
equipped with state-of-the-art technology enabling the sorting of
15,000 packages an hour.
2015, Łódzkie Voivodeship
Client: Panattoni Europe
Usable area: 14,222 sqm
Cubic capacity: 168,528 m³
Net value: PLN 31,468,197
Application of modern BIM technology allowed
us to execute the project within a mere six months.
Extension of a warehouse
in Nowy Dwór Mazowiecki
For La Lorraine Polska - manufacturer of bakery products we extended a plant by providing fully-automatized, high-storage
cold stores for deep-frozen products. It is one of the largest and most
modern facilities of this type in the country. The highest building within
the plant premises - the high cold store - reaches a height of almost
41 m. Its structure consists of self-supported racks with a capacity
of up to 16,000 palettes loaded and stored in a fully-automatized
manner. The racks are used to store frozen bakery products at
a temperature of -25°C. Within the framework of the investment,
a low-temperature cold store with docks, pasteurization and delivery
building were also constructed.
The investment has been executed at an operating
plant. Thanks to our experience, the production
process in the factory was not interrupted.
2015, Mazowieckie Voivodeship
Client: La Lorraine Polska
Usable area: 8,395 sqm
3
Did you know that...
During the execution of industrial, logistics and warehouse
facilities, we apply state-of-the-art construction technology by
using integrated BIM processes (a process of smart information
management during the facility lifetime). The application of this
technology increases the effectiveness of the use of resources
in an investment and it ensures more efficient preparation and
coordination of works during the execution of a contract.
We are the leader in the field of green construction, which has
been confirmed by LEED certificates (Leadership in Energy and
Environmental Design - a system for certification of sustainable
buildings) awarded to, amongst others, offices that we construct.
The Lidl Distribution Center in Bydgoszcz executed by us is the first
warehouse project that was awarded a LEED certificate at gold level
(LEED Gold).
Our offer includes services in the scope of design, production
and the assembly of steel structures. We execute contracts for
the needs of large logistics and distribution centers, in addition to
smaller industrial plants. We hold the Certificate of Steel Structure
Manufacturer issued by the Polish Chamber of Steelworks.
We are experienced in executing projects at operating production
plants. We are flexible and precise both when it comes to planning
and the execution of a project. This means that the client can be
certain that works conducted by us will not interrupt the production
process at the plant.
We consider issues of health and safety at work as important
as keeping deadlines and budgets. We work in observance
of safety at work standards that are binding for all Skanska
constructions throughout the world. Human health and safety
is the top priority for us.
We have our own design office, which ensures the proper execution
of investment, including industrial facilities, in the Design & Build
(D&B) formula.
MPK bus depot in Głogów
Thanks to the project executed by us, Głogów gained a modern public
transport bus depot with professional workshop facilities. Under the
contract, we executed, amongst others: a bus depot hall used mainly
for vehicle servicing, equipped with five repair stations and a bus
ozone wash, a fuel station with a fuel system including a tank with
a capacity of 50 m3 and distributors as well as a dispatch building.
Furthermore, the depot station has been equipped with mechanic’s
kits and lifts for vehicles. The investment has increased the standard
of services rendered within the framework of public transport
in Głogów.
2015, Dolnośląskie Voivodeship
Client: MPKM in Głogów
Usable area: 1,854 sqm
Cubic capacity: 12,741 m³
Net value: PLN 14,200,000
The depot has been equipped with wireless self-propelled
pole lifts, exhaust extractors and entry gateways
to the depot station to minimize heat loss.
Board Packaging Production Plant
in Bochnia
In the Bochnia Economic Activity Zone, we designed and executed
a modern Board Packaging Production Plant with a high degree
of cleanliness. It is another investment for the leading Polish producer
of corrugated board and packaging, apart from the plants in Krzycko
Wielkie, At the plant, we installed a 1.6 MW transformer - able to cover
electricity consumption of 260 households and installations - 6.5 km
of ventilation ducts and 25 km of installation pipes. The facility
was awarded with a BRC IOP certificate confirming the highest
production standards.
Construction of the roof consumed almost 600 tons
of steel manufactured and mounted by our Steel
Structure Manufacturing Plant.
4
2014, Małopolskie Voivodeship
Client: Werner Kenkel Bochnia Sp. z o.o.
Usable area: 21,535 sqm
Cubic capacity: over 216,627 m3
Net value: PLN 49,854,778
Technical Maintenance Hall at an MZA depot
“Kleszczowa” in Warsaw
2015, Mazowieckie Voivodeship
Client: MZA Sp. z o.o.
Premix Production Plants in Połaniec
2015, Świętokrzyskie Voivodeship
Client: Premix Sp. z o.o.
Investment Activity Zone in Bytom
2015, Śląskie Voivodeship
Client: The Municipality of Bytom and the Municipal Roads and Bridges Authority
Container terminal in Poznań Franowo
2015, Wielkopolskie Voivodeship
Client: PKP CARGO S.A.
Philip Morris manufacturing plant in Cracow
Extension
2014, Małopolskie Voivodeship
Client: Philip Morris Polska
SEGRO Industrial Park Wrocław warehouse halls
2014, Dolnośląskie Voivodeship
Client: Segro Poland Sp. z o.o.
Lidl Distribution Center in Turzyn near Wyszków
2013, Mazowieckie Voivodeship
Client: Lidl Polska Sp. z o.o.
Jeronimo Martins Distribution Center near Kraków
2013, Małopolskie Voivodeship
Client: Jeronimo Martins Polska S.A.
Production plant in Wrocław
2013, Dolnośląskie Voivodeship
Client: Sumika Ceramics Poland Sp. z o.o.
5
Other projects
Construction of a poultry breeding farm in Stoczek, for Integra
Sp. z o.o., 2016, Mazowieckie Voivodeship
Extension of a Logistics Center in Mosina, for Anton Röhr
Sp. z o.o., 2016 and 2014, Wielkopolskie Voivodeship
Construction of a high-stack warehouse at a logistics center
in Modła Królewska near Konin, for Kramp Polska,
2015, Wielkopolskie Voivodeship
Extension of a production plant in Gniewomierz, for Faurecia
Automotive Polska S.A., 2015, Dolnośląskie Voivodeship
Extension of Meat and Poultry Processing Plant in Sława,
for “Balcerzak i Spółka”, 2015, Lubuskie Voivodeship
Extension of Chocolate Factory in Łódź, for Barry Callebaut
Manufacturing Polska - 2nd stage, 2015, Łódzkie Voivodeship
Construction of a warehouse building in Stanowice, for BIMS PLUS
FHH Sp. z o.o., 2015, Dolnośląskie Voivodeship
Construction of halls for the Pipe Production Department in Gliwice,
for HUTA ŁABĘDY S.A., 2015, Śląskie Voivodeship
Extension of a manufacturing plant of liquid industrial paints
in Tarnów, for Beckers, 2015, Małopolskie Voivodeship
Construction of Volvo Prototype Workshop hall in Wrocław,
for Volvo POLAND Sp. z o.o., 2015, Dolnośląskie Voivodeship
Adaptation of a manufacturing and warehouse hall in Złotoryja
for FAIST CHemTec, 2015, Dolnośląskie Voivodeship
Extension of a charging bay as well as a heat processing and
finishing bay on the premises of BGH Polska Sp. z o.o. in Katowice,
2015, Śląskie Voivodeship
Construction of a Volvo Servicing Center in Pruszcz Gdański,
for Volvo POLAND Sp. z o.o., 2014, Pomorskie Voivodeship
Development of an internal reserve field in Gdańsk,
for DCT Gdańsk S.A., 2014, Pomorskie Voivodeship
Did you know that...
6
Construction of a pig breeding farm with accompanying facilities
in Brylewo, for Breeding Center “GARZYN” Sp. z o.o.,
2014, Wielkopolskie Voivodeship
Construction of warehouse halls in Wrocław, for Segro Poland
Sp. z o.o., 2014, Dolnośląskie Voivodeship
Extension of a Finished Goods Warehouse for the Electrolux
Manufacturing Plant in Świdnica, for Electrolux Poland Sp. z o.o.,
2014, Dolnośląskie Voivodeship
Extension of a hall for the needs of long rail manufacturing
for ArcelorMittal Polska, Branch in Dąbrowa Górnicza,
2014, Śląskie Voivodeship
Construction of pig iron transfer station for ArcelorMittal Polska,
Branch in Kraków, 2013, Małopolskie Voivodeship
Construction of Distribution Center in Lubartów, for Jeronimo
Martins Polska S.A., 2013, Lubelskie Voivodeship
Extension and adaptation of a production plant in Wrocław,
for Wago Elwag Sp. z o.o., 2013, Dolnośląskie Voivodeship
Extension of the Department for Liquid Soup Production in Poznań,
for Unilever Polska S.A., 2013, Wielkopolskie Voivodeship
Construction of a Distribution Center in Ruda Śląska, for Jeronimo
Martins Polska S.A., 2012, Śląskie Voivodeship
Construction of an industrial hall in Nowa Sarzyna, for Zakłady
Chemiczne Organika, 2012, Podkarpackie Voivodeship
Extension of a manufacturing hall in Kraków, for Stalprodukt S.A.,
2012, Małopolskie Voivodeship
Construction of a hen house shed with a density of 50,000 pieces
(200 LSU) - production of breeding eggs in Stradyń near Wolsztyn
for HAMA Plus S.A., 2012, Wielkopolskie Voivodeship
Skanska in Poland
We are one of the world’s leading project
development and construction companies.
Our history dates back to 1887. We operate
in Europe and America.
In Poland, we are the market leader. As a general
contractor, we construct enclosed structures, roads,
bridges, rail and tram lines as well as hydro-engineering
facilities. We also develop green office spaces,
apartments and suites.
We focus on local presence and client relations.
Our branches are located throughout the country.
We have successfully executed both small projects for
local investors and extended engineering or enclosed
structure contracts. We construct facilities for the largest
global companies in the automotive, pharmaceutical,
furniture, home appliances and metal industries, hotel
and retail chains, public investors and the military.
By the same token, we are equally committed when
it comes to smaller investments such as country
and municipal roads, bicycle paths, schools and
kindergartens. The most significant of our undertakings
include: the north section of the A1 highway, Świnna
Poręba water reservoir, Złote Tarasy shopping center
in Warsaw, Poznań Western Bypass, a bridge on the
Odra River in Brzeg Dolny, an airport in Jasionka near
Rzeszów, football stadiums in Kielce and Kołobrzeg,
the W-Z route in Gdańsk, university facilities in Łódź,
Poznań, Zielona Góra, Wrocław and Rzeszów, as well
as numerous sporting facilities throughout the country.
For many years, we have been at the top in rankings
for best employers in the construction and technical
industry as well as trade rankings. Our principles have
been specified in our “Code of Conduct”. On every
market, we work in pursuance of shared values: we care
for human life, we operate ethically and transparently.
Together, we are better and the client is paramount.
Our main goal is to build for the benefit of the society.
We supply products and services of the highest
quality to our clients and business partners. We own
bituminous mass production plants, concrete production
plants, road laboratories, aggregate mines, equipment
bases and a steel structure manufacturing plant.
At every stage of the investment process, we apply
quality standards compliant with the requirements
of ISO and AQAP standards. We are experienced
in the execution of green facilities compliant with
the requirements of the LEED certification.
We are one of signatories of the Cooperation
for Safety in Construction - an initiative of the largest
general contractors in Poland, aimed at eliminating
fatal accidents at construction sites. For years, at schools
throughout Poland, we have conducted our own
educational campaign for children “Safety near
a construction site”.
Annually, we execute ca. 1,300 investments in Poland. In our projects, we employ people of various predispositions who complement
the skills of the whole team. For example, if the project manager is an engineer, his team includes people who contribute
complementary skills and experience, e.g. knowledge of economics. Skanska is successful on the market thanks to these people
and their excellent, varied abilities.
7
Skanska S.A.
www.skanska.pl
Follow us in social media:
facebook.com/skanskapolska
youtube.com/skanskapoland
linkedin.com/company/skanska-property-poland
instagram.com/byskanska
Due to our consideration for the natural environment, this leaflet has been printed on eco-friendly paper
manufactured with respect for the natural environment.

Similar documents

brochure

brochure global companies in the automotive, pharmaceutical, furniture, home appliances and metal industries, hotel and retail chains, public investors and the military. By the same token, we are equally co...

More information

Residential and hotel facilities

Residential and hotel facilities global companies in the automotive, pharmaceutical, furniture, home appliances and metal industries, hotel and retail chains, public investors and the military. By the same token, we are equally co...

More information