Tulocay Creek Bank Stabilization Project
Transcription
Tulocay Creek Bank Stabilization Project
Napa County Flood Control and Water Conservation District PHILLIP M. MILLER, P.E. DISTRICT ENGINEER TULOCAY CREEK BANK STABILIZATION DESIGN-BUILD PROJECT Request for Qualifications BACKGROUND The Napa County Flood Control and Water Conservation District (District) is currently in need of engineering and construction services for biotechnical streambank stabilization of roughly 400 feet of the North bank of Tulocay Creek just east of the Soscol Avenue crossing. Please see the attachments for a more exact location. A new development will soon be built on the adjacent parcel which will impact future access to the area to complete the stabilization work. Therefore, the District desires the work to be completed in the summer of 2016 during the permitted in-water work window (typically June 1 to Oct 15). EXPECTED TASKS The expected tasks include but are not limited to: Surveying of the area for topographical features and general existing grades; Performance of a cultural resources survey, in accordance with applicable guidelines and regulations, to determine the existence of cultural artifacts which may restrict or impair excavation activities (note that cultural artifacts have been found nearby on the adjacent parcel); Preparation of detailed plans and specifications; Preparation of other design documentation to support obtaining applicable regulatory permits including an ‘in-water work plan’ (note that District staff will be directly applying for the permits); Construction of the project within the permitted time window and in accordance with all other permit conditions; Construction biological monitoring support in accordance with permit conditions; 804 First Street Napa, CA 94559-2623 (707) 259-8600 FAX (707) 259-8619 www.napaflooddistrict.org Page 2 Dewatering of channel with sensitive biological resources in close proximity to project area EVALUATION CRITERIA OF RESPONSES TO REQUEST FOR PROPOSAL Once statements of qualifications are received and evaluated per the criteria below, up to three firms will be selected to participate in a Request for Proposals (RFP) process. Final firm selection will be based upon the District’s evaluation of the firm’s response to the RFQ and RFP process using the evaluation criteria listed below: Bank stabilization design and construction experience. Higher weight will be given to teams demonstrating experience with a variety of biotechnical stabilization experience. Price. The District has budgeted $100,000 for the entirety of this project. Knowledge of and experience working with typical regulatory permit conditions and the associated agencies. The stabilization methods proposed for use given the expected project constraints. Teams do not need to address all the above items within their qualifications package. Only the items listed below under “Submittal Requirements” must be included at this time to respond to the RFQ. SUBMITTAL REQUIREMENTS 1) Outline of typical biotechnical bank repair methodologies used on similar projects. 2) Description of the team’s experience providing design, survey, and construction, services of similar type including cultural surveys and permit support. This section should also include a listing of references that may be contacted regarding the team’s experience including description of the project, name of owner, address, telephone number, and person to contact if we so choose. 3) Listing of proposed team members to cover all required tasks. Note: do not provide price or budget information in response to the RFQ. A team’s response to the RFQ shall address the criteria listed above. In order to be considered, a team’s response to the RFQ must be submitted no later than February 19, 2016 by 5:00 PM. Please submit two (2) hard copies of your team’s response to Andrew Butler, Senior Engineer at 804 First Street, Napa, CA 94559 OR an electronic copy to andrew.butler@countyofnapa.org and shaun.horne@countyofnapa.org. For any inquiries please contact Andrew Butler, in writing only, via e-mail at the email address above. Page 3 Submittals which do not contain the required numbers of copies and all the information requested in the RFQ may be considered as non-responsive and rejected without evaluation. Submittals received after the deadline or addressed to the wrong location will be considered as non-responsive. SOLICITATION CAVEAT The submitter understands and agrees that the District shall have no financial responsibility for any costs incurred by the responder in responding to this RFQ or the future RFP and shall not be liable to any submitter costs attributed to its own study and investigation or the preparation of any required item or information described in the RFQ or future RFP until the submitter has executed an agreement with the District and has been authorized in writing to provide professional services. The District reserves the right to terminate this RFQ upon three (3) days notice to all prospective proposers, and reserves the right to reject all responses to the RFQ. Andrew Butler, PE Senior Engineer Tulocay Creek Bank Stabilization Project Location Map N ➤ © 2016 Google 500 ft