Read more
Transcription
Read more
50Hertz balance sheet press conference 2013: large investments boost infrastructure development Balance sheet press conference Berlin, 12/03/2014 Boris Schucht, CEO; Udo Giegerich, CFO 12 March 2014 - 50Hertz balance sheet press conference 2013 1 / 39 Agenda Business development in 2013 Key company figures in 2013 Outlook 12 March 2014 - 50Hertz balance sheet press conference 2013 2 2 / 39 Business environment in 2013 (I) 1. Strong change of context in connection with high degree of uncertainty for all players 2. Fewer significant shortcomings in the regulatory framework over the past three years -> prerequisite fulfilled for grid development financing 3. Good business results for 2013 characterised by non-recurrent effects and improvement of the regulatory framework - net result within regulatory target range 4. Politics: federal government has addressed important themes, Federal Requirement Plan Act adopted through transparent procedure by Bundestag and Bundesrat, grid development plans and scenario framework consulted often and at an early stage by the public 12 March 2014 - 50Hertz balance sheet press conference 2013 3 / 39 Business environment in 2013 (II) 5. Close cooperation with NGOs (example: Renewables Grid Initiative) as well as better information and dialogue in the grid expansion regions Early information and high degree of public participation Grid development only to the degree required Minimise effects of new grids on man and nature Grid development is the key to the success of the energy transition 12 March 2014 - 50Hertz balance sheet press conference 2013 4 / 39 Grid development projects are picking up speed * Vierraden – Krajnik operational 2 km 2 Northern Hamburg-Schwerin operational 65 km 3 South-West Interconnector 1 Lauchstädt-Vieselbach operational 76 km High-temperature conductor Remptendorf-Redwitz operational 18 km Baltic 1 operational 75 km Grid connection substation Altentreptow Nord operational 1 km Capacity increase substation Perleberg operational 2 km Conversion from 220 to 380 kV lines: Ragow-Thyrow and Ragow-Wustermark operational 3 km Conversion of Eula-Großdalzig line for the Schleenhain mine operational 6 km 10 Grid connection substation Stendal West operational 1 km 11 South-West Interconnector 2 Vieselbach-Altenfeld under construction 57 km 12 Grid connection substation Förderstedt under construction 12 km 13 380 kV overhead line Bärwalde-Schmölln under construction 46 km 14 New construction works at substation Wolmirstedt under construction 6 km 15 Baltic 2 under construction 120 km 16 3rd interconnector to Poland spatial planning procedure ongoing ~ 10 km 17 380 kV overhead line "Nordring Berlin" planning approval procedure pending ~ 80 km 18 Uckermark line Neuenhagen-Bertikow planning approval procedure ongoing ~ 120 km 19 Bertikow-Pasewalk federal sector planning pending 20 Wolmirstedt-Perleberg planning approval procedure pending 21 Offshore connections in the Baltic Sea approval procedure ongoing ~ 70-90 km 22 Combined Grid Solution approval procedure ongoing ~ 15 km 4 22 15 1 5 6 21 5 Completed 7 8 2 6 7 20 10 14 19 1 18 17 8 12 16 3 11 9 13 50Hertz investments 4 * Projects since 2009 2010 2011 2012 2013 2014 12 March 2014 - 50Hertz balance sheet press conference 2013 9 Taken into operation Under construction Approval pending ~ 45 km ~ 100 km 250 km 240 km ~ 450 km 5 / 39 2013: infrastructure development makes headway! Systems under construction Systems for which procedures are ongoing • • • Planning approval procedure currently ongoing for third section of South-West Interconnector between Altenfeld and the Thuringia/Bavaria state border Start of the regional dialogue on the South-East Direct Current Passage in Thuringia und SaxonyAnhalt Planning approval procedure ongoing for Uckermark line and spatial planning procedure ongoing for 380 kV Nordring Berlin Substations • • • • • 9/2013: Connection of the most powerful wind farm of MecklenburgWestern Pomerania to the 50Hertz grid at the new substation Altentreptow-Nord Wind farm with 140 MW capacity has its own hydrogen storage unit Expansion of Perleberg substation with third transformer, fourth transformer planned for 2014 Project Bärwalde-Schmölln, construction starts August 2013, construction of new line during operation of existing line, no acceptance issues Second section of South-West Interconnector between Vieselbach and Altenfeld 12 March 2014 - 50Hertz balance sheet press conference 2013 6 6 / 39 Development of offshore projects in the Baltic Sea 2011: commissioning of Baltic 1 2012: start of construction on Baltic 2 2014: connection of Baltic 2 to the grid shortly before completion 2014: hand-over to wind farm operators in the Westlich Adlergrund region potential of offshore wind power (Baltic Sea): approx. 5,000 MW Reduced offshore targets reconcilable with potentials and consistent expansion in the Baltic Sea. 12 March 2014 - 50Hertz balance sheet press conference 2013 7 / 39 Information, dialogue and participation are of the utmost importance... Increasing acceptance Local dialogue - Dialogue with citizens for important decisions and requests High degree of transparency at an early stage - Process for grid development plan - Publication of load flow data - Joint search for optimal solutions 12 March 2014 - 50Hertz balance sheet press conference 2013 Participation and partnership - RGI – European partnership (for grid development) - Consultations (GDP, ...) - Project-related partnerships 8 / 39 ... and 50Hertz is striking out upon new paths Information material Mobile information office Discussion meetings, information fairs, workshops Internet sites on grid development projects 12 March 2014 - 50Hertz balance sheet press conference 2013 9 / 39 Milestones in European market development Load flow control Participation in energy exchanges In the course of 2013, 50Hertz acquired shares in the EEX worth 2.25% preemption rights for a share of 4.3 % were exercised 1/2013: first use of the "virtual phase shifter" for better load flow control between Germany and Poland The goal is to offer even stronger support for the further development of the electricity exchange market Agreement made with Poland and the Czech Republic on the installation of physical phase shifters Market coupling - Successful launch of the single European Price Couplings (EPC) in daily spot trading in North West Europe (NWE), step-by-step expansion to other regions - Project on the introduction of the EPC in the intraday spot trading - Project on the introduction of the load-flow based market coupling in Central East Europe (CEE) - Marketing the 50Hertz interconnectors • in NWE by • and in CEE by 12 March 2014 - 50Hertz balance sheet press conference 2013 10 / 39 50Hertz as an employer with social responsibility Fair Company 50Hertz joined the Fair Company initiative that was launched by karriere.de in 2004. The goal of this initiative is to support fair working conditions for trainees and career starters. FOCUS ranking 50Hertz is ranked first employer in its field of industry. A study by Focus magazine in cooperation with Xing asked nearly 20,000 employees how satisfied they were about their employer. 12 March 2014 - 50Hertz balance sheet press conference 2013 Commendation by UNESCO 50Hertz's interactive exhibition "Turning around energy together" for schools is commended by German UNESCO Commission The exhibition should promote the energy transition and sustainable thinking and acting to children and adults. 11 11 / 39 Renewable energy sources in the 50Hertz grid area Installed capacity in MW 30.000 Sonstige EE Biomasse Wind 21,915 22,727 2012 2013 * 35,0 36,7 2012 2013 * 18,008 20.000 11,304 13,395 15,101 10.000 0 2008 2009 2010 2011 40 30 Feed-in in TWh Photovoltaik 22,8 23,7 24,8 2008 2009 2010 28,2 20 10 0 2011 RES are in constant development in the 50Hertz area. Power generation from these sources accounted for about 37.4% (36.7 TWh) of power consumed in 2013. * temporary values, verified values for 2013 will be available in June 2014; source: netztransparenz.de 12 March 2014 - 50Hertz balance sheet press conference 2013 12 / 39 Line load in the 50Hertz grid area unsynchronised line load > 5h/y 2009 ____ ____ 2013 capacity used ≤ 50% 50% < capacity used < 70% ____ ____ capacity used ≥ 70% no values The grid load increases dramatically due to the changes in the power generation sector. 12 March 2014 - 50Hertz balance sheet press conference 2013 13 / 39 System security: solar forecast for April 2013 GW Dramatic forecast errors of up to 8800 MW in the day-ahead forecast Intraday forecasts clearly better in comparison, closer match with actual feed-in Control and reserve power exhausted in Germany 20 15 Day-ahead forecast Final Intraday forecast Real-time estimate Open positions 50Hertz 10 5 0 3. Apr. 4. Apr. 5. Apr. 6. Apr. The integration of renewable energy sources is a big challenge for system management! 12 March 2014 - 50Hertz balance sheet press conference 2013 14 14 / 39 System security: interventions in grid and market Power volumes and costs for redispatch (§13.1 EnWG) 4500 4000 140 Quantity in GWh Costs in million € 120 3500 100 3000 2500 80 2000 60 1500 40 1000 20 500 0 2009 2010 2011 2012 2013 0 Less redispatch because of relatively little wind this year and infrastructure development (Northern Line, Thuringian grid reinforcement). 12 March 2014 - 50Hertz balance sheet press conference 2013 2009 2010 2011 2012 2013 TenneT redispatch towards 50Hertz International redispatch National redispatch 50Hertz grid area Situation on: 31/12/2013, temporary values 15 / 39 System security: interventions in grid and market Power volumes and costs to reduce wind turbine output (§13.2 EnWG / §11 EEG) 160 14 Quantity in GWh 140 Costs in million € 12 120 10 100 8 80 6 60 4 40 2 20 0 2009 2010 2011 2012 2013 0 2009 2010 2011 2012 2013 Capping EEG peakloads within economically acceptable range Situation on: 31/12/2013 *temporary values 12 March 2014 - 50Hertz balance sheet press conference 2013 16 / 39 Agenda Business development in 2013 Key company figures in 2013 Outlook 12 March 2014 - 50Hertz balance sheet press conference 2013 17 17 / 39 Planned investment volumes realised in 2013 250 200 150 100 50 0 500 450 37 400 2008 2009 2010 2011 2012 2013 Instandhaltung 350 154 300 51 250 475 200 43 38 150 37 100 50 0 39 45 3 46 131 110 2008 2009 2010 2011 2012 2013 72 Offshore 248 114 107 105 114 2008 2009 2010 2011 144 40 Ø 20022007 0 Onshore Offshore 250 200 150 100 50 0 2012 Instandhaltung 2013 Plan Ø 20142023 250 200 150 100 50 0 2008 2009 2010 2011 2012 2013 Onshore Grid development has visibly picked up speed. For next year's challenges 50Hertz is well equipped in terms of financial as well as human resources. 12 March 2014 - 50Hertz balance sheet press conference 2013 18 / 39 Clear increase in investment volume Capex 2013: 402 million EUR Categories [+58.3% compared to 2012] Investment in process improvement Offshore 154 million EUR [+40.0% compared to 2012] Replacement investments 3% 6% Investments in nonelectrical installations Integration of renewable 2% energy sources 89% 154 (38.4%) 248 (61.6%) Offshore 248 million EUR [+72.2% compared to 2012] Clear increase in investment volume in 2013. Largest share apportioned to the integration of renewable energy sources and the development of the European electricity market. 12 March 2014 - 50Hertz balance sheet press conference 2013 19 / 39 HR +8.5% +9.1% +7.1% +4.7% 694 757 821 648 Full time equivalents 619 2009 2010 2011 2012 2013 Efficient recruiting to integrate renewables. 12 March 2014 - 50Hertz balance sheet press conference 2013 20 / 39 Net result* 18 24 14 166 110 Bereinigtes Regulatorische Rückstellungen Ergebnis 2013 Veränderungen (insb. Steuern) IFRS (t-2) Operative Einmaleffekte Nettoergebnis 2013 IFRS 2013 result influenced strongly by positive one-off effects * IFRS Eurogrid GmbH, 50Hertz Transmission GmbH and 50Hertz Offshore GmbH consolidated 12 March 2014 - 50Hertz balance sheet press conference 2013 21 / 39 Profit and loss statement* 2013 2012 Revenues (gross) 8,556 8,555 0.0% Neutral business Revenue from the grid business 7,664 7,710 -0.6% 892 845 5.6% 37 54 -31.5% 929 899 3.3% -393 -409 -3.9% -68 -64 6.3% -165 -156 5.8% EBITDA 303 270 12.2% Depreciation and amortisation -75 -75 0.0% 1 -29 n.a. Taxes -63 -55 14.5% Net result 166 111 49.5% in million € Other income Total of the proceeds and income Energy and material costs Personnel costs Other costs Financial result ∆ * IFRS Eurogrid GmbH, 50Hertz Transmission GmbH and 50Hertz Offshore GmbH consolidated 12 March 2014 - 50Hertz balance sheet press conference 2013 22 / 39 Balance sheet 2013* Assets in million € 2013 2012 ∆ 2,227 1,890 17.8% Current assets 737 1,042 -29.3% Cash 319 52 513.5% 3,283 2,984 10.0% 1,107 1,017 8.8% Provisions 155 217 -28.6% Long-term liabilities 523 524 -0.2% 1,190 1,093 8.9% 308 133 131.6% 3,283 2,984 10.0% Equity ratio (=equity/total assets) 34% 34% 0 Debt/equity ratio (=Net financial debt/equity) 18% 46% -28 Debt/equity ratio without EEG 14% 18% -4 Fixed assets Liabilities Equity Current liabilities Regulatory liabilities (net) * IFRS Eurogrid GmbH, 50Hertz Transmission GmbH and 50Hertz Offshore GmbH consolidated 12 March 2014 - 50Hertz balance sheet press conference 2013 23 / 39 Liquidity Eurogrid GmbH, 50Hertz Transmission GmbH (incl. EEG), 50Hertz Offshore GmbH Mio. € 500 400 300 200 100 0 -100 -200 -300 -400 -500 -600 -700 342 356 311 269 299 44 -45 -217 -486 12.2011 03.2012 TOTAL 06.2012 09.2012 EEG 12.2012 03.2013 TOTAL exkl. EEG 06.2013 09.2013 12.2013 saisonale Kreditlinien für EEG High need for financing in RES remains in 2013. Remark: the negative balance in the overall liquidity is covered by short-term current account financing for a maximum of 150 million EUR. Liquidity mentioned does not include accounts for which there is no power of disposition (e.g. consortium account) 12 March 2014 - 50Hertz balance sheet press conference 2013 24 / 39 Financial figures* 2013 2012 FFO interest cover 10.6 8.4 Net debt / Regulatory asset base 11% 41% FFO / Net debt 68% 26% 0.2 0.6 RCF / Net debt 37% 19% FFO 168 199 2,215 1,883 Net debt 249 778 RCF 92 144 Capex 405 253 Gross interest expense 18 27 Moody’s Rating Baa1 Baa1 Outlook stable stable RCF / Capex Regulatory asset base Moody's confirms stable Baa1 rating of Eurogrid GmbH for third consecutive time. * Figures based on IFRS and in accordance with the calculation schedule by Moody's Investors Service 12 March 2014 - 50Hertz balance sheet press conference 2013 25 / 39 Good long-term credit quality 180 2012 2013 120 161.1 109.2 140 115 110 120 Bond Index Spreads vs EUR m/s (bps) 160 100 80 98.7 67.4 60 105 100 40 95 20 0 90 Jan Feb Mar Apr Mai Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr Mai Jun Jul Aug Sept Oct Nov Dec Secondary Bond Performance* EUROGRID GMBH MTN.10/20** Eurogrid GmbH's credit quality is at a constantly good level. * EUROGRID GMBH MTN.10/20 3.875%; source: RBS/Bloomberg ** EUROGRID GMBH MTN.10/20 [WKN: A1EWR1, ISIN: XS0551935769]; source: Bloomberg 12 March 2014 - 50Hertz balance sheet press conference 2013 26 / 39 Agenda Business development in 2013 Company figures 2013 Outlook 12 March 2014 - 50Hertz balance sheet press conference 2013 27 27 / 39 Quo vadis, energy transition? A consensus should be reached on the energy transition Low degree of controllability of the RES expansion and poor synchronisation with grid expansion Energy transition Fossil world Costs of energy supply and efficiency Profitability problem of conventional generation Potential capacity problem in the future 12 March 2014 - 50Hertz balance sheet press conference 2013 28 / 39 Federal requirement plan for 2012 as legal basis for need of grid development Federal Requirement Plan Act adopted by German Bundestag in June 2013 - Basis: 2012 Grid Development Plan of the TSOs - 36 projects confirmed - 3 HVDC corridors - Current grid development plan confirms federal requirement plan - Federal Requirement Plan Act will be amended in 2015 and 2018 12 March 2014 - 50Hertz balance sheet press conference 2013 29 / 39 The three HVDC corridors in the German power grid - Wind farm connection in the north to a high-capacity regional east-west grid (AC) Wind bus bar - Integration of solar power in the south through regional grid reinforcement (AC) Solar bus bar - Integration of the guaranteed capacity through conventional power plants in the west and east (AC) Bus bar "guaranteed capacity" - Connection of bus bars with HVDC lines X X X HVDC lines are optimised addition to three phase current system 12 March 2014 - 50Hertz balance sheet press conference 2013 30 / 39 Outlook: what is essential to implement the energy transition? 1. Stable legal and regulatory framework conditions are of the highest priority for the realisation of the grid expansion 2. Broader consensus for grid development as the key for the energy transition and political support at all levels required 3. Observing economic efficiency and avoiding and eliminating false incentives (uniform grid fees, expanding deliverables) 4. Observing European framework - we are part of a European system The German federal government has addressed and is focussing on important and appropriate themes. What is important now is their implementation. 12 March 2014 - 50Hertz balance sheet press conference 2013 31 / 39 Thank you very much for your attention Backup 12 March 2014 - 50Hertz balance sheet press conference 2013 33 / 39 50Hertz at a glance - late 2013 Value (share in DE) Surface area 109,360 km² (31%) Line length1 10,209 km (~28%) Maximum load approx. 16 GW (21%) Power consumption (based on electricity supplied to final consumers in acc. with the EEG) Installed capacity2: - renewables - wind power approx. 98 TWh (20%) 44.3 GW (~24%) 22.9 GW (~28%) 13.5 GW (~40%) Workforce Turnover - grid 1 Installed 2 but not yet fully operational km 821 8.6 billion € 0.9 billion € Source: 50Hertz, FNA, situation on 31/12/13 Temporary values, verified values for 2013 will be available in June 2014 12 March 2014 - 50Hertz balance sheet press conference 2013 34 34 / 39 Development of the electricity consumption in the 50Hertz control area Power supplied to final consumers acc. to EEG 100 98,63 98,97 98 94,61 94,97 96 93,25 92,62 94 91,16 91,80 92 90 97,73 98,04 88,87 88 86 84 82 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Relatively constant electricity consumption in the 50Hertz control area * Values excl. own consumption 12 March 2014 - 50Hertz balance sheet press conference 2013 35 / 39 Fluctuating feed-in of renewable energy - wind power 50Hertz wind feed-in data for 2013 Wind feed-in (01/12/2013-07/12/2013) 11,064 MW Minimum feed-in 0 MW Greatest increase in 15 min. Greatest decrease in 15 min. 1,431 MW 901 MW 12000 10000 Feed-in in MW Maximum feed-in 8000 6000 4000 2000 Greatest difference between min. and max. in a single day 9,675 MW 0 0 24 48 Prognose 72 96 Time in h 120 144 Hochtrechnung cluster, upscaling (50Hz) High demands on forecasts, system controllability and fast-response system management 12 March 2014 - 50Hertz balance sheet press conference 2013 36 / 39 168 Fluctuating feed-in of renewable energy - solar power PV feed-in (01/06/2013-07/06/2013) 50Hertz solar feed-in data for 2013 Minimum feed-in Greatest increase in 15 min. Greatest decrease in 15 min. 5,346 MW 0 MW 1,594 MW 752 MW Feed-in in MW Maximum feed-in 5000 4000 3000 2000 1000 Greatest difference between min. and max. in a single day 5,346 MW 0 0 24 48 Prognose 72 96 Time in h 120 144 168 cluster, upscaling (50Hz) High demands on forecasts 12 March 2014 - 50Hertz balance sheet press conference 2013 37 / 39 Operational challenge wind - XAVER Wind direction and gust strength, 06/12/2013 00:00 hours 05:00 hours 12:00 hours 9730 MW 10187 MW Feed-in: 9650 MW Upscaling record for 50Hertz 06/12, 8 PM: 11,064 MW Strong wind (11-17 m/s) Storm (17-25 m/s) Heavy storm (25-33 m/s) Installed capacity: 13,488 MW (situation on 31/12) 12 March 2014 - 50Hertz balance sheet press conference 2013 Cyclone (>33m/s) 38 / 39 Very low failure rate at 50Hertz Comparison of EHV failure rates of 50Hertz and other TSOs for the years 2003-2013 Disturbances / 100 km of line length 3,0 Störquote 50Hertz Störquote aller dt. ÜNB 2,0 Mittelwert der Störquote von 50Hertz 1,0 Mittelwert der Störquote aller dt. ÜNB 0,0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Year 12 March 2014 - 50Hertz balance sheet press conference 2013 39 / 39
Similar documents
380 - kV overhead line Bertikow-Pasewalk Pilot project for
I.2 Situation of population, existing experience with power line projects The planned overhead line will affect two districts and two federated states. This causes a special starting position for ...
More information