2012 sponsorship opportunities
Transcription
2012 sponsorship opportunities
2012 sponsorship opportunities Masters of the Mountains roadrace series Miller Motorsports Park, Tooele, Utah Utah Sport Bike Association PO Box 27072 Salt Lake City, Utah 84127 Dana Wilson, Club Treasurer treasurer@utahsba.com 801-231-0139 Web package - $300 • Vendor’s Banner displayed randomly in rotating Website Advertising banner • Vendor Listing on Forum • Listed under Sponsors on UtahSBA Website • Allowed to periodically post on General Forum referencing specials in Vendor section • Allowed to periodically post on the UtahSBA Facebook page and link to offers Advanced Rider Training classes (ART) Sponsorship - $500/Event • Same privileges as Website/Forum Sales/Advertising • Special mention as main sponsor at particular ART school • Name mentioned at every ART event • Right to have ARTsponsored • Right to set up a vending booth at the sponsored ART • Name/Logo printed on UtahSBA brochures (if contract signed before March 1, 2011) 2012 Race Dates April 21-22 May 19-20 June 30-July 1 August 18-19 September 1-2 October 6-7 v012512 MoM Class Sponsorship 2012SeasonPricingperClass: Price Class $500 Formula5(ModernVintage) Sportsman Formula40 TwinsGTU TwinsGTO SuperTwins CombinedGTU CombinedGTO HeavyweightSuperstock For title sponsorship opportunities and the premier King of the Moutnain GTU and GTO classes, please contact Ryan Brand or Dana Wilson Moto3 $750 Endurance NoviceGTU NoviceGTO Open Superbike Open Superstock MiddleweightSuperbike MiddleweightSuperstock MoM Class Sponsorship Benefits: • Sponsor’snameonallemailcommunicationsandmarketingmaterials,astimingallows • Sponsor’snameonscheduleforparticularsponsoredclass • Sponsor’snamementionedataminimumof3times(atleastonceprior,duringand/oraftereachparticularraceclassevent) • Nameonwebsite’srevolvingadvertisingbanner • IfSponsorsignsupbyApril1,2012,Sponsor’sname/logoonUtahSBAracesignageandcollateralmaterial • Name/LogoprintedonthebackoftheUtahSBAracelicenses(astimingpermits) • Sponsor’snameassociatedwithcorrespondingclassonprintedresults • AllowedtoperiodicallypostonGeneralForumreferencingspecialsinVendorsection • AllowedtoperiodicallypostontheUtahSBAFacebookpageandlinktooffers Total Sponsorship Commitment: Webpackage($300) $____________ ARTSponsorship(Pleasecircledesireddate(s): Jun 10, Jul 15, Aug 12, Oct 21 $____________ MoMClassSponsorshipFee: $____________ MoMClass(es):_________________________________________________________________ Total ____________ Inconsiderationofthebenefitsasoutlinedabove,Sponsorshallpay UtahSBA $____________ General Terms and Conditions: 1. Effective Term - This Agreement shall become effective as of the execution date as defined below and shall remain in effect until February 28, 2013 unless terminated sooner. 2. Termination – If either party materially breaches any of its obligations under this Agreement and if such breach is not cured by the breaching party within 30 days of written notification, then the non-breaching party shall have the right, but not the obligation, to terminate this Agreement effective immediately. 3. Termination Reimbursement - If termination clause is executed by the Sponsor, only the prorated amount of the sponsor’s unfulfilled benefits shall be reimbursed as determined by the UtahSBA. 4. Agreement Restrictions – Notwithstanding anything to the contrary contained in this Agreement, in the event the UtahSBA’s compliance with any provision(s) of this Agreement is prohibited, limited or otherwise restricted under the terms of any other agreement, including, without limitation, any agreement in respect to Miller Motorsport Park, the UtahSBA shall not be required to comply with such provision(s) of this Agreement and such noncompliance shall not be deemed to be a breach of this Agreement by the UtahSBA, provided, however, that the consideration owed to the Sponsor by the UtahSBA under this Agreement shall be reduced by a proportionate amount to reflect such noncompliance by the UtahSBA. 5. Assignment - This Agreement shall inure to the benefit of and shall bind the parties; provided, however, that this Agreement may not be assigned or otherwise transferred by either party without the written consent of the other party. 6. Confidentiality – Except as required by law, neither party shall publicly disclose or publicize in any manner any of the specific terms of this Agreement. 7. No Joint Venture or Partnership – This Agreement shall not create a joint venture, partnership, principal-agent, employer-employee or similar relationship between the Parties. 8. Force Majeure – Neither Party shall be liable for any delay nor failure to perform any obligation hereunder caused by circumstances beyond its reasonable control (Event of Force Majeure) for such period of time as such event continues, provided that the party prevented from performing uses all reasonable efforts to perform such obligations once such event has ceased. If such Event of Force Majeure continues for more than 45 days, the performing party will have the right to terminate this Agreement upon notice to the non-performing party. 9. Material Costs – All costs associated with materials regarding the advertising agreed upon within this contract are the sole responsibility of the Sponsor to provide. The providing of locations, space, and physical area to advertise is the responsibility of the UtahSBA in regards to all advertising binding within this contract. The UtahSBA can coordinate for providers of advertising material if specifically noted within this Agreement and may be subject to additional fees not noted within this Agreement I believe this summarizes our Agreement. If you concur, please indicate your acceptance by signing in the space provided below and returning one (1) original counterpart to me for our files. Sincerely, Ryan Brand President - Utah Sport Bike Association Agreed and accepted by: Name (written): __________________________________________ Representing: ________________________________________________ Signature: _______________________________________________________________________ Date: ________________________
Similar documents
Pavithrotsavam Celebrations Sri Venkateswara Swamy Temple of Colorado Thursday, November 13
More information