stapons
Transcription
stapons
Geoloca'on Technologies for Wearable in Construc'on Maggie Brown Innova'on Consultant The Crossrail Route £14.8bn cost £42bn net benefit 118 km length 40 (10 new) sta/ons 24 Trains/hour 200m journeys pa The Crossrail Route Project Header'meline here max 30 characters 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Bill Funding Land & Property Acquisi'on Engineering Design Procurement Enabling Works Main Construc'on orks & Sta'ons Central Sec'on Works TW unnelling Systems Installa'on Rolling Stock and Depot – Spec, Procure, Build (CRL) Tes'ng / Commissioning Trial Opera'ons/ Staged Opening Innovate18 Collabora'on Innovate18 Club Members Innovate18 Programme Purpose 1. Share Informa/on 2. Connect People 3. Deliver Projects Crossrail Challenges Loca'ng personnel and plant in tunnels Invested Project: Bluetooth Beacons Objec/ves Proof of concept trial Understand poten/al of Bluetooth Low Energy (BLE) Beacons to pinpoint user on a floor plan and map out exclusion zones Benefits Supports H&S compliance to exclusion zone protocol Future poten/al for context sensi/ve data to be pushed to opera/ves Other Opportuni'es -‐ Sensors Objec/ves Proof of concept trial of smart personnel monitoring using URerberry that detects body heat Smart technology that discriminates/counts the presence of humans, vehicles and machines using bolometer technology Smart evacua/on based on real /me data Benefits Detects the presence of humans in the tunnel and iden/fies danger zone (e.g. fire source) In the event of an emergency, sends informa/on to a control room iden/fying the loca/on of personnel within the tunnels Other Opportuni'es -‐ Sensors Sensors to mi/gate risk associated with personnel and plant interac/on Other Opportuni'es -‐ Ac'vity Bands Fa/gue monitoring (TFL research) Health awareness What next? Outside of Crossrail… What next? Outside of Crossrail… Thank you MOVING LONDON FORWARD