Energy Management

Transcription

Energy Management
Energy Management
Ge.Ser.Ind. has a strong competence in the energy
management field, providing services concerning the
support and control of energy costs and consumption.
It collaborates with european partners in audit and
advisory activities for customers.
We help our customers in capitalizing their own resources,
optimizing them and avoiding possible wastes.
Our duty consists in supporting you with a constant and
personally customized dedication.
A significant reduction of energy costs is possible only with
a careful control of the energy utilization. Through an
analysis of the customer’s characteristics, his consumption
and the related energy costs we can find a strategy leading
to a greater awareness and a resulting optimization of the
energy consumption.
Energy Management
Energy AUDIT
Action Plan Execution
Training
Consumption control system
White certificates (Energy Efficiency Titles)
Energy Management Systems (EMS) – ISO 50001
ENERGY AUDIT:
Electric Consumption
The first step to energy management
is the knowIedge of how energy is
consumed.
3%
23%
30%
“You can’t manage what you don’t
measure...”
The first tool to know the energy
consumption is the ENERGY AUDIT.
Generally an energy audit leads to
detect interventions of potential
savings ranging from 15% to 20%.
25%
9%
10%
ENERGY AUDIT:
Data acquisition
700.000
2008
2009
2010
2011
Poly. (2010)
600.000
• Fatture energia elettrica e gas
500.000
400.000
• Trend of consumption schedule
300.000
200.000
100.000
• Layouts
• P&IDs
0
Gennaio
Febbraio
Marzo
Aprile
Maggio
Giugno
Luglio
Agosto
Settembre
Ottobre
Novembre
Dicembre
900
800
700
600
500
400
300
mag-11
mag-10
200
100
0
Domenica
Domenica
Domenica
Domenica
Domenica
Lunedì
Lunedì
Lunedì
Lunedì
Lunedì
Martedì
Martedì
Martedì
Martedì
Martedì
Mercoledì
Mercoledì
Mercoledì
Mercoledì
Mercoledì
Giovedì
Giovedì
Giovedì
Giovedì
Venerdì
Venerdì
Venerdì
Venerdì
Venerdì
Sabato
Sabato
Sabato
Sabato
Sabato
• Technical data of the systems
ENERGY AUDIT:
Inspection of
the customer’s
site
• Inspection lead by AEE (Association of Energy
Engineers) certified and expert engineers
• Acquisition of informations about production
processes and utilization of the systems
• Inspection of the production areas
• Inspection of general implants (compressed air,
chiller, refrigeration compressors, AHUs, thermal
plant, waste water treatment, drinking water
capture and distribution system, ...)
ENERGY AUDIT:
Analysis of
acquired data
• Analysis of energy consumption
(electric energy and methane)
• Check of consumption indexes
• Creation of consumption prevision
models
CUSUM energia elettrica
• Detection of improvement
opportunities
140.000
120.000
100.000
60.000
40.000
20.000
Apr- 11
May-11
Mar- 11
Jan- 11
Feb- 11
Dec- 10
Oct- 10
Nov- 10
Sep- 10
Jul- 10
Aug- 10
Jun- 10
Apr- 10
May-10
Mar- 10
-40.000
Jan- 10
0
-20.000
Feb- 10
• Preliminary evaluation of feasibility
and costs
kWh
80.000
ENERGY AUDIT:
Report
• Consumption analysis
ID
• Analysis of main energy users and
detection of improvement
opportunities in energy
management
• List of no-cost improvemenets
• List of potential achievable savings
after investments with the indication
of cost / benefit / payback
Perdita energetica/
opportunità risparmio
individuata
Voci di
consumo
Risparmio
annuo
(euro)
Riparare le perdite di aria
Aria
€
compressa
compressa
Verificare la possibilità di
Aria
2 abbassare la pressione di
compressa
mandata dei compressori.
Sostituire il sistema di
3 regolazione della UTA di
UTA
€
produzione
Ridurre la portata della UTA di
UTA
4
€
produzione
Fermare la UTA di produzione la
UTA
5
€
domenica
Spegnere le pompe dell'acqua
6 calda in prossimità e a servizio
UTA
€
della UTA in estate
Creazione cultura del risparmio
Illuminazione €
7
energetico per illuminazione
Implementazione impianto
8 illuminazione con lampade T5 e Illuminazione €
reattori elettronici
Installazione inverter su motore
9 ventilatore condensatore
Refrigerazione €
evaporativo
Installazione di inverter e
Trattamento
16
€
misuratori di ossigeno
acque reflue
Definire la politica di
Varie
17
sostituzione dei motori elettrici
Effettuare la ricarica dei muletti
18 di notte in tariffa F3 invece che in
Varie
€
tariffa F1
1
9.355
NA
Risparmio
Risparmio
Tempo
Risparmio
Risparmio Categoria
Costo
energia
energia
ritorno
metano
metano
di costo investimento
elettrica
elettrica
investimento
(mc)
(euro) (N/B/M/A)
(euro)
(kwh)
(euro)
(anni)
77.959
NA
€
NA
9.355
NA
B
NA
€
NA
6.000
NA
0,64
NA
6.900
45.000
5.000 €
5.400 €
1.500
B
€
5.000
0,72
9.900
70.000
5.000 €
8.400 €
1.500
B
€
5.000
0,51
3.367
21.242
2.725 €
2.549 €
818
B
1.555
12.960
€
1.555 €
-
N
1.404
11.700
€
1.404 €
-
B
2.961
24.673
€
2.961 €
-
B
€
3.629
30.240
€
3.629 €
-
B
6.307
52.560
€
6.307
M
NA
540
NA
NA
10.000
NA
€
NA
540
0,00
€
-
0,00
0,00
4.000
1,35
€
5.000
1,38
€
15.000
2,38
NA
NA
N
NA
0,00
Creazione check list per controllo
19 spegnimento utenze giorno/notte,
Varie
NA
Varie
€ 27.721
€ 92.880
€ 120.601
NA
NA
NA
NA
NA
NA
NA
180.000
100.000
280.000
6,49
1,08
2,32
we e cambio stagione
20 Pannelli fotovoltaici
Totale (senza proposta #20)
Totale (con proposta #20)
78.000
550.878
628.878
€ 27.721
91.449 € 65.445 € 27.435
91.449 € 93.167 € 27.435
A
€
€
€
ACTION PLAN EXECUTION:
No/low cost interventions
Ge.Ser.Ind. can support the
customer in writing the
maintenance procedures to put in
practise and the documents to
standardize such interventions
Investments with returns
Ge.Ser.Ind. can support the customer with:
•
•
•
•
•
•
•
•
Feasibility verifications
Detail design
Requesting proposals
Evaluating proposals
Work direction
Safey coordination
Tests
Procedures to get energy efficiency titles
(white certificates)
TRAINING:
Who’s aimed at
Production and maintenance staff
Objectives
Focused training to teach the production and
maintenance staff how the energy management
system works (according to the EN 16001 and ISO
50001 regulations based on the “continuous
improvement”) and to sensitize the staff about the
relevance of their activities to reach the saving of
energy consumption.
CONSUMPTION CONTROL SYSTEM AND BMS (Building Management System):
It’s necessary the introduction of a network of meters (to control the
consumption over time) and an integrated management system.
Ge.Ser.Ind. can help the customer company in designing, choosing and realizing
such systems.
White certificates or Energy Efficiency Titles (TEE)
They are state incentives which fund interventions aimed to
realize improvements in energy efficiency.
These titles are released by AEEG through ENEA; projects must
be presented to ENEA which evaluates the respect to the
necessary requirements to release the titles.
These titles can be sold to subjects or inside the Stock Market.
E.S.Co. can present projects to obtain the white certificates.
Ge.Ser.Ind. as an E.S.Co. can present projects to obtain White
Certificates and allow the customer company to get additional
economic benefits.
ENERGY MANAGEMENT SYSTEM (EMS):
Without an energy management system
based on the continuous improvement
any effort leads to results of limited
duration.
The best strategy for a constant
consumption reduction is managing the
energy according to the standards
introduced by the EN 16001 and ISO
50001 field regulations.
Results
The results of the introduction of a management system and an energy
audit are encouraging:
• implementing only the no/low cost interventions you can obtain savings
of 5-10%
• with mid-term investments (returns in 1-3 years) you can achieve
savings of 10-15%
• the introduction of a management system allow to reach values around
15-20 % and to keep such results over time